ITB_24_053 Addendum 1.pdf
PDF 147 KB Posted
- Solicitation number
- PE-66098-NONST-2024-000000035
- Issued by
- Fulton County, Georgia
About this file
This document is an Addendum to Invitation to Bid (ITB) #24-053 for the T2305 High Point Road Pedestrian Crosswalk project in the City of Sandy Springs, Georgia, located in Fulton County. The addendum addresses questions from prospective offerors regarding the provision of power meter and disconnect pedestal, the length of the strain pole, and the purpose of the pay items for the Rectangular Rapid Flashing Beacon (RRFB) installation. The ITB requires the contractor to provide all necessary materials and labor to complete the pedestrian safety improvements along High Point Road. The bid response is due on March 22nd, 2024 at 2:00 p.m.
The addendum clarifies that the city is not providing any equipment, the pole length is to be 30 feet above ground level, and the two pay items for RRFB installation serve different purposes - one for the comprehensive installation and the other for the specific procurement of RRFB units. No other salient pricing, funding, or contract term details are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024_01_18 T2305 High Point Final Plans Resub.pdf | ||
| 24_053 T2305 High Point Road Pedestrian Cross.pdf | ||
| SP Combined.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Number 1
Invitation to Bid (“ITB”) 24-053
T2305 High Point Road Pedestrian Crosswalk
COMPLETE THIS ADDENDUM, SIGN and SUBMIT with the ITB
RESPONSE DUE DATE: March 22nd, 2024, 2:00 p.m.
To All Prospective Offerors: In reference to the ITB listed above, the following answers to questions, additions, deletions, and change are hereby incorporated into the ITB:
Questions:
Question 1: Is the City providing the power meter and disconnect pedestal?
Answer: No, the city is not providing any equipment.
Question 2: What is the overall length of the strain pole?
Answer: The pole length is to be 30 feet above ground level.
Question 3: What is the purpose of having pay item 647-1030 RRFB Installation when pay item 999-3800 Rectangular Rapid Beacon Assembly covers the same work?
Answer: Pay item 647-1030 RRFB Installation is a lump sum (LS) item covering the installation of all necessary components. Pay item 999-3800 specifies the quantity of RRFB units to be ordered. While both pay items cover aspects of the RRFB system, they serve different purposes. One addresses installation costs comprehensively, while the other focuses specifically on procurement quantities.
I hereby acknowledge receipt of Addendum Number 1 for #24-053 S2188-4 T2305 High Point Road
Pedestrian Crosswalk Project and have incorporated the changes into my response for the above-mentioned Invitation to Bid.
COMPANY NAME:
CONTACT PERSON:
ADDRESS:
CITY: _________________________________STATE: ___________ ZIP: ________________________
PHONE: ________________ FAX: _______________
EMAIL ADDRESS: ______________________________________
SIGNATURE: ____________________________________________
DATE: ______________________________________