This document is an Invitation to Bid (ITB) Addendum 3 from the Melbourne Orlando International Airport (MLB) for a T-Hangar Demolition project scheduled for September 19, 2025. The addendum provides clarifications and responses to 21 bidder questions regarding the demolition scope, which involves removing eight building concrete slabs across six buildings and two additional standalone slabs. The project is planned to start no sooner than December 1, 2025, with existing tenants required to vacate their hangars by the end of 2025, and the demolition will commence either in early December or around the second week of January 2026 depending on tenant vacating timelines.
Key project details include specific demolition requirements such as using a demo hammer for slab removal, acceptable torch cutting for structural steel with a hot work permit, and no protection needed for existing pavement. The airport will provide three hose bibbs for dust control, install barriers with flags to define the construction zone, and require badges for personnel in the secure area. Parking for workers will be outside the secure fence along Harry Sutton Road, with no parking allowed in the hotel lot. Contractors can load and haul debris as needed, provided they meet permitting and safety requirements, and equipment movement between hangars is permitted with track marks acceptable on existing asphalt.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .