This is an Invitation to Bid (ITB PW 25-06) issued by the City of Norcross Department of Public Works seeking qualified contractors for cured-in-place-pipe (CIPP) relining services for 3,454 linear feet of storm pipes at various locations throughout the city. The project aims to repair and extend the life of storm pipes and culverts. Bids must be submitted by February 28, 2025 at 12:00 p.m., with public bid opening at 12:05 p.m. the same day. An optional but highly recommended pre-bid meeting and site visit is scheduled for February 14, 2025 at 11:00 a.m. at the Public Works department. Questions are due by February 14, 2025 at 5:00 p.m. The work must be completed within 90 days of Notice to Proceed.
The project includes pipes ranging from 18" to 66" in diameter across multiple locations including Atlantic Boulevard, Glouchester Place, Lancelot Drive, Lake Drive, and various other streets. Bidders must provide pricing per linear foot for each pipe segment, as well as costs for pipe cleaning, CCTV inspection, and mobilization. A bid bond of 5% is required for bids over $30,000. The selected contractor must provide performance and payment bonds equal to 100% of the contract amount if over $30,000. The contractor must be certified by the CIPP product manufacturer with at least 5 years of experience and must have installed a minimum of 1,000,000 linear feet of the same CIPP product in the United States.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 _ ITB PW 25_06.pdf | ||
| Addendum 2 _ ITB PW 25_06.pdf | ||
| Attachment 1 _ FEE SCHEDULE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Norcross Department of Public Works
INVITATION TO BID
CIPP RELINING
ITB PW 25-06
City of Norcross Department of Public Works
INVITATION TO BID
CIPP RELINING
ITB PW 25-06
OVERVIEW:
The City of Norcross is seeking sealed competitive bids from qualified contractors for cured-in-place-pipe relining for several locations. The project intends to address 3,454 linear feet of storm pipes that need repair in the City of Norcross and will extend the life of the storm pipes and culvert.
All work must be completed in 90 days from when Notice to Proceed is issued and in accordance to industry specifications and standards.
The BID package should be clearly marked “ITB PW 25-06 – CIPP RELINING” on its face and submitted by 12:00 p.m. on February 28, 2025, to the address below. Please submit two printed copies and one electronic copy (USB) of your package to:
Charlene Marsh Capital Projects Manager
ITB PW 25-06 – CIPP RELINING
City of Norcross – Public Works
345 Lively Avenue Norcross, GA 30071
Both printed and electronic copies must contain the same information.
Please submit questions/requests via e-mail only to the Capital Projects Manager at procurement@norcrossga.net by 5:00 p.m. on February 14, 2025. A Q&A addendum will be posted within a week.
An optional, but highly recommended pre-bid meeting with a site visit will take place on February 14, 2025, at 11:00 a.m. at the Public Works department located at 345 Lively Avenue Norcross GA 30071.
BIDS will be opened and publicly read at 12:05 p.m. on February 28, 2025, at the address noted above.
No BID will be received or accepted after the above specified date and time. Submissions received after the designated date and time will be deemed invalid and returned unopened to the firm.
No BID may be withdrawn within thirty (30) days after the BID opening. Requests for withdrawals must be submitted in writing. All BIDS shall remain firm for 90 days after bid opening.
We appreciate your interest in the City of Norcross!
mailto:procurement@norcrossga.net
BID CHECKLIST
The 10 Most Critical Things to Keep in Mind When Responding to a BID for the City of Norcross
1. Read the entire document. Note critical items such as: mandatory requirements;
supplies/services required; submittal dates; number of copies required for submittal; funding amount and source; contract requirements (i.e., contract performance security, insurance requirements, performance and/or reporting requirements, etc.).
2. Note the City of Norcross’ staff member’s name, address, phone numbers and e‐mail address. This is the only person you are allowed to communicate with regarding the ITB and is an excellent source of information for any questions you may have.
3. Attend the Pre‐bid meeting if one is offered. These meetings provide an opportunity to ask clarifying questions, obtain a better understanding of the project, or to notify the City of any ambiguities, inconsistencies, or errors in the ITB.
4. Take advantage of the “question and answer” period. Submit your questions to the Capital Projects Manager by the due date listed in the Schedule of Events and view the answers given in the formal “addenda” issued for the ITB. All addenda issued for this ITB will be posted on the City’s website and will include all questions asked and answered concerning the ITB.
5. Follow the format required in the ITB when preparing your response. Provide point‐ by‐point responses to all sections in a clear and concise manner.
6. Provide complete answers/descriptions. Read and answer all questions and requirements.
Do not assume the City or Evaluation Committee will know what your capabilities are or what items/services you can provide, even if you have previously contracted with the City.
Evaluations are based solely on the information and materials provided in your response.
7. Use the forms provided, i.e., sample budget form, certification forms, etc.
8. Check the City website for ITB addenda. Before submitting your response, check the City website at https://www.norcrossga.net/bids.aspx to see whether any addenda were issued for the
ITB.
9. Review and read the ITB document again to make sure that you have addressed all requirements.
10. Submit your response on time. Note all the dates and times listed and be sure to submit all required items on time. Late and incomplete responses are never accepted.
This checklist is provided for assistance only and should not be submitted with Company’s Response.
https://www.norcrossga.net/bids.aspx
1.0 INTRODUCTION
The City of Norcross is seeking sealed competitive bids from qualified contractors for cured-in-place-pipe relining for several locations. The project intends to address 3,454 linear feet of storm pipes that need repair in the City of Norcross and will extend the life of the storm pipes and culvert.
