ITB_2024_010_Addendum_3.pdf
PDF 215 KB Posted
- Attached to
- ITB 2024-010 Tucker Town Green Construction
- Solicitation number
- PE-66956-NONST-2024-000000022
- Issued by
- Dekalb County, Georgia
About this file
This document is Addendum #3 to Invitation to Bid (ITB) 2024-010 for the Tucker Town Green Construction project issued by the City of Tucker, Georgia. The addendum provides responses to several questions submitted by potential bidders. Key details include: 1) the project is not subject to Davis-Bacon wage requirements, 2) CAD files for the project will be provided to the awarded bidder, 3) bidders may submit unit pricing for removal of unsuitable soils and placement of engineered fill, 4) the awarded bidder is responsible for selecting and funding the disposal site for unsuitable soils, 5) backfilling is required for the reinforced concrete pipe (RCP) used in the project, and 6) GDOT prequalification is not necessary for subcontractors.
The original ITB 2024-010 solicitation describes a two-acre town center park project in Tucker, Georgia that includes earthwork, utilities, below-ground detention, hardscape, roadwork, a restroom building, a custom pavilion, fountains, landscape features, site furnishings, plant material, and irrigation. No additional pricing or funding details are provided in the addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF TUCKER
ACKNOWLEDGE RECEIPT OF ADDENDUM #3 FORM
ITB 2024-010
TUCKER TOWN GREEN CONSTRUCTION
Upon receipt, please print and add to your proposal.
I hereby acknowledge receipt of the supplement pertaining to the above referenced bid.
COMPANY NAME:
CONTACT PERSON:
ADDRESS:
CITY: STATE: ZIP:
PHONE: FAX:
EMAIL ADDRESS:
SIGNATURE DATE
ITB 2024-010
ADDENDUM #3
QUESTION ANSWER
1 Is Davis-Bacon wage applicable to the
Tucker Town Green project?
No.
2 Could you provide detailed information about the recreation berms included in the project plans?
Additional berm information included in Addendum #2
3 Would it be possible to obtain access to the CAD files for the Tucker Town Green project?
CAD files will be provided to the awarded bidder.
4 Could unit pricing be incorporated to address the unsuitable soil conditions outlined in the Geotechnical report?
Yes. Contractor may submit a per cubic yard unit price for removal of unsuitable soils and the placement of engineered fill, as outlined in the Geotechnical report.
5 Is there a designated landfill site where the unsuitable soil from the project must be disposed of?
No. The awarded bidder will be responsible for selecting disposal site and funding that effort.
6 Is backfilling required for the RCP used in the project?
Backfilling IS required for the RCP
7 Can HDPE be used in place of RCP for Storm on the project?
HDPE MAY NOT be used in place of RCP
8 Is GDOT prequalification necessary for subcontractors involved in the Tucker Town Green project?
GDOT Prequals. are NOT necessary