This document is an Addendum to Invitation to Bid (ITB) 2024-010 for the Tucker Town Green Construction project issued by the City of Tucker, Georgia. The addendum provides clarifications and responses to questions regarding the project, which includes earthwork, utilities, underground detention, hardscape, roadwork, a restroom building, a custom pavilion, fountains, landscape features, site furnishings, plant material, and irrigation for a two-acre town center park.
The addendum addresses the provision and installation of a compactor by DeKalb County Sanitation, coordination with AT&T for underground conduit, and responses to various questions related to the project, such as evaluation criteria, design of fountains, insurance requirements, noise ordinances, and details on site elements like berms, swing pads, curbs, and fall protection. The addendum also includes revised drawings for the site layout, grading and drainage, and landscape plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF TUCKER
ACKNOWLEDGE RECEIPT OF ADDENDUM #2 FORM
ITB 2024-010
TUCKER TOWN GREEN CONSTRUCTION
Upon receipt, please print and add to your proposal.
I hereby acknowledge receipt of the supplement pertaining to the above referenced bid.
COMPANY NAME:
CONTACT PERSON:
ADDRESS:
CITY: STATE: ZIP:
PHONE: FAX:
EMAIL ADDRESS:
SIGNATURE DATE
ITB 2024-010
ADDENDUM #2
This addendum contains the following:
• Clarification about the compactor.
o Please note: The compactor and the compactor remote power unit will be provided and installed by DeKalb County Sanitation.
• Clarification regarding ATT coordination:
o Contractor is to install all underground conduit as seen on the concept drawing provided by AT&T (shown in dashed red). Contractor shall retain a design/build entity to finalize the design drawing and obtain formal acceptance from AT&T prior to construction activities. All work must be accepted by AT&T prior to city acceptance.
o See attached ATT UTLP MARKUP Document
• Responses to Questions
• Revised drawings:
o C1.01 o C1.02 o C7.11 o L2.01 o L2.02 o L7.04
QUESTION ANSWER
1 When referring to “Evaluation” in terms of the bid submittal, Is that an evaluation of form/scoring, or will it include reference and past performance?
Evaluation in terms of the bid submittal refers to reference checks and similar project assessment.
2 Do you have any planned design of fountains?
Yes – Please reference Sheets SB0.01-Sb1.02 AND WF0.1-
WF6.0
3 Do we have to have CSX insurance because of the 50’ from middle of railroad?
Yes. Requirements stated in the bid package.
4 Will Railroad Avenue be open during construction?
Railroad Avenue will be closed for the duration of construction from west side of the gravel driveway to 2nd Avenue and can be used for equipment staging.
5 Are any vibration testing required for the structures on the property?
This is in the geo-tech report. Stakes in the ground under the structures. Look for the Addendum Report under Settlement Monitoring, page 4. Bidders are responsible for this.
6 Will there be a Noise Ordinance that must be observed during construction?
The noise ordinance codes are in the bid manual.
7 On sheet C1.01, there are two (2) areas [8] Recreation Berms on the plan. What is the correct Recreation Berms area and what is the other area supposed to be labeled as?
Both areas are recreational berms. Please reference L2.01, L2.02, L7.04 and L7.05
8 Where are the Swing Pads located on the project plans?
Reference Sheet L2.01 (SF-102), and Detail 5/L7.03
9 Where are the Mountable Curb and Gutters located on the project plans?
Sheet C1.01 & C1.02 have been revised, see attachment within this addendum to address location of Mountable Curb in the southwest on Railroad Ave. & 2nd St.
10 On sheet C1.01, there is an area labeled “Fall protection to be provided at proposed storm headwalls.” What are the details for this proposed Fall Protection?
Reference Detail #1 / C7.11 for fall protection to be installed in headwall, this was revised in this Addendum and attached.
11 On sheet C1.02, what are the striped hatched lines on the South side of Railroad Avenue supposed to be?
Roadway striping. Refer to GDOT T-14 Detail ‘C’ (White)
12 On sheet C1.02, there is an icon that looks like highway signage on the bottom right side of the page. Is this to
Sheet C1.01 & C1.02 have been revised, see attachment within this addendum to address signage that wasn’t labeled and additional signage added within this addendum.
be included in our scope of work? If so, what are its details?
13 On sheet L2.01, there are two (2) different hatched areas labeled P-101.
What are the correct areas for the light duty concrete finish and the correct areas for the light duty exposed aggregate finish?
Sheet L-2.01 & L2.02 have been revised see attachment within this addendum to address incorrect labels.
