ITB 2026-014 Stormwater System Conduit Repairs
This is a Bid Manual and Invitation to Bid issued by the City of Tucker, Georgia, for stormwater system conduit repairs across seven locations within the city. The project encompasses repair and rehabilitation work at the following addresses: 2119/2129 Spencers Way, 6091 Windsong Way, 1391 Juliette Road, 5623 Hugh Howell Road, 3504 Canadian Way, 2721 Tucker Valley Road NW, and 5012 Kanawha Bluff. Work includes excavation and replacement of corrugated steel pipe (SRCMP), high-density polyethylene pipe (HDPE), and precast concrete pipe (CFES) ranging from 18 inches to 48 inches in diameter; internal pipe point repairs and cured-in-place pipe (CIPP) lining; hydro-excavation; jet-vac cleaning; headwall replacement and installation; grout connections; erosion control; site restoration; and debris removal. The bid was issued on May 5, 2026, with a deadline for written questions on May 19, 2026, at 1:00 p.m. EST, responses posted May 22, 2026, and a bid deadline of June 4, 2026, at 2:00 p.m. EST. A pre-bid conference is not scheduled. Award at City Council is tentative for July 13, 2026, with a completion timeline of 120 calendar days from Notice to Proceed. Prospective bidders are encouraged to visit project sites to verify existing conditions and quantities.
Bids are unit price proposals submitted electronically to procurement@tuckerga.gov and must include a notarized bid bond equal to five percent (5%) of the total bid amount. Upon contract award, the successful contractor must submit a performance bond and payment bond each equal to 100% of the total contract price. Required insurance includes commercial general liability coverage of not less than $3,000,000, statutory workers' compensation and employers' liability insurance with limits of not less than $1,000,000, and commercial automobile liability insurance with limits of not less than $1,000,000, with the City of Tucker named as additional insured. The contractor is responsible for all traffic control, erosion control, permits, and licenses; the City retains 5% retainage until final acceptance. Liquidated damages are assessed at $500 per calendar day for failure to complete by 120 calendar days and $200 per calendar day for punch list work not completed within 45 calendar days. The cost proposal forms detail unit prices across 41 line items per location, including mobilization, traffic control, pipe materials and installation, specialty cleaning, lining, grout connections, earthwork, erosion control, and restoration. No specific contract funding amount or budget is stated in the bid manual.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Tucker
Invitation to Bid
ITB # 2026-014
STORMWATER SYSTEM CONDUIT REPAIRS
BID MANUAL
City of Tucker 1975 Lakeside Parkway, Suite 350
Tucker, Georgia 30234
City of Tucker Invitation to Bid
ITB #2026-014
INVITATION: The City of Tucker, Georgia requests that interested parties submit bids for the Stormwater System Conduit Repairs. Bids will be accepted until the date and time listed below and will be awarded to the lowest responsible and responsive bidder. Addenda and updates to this bid manual will be posted on the City of Tucker website http://tuckerga.gov/bids, the DOAS/Georgia Procurement Registry Website or may be requested by emailing procurement@tuckerga.gov.
BID ACTIVITY SCHEDULE
Bid Issued May 5, 2026 Pre-Bid Conference N/A Deadline for Questions May 19, 2026 at 1:00 pm EST Responses to Questions Posted (Addenda) May 22, 2026 Bid Deadline / Opening June 4, 2026 at 2:00pm EST Award at Council Meeting (Tentative) July 13, 2026 (Tentative) Completion from Notice to Proceed 120 calendar days
SCOPE OF WORK: Refer to Exhibit A.
PRE-BID CONFERENCE: A pre-bid conference will not be scheduled for this project.
QUESTIONS: Submit all questions in writing to procurement@tuckerga.gov. Reference ITB #2026-014 in the subject line of the email.
ADDENDA: Responses to the questions received will be by addenda and will be posted on the City website www.tuckerga.gov/bids and the DOAS/Georgia Procurement Registry Website. The signed acknowledgement issued with each addendum must be submitted with the proposal. It is the vendors responsibility to verify if any addenda were created.
SUBMITTAL REQUIREMENTS: Vendor shall submit ITB Response electronically to procurement@tuckerga.gov so it is received no later than June 4, 2026, at 2:00pm EST with the subject line “Submittal: ITB #2026-014”. The email must contain the vendor’s contact information. Bid Submittal should be one PDF file and named <Company Name>.ITB 2026- 014.Bid Submittal.pdf. Email will be opened to confirm receipt of the submittal, but the attached PDF file will remain unopened until the public bid opening.
BID OPENING: All bids received prior to the deadline will be opened publicly at 2:00pm EST on June 4, 2026 at Tucker City Hall located at 1975 Lakeside Parkway, Suite 350, Tucker GA.
BID SUBMITTALS: A listing of submittals received prior to the bid deadline will be posted on the City website http://tuckerga.gov/bids following the opening of the bids.
BID DOCUMENT SUBMITTAL REQUIREMENTS:
1. Unit Price Cost Proposal Form (Provided)
2. W-9 Form (provided)
3. Certificate of Current Liability, Worker’s Compensation and Vehicle Insurance
4. Notarized Bid Bond Form (Provided)
5. Notarized Contractor Affidavit Form (Provided)
6. Proposed List of Subcontractors Form (Provided)
7. Related Experience and References Form (Provided)
8. Notarized Contractor’s Oath Form (Provided)
9. Acknowledgement of Addendum issued with each Addendum.
10. Contact Form (Provided)
All responses must be received electronically by the Bid Deadline. (Addenda will show any schedule updates). No bids will be received orally, by phone, or by sealed paper documents. Only electronic bids in accordance with submittal requirement instructions will be accepted. Late bids will not be considered. Bids received after the bid deadline will be filed unopened. The City of Tucker reserves the right to reject any and all bids or any part, to waive any formalities to make an award and to re-advertise in the best interest of the City. The City reserves the right to consider past performance in determining the responsibleness of bidders.
