This Invitation to Bid (ITB) 2026-1019 is issued by the Augusta County School Board Maintenance Department for structural and masonry repairs to the Wilson Memorial High School (WMHS) Old Gym located at 189 Hornet Road, Fishersville, Virginia 22939. The scope of work includes four primary technical areas: roof-to-wall structural anchoring to connect roof structures to existing Concrete Masonry Unit (CMU) walls; brick veneer reinforcement with structural ties and anchor attachments; control and expansion joint retrofits at building corners; and masonry restoration with crack injection, repointing, and repair of damaged CMU blocks and brick units, all in accordance with engineered, stamped repair drawings prepared by DMWPV Engineers. A mandatory on-site walk is scheduled between October 20-27, 2026, at Wilson Memorial High School's gravel parking lot. Questions are due by October 28, 2026 at 4:00 p.m., with sealed bids due November 3, 2026 at 10:00 a.m. at the Augusta Maintenance Department, 168 Hornet Road, Fishersville, Virginia 22939. The anticipated award date is November 6, 2026, with work expected to begin on or about January 4, 2027, and completion as estimated by the bidder. Quote validity is 90 calendar days from the submission deadline.

Bidders must provide firm-fixed lump sum pricing for four line items: roof-to-CMU wall structural anchors, brick veneer retrofit anchors and ties, control joint expansion and corner joints, and masonry and brick wall repairs. The evaluation and award criteria prioritize best value considering price, schedule, experience, past performance, and bid completeness. Bidders must submit at least three professional references for comparable work performed within the last three years and demonstrate years in business providing the specified goods and services. Bids submitted electronically through eVA must also include a sealed hard copy by the deadline. The School Board is exempt from federal excise taxes and Virginia sales and use taxes; bid prices must be net and exclusive of taxes. The contract is governed by Virginia law, and standard General Terms and Conditions apply, including provisions for anti-discrimination, drug-free workplace compliance, environmental management systems compliance, and payment to subcontractors within seven days of the prime contractor's receipt of payment from the School Board.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUGUSTA COUNTY SCHOOL BOARD

Invitation to Bid Maintenance Department

168 Hornet Road Fishersville, VA 22939

ITB: 2026-1019

WMHS Old Gym Repair

BID RELEASE DATE

October 19, 2026

BID OPENING DATE AND HOUR

November 3, 2026 at 10:00 am

At Augusta Maintenance Department 168 Hornet Drive, Fishersville VA

Commodity:

Project Base Bid: WMHS Old Gym located at 189 Hornet Road, Fishersville, VA 22939, in accordance with the engineered, stamped repair drawings prepared by DMWPV Engineers https://dmwpv.sharefile.com/share/view/sb06b535140 f440b4a9e4316e72f0f006

ADDRESS ALL INQUIRIES AND CORRESPONDENCE TO:

Robbie Martin, Director of Maintenance and Operations E-MAIL ADDRESS: martin.rj@augusta.k12.va.us 540-245-5145

Douglas Smith, Maintenance Coordinator E-MAIL ADDRESS: smith.dh@augusta..k12.va.us 540-245-5145

NOTE: Augusta County School Board does not discriminate against faith-based organizations in accordance with the Code of Virginia 2.2-4343.1 or against a bidder because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by state law relating to employment discrimination in the performance of its procurement activity.

SPECIAL INSTRUCTIONS

● Responses must be submitted on this form and the attachments provided. See PERIOD OF PERFORMANCE & KEY DATES for submission details.

● Responses should be signed below.

● Responses will be received in the Augusta County Maintenance Department, 168 Hornet Road Fishersville VA, 22939 until the bid opening date and hour or, if specified, the bid return date and hour shown above. Faxed or emailed bid responses will not be accepted.

● Contact the person listed above for bid award information. Enclose a self-addressed stamped envelope if you wish to obtain price information.

● DELIVERY IS F.O.B. DESTINATION UNLESS OTHERWISE NOTED IN THE BODY OF THE BID.

● Attachments (if applicable) are incorporated by reference into this invitation for bid and any resulting contract.

CERTIFICATION: IN ACCORDANCE WITH THIS INVITATION FOR SEALED BID AND SUBJECT TO ALL TERMS AND CONDITIONS CONTAINED IN THE

ATTACHMENTS ENCLOSED, THE UNDERSIGNED OFFERS AND AGREES TO FURNISH THE GOODS OR SERVICES FOR THE PRICE(S) OFFERED.

CONTACT NAME/TITLE (PRINT) FAX NUMBER

SIGNATURE (IN INK) DATE

THIS IS NOT AN ORDER

NOTE: Bidders are required to perform an on-site walk. This may be scheduled between October 20-27, 2026 at Wilson Memorial High School, 189 Hornet Rd, Fishersville, VA 22939.

