ITB 25_029 FY2025 LMIG Resurfacing.pdf
PDF 717 KB Posted
- Attached to
- 25-029 FY2025 LMIG Resurfacing
- Solicitation number
- PE-66098-NONST-2025-000000075
- Issued by
- Fulton County, Georgia
About this file
This is an Invitation to Bid (ITB 25-029) from the City of Sandy Springs, Georgia for FY2025 Local Maintenance Improvement Grant (LMIG) Resurfacing project. The work includes milling to a minimum depth of 1.5 inches, patching, and paving with 12.5mm asphalt at 165 lbs/SY, along with temporary and permanent traffic striping. Bids are due March 6, 2025 at 2:00 PM EST via Zoom, with a non-mandatory pre-bid conference scheduled for January 30, 2025 at 2:00 PM EST. Questions are due by February 14, 2025 at 5:00 PM. The contractor must begin work within 10 days of Notice to Proceed and complete the project within 270 calendar days. Work hours are Monday to Friday, 8 AM to 5 PM, with modified hours of 9 AM to 3 PM for Collector, Arterial, and Minor Arterial streets.
The project requires a 5% bid bond and includes provisions for liquidated damages of $500 per day for delays. The contractor must be a GDOT Pre-qualified Prime Contractor and perform at least 51% of the work. The bid schedule includes 32 line items covering traffic control, mobilization, asphalt materials, milling, pavement marking, traffic loops, and speed cushions. Major quantities include 5,000 tons of patching, 31,800 tons of asphalt, 27,000 gallons of trackless tack, and 400,000 square yards of milling. Payment terms include 90% progress payments with 10% retainage until 50% project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| su407.pdf | ||
| Speed Cushion Installation Instructions v04_0.pdf | ||
| FY25 LMIG Road Resurfacing List.pdf | ||
| 20241118_ResurfacingPlan_FY25_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
25-029
FY2025 LMIG (Local Maintenance Improvement Grant) Resurfacing BID DUE DATE & OPENING March 6, 2025, 2:00 PM EST
VIA ZOOM
https://zoom.us/j/5773450328?pwd=S0o0RkczSmRsWkowMTJpcnJPWHhWQT09&omn=95287838774
Meeting ID: 577 345 0328 Passcode: 031237
+1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York)
+1 301 715 8592 US (Washington DC)
NON-MANDATORY PRE-BID CONFERENCE
Time: January 30, 2025, 2:00 PM Eastern Time (US and Canada)
VIA ZOOM
https://zoom.us/j/5773450328?pwd=S0o0RkczSmRsWkowMTJpcnJPWHhWQT09&omn=95162761924
Meeting ID: 577 345 0328 Passcode: 031237
+1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York)
+1 301 715 8592 US (Washington DC)
QUESTIONS DUE
February 14, 2025, 5:00 P.M.
Bids shall only be accepted online through the Bonfire Portal at:
https://sandysprings.bonfirehub.com/projects/168542/details Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
GENERAL INFORMATION:
1. All communications regarding this solicitation must be with the assigned Procurement Agent, Ericka
Kelly, ekelly@sandyspringsga.gov.
2. All questions or requests for clarification must be sent via Bonfire under Message Vendor Discussions:
https://sandysprings.bonfirehub.com/projects/168542/details. Questions are due no later than February 14, 2025, 5:00 p.m. Questions received after this date and time may not be answered. There is a pre-bid meeting associated with this solicitation.
https://zoom.us/j/5773450328?pwd=S0o0RkczSmRsWkowMTJpcnJPWHhWQT09&omn=95287838774 https://zoom.us/j/5773450328?pwd=S0o0RkczSmRsWkowMTJpcnJPWHhWQT09&omn=95162761924 https://sandysprings.bonfirehub.com/projects/168542/details mailto:ekelly@sandyspringsga.gov
3. Questions and clarifications will be answered in the form of an addendum. Any addenda, schedule changes and other important information regarding the solicitation related to this solicitation will be posted on Bonfire website at https://sandysprings.bonfirehub.com/projects/168542/details. It is the Offeror’s responsibility to check the Bonfire portal for any addendum or other communications related to this solicitation.
4. The form of contract (“Contract”) the City intends to execute with the successful Offeror is included in this ITB. Offerors are urged to read this Contract, including exhibits carefully prior to submitting a bid. In general, the City is unable to negotiate or revise contract provisions. If an Offeror believes certain contract provisions are out of date, not applicable or place an undue burden or cost on the Offeror or the City, the Offeror must address these concerns in writing during the question-and-answer period. The Procurement Manager will review and determine the appropriate response. If the City determines a change is warranted, an addendum will be posted to this ITB. If a firm is unwilling to execute the Contract, whether modified by addendum or not, a bid should not be submitted.
5. The City of Sandy Springs reserves the right to reject all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Sandy Springs.
6. The City of Sandy Springs is not responsible for any technical difficulties. It is highly recommended that all potential contractors submit their quotes prior to the due date of this solicitation.
7. Offerors shall submit an executed Contract and all executed Exhibits to the contract with the bid.
Bids that do not contain a fully executed contract with all executed Exhibits may be deemed non-responsive.
TERMS & CONDITIONS
1. All applicable Federal and State of Georgia laws and City of Sandy Springs ordinances, licenses and regulations of all agencies having jurisdiction shall apply to Offerors throughout and are incorporated herein.
2. Professionals requiring special licenses shall be licensed in the State of Georgia and shall be responsible for those portions of the work as may be required by law.