The city reserves the right to negotiate pricing and may, in its discretion, award a contract to the lowest responsible and responsive bidder submitting the proposal.
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIR PROJECTS
Exhibit A: Scope of Work
PURPOSE, INTENT AND PROJECT DESCRIPTION
The City of Tucker (City), requests that interested parties submit formal electronic bids for stormwater system conduit repairs at seven (7) locations.
The complete scope, specifications, and other relevant information for ITB 2026-014 is available for download on the City of Tucker website: www.tuckerga.gov/bids, the DOAS/Georgia Procurement Registry Website or request via email to procurement@tuckerga.gov.
SCOPE OF WORK
The project is also referred to as Task Order 44.
The work required under this contract includes furnishing materials, qualified labor, equipment, traffic control, erosion control, and site restoration at each location as described in the accompanying construction plans.
1. Conduct all activities as described in accompanying plans, details and exhibits.
2. Seed and straw all disturbed areas.
3. Clean work area.
LOCATION NOTES
1. 2119 / 2129 Spencers Way
a. Scope:
i. Dig and replace 40 lf of 24” diameter SRCMP at downstream end.
ii. Hydrovac bottom of existing junction box structure MH-1.
iii. Dig and replace 24 lf of 24” diameter HDPE.
iv. Backfill around existing junction box structure MH-1.
v. Replace 24” diameter pipe headwall denoted as S_26132.
vi. Internal point repair at 90 feet downstream from catch basin, 10 lf of 24” CMP invert.
vii. Clear and grub any existing landscape / trees in the easement as necessary gain access to conduct the excavation. Replace with grass seed that matches existing grass.
viii. Grout pipe connections at all affected structures.
ix. Back fill sinkholes along segment
x. Clean work area.
b. Reference Video, Photos and Report
c. Reference schedule of values from Bid Form for particular scope
2. 6091 Windsong Way
a. 175 linear feet of 48” diameter CMP. Scope:
i. Internal Point Repair of last 20 feet of 48” diameter CMP by way of restoring the invert base to receive a subsequent cured in place inlining -see accompanying exhibit.
ii. Cleaning of the 175 linear foot segment, less than 25% full
iii. Rebuild Invert of existing grate inlet junction box.
iv. Cured in place pipe lining of the 175 linear foot segment under Windsogn Way, 48” diameter pipe.
v. Bypass pumping.
vi. Grout pipe connections at junction box structures.
vii. Back fill sinkholes along segment
viii. Clean work area.
b. Reference Video, Photos and Exhibit
c. Reference schedule of values from Bid Form for particular scope
3. 1391 Juliette Road
a. 90 linear feet of 24” diameter CMP. Scope:
i. Dig and Replace 35 lf 24” diameter SRCMP, downstream end
ii. Cleaning of the 55 linear foot existing segment, less than 25% full
iii. Internal Point Repair of 40 feet of 24” diameter CMP by way of restoring the invert base to receive a subsequent cured in place inlining -see accompanying exhibit.
iv. Cured in place pipe lining of the 90 linear foot segment under Juliette Road, 24” diameter pipe.
v. Bypass pumping.
vi. Replace 24” headwall denoted as S_14611 with a new flared end section headwall;
vii. Grout pipe connections at all structures.
viii. Back fill sinkholes along segment
ix. Clean work area.
b. Reference Video, Photos and Exhibit
c. Reference schedule of values from Bid Form for particular scope
4. 5623 Hugh Howell Road
a. 175 linear feet of 30” diameter CMP. Scope:
i. Cleaning of the 175 linear foot existing segment, greater than 25% full
ii. Internal Point Repair of 20 feet of 30 diameter CMP by way of restoring the invert base to receive a subsequent cured in place inlining -see accompanying exhibit.
iii. Cured in place pipe lining of the 175 linear foot segment under Hugh Howell Road, 30” diameter pipe.
iv. Grout pipe connections at all structures.
v. Back fill sinkholes along segment
vi. Clean work area.
b. Reference Video, Photos and Exhibit
c. Reference schedule of values from Bid Form for particular scope
5. 3504 Canadian Way
a. 70 linear feet of 24” diameter CMP. Scope:
i. Specialty Cleaning of the 70 linear foot existing segment, removal of large debris and material
ii. Internal Point Repair of 20 feet of 24 diameter CMP by way of restoring the invert base to receive a subsequent cured in place inlining -see accompanying exhibit.
iii. Cured in place pipe lining of the 70 linear foot segment under Vancouver Drive and Canadian Way, 24” diameter pipe.
iv. Grout pipe connections at all structures.
v. Back fill sinkholes along segment
vi. Clean work area.
b. Reference Video, Photos and Exhibit
c. Reference schedule of values from Bid Form for particular scope
6. 2721 Tucker Valley Road NW
a. 120 linear feet of 24” diameter CMP. Scope:
i. Specialty Cleaning of 20 linear feet of the 120 linear foot existing segment, removal of large debris and material
ii. Cleaning of the 120 linear foot existing segment, less than 25% full
iii. Internal Point Repair of 30 feet of 24 diameter CMP by way of restoring the invert base to receive a subsequent cured in place inlining -see accompanying exhibit.
iv. Cured in place pipe lining of the 120 linear foot segment under Tucker Valley Road, 24” diameter pipe.
v. Grout pipe connections at all structures.
vi. Back fill sinkholes along segment
vii. Clean work area.
b. Reference Video, Photos and Exhibit
c. Reference schedule of values from Bid Form for particular scope.