1.1 PROJECT SCOPE
The pipes are intended to be rehabilitated in place by the cured-in-place pipe (CIPP) method following the accompanying specifications. The project scope includes relining, pipe cleaning, CCTV, and mobilization. See Appendix B for technical specifications and Appendix D for pipe dimensions.
Locations The project addresses pipes at the following locations in the City of Norcross:
Atlantic Boulevard, Glouchester Place, Lancelot Drive, Lake Drive, Terrace Garden Way, Hollow Ridge Lane, Ballard Way, Hollow Trace Way, Crest Hollow Court, Landings Court, Longview Drive, Marshes Glenn Drive, Summertown Drive, Goodwick Way, Huddersfield Way, Betty Mauldin Park, Executive Way, Lancelot Drive, Lawrenceville Stret, Rails Way, and three lines located along Anamanda Close.
1.2 GENERAL INFORMATION
1. It is extremely important that project schedules ARE met. Only those firms with the necessary resources and a commitment to complete all work on schedule should submit a bid.
2. The City of Norcross will expect to liaise with a single project manager representing the prime contractor (and the sub‐contractors).
3. The City will select the most responsive, lowest bidder whose bid best represents the best interest of the City.
4. The City of Norcross reserves the right to cancel this solicitation at any time when it is determined to be in the best interest of the City.
5. The City of Norcross also reserves the right to increase, reduce, add or delete any item in this solicitation as deemed necessary.
6. The City of Norcross reserves the right to approve sub‐contractors.
7. Any selection made because of this notice will be based strictly on qualifications and adherence to the submission guidelines, without regard to race, color, religion, sex, or national origin.
8. It is the responsibility of all firms interested in submitting a bid for this advertisement to routinely check the posting on the website for any revisions to this solicitation and addenda issued.
9. It is the responsibility of all firms to read this advertisement in detail and provide all requested information including forms and appendices.
10. Incomplete submittals will be considered non-responsive, thus disqualified.
Late submittals will not be accepted.
1.3 BID SUBMISSION GUIDELINES
Bidding requirements will consist of the following:
1. Statement of Qualifications and Equipment
2. Bid Form
3. References
4. Acknowledgement of Addenda
5. Bid Bond (if bid amount is over $30,000)
6. Certificate of Liability Insurance
7. E-Verify Contractor & SAVE Affidavits
1.4 SCHEDULE OF EVENTS
See Appendix A for the detailed Schedule of Events.
1.5 COMMUNICATIONS WITH STAFF
All questions about this ITB should include the company name and the referenced ITB section in the following format:
Company Name
1. Question
Citation of relevant section of the ITB
2.0 REQUIREMENT
Bid must include labor and all materials as specified; no substitutions for materials are allowed unless approved by City of Norcross.
BIDDERS ARE ADVISED TO THOROUGHLY UNDERSTAND THE GENERAL
CONDITIONS AND SPECIAL PROVISIONS, PRIOR TO SUBMITTING THEIR
BIDS.
2.1 GENERAL CONDITIONS
2.1.1 Qualifications
2.1.1.1 Bids will be considered only from experienced and well-equipped Contractor(s) engaged in work of this type and magnitude. Bidders must provide their own materials and tools for this contract.
2.1.1.2 Bidders may be required to submit evidence setting forth qualifications which entitle their company for consideration as a responsible Vendor. A list of work of similar character successfully completed within the last five years may be required, which lists the location, size, and scope for use on this work.
Before accepting any bid, the City may require evidence of the Vendor’s financial ability to successfully perform the work to be accomplished under the contract.
2.2 GUARANTEE TO ACCOMPANY BID
2.2.1 If the bid amount is greater than $30,000.00, then bids must be accompanied by an acceptable bid bond in an amount not less than five percent (5%) of the bid amount per section. Failure to submit a bid bond will be a cause for rejection.
2.3 JOINT VENTURES
2.3.1 Joint Ventures between two contractors will not be allowed. The General Contractor shall be required to perform all aspects of this projects and will not be allowed to sub-contract these items.
2.4 AUTHORITY TO SIGN
2.4.1 Bidder must ensure that the legal proper name of their firm and/or corporation is printed OR typed as appropriate on all documents.
2.5 RIGHTS RESERVED
2.5.1 The City of Norcross reserves the right to reject any or all bids, to waive informalities or to re-advertise. It is understood that all bids are made subject to this agreement, and that the City of Norcross reserves the right to decide which bids it deems the most qualified and lowest cost. In arriving at this decision, full consideration will be given to the experience and qualifications of the Bidder, their financial responsibility, costs and bid amount, work of this type successfully completed and past performance with the City of Norcross.
2.5.2 Bidders are advised to examine all corresponding documents carefully and to make examinations of the site(s) of the proposed work, as necessary, to familiarize themselves with location conditions, which may affect the proposed work. Bidders are also advised to inform themselves fully regarding conditions under which the work will be performed. The City will not be responsible for the Bidder’s errors or misjudgment, nor for any information on location conditions or general laws and regulations.
2.5.3 Any unauthorized additions, conditions, limitations, or provisions attached to the Bid shall render it informal and may be cause for rejection.
2.6 AWARD OF CONTRACT
2.6.1 Contract will be made to the most responsive and responsible lowest bidder.
Contracts will not be automatically awarded to the lowest bidder. The City will review all bids for responsiveness and responsibility. Bidders must comply with submission guidelines, show evidence of experience and qualifications, and provide proof that they are qualified to carry out the scope of work.