Any Changes and/or Addenda to this solicitation will be posted on the ACSB website at www.augusta.k12.va.us/page/procurement. Bidders are responsible for checking this website prior to bid submission.

Failure to acknowledge all addenda may result in rejection of your bid as non-responsive.

General Terms and Conditions and Special Terms and Conditions apply to this procurement and are posted on the Augusta County Public Schools website at www.augusta.k12.va.us/page/procurement https://dmwpv.sharefile.com/share/view/sb06b535140f440b4a9e4316e72f0f006 https://dmwpv.sharefile.com/share/view/sb06b535140f440b4a9e4316e72f0f006 mailto:martin.rj@aususta.k12.va.us mailto:martin.rj@aususta.k12.va.us http://www.augusta.k12.va.us/page/procurement http://www.augusta.k12.va.us/page/procurement

TABLE OF CONTENTS

Section Title Page No

Section 1: PURPOSE 2

Section 2: BACKGROUND 2

Section 3: PERIOD OF PERFORMANCE & KEY DATES 2

Section 4: CONTRACT ADMINISTRATORS / TECHNICAL POINTS OF CONTACT 2

Section 5: SCOPE OF SERVICES 2

Section 6: BID PREPARATION AND PRICING SCHEDULE 3

Section 7: EVALUATION AND AWARD CRITERIA 4

Section 8: GENERAL TERMS AND CONDITIONS 4

ENVIRONMENTAL MANAGEMENT SYSTEMS 11

ATTACHMENT A - CONTRACTOR DATA SHEET 14

ATTACHMENT B - CERTIFICATE OF COMPLIANCE 15

1. PURPOSE

The purpose and intent of this Invitation to Bid (ITB) is to solicit sealed bids from qualified contractors to perform structural and masonry repairs for the WMHS Old Gym located at 189 Hornet Road, Fishersville, VA 22939, in accordance with the engineered, stamped repair drawings prepared by DMWPV Engineers.

2. BACKGROUND

Augusta County Public Schools (ACPS) / Augusta County School Board (ACSB) requires structural, brick veneer, expansion joint, and masonry repair services at the Wilson Memorial High School (WMHS) Old Gym facility.

3. PERIOD OF PERFORMANCE & KEY DATES

● Mandatory On-Site Walk: May be scheduled between October 20-27, 2026. The meeting location is the gravel parking lot in the back of Wilson Memorial High School. Contractors should bring tools as needed.

● Questions Due: October 28, 2026 by 4:00 p.m. Responses will be posted via an Addendum.

● Bid Submission Deadline: November 3, 2026 @ 10:00 a.m. (local time). If bids are submitted electronically through eVA, a sealed hard copy must also be submitted by the deadline. Sealed bids shall be delivered to 168 Hornet Rd, Fishersville, VA 22939.

● Anticipated Notice to Proceed / Award Date: November 6, 2026.

● Quote Validity: Quotes shall remain firm for 90 calendar days after the submission deadline.

● Project Timeline: The winning company may begin work on or about January 4, 2027, with an expected completion date as estimated on the bid document.

4. CONTRACT ADMINISTRATORS / TECHNICAL POINTS OF CONTACT

● Robbie Martin, Director of Maintenance E-Mail: martin.rj@augusta.k12.va.us | Phone: 540-245-5145

● Douglas Smith, Maintenance Coordinator E-Mail: smith.dh@augusta.k12.va.us | Phone: 540-245-5145

5. SCOPE OF SERVICES

All work performed under this contract shall strictly adhere to the engineered, stamped repair drawings prepared by DMWPV Engineers (WMHS Old Gym Stamped Repair Drawings). The scope of work includes four primary technical areas:

Link for the Engineered Stamped Drawings:

https://dmwpv.sharefile.com/share/view/sb06b535140f440b4a9e4316e72f0f006

a. Roof-to-Wall Structural Anchoring: Supply and install engineered structural anchors attaching the roof structure directly to the existing Concrete Masonry Unit (CMU) walls to establish positive physical connection and restrain excessive lateral wall displacement.

b. Brick Veneer Reinforcement: Retrofit structural ties and anchor attachments to securely connect exterior brick veneer back to the CMU backup walls.

c. Control & Expansion Joint Retrofits: Enlarge existing brick veneer control joints and install new vertical expansion joints at designated building corners per stamped detail drawings.

d. Masonry Restoration & Crack Repair: Rake, structural crack-inject, repoint, and repair damaged or loose CMU blocks and brick masonry units across designated elevation areas.

https://dmwpv.sharefile.com/share/view/sb06b535140f440b4a9e4316e72f0f006

6. BID PREPARATION AND PRICING SCHEDULE

Contractors must provide firm-fixed line item pricing.

Line Description / Scope Area Unit / Pricing Basis Line Item Total 1 Roof-to-CMU Wall Structural Anchors (Supply & installation of roof tie-down anchors to limit wall movement per drawings)

Lump Sum $

2 Brick Veneer Retrofit Anchors & Ties (Reinforcing brick veneer connection back to CMU backing wall)

Lump Sum $

3 Control Joint Expansion & Corner Joints (Sawcutting/enlarging existing joints and creating corner expansion joints)

Lump Sum $

4 Masonry & Brick Wall Repairs (Repairing cracks, mortar repointing, and resetting loose brick/CMU units)

Lump Sum $

TOTAL MAXIMUM FIRM-FIXED BID PRICE (Lines 1 through 4) $

Contractor Schedule Commitment:

Start Date: on/or about January 4, 2027

Completion Date:

7. EVALUATION AND AWARD CRITERIA

ACPS/ACSB intends to award the contract to the responsible vendor whose responsive bid provides the best value considering price, schedule, experience, past performance, and completeness. ACSB reserves the right to accept or reject any quotes/bids, item(s), to negotiate, and to award in whole or in part.

8. GENERAL TERMS AND CONDITIONS

(Vendor: The general rules and conditions which follow apply to purchases and become a definite part of each formal solicitation and resulting contract award issued by the Purchasing Department, unless otherwise specified. Bidders or their authorized representatives are expected to inform themselves fully as to the conditions, requirements, and specifications before submitting bids; failure to do so will be at the bidder's own risk and relief cannot be secured on the plea of error.)

Subject to all State and local laws, policies, resolutions, and regulations and all accepted rules, regulations and limitations imposed by legislation of the Federal Government, bids on all solicitations issued by the Purchasing Department will bind bidders to applicable conditions and requirements herein set forth unless otherwise specified in the solicitation.

8.1 ANTI-DISCRIMINATION

By submitting their bid, the Bidder certifies to the School Board that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians With Disabilities Act, the Americans With Disabilities Act and 2.2-4311 of the Virginia Public Procurement Act (VPPA). If the award is made to a faith-based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the contract on the basis of the recipients religion, religious belief, refusal to participate in a religious practice, or on the basis of race, age, color, gender, or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs funded with public funds shall be subject to audit by the public body (Code of Virginia, 2.2-4343.1E).

In every contract over $10,000 the provisions in 8.1.1 through 8.1.4 below apply:

8.1.1 The contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the contractor.

The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.

8.1.2 The Contractor, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, will state that such Contractor is an equal opportunity employer.

8.1.3 Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting these requirements;

8.1.4 The Contractor will include the provisions of 8.1.1 above in every subcontract or purchase order over $10,000, so that the provisions will be binding upon each subcontractor or vendor.

8.2 ANTITRUST

By entering into a contract, the contractor conveys, sells, assigns, and transfers to the School Board all rights, title and interest in and to all causes of action it may now have or hereafter acquire under the antitrust laws of the United States and the Commonwealth of Virginia, relating to the particular goods or services purchased or acquired by the School Board under said contract.

8.3 APPLICABLE LAWS AND COURTS

This solicitation and any resulting contract shall be governed in all respects by the laws of the Commonwealth of Virginia, and any litigation with respect thereto shall be brought in the courts of the Commonwealth. The contractor shall comply with all applicable federal, state and local laws, rules and regulations.

8.4 ASSIGNMENT OF CONTRACT

A contract shall not be assignable by the Contractor in whole or in part without the written consent of the School Board and other participating jurisdictions.

8.5 AUTHORITY

The Finance Department has the sole responsibility and authority for issuance of invitations to bid, request for proposals, negotiations, placing and modifying invitations, requests, purchase orders and awards issued by and for the School Board of Augusta County. In the discharge of these responsibilities, the Finance Department may be assisted by delegating authority to Directors and other school board staff. No other School Board officers or employee is authorized to enter into purchase negotiations, change orders, contracts, or in any way obligate the School Board for indebtedness. Any purchase order or contract made which is contrary to these provisions and authorities shall be of no effect and void, and the School Board shall not be bound thereby.

8.6 CHANGES TO THE CONTRACT

ACSB may order changes within the general scope of the contract at any time by written notice to the Contractor. Changes within the scope of the contract include, but are not limited to things such as services to be performed, the method of packing or shipment and the place of delivery of installation. The Contractor shall comply with the notice upon receipt. The Contractor shall be compensated for any additional costs incurred as the result of such order and shall give ACSB a credit for any resulting savings. Additionally, an increase or decrease in the price of the contract resulting from such modification shall be agreed to by the parties as a part of their written agreement to modify the scope of the contract.