7. 5012 Kanawha Bluff
a. 110 linear feet of 30” diameter CMP. Scope:
i. Dig and Replace 144 lf of 18” HDPE
ii. Install Outlet Headwall
iii. Grout pipe connections at junction box structures
iv. Tree Removal / Grubbing
v. Backfill sinkholes along segment
vi. Remove and reinstall chain link fence.
vii. Clean work area.
b. Reference Video and Report
c. Reference schedule of values from Bid Form for particular scope
Notes
The prospective bidder is advised to visit the sites.
The city will obtain all necessary easements and right of entries which may be necessary to execute the work.
Please refer to the accompanying exhibits for more detailed information on the scope of work and locations of structures and conduits. Additionally, a link is provided in this document that has background information including but not limited to photographs, videos and reports. Prospective bidders are also advised to review these documents. SharePoint Link:
TO 44 ITB support files
General Conditions
1. The Contractor shall maintain access to residential properties as necessary by detours or covering of the work area when not mobilized.
2. The Contractor shall furnish, install, maintain and remove all necessary traffic signs, barricades, lights, signals, cones and other traffic control devices, and all flagging and other means of traffic protection and guidance as required by Special Provision 150 of the Georgia Department of Transportation. Such work shall be considered incidental to the overall contract, and no additional compensation will be made.
3. The Contractor will be responsible for calling Georgia 811 in and identifying utility locations.
The City shall be notified of any potential utility conflicts.
4. Specifications for repair activities in accordance with Georgia Department of Transportation Standards
5. City of Tucker ordinances and regulations.
6. OSHA standards and guidelines.
7. Any other applicable codes, laws and regulations including but not limited to Section 45- 10-20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug- Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990.
https://tuckerga-my.sharepoint.com/:f:/g/personal/jmueller_tuckerga_onmicrosoft_com/IgDOGqoTV_IzR42OssNVdDzPAVghtVD0x1Zjg7yL3etX2DE?e=o7dP4p
8. Mobilization will be defined under Section 151 of the 2021 Standard Specifications of the Georgia Department of Transportation. One mobilization shall include the cost of mobilization for all teams and subcontractors used by and at the discretion of the Contractor.
9. Out of scope hourly labor shall be paid only upon the prior approval of the city upon confirmation that the work performed is outside of the scope of the original contract.
10. All disturbed areas shall be restored to site conditions prior to disturbance, or better.
11. Refer to organization chart below for city assigned staff for this project. The city reserves the right to substitute staff at any time during the contract period.
12. Reference schedule of values from Cost Proposal Form and exhibits for particular details.
13. The contractor is responsible for inspecting the job site prior to submitting a bid and encouraged to do so. No change orders will be issued for differing site conditions.
14. 5% retainage will be withheld from the total amount due the contractor until Final Acceptance of work is issued by the City. City staff will inspect the work as it progresses.
Special Conditions
1. Pay Item 2. Traffic Control
The Contractor shall furnish, install, maintain and remove all necessary traffic signs, barricades, lights, signals, cones and other traffic control devices, and all flagging and other means of traffic protection and guidance as required by Special Provision 150 of the Georgia Department of Transportation. Such work shall be considered incidental to the overall contract, and no additional compensation will be made.
2. Pay Item 9. High Density Polyethaline Pipe (HDPE) This line item includes all labor, material and equipment costs associated with excavation, placement, bedding, backfill and compaction.
3. Pay Item 39. Earthwork and Grading “Grading Complete” are those activities, including but not limited to excavation, demolition, backfill and grading not identified in the unit price quantities schedule to ensure that the completed grading work conforms to the horizontal and vertical alignment and typical cross-sections shown on the plans or directed by the engineer of record.
PROSECUTION AND PROGRESS
The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by 120 calendar days. The contractor will be considered substantially complete when all work required by this contract has been completed.
The normal workday for this project shall be 8:00AM to 7:00PM and the normal workweek shall be Monday through Friday. The City will consider extended workdays or workweeks upon written request by the Contractor on a case-by-case basis. No work will be allowed on national holidays (i.e. Memorial Day, July 4th, Labor Day, etc.).
The work will require the bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor at the contractor’s expense prior to issuance of Final Acceptance.
The contractor shall be assessed liquidated damages in the amount of $500.00 per calendar day for any contract work that is not completed by 120 calendar days. Liquidated damages shall be deducted from the 5% retainage held by the City. The contractor will also be assessed liquidated damages in the amount of $200.00 per calendar day for not completing any required Punch List work within 45 calendar days.
The contractor shall provide all material, labor, and equipment necessary to perform the work without delay until final completion.
PERMITS AND LICENSES
The contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.
BONDING AND INSURANCE REQUIREMENTS
No bid may be withdrawn for a period of ninety (90) days after the bid deadline/opening.
All bids must be accompanied by a Bid Bond of a reputable bonding company authorized to do business in the State of Georgia, in an amount equal to at least five percent (5%) of the total amount of the bid.
Upon Notice of Award, the successful contractor shall submit a Performance Bond payable to the City of Tucker in the amount of 100% of the total contract price. The successful contractor shall also submit a Payment Bond in the amount of 100% pursuant to O.C.G.A. § 36- 91-70 and 90.
Upon Notice of Award, the successful contractor shall procure and maintain the following insurance policies:
1. Commercial General Liability coverage at their sole cos and expense with limits of not less than
$3,000,000 in combined single limits for bodily injury and/or property damage per occurrence, and such policies shall name the City of Tucker as an additional named insured.
2. Statutory Workers Compensation and Employers Liability Insurance with limits of not less than $1,000,000, which insurance must contain a waiver of subrogation against the City of Tucker and its affiliates.
3. Commercial automobile liability insurance with limits of not less than $1,000,000 combined single limit for bodily injury and/or property damage per occurrence, and such policies shall name the City of Tucker as an additional named insured.
EXISTING CONDITIONS / DEVIATION OF QUANTITIES
All information given in this ITB concerning quantities, scope of work, existing conditions, etc. is for information purposes only. It is the Contractor’s responsibility to inspect the project site to verify existing conditions and quantities prior to submitting their bid. This is a Unit Price bid and no payment will be made for additional work without prior written approval from the City. At no time will Contractor proceed with work outside the prescribed scope of services for which additional payment will be requested without the written authorization of the City.
The City reserves the right to add, modify, or delete quantities. The City may also elect to add or eliminate certain work locations at its discretion. The Contractor will not be entitled to any adjustment of unit prices or any other form of additional compensation because of adjustments made to quantities and/or work locations. Contractor will be paid for actual in-place quantities completed and accepted for pay items listed in the Bid Schedule. All other work required by this ITB, plans, specs, standards, etc. but not specifically listed in the Bid Schedule shall be considered “incidental work” and included in the bid prices for items on the Bid Schedule.
TRAFFIC CONTROL
The contractor shall, at all times, conduct their work so as to ensure the least possible obstruction of traffic.
The safety and convenience of the general public and the residents along the roadway and the protection of persons and property shall be provided for by the contractor as specified in the State of Georgia, Department of Transportation Standard Specifications Sections 104.05, 107.09 and 150.
Traffic, whose origin and destination is within the limits of the project shall be provided ingress and egress at all times unless otherwise specified by the City. The ingress and egress includes entrances and exits via driveways at various properties, and access to the intersecting roads and streets. The contractor shall maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project at all times, particularly during inclement weather, to ensure that ingress and egress are safely provided when and where needed.
Two-way traffic shall be maintained at all times, unless otherwise specified or approved by the City. In the event of an emergency, the Contractor shall provide access to emergency vehicles and/or emergency personnel through or around the construction area. Any pavement damaged by such an occurrence will be repaired by the Contractor at no additional cost to the City.
The contractor shall furnish, install and maintain all necessary traffic signs, barricades, lights, signals, cones and other traffic control devices, and all flagging and other means of traffic protection and guidance as required by Special Provision 150 of the Georgia Department of Transportation. Such work shall be considered incidental to the overall contract, and no additional compensation will be made.
CLEANUP
All restoration and clean-up work shall be performed daily. Operations shall be suspended if the contractor fails to accomplish restoration and clean-up within an acceptable period of time. Asphalt and other debris shall be removed from gutters, sidewalks, yards, driveways, etc. Failure to perform clean-up activities may result in suspension of the work. Milling operation shall be followed immediately by clean-up at which the contractor is to provide power brooms, vacuum sweepers, power blowers, or other means to remove loose debris or dust. Do not allow dust control to restrict visibility of passing traffic or to disrupt adjacent property owners. All pavement areas shall be clean and dry prior to placing tack coat, asphaltic concrete or other materials.
SAFETY
Beginning with mobilization and ending with acceptance of work, the contractor shall be responsible for providing a clean and safe work environment at the project site. The contractor shall comply with all OSHA regulations as they pertain to this project.
*********************************END OF SCOPE OF WORK**************************
Location 1 - 2119 SPENCERS WAY Item No. Item Projected
Units Unit Proposed Unit Price Proposed Cost
1 General Conditions
1.1 Mobilization 1 EA
1.2 Out of Scope Work, Foreman 15 HR
1.3 Out of Scope Work, Laborer 15 HR
2 Traffic Control
2.2 Traffic Control Minor 2 – Includes Cones and Signage 4 Per Day
3 TV Inspection and Jet-Vac Cleaning
3.3 Hydro-Excavation complete (onsite hours only) 4 Per Hour
7 Spiral Rib Corr. Steel Pipe (14 ga. Tp. 2 Alum) Includes excavation, backfill, & compaction
7.3 24" SRCMP 40 LF
9 High Density Polyethaline Pipe (HDPE) Includes excavation, backfill, & compaction
9.3 24" HDPE 24 LF
15 Precast Headwalls
15.2 Precast Headwall for 24" Pipe 1 EA
Internal Pipe Point Repairs (Including cutting, trimming, jacking, etc.)