14 The match lines do not match up on any of the sheets. Can you provide an updated set of plans?
Match lines seem to be in the correct locations, but will work with the awarded bidder prior to construction to make sure.
15 It is unclear where the Brick Paver Band (2/L7.01) ends on the top right section of sheet L2.02. Could you clarify the limits of new construction?
Sheet L-2.01 & L2.02 have been revised see attachment within this addendum. Brick Paver Band should stop at existing path.
16 Under the Paving Materials schedule on plan sheet L7.00, it lists a line item titled “Top-Cast concrete pavement” but this is not on the plans. Also, with its detail not showing the complete page number but only 1/701. Where can we get more information on this item and its details?
Top Cast Concrete Detail – 1 / L7.01
Pavement reference on Sheet L2.01 and L2.02 is < P-102> (See hatch key at bottom of sheet)
17 Please provide details on the following questions.
1. Park Monument details.
1. Park Monument sign has been removed from the project.
No details necessary.
18 2. Synthetic Turf under the concrete benches . - Will we be placing the turf under the concrete benches, or do we need to cut around them on L2.02?
Please Provide more details on the Mounds and any alternate(Foam Mounds ) are acceptable.
Concrete benches shall be placed on top of the synthetic turf. Mounds. See Detail – 3/L7.06 for mounding information.
19 What are the details for SF-105 shown on plan sheet L2.02?
There are no SF-105 Site Furnishings included in this project. Sheet L-2.01 & L2.02 have been revised see attachment within this addendum and callout has been revised to SF-108.
20 Detail #3 shown on plan sheet L7.04 has the perimeter of the climbing mound area as fall safety zone and outside its perimeter it shows it as Synthetic turf play area. However, the
The entire area is to be synthetic turf. Detail #3 Sheet L7.04 has been revised to add a 1” thick pad 6’x6’.
Fall safety zone is an offset area (Min 6’-0”) around all play equipment in which no hard fall surfaces are to be located.
details 3/L7.06 and 4/L7.05 have both these areas as synthetic turf. Is there to be any fall safety equipment or surfaces for these areas or is it all synthetic turf? If there is to be fall safety surfacing, what are the details?
21 Is the site grading balanced? The site is not balanced due to poor existing soil that will need to be removed. Refer to both Geotech reports in Addendum #1.
22 What are the milling limits? Refer to Sheet C2.04, from Station 6+00 to the east.
23 Where does the bioretention and infiltration details occur? Details on 7.04?
Reference Sheet C2.00 for locations and C7.04 for details.
24 Where does the CXT R/W occur? Property line?
Assume CSX R/W from property line south of Railroad Ave.
1087108710881089
1+00 2+00 3+00 4+00 5+00 6+00
D
D
D
S
D
DD
D
D A.2.1
A.4
A.1
PI
PE
A .4
A.7
PIPE A.7
A.3
A.6
PI
PE
A .3
F4
F.3PIPE F.4
F.2
PIPE F.3
F.1
PI
PE
F .2
PI
PE
F .1
E.2
E.1
PIPE E.2
PIPE E.1
D.2
D.1
PI
PE
D .2
PIPE D.1
PIPE A.2.1
A.2
A.2.3
A.2.2
PI
PE
A .2
.3
PIPE A.2.2
PIPE A.2
G.3
PIPE A.6
C.1PI
PE
C .1
C.3
C.2
PIPE C.3
PIPE C.2
A.5
B.3
B.2
PI
PE
B .3
B.1
PIPE B.2
UG DETENTION (B)
PIPE B.1
UG DETENTION (C)
UG DETENTION (A)
PIPE UG
G.1
G.2
PIPE G.2
0+00 1+00
2+
2+
S
1106.70
1106.70
1103.70
1103.46 1100.15
1100.17 1097.12
1098.12
B: 1097.78 B: 1094.47 B: 1094.11 B: 1090.10 B: 1089.65
B: 1089.31 B: 1088.96 B: 1088.29
1092.47
1092.60
BW: 1092.60
1097.05 B 1096.87
1098.98 B: 1088.22
B: 1088.13 B: 1088.78
B: ???