The contract will be awarded to the most qualified vendor whose bid will cost the least and prove to be the most advantageous to the City, experience, technical considerations, cost, and other factors considered. The City is to make the determination.
The City of Norcross reserves the right to reject any or all bids, to waive technicalities, and to make an award deemed in its best interest.
The City reserves the option to negotiate terms, conditions, and pricing with the most responsive, responsible and lowest bidder at its discretion.
2.6.1.1 The bid evaluation will be based on the following criteria:
o Bid price o Compliance with submission guidelines and specifications (including any required forms and documents) o Ability to perform scope of work and meet deadlines o References
Please provide accurate information and inform your references that the City of Norcross will follow up to perform reference checks. It will affect your evaluation if we are not able to contact your references, or they do not respond in time.
References will be contacted within a week of the submission deadline.
The City of Norcross will not serve as a reference, in the event that your Company worked with the City of Norcross previously.
Alternatively, Bidders are welcome to provide three (3) recent reference letters where they provided the same or similar services. Reference letters must be on official letterhead and signed by the point of contact of the agency where the service was performed.
2.6.2 Prior to award of the Contract, the successful Bidder will be required to submit a schedule to the City, demonstrating the Bidder’s ability to commence and proceed in a timely manner. Due to time constraints on this contract, it is mandatory that the work be performed simultaneously and immediately. A bidder’s failure to demonstrate the ability to proceed as required may result in contract cancellation, as deemed in the City’s best interest.
2.6.3 Failure to demonstrate the ability for simultaneous contract execution and progression will result in, at the City’s discretion, contract cancellation, re-advertising of any and/or all these contracts, or awarding any or all of the contract to the next most responsive and responsible lowest bidder.
2.6.4 If the contract amount is greater than $30,000.00, a Contract Performance Bond and a Payment Bond, each equal to 100% of the Contract amount per section, must be provided by the successful bidder by a surety company qualified to do business in the State of Georgia with an AM Best rating of B+ or higher and satisfactory to the City of Norcross prior to execution of contract.
Bonds given shall meet the requirements as listed in this ITB.
2.7 PRODUCTION REQUIREMENTS
2.7.1 The successful bidder will be required to commence work within ten (10) calendar days from the receipt of the Notice to Proceed and must carry on with utmost diligence to complete the work according to specifications in the ITB within 90 days from the Notice to Proceed.
2.8 PRICES AND INVOICING PROGRESS PAYMENTS AND RETAINAGE
2.8.1 Payment shall be provided based on the cost schedule provided in bidder’s response. Bidder shall submit an invoice with NET 30-day payment terms for services performed for the City of Norcross under the terms of the executed contract. The invoice shall be directed to Donald Maxwell, Stormwater & Roads Superintendent at 345 Lively Ave, Norcross, GA 30071. The invoice shall contain a complete itemization of services. The total amount due, invoice number, invoice date, the designated project number, if applicable, and the City of Norcross’ Purchase Order Number. After work has commenced, progress payments shall be made monthly, based on the value of work completed as provided in the contract documents.
2.8.2 The City shall retain a maximum of 10% of each progress payment; provided, however, when 50% of the contract value including change orders and other additions to the contract value provided for by the contract documents is due and the manner of completion of the contract work and its progress are reasonably satisfactory to the City, the City shall withhold no more retainage.
2.9 LOCATION AND SITE(S)
2.9.1 The site(s) of the proposed work is within City limits of the City of Norcross, Georgia.
2.9.2 The Contractor shall accept the site(s) in its present condition and carry out all work in accordance with the requirements of the specifications as indicated in the appendices or as directed by the Department of Public Works, Utilities and Parks.
2.9.3 The Contractor, before submitting a bid is required to visit the site(s) and acquaint themselves with the actual conditions and the location of any and/or all obstructions that may exist on the site(s).
2.9.4 The Contractor is responsible for the location of, above and below ground utilities and structures, which may be affected by the work.
2.10 COMPLIANCE WITH OSHA STANDARDS AND REGULATIONS
2.10.1 The work connected with this Contract shall be performed in accordance with all applicable OSHA regulations and standards including any additions or revisions thereto, until the job is completed and accepted by the City of Norcross.
2.11 MATERIALS
2.11.1 Unless otherwise specified in the Contract, the bidder shall provide and assume full responsibility for all services, materials, equipment, labor, and all other facilities and incidentals necessary for the completion of this project.
2.11.2 All materials and equipment incorporated into the work shall be of good quality, except as otherwise provided in the Contract. All special warranties and guarantees required shall expressly run to the benefit of the City.
2.12 INSPECTION
The City of Norcross does not commit to having a full-time inspection or testing of work while in progress or at sources of materials furnished. Any lack of inspection and/or testing will in no way relieve the Contractor of his responsibility to provide quality workmanship in accordance with the specifications. Any test ordered under the supervision of the City that fails to meet standards or any retesting that is required will be at the Contractor’s expense.
2.13 NON-COLLUSION
2.13.1 Bidder(s), by submitting a bid, certify that the accompanying bid is not the result of, or affected, by any unlawful act of collusion with any other person or company engaged in the same line of business or commerce, or any other fraudulent act punishable under Georgia or United States law.
2.14 CONTRACT REQUIREMENTS
2.14.1 The successful bidder is required to do the following within ten (10) days of Notice:
2.14.1.1.1 Return to the Department of Public Works, Utilities & Parks contract documents executed by the authorized representative attested by the corporate secretary treasurer.