19.2 24" Diameter 10 LF
29 Miscellaneous & Special Structures/Components
29.16 Invert Installation, 4' Diameter 2 EA
30 Grout Connection To Structure
30.5 24" Grout Each End to Structure 3 EA
30.16 Grout all joint, cracks & holes, in structures, complete (structers greater than 8' deep) 2 EA
37 Cast in Place Concrete
37.2 Driveway 4" Concrete (Residential w/4"of GAB included) 50 SY
38 Road Restoration
38.2 Crusher Run Stone 40 Ton
39 Earthwork & Grading
39.1 Tree Removal 6"-12"" 5 EA
39.2 Tree Removal 13"-23" 1 EA
39.4 Clear & Grubbing 600 SY
39.5 Channel Excavation 10 CY
39.7 Haul-In Structural Fill Material 80 CY
39.8 Haul-Off Soil Material 40 CY
39.9 Finish Grading 600 SY
39.11 Debris Removal 40 CY
39.12 Grading Complete 1 LS
40 Erosion Control
40.3 Stone Grouted Rip Rap 12" Installed 10 SY
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
Units Unit Proposed Unit Price Proposed Cost
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
40.6 Install & Remove Type C Silt Fence 200 LF
40.9 Rock Bags for curb inlet/CB sediment Protection 1 EA
40.10 Install & Remove Orange Tree Save Fence 350 LF
40.14 Seed & Straw (Permanent Grassing) 600 SY
40.21 Pine Straw 30 EA
40.34 Irrigation Line Replacement 40 LF
40.35 Irrigation Head Replacement (Builder Grade) 2 EA
41 Miscellaneous Items
41.1 Connect to Existing Structures 3 EA
41.2 Debris Removal, Tandem Dump Truck 1 Per Load
41.3 Removal of Existing Non Drainage Structure 1 EA
41.4 Removal of Existing Drainage Structure 1 EA
41.5 Remove Existing Pipe all Types and Sizes 64 LF
41.6 Saw Cut Existing Pavements 40 LF
41.7 Stone #57 25 TON
41.25 Remove and Replace Existing 6' Wood Fence Residential 40 LF
2119 / 2129 SPENCERS WAY SUBTOTAL
Location 2 - 6091 WINDSONG WAY
Units Unit Proposed Unit Price Proposed Cost
1.1 Mobilization 1 EA
1.2 Out of Scope Work, Foreman 4 HR
1.3 Out of Scope Work, Laborer 8 HR
2 Traffic Control
2.2 Traffic Control Minor 2 – Includes Cones and Signage 3 Per Day
3 TV Inspection and Jet-Vac Cleaning
3.1 TV Storm Lines (includes DVD & Report) 175 LF
3.2 Visual Inspection (Pictures), per Project (During Construction) 1 EA
4 Storm Line Cleaning (less than 25% full)
4.9 48" PIPE - Cleaning less than 25% full 175 LF
Internal Pipe Point Repairs (Including cutting, trimming, jacking, etc.)
19.6 48" Diameter 50 LF
29 Miscellaneous & Special Structures/Components
29.18 Invert Installation, 6' Diameter 2 EA
30 Grout Connection To Structure
30.10 48" Grout Each End to Structure 4 EA
30.15 Grout all joint, cracks & holes, in structures, complete (structures 8' deep or less) 2 EA
LINING REQUIREMENTS
31 Cured In Place Pipe Liner (CIPP) - (12' or less in depth)
31.9 48" PIPE - 22.5mm (.886") 175 LF
31.26 Additional Cost Per 1.5mm (.0591") Thickness - 48" PIPE 175 LF
32 Inversion Setup
32.2 Inversion Setup Charge 42"- 60" CIPP 1 EACH
41.13 Bypass pumping setup-equipment and hose placement 1 EA
41.15 6" Pumping Operation Time 24 HR
Location 2 - 6091 WINDSONG WAY SUBTOTAL
Miscellaneous Items
Includes Pre and Post Television Inspections during lining
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
Location 3 - 1391 JULIETTE ROAD
Units Unit Proposed Unit Price Proposed Cost
1.1 Mobilization 1 EA
1.2 Out of Scope Work, Foreman 10 HR
1.3 Out of Scope Work, Laborer 10 HR
2 Traffic Control
2.2 Traffic Control Minor 2 – Includes Cones and Signage 4 Per Day
3 TV Inspection and Jet-Vac Cleaning
3.1 TV Storm Lines (includes DVD & Report) 90 LF
3.2 Visual Inspection (Pictures), per Project (During Construction) 4 EA
4 Storm Line Cleaning (less than 25% full)
4.5 24" PIPE - Cleaning less than 25% full 55 LF
7 Spiral Rib Corr. Steel Pipe (14 ga. Tp. 2 Alum) Includes excavation, backfill, & compaction
7.3 24" SRCMP 35 LF
Includes excavation, backfill, & compaction
10.1 Invert >8.1' to 12' 35 LF
13.2 24" CFES In Place 1 EA
Internal Pipe Point Repairs (Including cutting, trimming, jacking, etc.)
19.2 24" Diameter 40 LF
30 Grout Connection To Structure
30.5 24" Grout Each End to Structure 6 EA
30.16 Grout all joint, cracks & holes, in structures, complete (structers greater than 8' deep) 4 EA
LINING REQUIREMENTS
31 Cured In Place Pipe Liner (CIPP) - (12' or less in depth)
31.5 24" PIPE - 11.0mm (.433") 90 LF
31.22 Additional Cost Per 1.5mm (.0591") Thickness - 24" PIPE 90 LF
32 Inversion Setup
32.1 Inversion Setup Charge 15"- 36" CIPP 1 EACH
39.2 Tree Removal 13"-23" 1 EA
39.4 Clear & Grubbing 70 SY
39.9 Finish Grading 70 SY
39.11 Debris Removal 10 CY
39.12 Grading Complete 1 LS
40.2 Stone Rip Rap Type III In Place 50 TON
Includes Pre and Post Television Inspections during lining
Earthwork & Grading
Erosion Control
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
General Conditions
Additional Depth for Pipes
Precast Concrete Flared End Section
Location 3 - 1391 JULIETTE ROAD
Units Unit Proposed Unit Price Proposed Cost
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
40.6 Install & Remove Type C Silt Fence 200 LF
40.9 Rock Bags for curb inlet/CB sediment Protection 2 EA
40.14 Seed & Straw (Permanent Grassing) 100 SY
41.1 Connect to Existing Structures 1 EA
41.5 Remove Existing Pipe all Types and Sizes 35 LF
41.7 Stone #57 20 TON
41.13 Bypass pumping setup-equipment and hose placement 1 EA
41.15 6" Pumping Operation Time 24 HR
Location 3 - 1391 JULIETTE ROAD SUBTOTAL
Miscellaneous Items
Location 4 - 5623 HUGH HOWELL ROAD
Units Unit Proposed Unit Price Proposed Cost
1.1 Mobilization 1 EA
1.2 Out of Scope Work, Foreman 6 HR
1.3 Out of Scope Work, Laborer 6 HR
2 Traffic Control
2.2 Traffic Control Minor 2 – Includes Cones and Signage 2 Per Day
3 TV Inspection and Jet-Vac Cleaning
3.1 TV Storm Lines (includes DVD & Report) 175 LF
5 Storm Line Cleaning (25% full or greater)
5.6 30" PIPE - Cleaning 25% full or greater 175 LF
Internal Pipe Point Repairs (Including cutting, trimming, jacking, etc.)
19.3 30" Diameter 20 LF
30 Grout Connection To Structure
30.7 30" Grout Each End to Structure 2 EA
30.15 Grout all joint, cracks & holes, in structures, complete (structures 8' deep or less) 2 EA
LINING REQUIREMENTS
31 Cured In Place Pipe Liner (CIPP) - (12' or less in depth)
31.6 30" PIPE - 13.5mm (.532") 175 LF
31.23 Additional Cost Per 1.5mm (.0591") Thickness - 30" PIPE 175 LF
32 Inversion Setup
32.1 Inversion Setup Charge 15"- 36" CIPP 1 EACH
Location 4 - 5623 HUGH HOWELL ROAD SUBTOTAL
Includes Pre and Post Television Inspections during lining
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
Location 5 - 3054 CANADIAN WAY
Units Unit Proposed Unit Price Proposed Cost
1.1 Mobilization 1 EA
1.2 Out of Scope Work, Foreman 4 HR
1.3 Out of Scope Work, Laborer 4 HR
2 Traffic Control
2.2 Traffic Control Minor 2 – Includes Cones and Signage 2 Per Day
3 TV Inspection and Jet-Vac Cleaning
3.1 TV Storm Lines (includes DVD & Report) 70 LF
6 Specialty Storm Line Cleaning, Applicable to heavy roots, Large diameter rocks, large debris, etc
6.1 12" to 36" PIPE 70 LF
Internal Pipe Point Repairs (Including cutting, trimming, jacking, etc.)
19.2 24" Diameter 20 LF
30 Grout Connection To Structure
30.5 24" Grout Each End to Structure 4 EA
30.15 Grout all joint, cracks & holes, in structures, complete (structures 8' deep or less) 2 EA
LINING REQUIREMENTS
31 Cured In Place Pipe Liner (CIPP) - (12' or less in depth)
31.5 24" PIPE - 11.0mm (.433") 70 LF
31.22 Additional Cost Per 1.5mm (.0591") Thickness - 24" PIPE 70 LF
32 Inversion Setup
32.1 Inversion Setup Charge 15"- 36" CIPP 1 EACH
Location 5 - 3054 CANADIAN WAY SUBTOTAL
Includes Pre and Post Television Inspections during lining
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
Loceation 6 - 2721 TUCKER VALLEY RD SW
Units Unit Proposed Unit Price Proposed Cost
1.1 Mobilization 1 EA
1.2 Out of Scope Work, Foreman 6 HR
1.3 Out of Scope Work, Laborer 6 HR
2 Traffic Control
2.2 Traffic Control Minor 2 – Includes Cones and Signage 2 Per Day
3 TV Inspection and Jet-Vac Cleaning
3.1 TV Storm Lines (includes DVD & Report) 120 LF
4 Storm Line Cleaning (less than 25% full)
4.5 24" PIPE - Cleaning less than 25% full 120 LF
6 Specialty Storm Line Cleaning, Applicable to heavy roots, Large diameter rocks, large debris, etc
6.1 12" to 36" PIPE 20 LF
Internal Pipe Point Repairs (Including cutting, trimming, jacking, etc.)
19.2 24" Diameter 30 LF
30 Grout Connection To Structure
30.5 24" Grout Each End to Structure 4 EA
LINING REQUIREMENTS
31 Cured In Place Pipe Liner (CIPP) - (12' or less in depth)
31.5 24" PIPE - 11.0mm (.433") 120 LF
31.22 Additional Cost Per 1.5mm (.0591") Thickness - 24" PIPE 120 LF
32 Inversion Setup
32.1 Inversion Setup Charge 15"- 36" CIPP 1 EACH
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
Location 6 - 2721 TUCKER VALLEY ROAD NW SUBTOTAL
Includes Pre and Post Television Inspections during lining
Location 7 - 5012 KANAWHA BLUFF
Units Unit Proposed Unit Price Proposed Cost
1.1 Mobilization 1 EA
1.2 Out of Scope Work, Foreman 10 HR
1.3 Out of Scope Work, Laborer 10 HR
2 Traffic Control
2.2 Traffic Control Minor 2 – Includes Cones and Signage 3 Per Day
3 TV Inspection and Jet-Vac Cleaning
3.1 TV Storm Lines (includes DVD & Report) 110 LF
3.2 Visual Inspection (Pictures), per Project (During Construction) 4 EA
9 High Density Polyethaline Pipe (HDPE) Includes excavation, backfill, & compaction
9.4 30" HDPE 110 LF
Includes excavation, backfill, & compaction
10.2 Invert >12' 110 LF
15.3 Precast Headwall for 30" Pipe 1 EA
30 Grout Connection To Structure
30.7 30" Grout Each End to Structure 2 EA
39.1 Tree Removal 6"-12"" 5 EA
39.2 Tree Removal 13"-23" 5 EA
39.3 Tree Removal >23" 2 EA
39.4 Clear & Grubbing 400 SY
39.7 Haul-In Structural Fill Material 100 CY
39.8 Haul-Off Soil Material 100 CY
39.9 Finish Grading 400 SY
39.11 Debris Removal 100 CY
39.12 Grading Complete 1 LS
40.4 Install & Remove Type A Silt Fence 150 LF
40.14 Seed & Straw (Permanent Grassing) 400 SY
40.34 Irrigation Line Replacement 100 LF
40.35 Irrigation Head Replacement (Builder Grade) 4 EA
41.1 Connect to Existing Structures 1 EA
41.2 Debris Removal, Tandem Dump Truck 2 Per Load
41.4 Removal of Existing Drainage Structure 1 EA
41.5 Remove Existing Pipe all Types and Sizes 110 LF
41.7 Stone #57 20 TON
Location 75012 KANAWHA BLUFF SUBTOTAL
Precast Headwalls
Miscellaneous Items
Earthwork & Grading
Erosion Control
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form
General Conditions
Additional Depth for Pipes
Proposed Cost
Location 2 - 6091 WINDSONG WAY
Location 3 - 1391 JULIETTE ROAD
Location 4 - 5623 HUGH HOWELL ROAD
Location 5 - 3054 CANADIAN WAY
Loceation 6 - 2721 TUCKER VALLEY RD SW
Location 7 - 5012 KANAWHA BLUFF
TOTAL COST PROPOSAL
DATE
COMPANY NAME
AUTHORIZED SIGNATURE
PRINT NAME
CONTACT'S EMAIL ADDRESS
In compliance with the attached specification, the undersigned understands the City’s minimum scope requirements.
The undersigned offers and agrees that if this proposal is accepted by the Mayor and City Council within one hundred twenty (120) days of the date of proposal opening, that the undersigned will furnish any or all of the deliverables and additional services offered, at the quoted price, to the designated point(s) within the time specified.
ITB #2026-014 STORMWATER SYSTEM CONDUIT REPAIRS
Unit Price Cost Proposal Form - Location Summary
*In case of discrepancy between the unit price and the total price on the completed Bid Schedule, the unit price will prevail, and the total price will be corrected.
Proposal Price Certification
BID BOND
KNOW ALL MEN BY THESE PRESENTS, THAT
(Name of Contractor) at
(Address of Contractor)
(Corporation, Partnership and / or Individual) hereinafter called Principal, and
(Name of Surety)
(Address of Surety)
A corporation of the State of __________________ , and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held, and firmly bound unto
(Name of Obligee) City of Tucker Georgia
(Address of Obligee) 1975 Lakeside Parkway, Suite 350, Tucker, Georgia 30084
Hereinafter referred to as Obligee, in the penal sum of Dollars ($_______________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
WHEREAS, the Principal is about to submit, or has submitted, to the City of Tucker, Georgia, a proposal for furnishing materials, labor, and equipment for:
ITB # 2026-014
WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder’s check otherwise required to accompany this Proposal.
NOW, THEREFORE, the conditions of this obligation are such that if the bid is accepted, the Principal shall within ten days after receipt of notification of the acceptance execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth in the form and manner required by the City of Tucker, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to the City of Tucker, Georgia, each in an amount of 100% of the total Contract Price, in form and with security satisfactory to said the City of Tucker, Georgia, and otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Tucker, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.
PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant, to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. § 13-10-20, et. Seg. And § 36- 91-50, et.
Seg. and is intended to be and shall be constructed as a bond in compliance with the requirements thereof.
Signed, sealed, and dated this _________day of _______________________A.D., 20____.
ATTEST:
(Principal Secretary) (Principal)
(SEAL) BY:
(Witness to Principal) (Address)
(Address) (Surety)
ATTEST:
BY:
(Attorney-in-Fact) and Resident Agent
(Attorney-in-Fact)
(SEAL)
(Address)
(Witness as to Surety)
REVISED 10.25.2022
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
GEORGIA E-Verify and Public Contracts: The Georgia E-Verify law requires contractors and all sub-contractors on Georgia public contract (contracts with a government agency) for the physical performance of services over $2,499 in value to enroll in E-Verify, regardless of the number of employees.
Contractor Name:
Solicitation/Bid number or Project Description:
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, entity or corporation which is engaged in the physical performance of services under a contract on behalf of the City of Tucker, Georgia has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.
Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period as required by O.C.G.A. § 13-10-91(b) and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present and affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization (EEV/E-Verify Company Identification Number)
Name of Contractor
I hereby declare under penalty of perjury that the foregoing is true and correct
Printed Name (of Authorized Officer or Agent of Contractor) Title (of Authorized Officer or Agent of Contractor)
Signature (of Authorized Officer or Agent) Date Signed
SUBSCRIBED AND SWORN BEFORE ME ON THIS THE
DAY OF , 20
[NOTARY SEAL]
Notary Public
My Commission Expires:
ITB 2026-014 Stormwater System Conduit Repairs
PROPOSED SUBCONTRACTOR FORM: ITB 2026-014
Please complete this form and return it as part of the submitted bid package.
