ITB 2026-1019 WMHS Old Gym Repair Questions Responses.pdf
PDF 145 KB Posted
- Solicitation number
- IFB-130372
- Issued by
- Arlington County, Virginia
About this file
This document is a Questions and Responses Schedule for ITB 2026-1019, issued by the Augusta County School Board (ACSB) in Virginia for structural and masonry repairs to the WMHS Old Gym. The project encompasses repair work designed by DMWPV Engineers, including structural reinforcement, masonry repairs, brick replacement, repointing, helical tie installation, and related restoration work on all four exterior elevations of the gymnasium. Sealed bids were due on November 3, 2026, at 10:00 AM with no extension granted despite requests for additional time. The anticipated project start date is on or after January 4, 2027, with contractors required to provide an estimated completion date in their bid submissions. Work may be performed Monday through Friday between 6:00 AM and 10:00 PM, with the gymnasium closed to students and staff during construction and weekend work prohibited. The contractor may utilize the surrounding grassy area on the exterior of the gym for equipment storage and laydown, which may be fenced off as needed.
The contractor is responsible for providing porta potties for personnel, as facility toilet access will not be available, and must supply all heating equipment, curing monitoring, and winter enclosure provisions if needed. ACSB may provide a 200-ampere generator with the contractor responsible for fuel costs, and exterior water spigots are available for use. Quantities for masonry repair items including mortar repointing, crack repairs, brick replacement, and CMU work are not provided by ACSB; contractors must estimate these based on site visits and provided information using unit rate pricing. Helical veneer ties are required across all four complete exterior elevations as shown on plans, and contractors are responsible for all scaffolding, roof and floor protection, and compliance with specified load limitations. Detailed engineered drawings are referenced and available, with horizontal angle bracing to be installed at top and bottom chords per the updated design specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WMHS Old Gym Blueprint.pdf | ||
| ITB 2026-1019 WMHS Old Gym.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Augusta County School Board Date: October 30, 2026
WMHS Old Gym Repair
ITB: 2026-1019
Questions & Response
Schedule, Work Environment, & Submission:
1. Would this bid date be able to be extended a few days due to the pricing of particularly the steel material?
No, we are not able to extend the bid date.
2. We kindly request a two-week bid extension on this project (to be due on 11/17/2026). This request is due to the project complexity and obtaining fabrication pricing along with accessing equipment/plans.
There will not be an extension to the closing bid date. Bids are due November 3 at 10:00AM.
3. What is the anticipated schedule duration of this project? Start / Complete date.
The anticipated start date is on or after January 4, 2027. ACSB is requesting the Contractor to give an anticipated completion date on the bid document.
4. Will the contractor be required to work around any particular schedule to accommodate school scheduling? Confirm that the gym will be closed for access as repairs are in progress. Will the site be available on weekends if needed?
Work may be performed during the hours of 6:00AM-10:00PM, Monday through Friday. The gym will be closed to students and staff once the work begins. Weekend work will not be permitted.
5. Is there a laydown area and/or is the contractor able to have a storage trailer on site?
The surrounding grassy area on the exterior of the gym may be fenced off by the Contractor for storage.
6. Is the surrounding area on the exterior of the gym able to be closed off during construction? Confirm that the exterior grass area, at the north side of the gym, can be used for a laydown area while work is in progress.
The grassy area may be fenced off by the Contractor for storage.
7. Confirm if any special clearance will be needed for our team prior to accessing the Facility.
No special clearances will be needed between the times stated above. The gym will be closed to students and staff once the work begins.
8. Confirm where water and power could be made available for work.
There are exterior water spigots that may be accessed. ACSB may provide a 200Amp generator, the Contractor is responsible for providing the fuel.
9. Confirm if we will have access to toilets or will porta potties be required to be on site for our team.
No, access to toilets will not be provided. The Contractor will need to supply their own porta potties.
10.Confirm that ALL questions and answers will be shared with ALL bidders.
All questions will be posted in the form of an addendum.
Technical Specifications and Materials:
1. On page 10 in the repair recommendations report, it shows a vertical angle to be installed on each side of the rafters welded to the rafters and anchored to the wall. I do not see a detail in the drawings for this. Is this a recommendation or to be bid as a part of the scope? If so what is anchor spacing in the angle For item 1, our initial design concept was to use vertical angles. After reviewing the photos, we decided horizontal angles would be better so we changed the design. The vertical angle statement should be ignored.
2. On page 10 in the repair recommendations report, it shows this vertical angle to be installed on each side of the rafters welded to the rafters and anchored to the wall. I do not see a detail in the drawings for this. Is this a recommendation or to be bid as a part of the scope? If so, what is anchor spacing in the angle? On the drawings 1/S002 it shows horizontal angle at top and bottom cord. Which detail is to be used?
Our initial design concept was to use vertical angles. After reviewing the photos, we decided horizontal angles would be better so we changed the design. The vertical angle statement should be ignored.
3. In the drawings on 2/S002, in lieu of all the individual brackets anchored to the wall and welded to the trusses, it would be a lot easier and cheaper on the budget, to run a continuous angle in between the chords. You could also maybe run them every other section in between the chords along the wall. This will save a lot in labor to fabricate and the installation of all the individual brackets.
For item 2, the angles need to be attached to the top chord. This proposal will not work for the design intent.
4. Quantity of brick replacements to be included in the bid.
We are not providing quantities. Based on the information provided and the site visits, it is the responsibility of the contractor to bid those estimates.
5. Lineal feet of selective repointing to be included in the bid?
6. Confirm if there will be a more detailed scope of work, including LF for repair on this project will be sent.
7. For bidding purposes, can the following repair items be quantified and or clarified?
a. Mortar Repointing of the exterior brick masonry facade per linear Foot.
b. Crack repairs throughout the brick facade per linear foot
c. Damaged Brick Replacement per each.
d. CMU replacement and or face shell per each
e. Crack repairs throughout the interior CMU including Helical ties per linear foot.
8. Is the EOR and/or owner able to give quantities of repairs requested? Most of the masonry repairs quantities are subjective and leave a lot of room for deciding to what extent areas are to be repaired. Unit rate pricing seems much more aligned with this project's goals and current scope.
9. We would need several 50 amp power cables connected into existing panels. These will supply our power distribution boxes (spider boxes). Would you prefer that we hire an electrical company or would you engage our own electrical company?
ACSB may provide a 200Amp generator, the Contractor is responsible for providing the fuel.
10.RFI 01 – Roof Scaffolding / Winter Enclosures (S001–S002) Please confirm allowable roof loading, required bearing protection, and approved scaffold/enclosure anchorage for the two proposed 35-foot scaffold runs.
The contractor is responsible for scaffolding. The roof is typically designed for a live load of 20psf and a concentrated load not to exceed 300lb. Scaffolding must be placed on a protective surface and not directly on the roof membrane.
11.RFI 02 – Helical Ties (S002–S004) Please clarify whether the specified helical veneer ties are required across all four complete elevations or only within designated repair areas.
Please also confirm whether Spira-Lok ties and Spira-Bar crack stitching are acceptable approved equivalents.
Helical ties are required for all of the brick associated with the Old Gym. The extents are shown on plan.
12.RFI 03 – Winter Heating and Curing
Please confirm that the GC will provide indirect-fired heating equipment, ducting, propane, power, and continuous heating during the required curing periods.
Please clarify the specified 72-hour damp-curing requirements and confirm that humidity monitoring will be the GC’s responsibility.
Yes, the contractor would be responsible for the heating equipment if needed and setting the timeline you deem necessary and the monitoring would be the GC’s responsibility.
13.RFI 04 – Gym Floor / Scissor Lift Loading
Please confirm that the existing gym floor can accommodate the proposed scissor-lift loads, including travel and operating loads, with appropriate floor protection.
Gym typical live load is usually limited to 100psf. The contractor would be responsible for the protection of the athletic floor during construction.
14.Are the Brick Veneer Retrofit Ties to be installed throughout all four (4) exterior elevations, from ground-to-roof on the North Elevation, and from the low roofs-to-top of gym roof on the East, West, & South Elevations?
Yes
15.Are there Facade Elevation drawings available for the exterior & interior gym walls?
There are existing engineered drawings available. Please see the addendum attachment titled WMHS Old Gym Blueprint.
16.Are the Control Joint Expansion & Corner Joints only to be performed throughout the exterior facade (no CJ work on the interior)?
No CJ is required for interior CMU.
17.Is detail 1/S002 only to be installed along the West Elevation?
Detail 1/S002 applies to the West and East elevations.