2.14.1.1.2 Provide Insurance Certificates as specified in the ITB Checklist.
2.14.1.1.3 Provide bonding as required by the ITB documents.
2.14.2 Failure to execute the contract, bonds, or furnish satisfactory proof of carriage of the insurance required within ten days after the date of Notice of Award of the Contract may be just cause for the annulment of the award and for the forfeiture of the bid guaranty of City of Norcross, not as a penalty, but as liquidation of damages sustained. At the discretion of the City, the award may then be made to the next most qualified bidder, or the work may be re-advertised. The Contract and Contract Bonds shall be executed in duplicate to the City of Norcross. «AddressBlock»
2.15 MISCELLANEOUS PROVISIONS
(May not be applicable to this ITB)
2.15.1 Permits
All permits and licenses necessary for the work shall be secured and paid for by the Contractor. If any permit, license or certificate expires or is revoked, terminated, or suspended as a result of any action on the part of the Contractor, the Contractor shall not be entitled to additional compensation or time.
2.15.2 Work Hours
8:00am to 10:00pm Monday through Friday and 10:00am to 8:00pm on Saturdays and city holidays. Construction activity may occur on Sundays and outside of mentioned hours specified on other days of the week when the contractor applies for, and is granted, a variance by the Director of Community Development and Planning.
2.15.3 Detour/Closures
All road closures and detours shall be approved by the Norcross Public Works Department.
2.15.4 Residential Refuse
The Contractor is required to contact the Public Works Department at 678- 421-2069, to obtain sanitation schedules in an attempt to reduce inconveniences to the citizens of Norcross.
2.15.5 Project Briefing
All bidders are required to schedule an appointment with the Public Works Superintendent in order to inspect each work site. The Superintendent can be reached at donald.maxwell@norcrossga.net or 678-421-2069.
2.15.6 Disposal of Refuse
The Contractor shall be solely responsible for disposing of materials and shall consider, before bidding, the compliance with the above stated ordinances and regulations. Disposal of debris must be done in a lawful manner, in accordance with all applicable federal, state and/or local laws, statutes, rules, ordinances, and/or regulations. All trash and debris shall be collected and removed from the site(s) on a daily basis. The Contractor will not be permitted to burn any of the materials on site or within the boundary limits of Norcross, Georgia.
APPENDIX A
ITB PW 25-06
SCHEDULE OF EVENTS
Event:
Release of ITB
Date:
January 29, 2025, 10:00 a.m.
Pre-bid Meeting (Optional but highly recommended) February 14, 2025, 11:00 a.m.
Deadline for Written Questions February 14, 2025, 5:00 p.m.
Bids Due February 28, 2025, 12:00 p.m.
Public Bid Opening and Reading February 28, 2025, 12:05 p.m.
Bid Review/Evaluation On/About March 2025
Contract Award On/About April 2025
CIPP Specifications Issued: January 2, 2013
CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL
PART 1 - PRODUCTS
1.1 GENERAL
It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated flexible tube that is either inverted or pulled into the original pipeline/conduit and expanded to fit tightly against said pipeline by the use of water or air pressure. The resin system shall then be cured by elevating the temperature of the fluid
(water/air) used for the inflation to a sufficient enough level for the initiators in the resin to effect a reaction. The finished pipe shall be such that when the thermosetting resin cures, the total wall thickness shall be a homogeneous and monolithic felt and resin composite matrix, chemically resistant to withstand internal exposure to domestic sewage or stormwater.
1.2 QUALIFICATIONS
Since sewer products are intended to have a 50-year design life, and in order to minimize the
Owner’s risk, only proven products with substantial successful installations and experience will be approved.
In order for the CIPP product and Installation Contractor to be deemed commercially acceptable and approved for this project, they must meet the following criteria:
A. CIPP Product
1. The CIPP product must have been installed in a minimum of 5,000,000 linear feet or
4,000 manhole to manhole line sections of successful wastewater collection systems in
North America and must be documented to the satisfaction of the Owner.
2. The CIPP product shall comply with the latest versions of ASTM F1216 or ASTM
F1743, including appendices.
3. For the CIPP to be considered Commercially Proven, it shall have been successfully in service in an application similar to this project for a minimum of 10 years and documented to the satisfaction of the Owner.
4. The lining tube manufacturer shall operate under a quality management system that is third party certified to ISO 9001 or other internationally recognized organization standards. Proof of certification shall be submitted with the Contractor’s bid and required for approval.
5. Third-party test results supporting the structural properties and long-term performance of the CIPP product shall be submitted for approval, and such data shall be satisfactory to the Owner. No CIPP product will be approved without independent third party testing verification.
APPENDIX B
TECHNICAL SPECIFICATIONS
B. Installation Contractor
1. The Installation Contractor shall be certified by the CIPP product manufacturer to have had at least 5 years active experience in the installation of the proposed CIPP product.
2. The Installation Contractor shall satisfy all insurance, financial and bonding requirements of the Owner, and shall have installed within the United States a minimum of 1,000,000 lineal feet of the same CIPP product being represented by the bidder.
3. The Installation Contractor superintendent(s) designated for the project shall have installed a minimum of 100,000 lineal feet and shall have 5 years of installation experience of the same CIPP product being represented by the bidder. This shall be documented to the Owner’s satisfaction in the form of a resume of work experience detailing scope of work (linear footage and pipe diameters), location of work, and reference contact information for each project listed.
4. The Installation Contractor shall operate under a quality management system that is third party certified to ISO 9001 or equivalent standards. Proof of certification or quality management system shall be submitted with the Installation Contractor’s bid and required for approval.