Name of Bidder
1. Subcontractor Name: _____________________________________________________
% of Bid Amount: __________________________________________________________
Description of Work provided: _______________________________________________
2. Subcontractor Name: _____________________________________________________
% of Bid Amount: __________________________________________________________
Description of Work provided: _______________________________________________
3. Subcontractor Name: _____________________________________________________
% of Bid Amount: __________________________________________________________
Description of Work provided: _______________________________________________
4. Subcontractor Name: _____________________________________________________
% of Bid Amount: __________________________________________________________
Description of Work provided: _______________________________________________
REFERENCES FORM: ITB 2026-014
Please complete this form and return it as part of the submitted bid package.
Name of Bidder
REFERENCE #1
Contact Name: ___________________________________________________________
Contact Number/Email__________________________________________________________
Brief Description of work provided:___________________________________________
REFERENCE #2
Contact Name: ___________________________________________________________
Contact Number/Email:_________________________________________________________
Brief Description of work provided:___________________________________________
REFERENCE #3
Contact Name: ___________________________________________________________
Contact Number/Email:_________________________________________________________
Brief Description of work provided:___________________________________________
Please complete and submit in bid package
OATH OF NON-COLLUSION
COMES NOW, ______________________________________________ (“Contractor”), [name of Contractor] appearing by and through _______________________________________________________, [name of individual with authority to bind Contractor] its _____________________________________ (“Individual And Representative Affiant”), and [title]
[insert the names of all those required to give the oath]
(collectively, “Individual Affiants”), and each of the Individual And Representative Affiant and
Individual Affiants, after first being duly sworn, deposes and says that:
1. Contractor has not directly or indirectly violated subsection (d) of the Official Code of
Georgia Annotated Section 36-91-21, which provides as follows:
Whenever a public works construction contract for any governmental entity subject to the requirements of this chapter is to be let out by competitive sealed bid or proposal, no person, by himself or herself or otherwise, shall prevent or attempt to prevent competition in such bidding or proposals by any means whatever. No person who desires to procure such work for himself or herself or for another shall prevent or endeavor to prevent anyone from making a bid or proposal therefor by any means whatever, nor shall such person so desiring the work cause or induce another to withdraw a bid or proposal for the work.
Code Section 36-91-21(d) also applies to municipal street system contracts pursuant to
Official Code of Georgia Annotated Section 32-4-122.
2. Individual And Representative Affiant is the officer of Contractor whose duty it is to make the payment.
3. If Contractor is a partnership, then Individual and Representative Affiant and Individual
Affiants together constitute all of the partners and any officer, agent or other person who may have represented or acted for Contractor in bidding for or procuring the contract.
4. If Contractor is a corporation, then Individual and Representative Affiant and Individual
Affiants together constitute all officers, agents, or other persons who may have acted for or represented Contractor in bidding for or procuring the contract.
Further affiants sayeth not.
This ____ day of ________________, 20___.
By: _________________________________________, individually and on behalf of Contractor [signature of Individual And Representative Affiant]
Name: _____________________________ Title: ______________________________
Individual Affiants’ signatures and names:
Name: Name:
Name: Name:
Name: Name:
Subscribed and Sworn before me on this ______ day of ________________, 20_____.
NOTARY PUBLIC
My Commission Expires:
Contact Information Form
Please fill out this form with the appropriate contact information for your company.
Full Legal Name of Company:
Date:
Contractor Information:
Primary Contact Person:
Title: Telephone Number:
E-mail Address:
Secondary Contact Person:
Title: Telephone Number:
E-mail Address:
Preferred Contact for Administration: (i.e. Document Processing) (Choose one)
☐ Primary Contact ☐ Secondary Contact
Address:
City / State / Zip:
Mailing Address (If different than above):
City / State / Zip:
Federal Employee ID Number (FEIN):
| SUBMITTAL REQUIREMENTS: Vendor shall submit ITB Response electronically to procurement@tuckerga.gov so it is received no later than June 4, 2026, at 2:00pm EST with the subject line “Submittal: ITB #2026-014”. The email must contain the vendor’s cont... |
| BID DOCUMENT SUBMITTAL REQUIREMENTS: |
| PROSECUTION AND PROGRESS |
| PERMITS AND LICENSES |
| BONDING AND INSURANCE REQUIREMENTS |
| EXISTING CONDITIONS / DEVIATION OF QUANTITIES |
| TRAFFIC CONTROL |
| CLEANUP |
| SAFETY |
| ITB 2026-014 Bid Manual Forms.pdf |
| E-Verify Affidavit.pdf |
| I hereby declare under penalty of perjury that the foregoing is true and correct |
| ITB 2026-014 Cost Proposal Forms.pdf |
| BID FORM 44a LOC 1 |
| BID FORM 44b LOC 2 |
| BID FORM 44c LOC 3 |
| BID FORM 44e LOC 4 |
| BID FORM 44g LOC 5 |
| TO 44j PRICING |
| TO 44m PRICING |
| TOTALS |
| ITB 2026-014 Bid Manual DRAFT.pdf |
| SUBMITTAL REQUIREMENTS: Vendor shall submit ITB Response electronically to procurement@tuckerga.gov so it is received no later than June 4, 2026, at 2:00pm EST with the subject line “Submittal: ITB #2026-014”. The email must contain the vendor’s cont... |
| BID DOCUMENT SUBMITTAL REQUIREMENTS: |
| PROSECUTION AND PROGRESS |
| PERMITS AND LICENSES |
| BONDING AND INSURANCE REQUIREMENTS |
| EXISTING CONDITIONS / DEVIATION OF QUANTITIES |
| TRAFFIC CONTROL |
| CLEANUP |
| SAFETY |
File details come from the government source that posted it. Updated .