8.7 CLARIFICATIONS OF TERMS

If any prospective bidder has questions about the specifications or other solicitation documents, the prospective bidder should contact the buyer whose name appears on the face of the solicitation no later than five (5) working days before the due date. Any revisions to the solicitation will be made only by addendum issued by the buyer.

8.8 CONTRACT DOCUMENTS

The Contract entered into by the parties shall consist of this IFB or RFP, the signed bid submitted by the Contractor, the Notice of Award or Purchase Order/Contract, the General and Special Terms and Conditions, the listed Specifications and drawings, if any, including all modifications thereof, all of which shall be referred to collectively as the Contract Documents. All time limits stated in the Contract Documents are the essence of the Contract.

8.9 CONTRACTUAL DISPUTES

Any dispute concerning a question of fact including claims of money or other relief as a result of a contract with ACSB which is not disposed of by agreement shall be decided by the Supervisor of Purchasing, who shall reduce a decision to writing and mail or otherwise forward a copy thereof to the Contractor within ten

(10) days. The decision of the Supervisor of Purchasing shall be final and conclusive unless the Contractor appeals within ten (10) days of receipt of the written decision. Contractual claims, whether for money or other relief, shall be submitted in writing no later than sixty (60) days after final payment; however, written notice of the Contractor's intention to file such a claim shall have been given at the time of the occurrence or beginning of the work upon which the claim is based. Pendency of claims shall not delay payment of amounts agreed due in the final payment.

8.10 DEFAULT

In case of failure to deliver goods and services in accordance with the contract terms and conditions, the School Board, after due oral or written notice, may procure them from other sources and hold the contractor responsible for any resulting additional purchase and administrative costs. This remedy shall be in addition to any other remedies which the School Board may have.

8.11 DEBARMENT STATUS

By submitting their bid, the Bidder certifies that he/she is not currently debarred by the Commonwealth of Virginia or ACSB from submitting bids or proposals on contracts for the type of goods and/or services covered by this solicitation, nor are they an agent of any person or entity that is currently so debarred.

8.12 DRUG-FREE WORKPLACE

During the performance of this contract, the contractor agrees to (i) provide a drug-free workplace for the contractor's employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the contractor's workplace and specifying the actions that will be taken against employees for violations of such prohibition; (iii) state in all solicitations or advertisements for employees placed by or on behalf of the contractor that the contractor maintains a drug-free workplace; and (iv) include the provisions of the foregoing clauses in every subcontract or purchase order of over $10,000, so that the provisions will be binding upon each subcontractor or vendor.

For the purposes of this section, "drug-free workplace" means a site for the performance of work done in connection with a specific contract awarded to a contractor in accordance with this chapter, the employees of whom are prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession or use of any controlled substance or marijuana during the performance of the contract.

8.13 ETHICS IN PUBLIC CONTRACTING

By submitting their bid, bidders certify that their bid is made without collusion or fraud and that they have not offered or received any kickbacks or inducements from any other bidder, supplier, manufacturer or subcontractor in connection with their bid, and that they have not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit of money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged.

8.14 EXHAUSTION OF ADMINISTRATIVE REMEDIES

No potential Bidder or Contractor shall institute any legal action until all administrative remedies available under this solicitation and resulting contract have been exhausted and until all statutory requirements have been met.

8.15 IMMIGRATION REFORM AND CONTROL ACT OF 1986

By submitting their bid, Bidders certify that they do not and will not during the performance of this contract employ illegal alien workers or otherwise violate the provisions of the federal Immigration Reform and Control Act of 1986.

8.16 INVOICES

Invoices for goods and/or services ordered, delivered and accepted shall be submitted by the Contractor(s) directly to the payment address shown on the purchase order/contract. All invoices shall reference said purchase order/contract number and shall be in the same legal name of the Contractor as indicated on the Contract.

8.17 LABELING OF HAZARDOUS SUBSTANCES

If the items or products requested by this solicitation are "Hazardous Substances" as defined by Section 1261 of Title 15 of the United States Code (U.S.C.) then the Bidder, by submitting his/her bid, certifies and warrants that the items or products to be delivered under this contract shall be properly labeled as required by the foregoing sections and that by delivering the items or products the Bidder does not violate any of the prohibitions of Title 15 of the U.S.C. or Section 1263.

8.18 MANDATORY USE OF FORM AND TERMS AND CONDITIONS

Failure to submit a bid on the form provided for that purpose shall be cause for rejection of the bid.