1.3 STRUCTURAL REQUIREMENTS
A. Each CIPP shall be designed to withstand internal and/or external loads as dictated by the site and pipe conditions. Unless specified differently by the Owner/Engineer in the contract documents, the design thickness of the CIPP shall be derived at using standard engineering methodology as found in ASTM F1216, Appendix X1. The long-term flexural modulus shall not exceed 50 percent of the short-term value for the CIPP resin system and shall be substantiated through third-party testing. The thickness calculations, signed and sealed by a registered professional engineer, shall be submitted to the Owner prior to CIPP installation.
B. The layers of the finished CIPP shall be uniformly bonded. It shall not be possible to separate any two layers with a probe or point of a knife blade so that the layers separate cleanly or such that the knife blade moves freely between the layers. If separation of the layers occurs during testing of the field samples, new samples will be cut from the work.
Any reoccurrence may be cause for rejection of the work.
C. The Enhancement Factor ‘K’ to be used in the CIPP design shall be assigned a value of 7.
D. Long-term testing in general accordance with ASTM D2990 must have been performed for flexural creep of the CIPP pipe material to be installed. Such testing results are to be used to determine the long-term, time dependent flexural modulus to be utilized in the product design. This is a performance test of the materials (CIPP Tube and Resin) and general workmanship of the installation and curing as defined within the relevant ASTM standard.
A percentage of the instantaneous flexural modulus value (as measured by ASTM D790 testing) will be used in design calculations for external buckling. The percentage, or the long-term creep retention value utilized, will be verified by this testing. The materials utilized for the contracted project shall be of a quality equal to or better than the materials used in the long-term test with respect to the initial flexural modulus used in the CIPP design.
E. The CIPP shall meet the following minimum strength requirements:
MINIMUM PHYSICAL PROPERTIES
ASTM Polyester Filled Polyester Vinyl Ester
Property Test Method System System System
Flexural Strength D790 4,500 psi 4,500 psi 5,000 psi
Flexural Modulus (initial) D790 250,000 psi 400,000 psi 300,000 psi
Flexural Modulus (50-year) D790 125,000 psi 200,000 psi 150,000 psi
F. The required CIPP wall thickness shall be based as a minimum on the physical properties in
Section 1.3.E above, and in accordance with the design equations in the Appendix X1 of
ASTM F1216, and the following design parameters:
Design Safety Factor (typically used value) = 2.0
Retention Factor for Long-Term Flexural Modulus to be used in Design = 50% max
(As determined by long-term tests described in Section 1.3.D and approved by the Owner)
Ovality* (calculated from (X1.1 of ASTM F1216) = % (1)
Enhancement Factor, K = 7.0
Groundwater Depth (above invert of pipe) = feet
Soil Depth (above crown of pipe) = feet
Soil Modulus (only required for fully deteriorated design conditions) = psi
Soil Density (only required for fully deteriorated design conditions) = lb/ft (1)
Live Load (only required for fully deteriorated design conditions) = e.g. H20 Highway
Design Condition (partially or fully deteriorated)* = *
* Based on review of video logs, design conditions of pipeline can be fully or partially deteriorated (See
ASTM F1216, Appendix X1). The Owner will be solely responsible for determining pipe conditions and parameters utilized in design.
(1) In the absence of other information and to ensure uniformity in bidding, the following assumptions shall be used: Ovality = 2%; Groundwater Depth at one half soil depth to invert; Soil Modulus =
1000 psi; Soil Density = 120 lb/ft
1.4 MATERIALS
A. CIPP Tube
1. The CIPP tube shall consist of one or more layers of a flexible needled felt or an equivalent nonwoven or woven material, or a combination of nonwoven and woven materials, capable of carrying resin, withstanding installation pressures and curing temperatures. The CIPP tube should be compatible with the resin system to be used on this project. The material should be able to stretch to fit irregular pipe sections and negotiate bends.
2. The CIPP tube should be fabricated under controlled conditions to a size that, when installed, will tightly fit the internal circumference and the length of the original conduit.
Allowances should be made for the longitudinal and circumferential stretching that occurs during placement of the tube. Maximum stretching allowances shall be as defined in ASTM F1216 or ASTM F1743. The Installation Contractor shall verify the lengths in the field before cutting the liner to length. Continuous individual liners can be made over one or more manhole to manhole sections.
3. The CIPP tube shall be uniform in thickness and when subjected to the installation pressures shall meet or exceed the designed wall thickness.
4. Any plastic film applied to the tube on what will become the interior wall of the finished
CIPP shall be compatible with the resin system used, translucent enough that the resin is clearly visible, and shall be firmly bonded to the felt material.
5. At time of manufacture, each lot of CIPP tube shall be inspected and certified to be free of defects. The tube shall be marked for distance at regular intervals along its entire length, not to exceed five feet. Such markings shall also include the CIPP tube
Manufacturer’s name or identifying symbol.
6. The CIPP tube may be made of single or multiple layer construction where any layer must not be less than 1.5 mm thick. A suitable mechanical strengthener membrane or strip may be placed in between layers where required to control longitudinal stretching.
B. Resin Components
1. The resin system shall be a corrosion resistant polyester or vinyl ester, along with a compatible catalyst system.
2. The resin used shall not contain non-strength enhancing fillers.
3. When combined with the CIPP tube, the resin system shall provide a CIPP that meets the structural requirements of ASTM F1216 or ASTM F1743, the minimum physical properties specified in Section 1.3.E, and those properties which are to be utilized in the design of the lining system for this project.