3. No bid shall be accepted from, and no contract will be awarded to, any person, firm, or corporation that (i) is in arrears to the City with respect to any debt, (ii) is in default with respect to any obligation to the City, or (iii) is deemed irresponsible or unreliable by the City.
4. The City shall be able to request of an Offeror satisfactory evidence that it has the necessary financial resources to accomplish the requirements of the contract.
5. From the date this ITB is issued until a firm is selected, Offerors are not allowed to communicate with any staff or elected officials of the City regarding this solicitation, except at the direction of Ericka
Kelly, Procurement Agent in charge of this solicitation. Any unauthorized contact may disqualify the
Offeror from further consideration. Contact information for the single point of contact is as follows:
Ericka Kelly, Procurement Agent
City of Sandy Springs
1 Galambos Way
Sandy Springs, Georgia 30328
Email: ekelly@sandyspringsga.gov
6. While the City has every intention to make an award as a result of this solicitation, issuance of the ITB in no way constitutes a commitment by the City to award and execute a contract. Upon a determination such actions would be in its best interest, the City, in its sole discretion, reserves the right to:
a. Cancel or terminate this ITB at any time. A notice of cancellation will be issued. If the ITB is cancelled, the City will not reimburse any Offeror for preparation of its Proposal.
Proposals may be returned upon request if unopened;
b. Reject any or all Bids received, make a contract award based directly on the Proposals received in the best interest of the City, in its sole discretion, or enter into further discussions with one (1) or more Offerors;
c. Waive and/or amend any undesirable, inconsequential, or inconsistent provisions/specifications of this ITB which would not have significant impact on any
Proposal;
d. Make partial award or no award if it is in the best interest of the City to do so; and
e. Terminate any contract if the City determines adequate funds are not available.
mailto:ekelly@sandyspringsga.gov
DEFINITIONS
SSPWD: Sandy Springs Public Works Department
GDOT: Georgia Department of Transportation
ADA: Americans with Disabilities Act. The federal act that gives civil rights protections to the disabled similar to those provided to individuals based on race, color, sex, national origin, age and religion. It guarantees equal opportunity for individuals with disabilities in public accommodations, employment, transportation, state and local government services and telecommunications.
CONTRACT DOCUMENTS: Contract Agreement. General Conditions, Appendices, Special Provisions, Technical Specifications, Drawings and Plans, Bidding Documents, Exhibits
EA: Each
GAL: Gallon
LF: Lineal Feet
LS: Lump Sum
SY: Square Yard
TN: Ton
OWNER: City of Sandy Springs
Contractor: The Prime Contractor for the Construction Project.
DOL: U.S. Department of Labor
Best Management Practices: a practice or combination of practices that is an effective, practicable means of preventing or reducing the amount of pollution generated by nonpoint sources.
EXHIBIT A
TO CONTRACT AGREEMENT
SCOPE OF SERVICES
FY2025 LMIG Resurfacing Scope: The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specifications as directed and the terms of this contract including all incidentals as directed by the City of Sandy Springs Director of Public Works or his representative.
NOTES: Bidders shall submit unit pricing for all items unless otherwise specified, all work shall be completed in accordance with Georgia Department of Transportation Standard Specifications (current edition). The City reserves the option to add or delete street segments from the scope of work. Traffic control and mobilization costs will be adjusted for areas that are added or removed from the scope of the contract. The contractor shall be Pre-qualified Prime Contractor listed by the Georgia Department of Transportation and must perform at least 51% of the work.
• The work shall consist of milling to a minimum depth of one and one half (1.5) inches, patching (12.5mm or 19mm) as required, and paving with 12.5mm at 165 lbs./SY or as directed by the engineer/COSS representative.
• Temporary striping where required shall follow within twenty-four (24) hours of resurfacing.
• Permanent traffic striping shall take place no later than fourteen (14) days after resurfacing ($250.00 per day liquidated damages will be paid by the Contractor for each instance of permanent striping not being installed within 14 days of resurfacing being completed).
• Loops and Sensys pucks are to be re-installed no later than fourteen (14) days after permanent striping is installed ($250.00 per day liquidated damages will be paid by the Contractor for each instance of a loop or puck not being installed within 14 days of permanent striping being completed).
• Roads shall not remain milled for a period of more than seven (7) days.
• All tack shall be trackless tack approved by the Georgia Department of
Transportation. Refer to QPL #7 “Sources of Bituminous Materials”.
• Working hours are expected to be Monday to Friday, 8 AM to 5 PM, with the exception of all Collector, Arterial, and Minor Arterial streets work hours being Monday to
Friday, 9AM to 3PM.
General Notes:
1. Prior to beginning work the contractor will be required to submit a job mix formula for review and acceptance by the city.
2. The Contractor shall perform project housekeeping/clean-up on a daily basis; this includes sweeping and/or vacuuming for dust and debris along the roadway and cleaning of driveways if applicable. This includes tack overspray on driveways and curbs. Cleanliness is a point of emphasis for the City and our Citizens and great attention must be paid to keeping the streets and properties affected by this work as clean and in order as possible.
3. Scheduling: The Contractor shall submit a master schedule of work to be performed two (2) weeks in advance of starting.
4. The contractor shall obtain permission from any private property owner whose property construction equipment may be parked in front of or on. Failure to obtain permission from property owners may result in citations. No equipment/materials will be permitted to be stored/parked in City ROW over night/weekends.