Modification of or additions to any portion of the Invitation for Bids may be cause for rejection of the bid;

however, the School Board reserves the right to decide, on a case by case basis, in its sole discretion, whether to reject such a bid as non-responsive. As a precondition to its acceptance, the School Board may, in its sole discretion, request that the bidder withdraw or modify non-responsive portions of a bid which do not affect quality, quantity, price, or delivery.

8.19 MATERIAL SAFETY DATA SHEETS

Material and Safety Data Sheets shall be provided within two (2) business days upon request for each chemical and/or compound offered. Failure on the part of the Contractor to submit such data sheets may be cause for declaring the Contractor in default.

8.20 MODIFICATION OF CONTRACT

ACSB may, upon mutual agreement with the Contractor, issue written modifications to the scope of work/specifications of this contract, and within the general scope thereof, except that no modifications can be made which may result in an increase of the original contract price by a cumulative amount of more than $50,000 or 25%, whichever is greater, without the advance written approval of the County School Board.

In making any modification, the resulting increase or decrease in cost for the modification shall be determined by one of the following methods as selected by the Purchasing Supervisor:

a. The written modification shall stipulate the mutually agreed price for the specific addition to or deletion from the scope of work/specifications, which shall be added to or deducted from the contract amount.

b. The written modification shall stipulate the number of unit quantities added to or deleted from the contract and multiplied by the unit price, which shall be added to or deducted from the contract amount.

c. The written modification shall direct the Contractor to proceed with the work and to keep, and present in such form as ACSB may direct, a correct account of the cost of the change together with all vouchers therefore. The cost shall include an allowance for overhead and profit to be mutually agreed upon by ACSB and the Contractor.

8.21 NONDISCRIMINATION OF CONTRACTORS

A bidder, offeror, or contractor shall not be discriminated against in the solicitation or award of this contract because of race, religion, color, sex, national origin, age, disability, faith-based organizational status, or any other basis prohibited by state law relating to discrimination in employment or because the bidder or offeror employs ex-offenders unless the state agency, department or institution has made a written determination that employing ex-offenders on the specific contract is not in its best interest. If the award of this contract is made to a faith-based organization and an individual, who applies for or receives goods, services, or disbursements provided pursuant to this contract objects to the religious character of the faith-based organization from which the individual receives or would receive the goods, services or disbursements, the public body shall offer the individual, within a reasonable period of time after the date of his objection, access to equivalent goods, services or disbursements from an alternate provider.

8.22 OFFICIAL NOT TO BENEFIT

8.22.1 Each Bidder shall certify upon signing a bid that to the best of his/her knowledge no ACSB official or employee having official responsibility for the procurement transaction or member of his/her immediate family has received or will receive any financial benefit of more than nominal or minimal value relating to the award of this contract. If such a benefit has been received or will be received, this fact shall be disclosed with the bid or as soon thereafter, as it appears that such a benefit will be received. Failure to disclose the information prescribed above may result in suspension or debarment or recession of the contract made or could affect payment pursuant to the terms of the contract.

8.22.2 Whenever there is a reason to believe that benefit of the sort described in the paragraph above has been or will be received in connection with the bid or contract and that the Contractor has failed to disclose such benefit or has inadequately disclosed it, ACSB, as a prerequisite to payment pursuant to the Contractor, or at any time may require the contractor to furnish, under oath, answers to any interrogatories related to such possible benefit.

8.22.3 In the event the Bidder has knowledge of benefits as outlined above, this information should be submitted with the bid. If the above does not apply at time of award of contract and becomes known after the inception of a contract the Bidder shall address the disclosure of such facts to: Supervisor of Purchasing, Augusta County School Board, 18 Government Center Lane, Verona, VA 24482. The Invitation for Bids Number shall be referenced in the disclosure.

8.23 PAYMENT TO PRIME CONTRACTOR

8.23.1 Invoices for items ordered, delivered and accepted shall be submitted by the contractor directly to the payment address shown on the purchase order/contract. All invoices shall show the purchase order number;

social security number (for individual contractors) or the federal employer identification number (for proprietorships, partnerships, and corporations).

8.23.2 Any payment terms requiring payment in less than 30 days will be regarded as requiring payment 30 days after invoice or delivery, whichever occurs last. This shall not affect offers of discounts for payment in less than 30 days.

8.23.3 All goods or services provided under this contract or purchase order, that are to be paid with public funds, shall be billed by the contractor at the contract price, regardless of which public agency is being billed.

8.23.4 The following shall be deemed to be the date of payment: the date of postmark in all cases where payment is made by mail, or the date of offset when offset proceedings have been instituted as authorized under the Virginia Debt Collection Act.