4. When combined with the CIPP tube, the resin system shall provide a CIPP that complies with the chemical resistance requirements specified in ASTM F1216 or ASTM F1743.
PART 2 - EXECUTION
2.1 GENERAL
A. The Installation Contractor shall deliver the resin impregnated CIPP tube to the site and provide all equipment required to insert and cure the CIPP within the host pipe. The
Installation Contractor shall designate a location where the tube will be vacuum impregnated with the resin prior to installation. If requested by the Owner, the Installation Contractor shall notify the Engineer at least 48 hours prior to wet out to allow the Owner’s representative to observe the materials and wet out procedure. All procedures to prepare the CIPP for installation shall be in strict accordance with the Manufacturer’s recommendations.
B. The CIPP shall be vacuum impregnated with resin not more than 120 hours before the time of installation and stored out of direct sunlight at a temperature of less than 70° F.
2.2 NOTIFICATION AND PREPARATION
A. The Installation Contractor shall notify all residents affected by this construction at least 24 hours prior to any service disruption affecting their service connection. The Installation
Contractor shall make every effort to maintain service usage throughout the duration of the project.
B. The Installation Contractor shall perform cleaning, video, and inspection prior to installation of the CIPP. The Installation Contractor, when required, shall remove all debris from within the pipe that will interfere with the installation of the CIPP. The Owner shall provide a dumpsite for such debris removed during the cleaning operations.
C. It shall be the responsibility of the Installation Contractor to notify the Owner of line obstructions, offset joints or collapsed pipe that will prevent the insertion of the tube or significantly reduce the capacity of the sewer. The Owner, with input from the Installation
Contractor shall determine the method of pipe repair required and shall address these concerns on a case-by-case basis.
D. Protruding laterals or services shall be trimmed flush with the inside of the main sewer wall prior to installation of the CIPP. Trimming shall not cause damage to the lateral or service beyond the inside face of the main sewer.
2.3 BYPASS PUMPING
A. The Installation Contractor, when required, shall provide for the flow of sewage around the section or sections of pipe designated for repair. When possible, the bypass shall be made by plugging the line at an existing upstream manhole and pumping the flow into a downstream manhole or adjacent system. The pump and bypass lines shall be of adequate capacity and size to handle the flow. The Installation Contractor shall furnish all necessary pumping equipment, conduit, etc. to adequately, safely, and environmentally divert sewage flow around the work.
B. When requested by the Engineer, the Installation Contractor shall submit a general bypass plan.
2.4 TELEVISION INSPECTION
A. The Installation Contractor shall provide video equipment capable of properly documenting the conditions as found within the pipe. Lighting for the video camera shall illuminate the entire periphery of the sewer. The camera shall be radial view type capable of viewing 360° within the pipe and shall provide an unobstructed view of the full pipe.
B. The video shall begin with a clear identification of the pipeline location, upstream and downstream manhole designation, and pipe diameter. The video shall provide an accurate length measurement of the entire segment and of the distance to each lateral connection. The
Installation Contractor shall pan all lateral connections on both the pre and post-videos.
C. Reverse video set-ups shall be utilized when line obstructions prevent full segment televising from the initial set-up direction.
D. Both a pre-lining and post-lining video shall be submitted to the Owner for approval. The discs shall be clearly and properly labeled.
2.5 INSTALLATION
A. The CIPP shall be installed in accordance with the practices given in ASTM F1216 (for direct inversion installations) or ASTM F1743 (for pulled-in-place installations). The quantity of resin used for the tube’s impregnation shall be sufficient to fill the volume of air voids in the
CIPP tube with additional allowances being made for polymerization shrinkage and the loss of any resin through cracks and irregularities in the original pipe wall. A vacuum impregnation process shall be used in conjunction with a roller system to achieve a uniform distribution of the resin throughout the CIPP tube.
B. The resin-impregnated CIPP tube shall be installed into the host pipe by methods specified in
ASTM F1216 or ASTM F1743 and proven through previous successful installations. The insertion method shall not cause abrasion or scuffing of the CIPP tube. Hydrostatic or air pressure shall be used to inflate the CIPP tube and mold it against the walls of the host pipe.
There will be no use of sewage in place of clean water for insertion of the tube, or for the curing of the liner.
C. Temperature gauges shall be placed between the CIPP tube and the host pipe’s invert position to monitor the temperatures during the cure cycle.
2.6 CURING
A. After the CIPP tube installation is completed, the Installation Contractor shall supply a suitable heat source and recirculation equipment (if required). The equipment shall be capable of delivering hot water or steam throughout the section to uniformly raise the temperature above the temperature required to affect a cure of the resin.
B. The heat source shall be fitted with suitable monitors to gauge the temperature of the incoming and outgoing heat supply (for water cure) and outgoing heat supply (for steam cure). Water or air temperature in the pipe during the cure period shall be as recommended by the resin Manufacturer.
C. Initial cure shall be deemed to be completed when inspection of the exposed portions of the
CIPP appears to be hard and sound and the remote temperature sensor(s) indicates that the temperature is of a magnitude to realize an exotherm. The cure period shall be of a duration recommended by the resin Manufacturer, as modified for the installation process, during which time the recirculation of the heat and/or cycling of the heat exchanger to maintain the temperature is continued.
2.7 COOL DOWN
A. Cool down may be accomplished by the introduction of cool water or air to replace water or pressurized air being relieved. Care shall be taken in the release of the hydrostatic head so that a vacuum will not be developed.