5. The contractor is responsible for calling for utility locations prior to the start of work. It shall be the contractor’s responsibility to coordinate his work with any utility owner whom maybe in conflict with his work. No claims will be considered for extra compensation.
6. A 24-hour contact shall be provided to the City of Sandy Springs Public Works Department for all issues as needed in regard to the project for any safety, signage, or any other emergency as needed.
7. Any item which must be removed during the construction work and is not specially called for shall be removed by the contractor. The cost shall be included in other unit price bid. No claims will be considered for extra compensation.
8. Upon the completion of each street, any excess items which might be left over from the construction related work shall be removed and disposed of properly by the contractor.
The cost for such removal and disposal of such items will be included in other unit price bid. No claims will be considered for extra compensation.
9. The general descriptions of each item of work are as described in the Georgia Department of Transportation’s standards and specifications, complete and accepted. Any conflicts which might occur during the construction work or any conflicts which might be related to the compensation of any work shall be decided based on the Georgia DOT’s standards and specifications. No claims will be considered for extra compensation.
10. Working hours are expected to be Monday to Friday, 8 AM to 5 PM except where otherwise noted. Any extended work hours or alternate work times must be approved by the Public Works Director.
11. Contractor shall have all vehicles marked with their company name.
12. The City of Sandy Springs will not provide restroom facilities.
13. The Contractor’s performance will be measured based on the following:
• Compliance with the Scope of Work and GDOT Specifications
• Cleanliness of the worksite
• Meeting agreed upon schedule dates.
• Submission of all deliverables as specified.
14. Sewer Manhole risers and water valve risers shall be provided by the contractor.
15. All tack shall be trackless tack approved by the Georgia Department of Transportation. Refer to QPL #7 “Sources of Bituminous Materials”.
REQUIREMENTS
1. The contractor and the City will conduct a contract and pre-construction meeting prior to beginning paving. The contractor and the City will discuss the terms of the contract as well as the schedule for the Work. The contractor shall submit a construction schedule to the city one week before the meeting. The work is to be assigned to the contractor by geographical areas unless scheduling and coordination dictates otherwise.
2. The Contractor shall commence actual physical work on the Project within ten (10) calendar days of the date of the Notice to Proceed. The Contractor shall complete the work of the project ready for use not later than the number of calendar days as set forth below.
3. Base Bid work is expected to begin in Spring 2025 and to be substantially completed within 270 calendar days of Notice to Proceed.
BIDDING INSTRUCTIONS
Failure to submit the following bid documents may result in the bid being deemed non-responsive and the bid shall be rejected:
City Bid Form City Qualification Signature and Certification Form
Bid Schedule Bid Price Certification
E-Verify Affidavit under O.C.G.A. 13-10-91(b)(1) Addenda Acknowledgment Subcontractor List Bid Bond (5%) Certification of Sponsor Drug Free Workplace Georgia Security Immigration Compliance Act Affidavit Notice to Contractors Compliance with Electrical Safety Provisions Affidavit verifying Status for City Public Benefit Application Corporate Certificate GDOT Certificate of Qualification
Upon award of contract the following items shall also be submitted:
Certificate of Insurance Performance Bond Payment Bond
BID FORM
(Bidder to sign and return)
TO: PURCHASING DIRECTOR
CITY OF SANDY SPRINGS
SANDY SPRINGS, GEORGIA 30350
Ladies and Gentlemen:
In compliance with your Invitation To Bid, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Sandy Springs, Georgia, to provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the Work in the manner therein specified within the time specified, as therein set forth, for:
25-029 FY2025 LMIG Resurfacing
The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his bid is accepted, he will contract with the City of Sandy Springs in full conformance with the Contract Documents.
Unless otherwise directed, all work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition). All materials used in the process of completion of the work included in the Contract will be furnished from Georgia Department of Transportation certified suppliers only.
It is the intent of this Bid to include all items of construction and all Work called for in the Specifications, or otherwise a part of the Contract Documents.
In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.
The Bidder agrees that the cost of any work performed, materials furnished, services provided or expenses incurred, which are not specifically delineated in the Contract Documents but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces and equipment within ten (10) calendar days from receipt of Notice to Proceed and to complete all Work within two hundred seventy (270) calendar days from the initial Notice to Proceed.
The Bidder shall be responsible for installing and maintaining the “Best Management Practices” (BMP’s) throughout the term of the project.
If this bid shall be accepted by the City of Sandy Springs and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of Sandy Springs may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond or certified check shall be forfeited to the City of Sandy Springs as liquidated damages.
Bidder acknowledges receipt of the following addenda:
Addendum No. Date Received
Bidder further declares that the full name and resident address of Bidder’s Principal is as follows:
Signed, sealed, and dated this day of
Bidder:
Company Name
Seal
Bidder Mailing Address:
By:
Title: _
By:
Title:
QUALIFICATIONS SIGNATURE AND CERTIFICATION
(Bidder to sign and return)
I certify that this offer is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer. I further certify that the provisions of the Official Code of Georgia Annotated, Sections 45-10-20 et. seq., have not been violated and will not be violated in any respect.
Authorized Signature Date_
Print/Type Name_______________________________________________________
Email Address
Print/Type Company Name Here_
REQUESTTFOR REFERENCES
INVITATION TO BID #25-029
FY2025 LMIG Resurfacing
All references must be from customers for whom your company has provided projects completed in the last five years of similar scope and services as the specifications of
Invitation to Bid #25-029 FY2025 LMIG Resurfacing
References for: _______________________________________ (Company Name)
1. Company ____________________________________________________________________________
Street Address__________________________________________________________________________
City, State & Zip _________________________________________________________________________
Contract Person Name______________________________________Phone_________________________
Email address___________________________________________________________________________
Describe specific job performed and date:
2. Company______________________________________________________________________________
Street Address ___________________________________________________________________________
City, State & Zip __________________________________________________________________________
Contact Person Name_________________________________Phone________________________________
Email address____________________________________________________________________________
Describe specific job performed and date:
3. Company _____________________________________________________________________________
Street Address ___________________________________________________________________________
City, State & Zip __________________________________________________________________________
Contact Person Name _______________________ Phone ________________________________________
Email address____________________________________________________________________________
Describe specific job performed and date:
BID SCHEDULE
FY 2025 CIP, LMIG
Resurfacing
L.I.N.
Pay
Item No.
Description
Unit
QTY
Unit Price
Total Price
1 150-1000 Traffic Control LS 1 $ $
2 151-1000 Mobilization LS 1 $ $
3 402-1802 Patching (Not to exceed, as directed by engineer) TN 5,000 $ $
4 402-3130 Asphalt TN 31,800 $ $
5 407-0010 Asphalt Rubber Joint and Crack Seal, TP M LF 20,000 $ $
6 413-1000 “Trackless” Tack GL 27,000 $ $
7 432-5010 Milling SY 400,000 $ $
8 611-8050 Adjust Manhole (MH Riser) EA 60 $ $
9 611-8140 Adjust Water Valve (Valve Riser) EA 60 $ $
10 653-0110 PVMT Marking Arrow, TP1 (Straight) EA 40 $ $
11 653-0120 PVMT Marking Arrow, TP2 (Left or Right) EA 100 $ $
12 653-0130 PVMT Marking Arrow, TP3 (Straight/Turn) EA 20 $ $
13 653-0210 PVMT Marking Word, TP1 (ONLY) EA 20 $ $
14 653-1501 Solid Traf Stripe, 5 IN, White LF 95,000 $ $
15 653-1502 Solid Traf Stripe, 5 IN, Yellow LF 95,000 $ $
16 653-1704 Solid Traf Stripe, 24 IN, White LF 1,500 $ $
17 653-3501 Skip Traf Stripe, 5 IN, White GLF 22,000 $ $
18 653-6004 Solid Traf Stripe, 8 IN, White SY 2,200 $ $
19 653-6006 Solid Traf Stripe, 8 IN, Yellow* SY 2,200 $ $
20 647-6090 6’X40’ traffic Loop EA 15 $ $
21 647-6090 6’X6’ Traffic Loop EA 10 $ $
22 647-0000 Puck Detection Removal and Installation EA 35 $ $
23 652-0105 Pavement Marking, Bike Shared Lane Symbol EA 50 $ $
24 652-0094 Pavement Marking Symbol, TP 4 - Bicycle Lane EA 40 $ $
25 654-1001 Raised Pavement Markers TP 1 EA 2,000 $ $
26 654-1002 Raised Pavement Markers TP 2 EA 500 $ $
27 654-1003 Raised Pavement Markers TP 3 EA 1,500 $ $
28 888-0001 Adjust Manhole Alternate (Major Excavation) EA 5 $ $
29 888-0002 Adjust Water Valve Alternate (Major Excavation) EA 5 $ $
30 001-2000 Remove and Dispose of Rubber Speed Tables SETS 6 $ $
31 001-2001 Purchase and Install RubberForm Speed Cushions (2 per set) EA 3 $ $
32 001-2002 Purchase and Install RubberForm Speed Cushions (3 per set) EA 3 $ $
TOTAL
BASE
BID
AMOUNT
BID PRICE CERTIFICATION
In compliance with the attached Specification, the undersigned offers and agrees that if this Bid is accepted, by the City Council within one hundred and twenty (120) days of the date of Bid opening, that he will furnish any or all of the Items upon which Prices are quoted, at the Price set opposite each Item, delivered to the designated point(s) within the time specified in the Bid Schedule.
TOTAL BID PRICE: ______________________________________________________________
TOTAL BID PRICE IN WORDS: _____________________________________________________
COMPANY: ___________________________________________________________________
ADDRESS: ____________________________________________________________________
AUTHORIZED SIGNATURE: _______________________________________________________
EMAIL ADDRESS: _______________________________________________________________
PRINT / TYPE NAME: ____________________________________________________________
BID BOND
(BID BOND TO BE RETURNED WITH BID)
KNOW ALL MEN BY THESE PRESENTS, THAT ___________________________________
(Name of Contractor) _________________ (Address of Contractor) at __________________________________
(Corporation, Partnership and or Individual) hereinafter called Principal, and ________________ (Name of Surety) (Address of Surety
A corporation of the State of _________________, and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held and firmly bound unto
The City of Sandy Springs Georgia
1 Galambos Way, Sandy Springs, Georgia 30328 herein after referred to as Obligee, in the penal sum of____________________________________ Dollars ($ _______________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
WHEREAS, the Principal is about to submit, or has submitted, to the City of Sandy Springs, Georgia, a proposal for furnishing materials, labor and equipment for:
25-029 FY2025 LMIG Resurfacing
WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder’s check otherwise required to accompany this Proposal.
NOW, THEREFORE, the conditions of this obligation are such that if the bid is accepted, the Principal shall within ten days after receipt of notification of the acceptance execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth in the form and manner required by the City of Sandy Springs, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to the City of Sandy Springs, Georgia, each in an amount of 100% of the total Contract Price, in form and with security satisfactory to said the City of Sandy Springs, Georgia, and otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Sandy Springs, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.
PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant, to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. § 36-91-1, et. seq., and is intended to be and shall be constructed as a bond in compliance with the requirements thereof.
Signed, sealed, and dated this __________ day of ________________________________A.D., 2024
ATTEST:
(Principal Secretary) (Principal)
(SEAL)
BY: ___________________________
(Witness to Principal) (Address)
(Address)
(Surety)
ATTEST
BY: _______________________________
(Attorney-in-Fact) and Resident Agent
(Attorney-in-Fact)
(Seal)
(Witness as to Surety)
CONTRACT AGREEMENT
For
LMIG (Local Maintenance Improvement Grant) Resurfacing (“Project”)
Between
CITY OF SANDY SPRINGS, GEORGIA
(“City”) and
(“Contractor”)
ITB: 25-029
TABLE OF CONTENTS
ARTICLE I
THE CONTRACT AND THE CONTRACT DOCUMENTS
1.1 The Contract
1.2 The Contract Documents
1.3 Entire Agreement
1.4 Subletting, Assignment, or Transfer
1.5 No Privity with Others
1.6 Intent and Interpretation
1.7 Ownership of Contract Documents
1.8 Hierarchy of Contract Documents
ARTICLE II
THE WORK
2.1 Contractor Responsibility
2.2 “Work” Defined
2.3 Review of Work
2.4 Workday and Restrictions, Suspension and Interruption
2.5 Work to be Performed by the Prime Contract
ARTICLE III
CONTRACT TIME
3.1 Time and Liquidated Damages
3.2 Substantial Completion
3.3 Time is of the Essence
ARTICLE IV
CONTRACT PRICE
4.1 The Contract Price
ARTICLE V
PAYMENT OF THE CONTRACT PRICES
5.1 Bid Schedule
5.2 Payment Procedure
5.3 Withheld Payment
5.4 Substantial Completion and Punch List
5.5 Final Completion and Final Payment
ARTICLE VI
THE CITY
6.1 City Responsibility
6.2 Right to Stop Work
6.3 City’s Right to Carry Out Work
ARTICLE VII
THE CONTRACTOR
7.1 Duties with Respect to Documents
7.2 Manner of Performance
7.3 Supervision
7.4 Compliance
7.5 Warranty
7.6 Permits, Inspections, Fees and Licenses
7.7 Supervision
7.8 Schedules
7.9 Contract to be Maintained at Project Site
7.10 Shop Drawings, Product Data and Samples
7.11 Cleaning the Project Site and the Project
7.12 Access to Work
7.13 Indemnity
7.14 Means, Methods, Techniques, Sequences, Procedures and Safety
7.15 Separate Contracts
7.16 Maintenance of Contract Cost Records
ARTICLE VIII
CONTRACT ADMINISTRATION
8.1 Claims by the Contractor
ARTICLE IX
SUBCONTRACTORS
9.1 Definition
9.2 Award of Subcontracts
ARTICLE X
CHANGES IN THE WORK
10.1 Changes Permitted
10.2 Change Order Defined
10.3 Changes in the Contract Price
10.4 Effect of Executed Change Order
10.5 Notice to Surety; Consent
ARTICLE XI
UNCOVERING AND CORRECTING WORK
11.1 Uncovering Work
11.2 Correcting Work
11.3 City May Accept Defective or Nonconforming Work
ARTICLE XII
CONTRACT TERMINATION
12.1 Termination by the Contractor
12.2 Termination by the City
ARTICLE XIII
INSURANCE
13.1 Insurance Requirements
ARTICLE XIV
DISPUTES
14.1 Mediation
ARTICLE XV
INDEPENDENT CONTRACTOR
15.1 Relationship between Contractor and City
ARTICLE XVI
COVENANT AGAINST CONTINGENT FEES
16.1 Warranty by Contractor
ARTICLE XVII
MISCELLANEOUS
17.1 Governing Law
17.2 Successors and Assigns
17.3 Surety Bonds
17.4 Notices
EXHIBITS
EXHIBIT A SCOPE OF SERVICES
EXHIBIT B BID SCHEDULE
EXHIBIT C BID PRICE CERTIFICATION
EXHIBIT D NOTICE TO CONTRACTORS - COMPLIANCE WITH
TITLE VI OF THE CIVIL RIGHTS ACT
EXHIBIT E CERTIFICATION OF SPONSOR DRUG-FREE WORKPLACE
EXHIBIT F CERTIFICATION OF CONTRACTOR GEORGIA SECURITY
AND IMMIGRATION COMPLIANCE ACT
EXHIBIT G INSURANCE REQUIREMENTS
EXHIBIT H SPECIAL PROVISIONS
EXHIBIT I NOTICE TO CONTRACTORS COMPLAINCE WITH ELECTRICAL SAFETY PROVISIONS
EXHIBIT J AFFIDAVIT VERIFYING STATUS FOR CITY PUBLIC BENEFIT APPLICATION
EXHIBIT K CONTRACTOR AND SUBCONTRACTOR AFFIDAVIT UNDER O.C.G.A. § 13-10-91(b)(1)
EXHIBIT L CORPORATE CERTIFICATE
EXHIBIT M ADDENDUMS
EXHIBIT N BONDS
EXHIBIT O LIST OF SUBCONTRACTORS
CONTRACT AGREEMENT
THIS AGREEMENT (“the Agreement”) is made effective as of the execution date of the last party signing this Agreement by and between the City of Sandy Springs, a Georgia Municipal Corporation located 1 Galambos Way Sandy Springs, GA 30328 (“City or Owner”) and _________________________________, (“Contractor”) a legal entity having a principal office address of______________________________________ and authorized to do business in the State of Georgia under seal for construction of the ____________________________________ (hereinafter referred to as “the Project”);
WHEREAS, the Contractor desires to enter into this Agreement for construction of the Project and has represented to the City that it is qualified and experienced to provide such services necessary for construction of the Project (the City requires that the Contractor comply with all federal, state and local legal requirements imposed on the Project as the result of federal funding and the City has relied on such representation);
NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, it is agreed by and between the Contractor and the City as follows:
ARTICLE I
THE CONTRACT AND THE CONTRACT DOCUMENTS
1.1 The Contract
1.1.1 The Contract between the City and the Contractor, of which this Agreement is a part, consists of the Contract Documents. It shall be effective on the date this Agreement is executed by the last party to execute it.
1.2 The Contract Documents
1.2.1 The Contract Documents consist of this Agreement, General Conditions, Special Provisions, the Technical Specifications, the Drawings and Plans, Bidding Documents, all Change Orders and Field Orders issued hereafter, the base bid made by the Contractor in response to the City’s Invitation to Bid No. 25-029 (the “Bid”), and any other amendments hereto executed by the parties hereafter, together with the following (if any):
Documents not enumerated in this Paragraph 1.2 are not Contract Documents and do not form a part of this Contract.
1.3 Entire Agreement
1.3.1 The Contract Documents constitute the entire and exclusive agreement between the City and the Contractor with reference to the Project.
1.4 Subletting, Assignment, or Transfer
1.4.1 It is understood by the parties to this Agreement that the Work of the Contractor is considered personal by the City. The Contractor agrees not to assign, sublet, or transfer any or all of its interest in this Agreement without prior written approval of the City.
1.4.2 The City reserves the right to review all subcontracts prepared in connection with the Agreement, and the Contractor agrees that it shall submit to the City proposed subcontract documents together with Subcontractor cost estimates for the City’s review and written concurrence in advance of their execution.
1.4.3 All subcontracts in the amount of $10,000.00 or more shall include the provisions set forth in this Agreement.
1.5 No Privity with Others
1.5.1 Nothing contained in this Contract shall create, or be interpreted to create, privity or any other contractual agreement between the City and any person or entity other than the Contractor.
1.6 Intent and Interpretation
1.6.1 The intent of this Contract is to require complete, correct and timely execution of the Work. Any Work that may be required, implied or inferred by the Contract Documents, or any one or more of them, as necessary to produce the intended result shall be provided by the Contractor for the Contract Price, as hereinafter defined.
1.6.2 This Contract is intended to be an integral whole and shall be interpreted as internally consistent.
What is required by any one Contract Document shall be considered as required by the Contract.
1.6.3 When a word, term or phrase is used in this Contract, it shall be interpreted or construed, first, as defined herein; second, if not defined, according to its generally accepted meaning in the construction industry; and third, if there is no generally accepted meaning in the construction industry, according to its common and customary usage.
1.6.4 The words include, includes, or including, as used in this Contract, shall be deemed to be followed by the phrase, without limitation.
1.6.5 The specification herein of any act, failure, refusal, omission, event, occurrence or condition as constituting a material breach of this Contract shall not imply that any other, non-specified act, failure, refusal, omission, event, occurrence or condition shall be deemed not to constitute a material breach of this Contract.
1.6.6 Words or terms used as nouns in this Contract shall be inclusive of their singular and plural forms, unless the context of their usage clearly requires a contrary meaning.
1.6.7 The Contractor shall have a continuing duty to read, carefully study and compare each of the Contract Documents, the shop drawings and the product data and shall give written notice to the City of any inconsistency, ambiguity, error or omission which the Contractor may discover with respect to these documents before proceeding with the affected Work. The issuance or the express or implied approval by the City of the Contract Documents, shop drawings or product data shall not relieve the Contractor of the continuing duties imposed hereby, nor shall any such approval be evidence of the Contractor’s compliance with this Contract. HOWEVER, THE CITY MAKES NO REPRESENTATION OR WARRANTY OF ANY NATURE WHATSOEVER TO THE CONTRACTOR CONCERNING THE DOCUMENTS FOR THE PROJECT, INCLUDING THE DRAWINGS AND SPECIFICATIONS FOR THE PROJECT. By the execution hereof, the Contractor acknowledges and represents that it has received, reviewed and carefully examined such documents, has found them to be complete, accurate, adequate, consistent, coordinated and sufficient for construction, and that the Contractor has not, does not, and will not rely upon any representation or warranties by the City concerning such documents as no such representation or warranties have been or are hereby made.
1.6.8 Neither the organization of any of the Contract Documents into divisions, sections, paragraphs, articles, (or other categories), nor the organization or arrangement of the design, shall control the Contractor in dividing the Work or in establishing the extent or scope of the Work to be performed by Subcontractors.
1.7 Ownership of Contract Documents
1.7.1 The Contractor may be provided, have access to or become aware of the City’s Confidential Information including the City’s strategic plans, employee data, customer data and other technical and business information of the City (collectively referred to as the “Confidential Information”). The term Confidential Information includes the deliverables as well as all information generated by the Contractor that contains, references or is derived from the Confidential Information and the Services including, without limitation, the Contractor’s summaries, analysis, extracts, working papers and notes relating to the Services and the Deliverables (referred to as the “Working Papers”). The Contractor agrees not to disclose the Confidential Information to third parties without the prior written approval of the City and not to make use of the Confidential Information other than as needed to perform the Services. The Contractor further agrees that it will only disclose the Confidential Information to its personnel on a need-to-know basis solely for the performance of the Services and will protect the Confidential Information with the same degree of care that the Contractor uses to protect its own confidential information, but no less than reasonable care or as the various laws may require or impose.
All Confidential Information as well as other documents, data and information provided to the Contractor by the City is and will remain the property of the City to the extent that it was the property of the City at the time it was provided to the Contractor.
All Confidential Information shall be returned to the City by the Contractor within five (5) business days of the completion of the Services under this Contract. The Contractor will keep no copies of the Confidential Information except that the Contractor may retain one copy of the Working Papers as required by law, regulation, professional standards or reasonable business practice. If requested by the City, an officer of the Contractor will certify in writing that, to the best of his/her knowledge, information and belief, all Confidential Information and all copies thereof (except for one copy of the Working Papers) have been delivered to the City or destroyed.
The Contract Documents, and each of them, shall remain the property of the City. The Contractor shall have the right to keep one record set of the Contract Documents upon completion of the Project; provided, however, that in no event shall Contractor use, or permit to be used, any or all of such Contract Documents on other projects without the City’s prior written authorization.
1.8 Hierarchy of Contract Documents
1.8.1 In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents, the following hierarchy shall control: (a) as between figures given on drawings and the scaled measurements, the figures shall govern; (b) as between large scale drawings and small scale drawings, the large scale shall govern; (c) as between drawings and specifications, the requirements of the specifications shall govern; (d) as between the Contract Agreement and General Conditions, Special Provisions, the Technical Specifications, the Drawings and Plans, Bidding Documents, all Change Orders and Field Orders issued hereafter, the requirements of the Contract Agreement shall govern unless specifically and expressly modified by a Change Order or Amendment to this Contract Agreement approved by the City. As set forth hereinabove, any and all conflicts, discrepancies, or inconsistencies shall be immediately reported to the City in writing by the Contractor. If after application of the above, if the conflict, discrepancy, or inconsistency cannot be resolved, the Contractor shall be obliged to perform in accordance with the most stringent requirement and/or provide the greater scope of Work as such resolution.
ARTICLE II
THE WORK
2.1 Contractor Responsibility
2.1.1 The Contractor shall perform all of the Work required, implied or reasonably inferable from, this Contract.
2.2 “Work” Defined
2.2.1 The term Work shall mean whatever is done by or required of the Contractor to perform and complete its duties under this Contract, including the following: construction of the whole or a designated part of the Project; furnishing of any required surety bonds and insurance; and the provision or furnishing of labor, supervision, services, materials, supplies, equipment, fixtures, appliances, facilities, tools, transportation, storage, power, permits and licenses required of the Contractor, fuel, heat, light, cooling and all other utilities as required by this Contract. The Work to be performed by the Contractor is generally described in Exhibit A, SCOPE OF SERVICES, attached hereto and incorporated herein.
2.3 Review of Work
2.3.1 Authorized representatives of the City and affected state or federal agencies may at all reasonable times review and inspect the activities and data collected under the terms of the Contract and any amendments thereto, including but not limited to, all reports, drawings, studies, specifications, estimates, maps, and computations, prepared by or for the City.
2.4 Workday and Restrictions, Suspension and Interruption
2.4.1 Normal workday for the Work shall be from 8:00 A.M. to 5:00 P.M. and the normal work week shall be Monday through Friday. The City will consider extended workdays or work weeks upon written request on a case-by-case basis. The City may restrict work hours in certain locations or at certain times of the day.
No work will be allowed on national holidays (i.e., Memorial Day, July 4th, Labor Day, etc.). The City may order the Contractor in writing to suspend, delay or interrupt all or any part of the Work for such period of time as it may determine appropriate for the convenience of the City. The time for completion of the Work shall be extended by the number of days the Work is suspended. The City shall not be responsible for any claims, damages or costs stemming from any delay of the Project.
2.5 Work to be Performed by the Prime Contract
2.5.1 Tasks constituting of at least fifty-one percent (51%) of the value of this contract must be performed directly by the prime contractor and shall not be sub-contracted to other firms.
2.5.2 The Contractor shall identify which tasks shall be self-performed.
ARTICLE III
CONTRACT TIME
3.1 Time and Liquidated Damages
3.1.1 The Contractor shall not proceed to furnish such services and the City shall not become obligated to pay for same until a written authorization to proceed (“Notice to Proceed”) has been sent to the Contractor from the City. The Contractor shall commence the Work no later than ten (10) days after the effective date of the Notice to Proceed and shall achieve Substantial Completion of the Work, as hereinafter defined, no later than two hundred seventy (270) Calendar Days, from the date on which the City Issues the Notice to
Proceed. The two hundred seventy (270) calendar days from the date on which the Work is permitted to proceed, through the date set forth for Substantial Completion shall constitute the Contract Time. The Work shall be carried on expeditiously, it being understood, however, that this Agreement may be extended or continued in force by the parties hereto in writing as provided herein.
3.1.2 The Contractor shall pay the City the sum of $500.00 per day for each and every calendar day of unexcused delay in achieving Substantial Completion beyond the Contract Time set forth herein . Any sums due and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated damages representing an estimate of delay damages likely to be sustained by the City, estimated at or before the time of executing this Contract. When the City reasonably believes that Substantial Completion will be inexcusably delayed, the City shall be entitled, but not required, to withhold from any amounts otherwise due the Contractor an amount then believed by the City to be adequate to recover liquidated damages applicable to such delays. If and when the Contractor overcomes the delay in achieving Substantial Completion, or any part thereof, for which the City has withheld payment, the City shall promptly release to the Contractor those funds withheld, but no longer applicable, as liquidated damages.
3.2 Substantial Completion
3.2.1 Substantial Completion shall mean the stage of the Contractor’s performance under this Agreement when Sandy Springs has determined in its sole and absolute discretion, that the Work is sufficiently complete allowing the newly constructed facilities to be used for their intended purpose. The City and Contractor may agree to declare portions of the Work substantially complete and allow the City to occupy and use such portions by written agreement. However, absent such agreement, partial use or occupancy of the Work shall not result in the Work being deemed substantially complete, and such partial use or occupancy shall not be evidence of Substantial Completion
3.3 Time is of the Essence
3.3.1 The Contractor’s timely performance of the Work, and all limitations of time related thereto as set forth in the Contract Documents are of the essence of this Contract
ARTICLE IV
CONTRACT PRICE
4.1 The Contract Price
4.1.1 The total contract amount for the Project (the “Contract Price”) shall be as set forth in the bid schedule (“Bid Schedule”) attached hereto as EXHIBIT B, BID SCHEDULE and incorporated herein. Payment to the Contractor pursuant to the Bid Schedule is full payment for the complete scope of services. The total contract amount shall be certified by the Bid Price Certification (“Bid Price Certification”) attached hereto as EXHIBIT C, BID PRICE CERTIFICATION and incorporated herein. Payment to the Contractor pursuant to the Bid Schedule is full payment for the complete scope of services. The Contract Price shall not be modified except by Change Order as provided in this Contract.
ARTICLE V
PAYMENT OF THE CONTRACT PRICE
5.1 Bid Schedule
5.1.1 The Contractor shall invoice and be paid pursuant to the Bid Schedule contained in the Contract Documents.
5.2 Payment Procedure
5.2.1 The City shall pay the Contract Price to the Contractor as provided below.
5.2.2 Based upon the Contractor’s invoices for payment submitted to the City, the City shall make progress payments to the Contractor on account of the Contract Price.
5.2.3 On or before the 5th day of each month after commencement of the Work, the Contractor shall submit an invoice for Work satisfactorily completed as evaluated by an inspector representing the City pursuant to the Bid Schedule. The invoice shall be in such form and manner, and with such supporting data and content, as the City may require. Therein, the Contractor may request payment for ninety percent (90%) of that portion of the Contract Price properly allocable to Contract requirements properly provided, labor, materials and equipment properly incorporated into the Work plus ninety percent (90%) of that portion of the Contract Price properly allocable to materials or equipment properly stored on-site (or elsewhere if approved in advance in writing by the City) for subsequent incorporation into the Work, less the total amount of previous payments received from the City. Payment for stored materials and equipment shall be conditioned upon the Contractor’s proof satisfactory to the City, that the City has title to such materials and equipment and shall include proof of required insurance. Such invoice shall be signed by the Contractor and shall constitute the Contractor’s representation that the Work has progressed to the level for which payment is requested in accordance with the Schedule of Work, that the Work has been properly installed or performed in full accordance with this Contract, and that the Contractor knows of no reason why payment should not be made as requested. Thereafter, the City will review the invoice and may also review the Work at the Project Site or elsewhere to determine whether the quantity and quality of the Work is as represented in the invoice and is as required by this Contract. The City shall make partial payments on account of the Contract Price to the Contractor within thirty (30) days following receipt of each invoice. The amount of each partial payment shall be the amount approved for payment less such amounts, if any, otherwise owing by the Contractor to the City or which the City shall have the right to withhold as authorized by this Contract.
The City shall not be precluded from the exercise of any of its rights as set forth in Paragraph 5.3 herein below;
PROVIDED, HOWEVER, that when fifty (50) percent of the Contract value, including Change Orders and other additions to the Contract value, provided for by the Contract Documents is due, and the manner of completion of the Contract Work and its progress are reasonably satisfactory to the City, the City shall withhold no more retainage. At the discretion of the City, and with the approval of the Contractor, the retainage of any Subcontractor may be released separately as the Subcontractor completes its Work. If, however, after discontinuing the retention, the City determines that the Work is unsatisfactory or has fallen behind schedule, retention may be resumed at the previous level. If retention is resumed by the City, the Contractor and Subcontractors shall be entitled to resume withholding retainage accordingly. The rights of the City set forth herein to retainage are in addition to all of the other rights and remedies of the City set forth in this Agreement.
5.2.4 The Contractor warrants that upon submittal of an invoice, all Work for which payments have been received from the City shall be free and clear of liens, claims, security interest or other encumbrances in favor of the Contractor or any other person or entity whatsoever.
5.2.5 The Contractor shall promptly pay each Subcontractor out of the amount paid to the Contractor on account of such Subcontractor’s Work, the amount to which such Subcontractor is entitled. In the event the City becomes informed that the Contractor has not paid a Subcontractor as herein provided, the City shall have the right, but not the duty, to issue future checks in payment to the Contractor of amounts otherwise due hereunder naming the Contractor and such Subcontractor as joint payees.
This is the start of the file's text. The full file is on GovTribe.