8.24 PAYMENT TO SUBCONTRACTORS

A contractor awarded a contract under this solicitation is hereby obligated to:

8.24.1 Pay the subcontractor(s) within seven days of the contractor's receipt of payment from the School Board for the proportionate share of the payment received for work performed by the subcontractor(s) under the contract; or

8.24.2 Notify the agency and the subcontractor(s), in writing, of the Contractor's intention to withhold payment and the reason for such.

8.24.3 The contractor is obligated to pay the subcontractor(s) interest at the rate of one percent per month (unless otherwise provided under the terms of the contract) on all amounts owed by the contractor that remain unpaid seven days following receipt of payment from the School Board, except for amounts withheld as stated in (2) above. The date of mailing any payment by U.S. Mail is deemed to be payment to the addressee. These provisions apply to each sub-tier contractor performing under the primary contract. A contractor's obligation to pay an interest charge to a subcontractor may not be construed to be an obligation of the School Board or any participating jurisdiction.

8.25 PRECEDENCE OF TERMS

All of these General Terms and Conditions shall apply in all instances. In the event there is a conflict between any of the General Terms and Conditions and Special Terms and Conditions in this solicitation, the Special Terms and Conditions shall apply.

8.26 PROTEST OF AWARD OR DECISION TO AWARD

Any Bidder may protest the award or decision to award a contract by submitting a protest in writing to the Bid Protest Officer no later than ten (10) days after public notice of the award or the announcement of the decision to award, whichever occurs first. The written protest shall include the basis for the protest and the relief sought. The Bid Protest Officer shall issue a decision in writing within ten (10) days of the receipt of the protest stating the reasons for the action taken.

8.26.1 If prior to award it is determined that the decision to award is arbitrary and capricious then the sole relief shall be a finding to that effect. The Supervisor of Purchasing shall cancel the proposed award or revise it to comply with the law. If, after an award, it is determined that an award of a contract was arbitrary and capricious, then the sole relief shall be as hereinafter provided. Where the award has been made but performance has not begun, the performance of the contract may be declared void by ACSB. Where the award has been made and performance begun, the Supervisor of Purchasing may declare the contract void upon finding that this action is in the best interest of ACSB. Where a contract is declared void, the performing Contractor shall be compensated for the cost of performance at the rate specified in the contract up to the time of such declaration. In no event shall the performing Contractor be entitled to lost profits.

8.26.2 Pending final determination of a protest or appeal, the validity of a contract awarded and accepted in good faith in accordance with this paragraph shall not be affected by the fact that a protest or appeal has been filed.

8.26.3 An award need not be delayed for the period allowed a Bidder to protest, but in the event of a timely protest, no further action to award the contract will be taken unless there is a written determination that proceeding without delay is necessary to protect the public interest or unless the offer would expire.

8.27 QUALIFICATIONS OF BIDDERS

The School Board may make reasonable investigations as deemed proper and necessary to determine the ability of the bidder to perform the services/furnish the goods and the bidder shall furnish to the School Board all such information and data for this purpose as may be requested. The School Board reserves the right to inspect the bidder's physical facilities prior to awarding to satisfy questions regarding the bidder's capabilities. The School Board further reserves the right to reject any bid if the evidence submitted by, or investigations of, such bidder fails to satisfy the School Board that such bidder is properly qualified to carry out the obligations of the contract and to provide the services and/or furnish the goods contemplated therein.

8.28 SMALL AND MINORITY BUSINESS ENTERPRISES

It is the policy of ACSB to undertake every effort to increase opportunity for utilization of small and minority businesses in all aspects of procurement to the maximum extent feasible. In connection with the performance of this contract, the Contractor agrees to use their best effort to carry out this intent and ensure that Small and Minority Businesses shall have the maximum practicable opportunity to compete for subcontract work under this contract consistent with the efficient performance of this contract. Contractors may rely on oral or written representation by subcontractors regarding their status as small and/or minority business enterprises in lieu of an independent investigation.

Where Federal grants or monies are involved, it is the policy of the School Board through its agents and employees to comply with the requirements set forth in the Standards governing State and Local Grantee Procurement of the U.S. Office of Management and Budget Circular No. A-102, Uniform Administrative Requirements for Grants-in-Aid to State and Local Governments, as they pertain to small and minority business utilization.

8.29 TAX EXEMPTION

ACSB is exempt from the payment of federal excise or Virginia Sales and Use Tax. The bid price must be net, exclusive of taxes. Under established trade practices, any federal excise tax is included in the list price;

the Bidder may bid the list price and shall show separately the amount of federal excise tax, either as a flat sum or as a percentage of the list price, which shall be deducted by ACSB.

8.30 TERMINATION FOR CAUSE/DEFAULT

In case of failure to deliver goods or provide services in accordance with the contract terms and conditions, ACSB, after due oral or written notice, may procure them from other sources and hold the Contractor responsible for any resulting additional purchase and administrative costs. This remedy shall be in addition to any other remedies which ACSB may have. Specifically,

8.30.1 If, through any cause, the Contractor shall fail to fulfill in a timely and proper manner their obligations under this contract, or if the Contractor shall violate any of the covenants, agreements, or stipulations of this contract, ACSB shall thereupon have the right to terminate, specifying the effective date thereof, at least five...

Environmental Management Systems

Contractor’s Environmental Requirements

Index

1. Introduction

2. Material Storage / Spills

3. Waste Disposal

4. Water Discharges

5. Land Disturbance

6. Equipment Decommissioning

7. Inspections

8. Contractor Sign Off

1. Introduction

The following information is supplied to contractors who perform work on property owned by Augusta County, Augusta County Service Authority or Augusta County Public Schools. The contractor receives these requirements in the event contractor services have a potential to cause significant environmental impacts.

The information presented in this package has been developed in response to Augusta County’s Environmental Management System (EMS). The intent of this information is to make onsite contractors aware of the EMS that has been implemented and to ensure that they conform to the applicable EMS program requirements as well as State and Federal regulations. The contractor will respond to receipt of this document by signing a statement indicating they have read these requirements, fully understand them and will comply with all EMS, State and Federal regulations.

Conformance with EMS requirements and State and Federal regulations are expected of all subcontractors and employees and will be enforced by the project's contractor.

For further information, or review of EMS details, please contact the Environmental Programs Manager at 540-245-5615.

2. Material Handling / Spills

There will be no outside storage of any hazardous materials without the consent of the owner’s representative and/or Environmental Programs Manager.

Contractors will properly label, store and dispose of all hazardous materials.

When handling, storing or disposing of hazardous chemicals or materials contractors will meet all applicable laws and regulations.

Contractors will provide adequate spill/release prevention for all bulk materials.

The contractor will ensure that chemical containers are closed except when in use or if regulations prohibit closure.

The contractor will have available the Material Safety Data Sheets (MSDS) for all chemical products on site.

MSDSs will be made available to maintenance personnel, medical personnel, environmental personnel or their representatives upon request.

Contractors will maintain spill kits to contain and clean up spills generated by their employees or from their materials. Spill kits will be kept on site and will be easily accessible in the event of an emergency.

Contractors will immediately notify the owner’s representative who will contact the Environmental Programs Manager of any reportable spills, releases or other environmental incidents. Contractors will follow up by submitting a completed Environmental Tracking of Spills and Releases Form to the Environmental Programs Manager. The contractor is responsible for notifying appropriate State/Federal agencies and cleaning up the spill within legal time requirements.

3. Waste Disposal

Shipping information and paperwork (MSDS, Waste Profiles, Land Ban Forms and Recycling/Disposal Certificates) must be provided to the owner’s representative or Environmental Programs Manager upon request.Contractors are responsible for all regulated wastes. All State, Federal, and EMS requirements must be met.

4. Water Discharges

Discharge of materials other than clean water to ANY drainage system is prohibited.Discharges to sanitary sewers are prohibited.

5. Land Disturbance

Solids must be prevented from entering sewer drains. Roadways and outside areas must be kept clean.

It is the contractor’s responsibility to comply with all Virginia Erosion and Sediment Control Laws and County Ordinances administered by the County Engineer. The County Engineer may be contacted at 54-245-5700.

A Land Disturbing Permit may be required.

6. Equipment Decommissioning

All equipment will be thoroughly inspected by the contractor for fluids and other hazardous materials prior to removal.

All fluids and other hazardous materials will be removed prior to decommissioning of equipment.

Disposal of any waste generated will be handled in accordance with EMS, Federal and State requirements.

7. Inspections

The owner’s representative and/or Environmental Programs Manager may inspect hazardous materials, training/disposal records, equipment, etc. to ensure compliance with EMS program requirements and State and Federal regulations. By execution of the contract, permission will be given for the owner’s representative and/or Environmental Programs Manager to conduct the proper inspections. Any items found insufficient in protecting the environment will be corrected by the contractor.

8. Contractor Sign Off

Contractors are required to be familiar with the Contractor’s Environmental Requirements and are required to sign the attached statement and submit it with the formal bid documents.

Environmental Management Systems

Compliance with Environmental Requirements

I have read and fully understand the environmental requirements contained in the Contractor’s Environmental Requirements. My company and its subcontractors and employees will comply with all EMS requirements and State and Federal Regulations concerning hazardous chemicals and materials when storing, using, transporting and disposing.

Company:

Principal in Charge:

Signature of Principal: Date:

Attachment A

CONTRACTOR DATA SHEET

1. QUALIFICATIONS OF BIDDER: The Bidder shall have the capability and the capacity in all respects to fully satisfy all the contractual requirements.