2.8 FINISH
A. The finished CIPP shall be continuous over the entire length of an insertion run and be as free as commercially practical from visual defects such as foreign inclusions, dry spots, pinholes, and delamination. The CIPP shall be homogeneous, and free of any leakage from the surrounding ground to the inside of the CIPP.
B. Where the CIPP is installed through a manhole uninterrupted, the invert shall be maintained smooth within the manhole, with approximately the bottom half of the CIPP continuous through the length of the manhole. The invert of the manhole shall be shaped and grouted as necessary to support the liner. The cost of this work shall be included in the CIPP unit price.
C. During the warranty period, any defects which will affect the integrity or strength of the
CIPP, collect solids, or reduce hydraulic flow capabilities of the product shall be repaired at the Installation Contractor’s expense in a manner mutually agreed upon by the Owner and the
Installation Contractor.
2.9 REINSTATE LATERALS AND SERVICES
A. Accurate location of the lateral and service connections shall be made by inspection of the pre-installation videotape or sewer walk.
B. After the CIPP has been installed, all existing active lateral sewers and services shall be reinstated unless otherwise indicated by the Owner or on the plans. The reinstatement of laterals and services shall be done without excavation unless otherwise specified by the
Engineer. Reinstatement of laterals and services will be accomplished from the interior of the
CIPP by means of a video camera directed cutting device or by direct man entry when feasible.
C. All cut lateral and service connections shall be free of burrs, frayed edges, or any restriction preventing free flow of wastewater. Laterals shall be reinstated to a minimum of 90% of their original diameter and no more than 100% of their minimum diameter. The CIPP shall be tightly sealed at the cut openings with no gaps.
2.10 QUALITY ASSURANCE PROCEDURES
A. For every two thousand five hundred (2,500) lineal feet of CIPP installed, two (2) flat plate samples shall be processed and tested. For pipe diameters less than 18 inches, restrained end samples may also be utilized. The CIPP physical properties shall be tested in accordance with ASTM F1216, Section 8, using either allowed sampling method. The flexural properties must meet or exceed the values listed in Section 1.3.E of this specification and the values submitted to the Owner by the Installation Contractor for this project’s CIPP wall design, whichever is greater.
B. Testing shall be completed by an accredited, independent laboratory. Testing results shall be provided to the Owner within seven (7) days of receipt.
C. Wall thickness of samples shall be determined in a manner consistent with paragraph 8.1.2 of
ASTM D5813. The minimum wall thickness at any point shall not be less than 87.5% of the specified design thickness calculated in Section 1.3.F of this document.
D. Flexural testing of the collected samples shall be conducted in accordance with ASTM D790, latest version, with only the structural portion of the CIPP being tested.
E. CIPP installation shall be inspected by post-lining video inspection. Variations from true line and grade may be inherent because of the conditions of the original piping. No infiltration of groundwater should be observed. All service entrances should be unobstructed and accounted for.
PART 3 - PAYMENT
Payment for the work included in this section will be in accordance with the unit prices set forth in the proposal for the quantity of work performed. Progress payments will be made on the work performed during each monthly period.
When not defined, payment shall be broken down as follows:
A. Mobilization and demobilization shall be paid for as one lump sum amount.
B. Cleaning shall be paid for per lineal foot of line cleaned. Items for both light and heavy cleaning shall be designated as appropriate.
C. Protruding laterals shall be paid for per each lateral removed.
D. CIPP shall be paid per lineal foot of each diameter rehabilitated as measured from center of manhole to center of manhole.
E. Lateral reinstatement shall be paid per each lateral reinstated.
F. Bypass pumping shall be paid for as one lump sum and shall include all incidentals required for the bypass efforts.
G. Traffic control shall be paid as one lump sum and shall include all incidentals required for traffic control.
All other incidental costs such as sample testing shall be included in the cost of these items.
APPENDIX C
MAPS
APPENDIX D
ITB PW 25-06
BID FORM
Both components of the bid form are mandatory and must be included in the bid packet.
Please complete the itemized bid sheet in addition to this form.
Project Name: ________________________________________________________________
Total Bid: $________________________________________________________________
BIDDER, in compliance with the Invitation to Bid for the construction of this project, having examined the Specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials and supplies, and to construct the project in accordance with the production and contract requirements, within the time set forth therein, and at the price(s) stated above. This price is to cover all expenses including overhead and profit incurred in performing the work required under the contract documents, of which this proposal is a part.
BIDDER verifies that all information provided in response to this bid package is truthful and accurate to the best of the Bidder’s knowledge and belief.
This bid is submitted to the City of Norcross by:
Firm Name: __________________________________________________________________
Authorized Representative: _____________________________________________________
Firm Address: _________________________________________________________________
Phone Number: _______________________________
Item No.
Item Description Diameter (Inches)
Length (Feet)
Cost Per Linear Foot
Total Cost
1 Pipe 918 Atlantic Blvd 18 20 $ $ 2 Pipe 919 Atlantic Blvd 18 22 $ $ 3 Pipe 922 Atlantic Blvd 18 40 $ $ 4 Pipe 923 Atlantic Blvd 18 32 $ $ 5 Pipe 917 Atlantic Blvd 18 16 $ $ 6 Pipe 810 Glouchester Place 18 153 $ $ 7 Pipe 815 Lancelot Drive 18 110 $ $ 8 Pipe 271 Lake Drive 18 228 $ $ 9 Pipe 1272 Terrace Garden Way 18 133 $ $
10 Pipe 1531 Hollow Ridge Lane 18 94 $ $ 11 Pipe 1579 Ballard Way 18 36 $ $ 12 Pipe 1580 Ballard Way 18 100 $ $ 13 Pipe 1521 Hollow Trace Way 18 34 $ $ 14 Pipe 1523 Crest Hollow Court 18 137 $ $ 15 Pipe 1524 Crest Hollow Court 18 33 $ $ 16 Pipe 1578 Landings Court 18 79 $ $ 17 Pipe 55 Longview Drive 18 60 $ $ 18 Pipe 1542 Marshes Glenn Drive 18 48 $ $ 19 Pipe 1589 Summertown Drive 18 95 $ $ 20 Pipe 1261 Goodwick Way 18 126 $ $ 21 Pipe 1247 Huddersfield Way 18 180 $ $ 22 Pipe 740 Betty Mauldin Park 24 101 $ $ 23 Pipe 1575 Executive Way 24 72 $ $ 24 Pipe 816 Lancelot Drive 24 30 $ $ 25 Pipe 817 Lancelot Drive 24 165 $ $ 26 Pipe 973 125 Lawrenceville St 36 40 $ $ 27 Pipe 974 125 Lawrenceville St 36 99 $ $ 28 Pipe 975 125 Lawrenceville St 36 106 $ $ 29 Pipe 976 125 Lawrenceville St 36 26 $ $ 30 Pipe 1565 Executive Way 36 241 $ $ 31 Pipe 1557 Marshes Glenn Drive 36 131 $ $ 32 Pipe 1628 Rails Way 42 339 $ $ 33 Pipe 1629 Rails Way 42 97 $ $ 34 Line 1482 Anamanda Close 66 77 $ $ 35 Line 1483 Anamanda Close 66 77 $ $ 36 Line 1484 Anamanda Close 66 77 $ $ 37 N/A Pipe Cleaning N/A 3454 $ $
38 N/A CCTV N/A 3454 $ $
39 N/A Mobilization Lump Sum
TOTAL COST (Sum of items 1-39) $
APPENDIX E
ITB PW 25-06
STATEMENT OF QUALIFICATIONS AND EQUIPMENT
All questions must be answered. Information given must be clear and comprehensive. If necessary, questions may be answered on separate attached sheets.
About the Firm:
a. Name of Bidder:
b. Permanent main office address, email address, & pertinent contact numbers:
c. How long (years) has your firm been in business under your present name; also, state names and dates of previous firm names, if any; where organized?
d. Attach a list of your employees with job titles, responsibilities, and years of experience as they relate the requirements of this bid document.
e. With what bank do you do business?
NOTE: Latest Financial Statements, certified audit, if available, prepared by an independent certified public accountant, or other financial documents or reporting may be requested by City. If requested, such statements must be provided within five (5) business days, or the bid proposal will be rejected.
Experience:
f. Attach a list of 3-5 similar projects completed in the last 5 five years.
g. Contracts on hand (schedule – showing gross amount of each contract and the approximate anticipated dates of completion).
h. General character of work performed by your company.
i. Have you ever failed to complete any work awarded to you, if so, where, and why?
j. Have you ever defaulted on a Contract, if so, where, and why?
k. Have you ever failed to complete a project in the time allotment according to the Contract documents, if so, where, and why?
l. List the most important contracts recently executed by your company, stating approximate cost for each, and the month and year completed.
m. How long do you warrant a project?
n. Does your professional liability insurance coverage extend past the completion date and warrant of any project? If yes, for how long?
Approach:
o. Implementation plan and timeline for the project
p. List your major equipment available for this contract.
q. List any subcontractors whom you would expect to use for the contract.
APPENDIX F
ITB PW 25-06
REFERENCES
Please provide accurate information and inform your references that the City of Norcross will follow up to perform reference checks. It will affect your scores if we are not able to contact your references, or they do not respond in time.
The City of Norcross will not serve as a reference, in the event that your Company worked with the City of Norcross previously.
Alternatively, Bidders are welcome to provide four (4) reference letters where they provided the same or similar services. Reference letters must be on official letterhead and signed by the point of contact of the agency where the service was performed.
References for _____________________________________________________________
Please provide a list of contact numbers, addresses and a contact person for at least four (4) projects completed (or in progress) having a similar specification and scope of work.
City of Norcross requests a minimum of four (4) references where work of a similar size and scope has been completed (or in progress).
Company Name: _______________________________________________________
Description of Project: __________________________________________________
Completion Date: ______________________________________________________
Contact Person: ________________________________________________________
Telephone: ____________________________ Fax: ___________________________
Email address: ________________________________________________________
Company Name: _______________________________________________________
Description of Project: __________________________________________________
Completion Date: ______________________________________________________
Contact Person: ________________________________________________________
Telephone: ____________________________ Fax: ___________________________
Email address: ________________________________________________________
Company Name: _______________________________________________________
Description of Project: __________________________________________________
Completion Date: ______________________________________________________
Contact Person: ________________________________________________________
Telephone: ____________________________ Fax: ___________________________
Email address: ________________________________________________________
Company Name: _______________________________________________________
Description of Project: __________________________________________________
Completion Date: ______________________________________________________
Contact Person: ________________________________________________________
Telephone: ____________________________ Fax: ___________________________
Email address: ________________________________________________________
Company Name: _______________________________________________________
Description of Project: __________________________________________________
Completion Date: ______________________________________________________
Contact Person: ________________________________________________________
Telephone: ____________________________ Fax: ___________________________
Email address: ________________________________________________________
Company Name:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .