ITB_#21245_Bid_Cost_Form.pdf

PDF 125 KB Posted

Attached to
New Classroom Renovations For Wilbur Wright School
Solicitation number
ITB-21425
Issued by
Cuyahoga County, Ohio

About this file

The document is a Bid Cost Form (ITB #21425) for Interior Renovations to Wilbur Wright School, issued by a district (likely the Cleveland Metropolitan School District or CMSD). The project involves comprehensive interior renovations including selective demolition, general trades, electrical, mechanical, plumbing, fire protection, and technology work. The proposed agreement is set to begin September 22, 2025, pending fund authorization, with construction to be completed and Certificate of Occupancy obtained by January 2, 2025, and punch list finalization by January 30, 2025.

The Architect's estimated probable construction cost is $470,000, with the base bid including a 10% contingency allowance to address concealed conditions. The bid form allows contractors to propose materials and labor costs, with space to list potential substitutions and their associated price adjustments. The district reserves the right to require all work to conform to the issued specifications, and encourages bidders to submit proposed substitutions for cost savings or construction improvements. Contractors are expected to provide a comprehensive bid that includes removal and disposal of all demolition items using a contractor-provided dumpster.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Cost Form ITB #21425 Interior Renovations to Wilbur Wright School

The Bidder proposes to furnish all labor, materials, and equipment necessary to complete Interior Renovations to Wilbur Wright School. The undersigned proposes to renovate the interior of Wilbur Wright School for the District in accordance with the Specifications and to the entire satisfaction of, and acceptance by, the District and for the following prices. The Agreement will begin September 22, 2025 pending authorization of funds at the discretion of the District.

The Architect’s opinion of probable cost of construction, for base bid is $470,000.

Base Bid: Unless otherwise noted, all work indicated on the drawings and/or described in this project manual for Base Bid. The work includes, but is not limited to selective demolition, general trades, electrical, mechanical, plumbing, fire protection, and technology. Base Bid shall also include, removal and disposal of all demolition items in a dumpster provided by the contractor.

Base bid shall include a 10% contingency allowance to address concealed conditions and items approved by

CMSD.

Materials: $________

Labor: $________

10% Contingency Allowance $________

Total Sum: $________

Schedule:

Date to Begin Construction with Construction to be completed and C of O obtained by January 2, 2025. Punch List Completed by January 30, 2025.

Event: Date:

Substitutions: Bidder is to list here any “Substitutions” for which consideration is desired, showing the addition or reduction in price to be made, for each, if the substitution is accepted, or stated “No Change in Price”, if none is provided. Submission of proposed substitution for approval, whether for savings in cost or improvement in construction is encouraged.

Substitutions are for consideration of inclusion only. The District has the right to require all work to conform to the Specifications issued.

Branded or Make Specified

Proposed Substitutions Add Deduct

undefined:
undefined_2:
undefined_3:
10 Contingency Allowance:
undefined_4:
EventRow1:
DateRow1:
EventRow2:
DateRow2:
EventRow3:
DateRow3:
EventRow4:
DateRow4:
EventRow5:
DateRow5:
EventRow6:
DateRow6:
EventRow7:
DateRow7:
EventRow8:
DateRow8:
Branded or Make SpecifiedRow1:
Proposed SubstitutionsRow1:
AddRow1:
DeductRow1:
Branded or Make SpecifiedRow2:
Proposed SubstitutionsRow2:
AddRow2:
DeductRow2:
Branded or Make SpecifiedRow3:
Proposed SubstitutionsRow3:
AddRow3:
DeductRow3:
Branded or Make SpecifiedRow4:
Proposed SubstitutionsRow4:
AddRow4:
DeductRow4:
Branded or Make SpecifiedRow5:
Proposed SubstitutionsRow5:
AddRow5:
DeductRow5:
Branded or Make SpecifiedRow6:
Proposed SubstitutionsRow6:
AddRow6:
DeductRow6:
Branded or Make SpecifiedRow7:
Proposed SubstitutionsRow7:
AddRow7:
DeductRow7:
Branded or Make SpecifiedRow8:
Proposed SubstitutionsRow8:
AddRow8:
DeductRow8:

File details come from the government source that posted it. Updated .