2. YEARS IN BUSINESS: Indicate the length of time the Bidder has been in business providing the goods/services in this solicitation: ____________ Years _____________ Months.

3. REFERENCES: Bidders shall provide a listing of at least three (3) references for which the company has provided specified goods/services of the same or greater scope within the last three (3) years. ACSB cannot be a reference.

1. Customer Name: Contact Name: Contact Title:

Address: Phone No.

Fax No.

2. Customer Name: Contact Name: Contact Title:

3. Customer Name: Contact Name: Contact Title:

4. Customer Name: Contact Name: Contact Title:

5. Customer Name: Contact Name: Contact Title:

Attachment B

PRICING SCHEDULE: Contractors must provide firm-fixed line item pricing.

Line Description / Scope Area Unit / Pricing

Basis Line Item Total 1 Roof-to-CMU Wall Structural Anchors (Supply & installation of roof tie-down anchors to limit wall movement per drawings)

Lump Sum $

2 Brick Veneer Retrofit Anchors & Ties (Reinforcing brick veneer connection back to CMU backing wall)

Lump Sum $

3 Control Joint Expansion & Corner Joints (Sawcutting/enlarging existing joints and creating corner expansion joints)

Lump Sum $

4 Masonry & Brick Wall Repairs (Repairing cracks, mortar repointing, and resetting loose brick/CMU units)

Lump Sum $

TOTAL MAXIMUM FIRM-FIXED BID PRICE (Lines 1 through 4) $

Contractor Schedule Commitment:

Start Date: on/or about January 4, 2027

Completion Date:

AUGUSTA COUNTY SCHOOL BOARD
Maintenance Department
168 Hornet Road
Fishersville, VA 22939
TABLE OF CONTENTS
1. PURPOSE
2. BACKGROUND
3. PERIOD OF PERFORMANCE & KEY DATES
4. CONTRACT ADMINISTRATORS / TECHNICAL POINTS OF CONTACT
5. SCOPE OF SERVICES
6. BID PREPARATION AND PRICING SCHEDULE
7. EVALUATION AND AWARD CRITERIA
8. GENERAL TERMS AND CONDITIONS
8.1 ANTI-DISCRIMINATION By submitting their bid, the Bidder certifies to the School Board that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended, as well as the Virginia Fair Employment Contracting Act of 1975, as amended, where applicable, the Virginians With Disabilities Act, the Americans With Disabilities Act and 2.2-4311 of the Virginia Public Procurement Act (VPPA). If the award is made to a faith-based organization, the organization shall not discriminate against any recipient of goods, services, or disbursements made pursuant to the contract on the basis of the recipients religion, religious belief, refusal to participate in a religious practice, or on the basis of race, age, color, gender, or national origin and shall be subject to the same rules as other organizations that contract with public bodies to account for the use of the funds provided; however, if the faith-based organization segregates public funds into separate accounts, only the accounts and programs
8.2 ANTITRUST
8.3 APPLICABLE LAWS AND COURTS
8.4 ASSIGNMENT OF CONTRACT
8.5 AUTHORITY
8.6 CHANGES TO THE CONTRACT
8.7 CLARIFICATIONS OF TERMS
8.8 CONTRACT DOCUMENTS
8.9 CONTRACTUAL DISPUTES
8.10 DEFAULT
8.11 DEBARMENT STATUS
8.12 DRUG-FREE WORKPLACE
8.13 ETHICS IN PUBLIC CONTRACTING
8.14 EXHAUSTION OF ADMINISTRATIVE REMEDIES
8.15 IMMIGRATION REFORM AND CONTROL ACT OF 1986
8.16 INVOICES
8.17 LABELING OF HAZARDOUS SUBSTANCES
8.18 MANDATORY USE OF FORM AND TERMS AND CONDITIONS
8.19 MATERIAL SAFETY DATA SHEETS
8.20 MODIFICATION OF CONTRACT
8.21 NONDISCRIMINATION OF CONTRACTORS
8.22 OFFICIAL NOT TO BENEFIT
8.23 PAYMENT TO PRIME CONTRACTOR
8.24 PAYMENT TO SUBCONTRACTORS
8.25 PRECEDENCE OF TERMS
8.26 PROTEST OF AWARD OR DECISION TO AWARD
8.27 QUALIFICATIONS OF BIDDERS
8.28 SMALL AND MINORITY BUSINESS ENTERPRISES
8.29 TAX EXEMPTION
8.30 TERMINATION FOR CAUSE/DEFAULT
Environmental Management Systems
____________________________________________________________

File details come from the government source that posted it. Updated .