B: 1089.03
1094.20
1090.67
1092.29
1088.98
1097.08
1090.33
1090.331090.33
1093.06
1094.77 TW: 1096.29
BW: 1095.23
1094.68
TW: 1096.00
BW: 1094.35
TW: 1097.00
BW: 1095.87
BW: 1097.65
1099.16 1097.10
10921093
SA
SA
SA
SA SA SA
W W
W W
SA
W
S SA-(2)
116 LF 8" PVC
S
SA-(4)
S
SA-(5)
27 LF 6" PVC
S
SA-(6)
32 LF 6" PVC
S
SA-(7)6 LF 6" PVC
125 LF 6" PVC
SS-(10)
1095.72
TW: 1096.00
BW: 1094.50
TS: 1093.92
BS: 1092.41
TS: 1092.29
BS: 1090.79
TS: 1090.48BS: 1089.00
BS: 1088.88
TS: 1092.38
BW: 1095.10
TW: 1096.87
1090.33 1091.831090.331091.83
T: 1089.80 T: 1088.80
B: 1088.18 T: 1088.27
TW: 1091.84
BW: 1091.72
TW: 1088.89
BW: 1088.88
1094.29
1093.67
1093.65 1093.65
1092.39
1092.14 1092.28
1091.93 1090.29
1088.58
TW: 1094.10
1094.93
1097.00
TW: 1099.00
1092.60
1092.60
1092.60
1092.60
B: 1092.49 1092.60
B: 1092.54
B: 1092.57 B: 1092.52
B: 1092.38
1092.60
1092.60
1092.60
1093.101092.601092.60 1092.601092.601092.60
B: 1092.60 TW: 1093.60
B: 1092.57
1092.52 1092.511092.521092.39
1094.10
1094.10
TU
C
KE
R
T O
W N
G R
EE
N
P
AR
K C
IT
Y
O F
TU
C
KE
R
PROJ. NO.
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
3r d
Av en ue S ou th
S ui te
N as hv ille , T en ne ss ee
PH
O N
E (6
) 2
-1
FA
X (6
) 2
-6
U
SE
R :S
AW
IL
SO
N
FI
LE
:F :\3
8\
8\
5\
_C
AD
\C
IV
L\
PL
O
T\
5_ C
2.
G ra di ng
D ra in ag e Pl an .d w g
PL
O
TT
ED
:1 2/
/2
SA
VE
D :1
2/
/2
Know what'sbelow Callbefore you dig.
www.call811.com
Know what'sbelow Callbefore you dig.
www.call811.com
: 3808805
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
C2.00
R
AI
LR
O
AD
A
VE
N
U E, T U
C
KE
R G
EO
R
G
IA
/2
0/
P R
O G
R
ES
S
SE
T O
VE
R
AL
L
G R
AD
IN
G
D R
AI
N
AG
E
PL
AN
GRADING AND DRAINAGE NOTES
1. SEE SHEET C0.01 FOR ADDITIONAL GRADING AND
DRAINAGE NOTES.
2. CONTRACTOR TO FIELD VERIFY LOCATIONS OF
EXISTING UTILITIES PRIOR TO START OF
CONSTRUCTION.
3. CONTRACTOR TO INSTALL STRUCTURE CASTINGS
FLUSH WITH FINISHED GRADE.
4. ROOF DRAIN DOWNSPOUTS SPLASH ON GRADE. SEE
ARCHITECTURAL PLANS FOR LOCATION AND
ADDITIONAL INFORMATION.
5. STORM STRUCTURES SHALL COMPLY WITH DEKALB
COUNTY DEVELOPMENT SPECIFICATIONS
ABBREVIATIONS
FFE FINISHED FLOOR ELEVATION
HP HIGH POINT
IE INVERT ELEVATION
G GUTTER
T TOP OF CURB
B BOTTOM OF CURB
TW TOP OF WALL
BW BOTTOM OF WALL
TS TOP OF STAIRS
BS BOTTOM OF STAIRS
FFE 1092.60
FFE 1091.83
LEGEND
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED SPOT ELEVATION
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
ROCK DRAINAGE SWALE
(SEE DETAIL 8/L7.01)
UNDERGROUND
DETENTION UNIT
UNDERGROUND
DETENTION UNIT
SEE STORM DRAIN
PROFILE 1, SHEET C4.21
SEE STORM DRAIN
PROFILE 2, SHEET C4.21
SEE STORM DRAIN
PROFILE 3, SHEET C4.21
C2.01 C2.02
GRATE INLET
OUTLET CONTROL STRUCTURE
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
BIORETENTION BASIN
(SEE DETAIL 1/C7.04)
INFILTRATION TRENCH
(SEE DETAIL 2/C7.04)
(15) DUCT -4"PVC
- 72 FOC
- 216 FOC
- 1800 PAIR
- 432 FOC
- 1500 PAIR
- 144 FOC
- 32 FOC
- 24 FOC
MH R4
(1) DUCT -4"PVC
- 24 FOC
(1) DUCT -4"PVC
- 24 FOC
ASW
ASW
24 FOC
300 PAIR
300 PAIR
50 PAIR
ATT REQUESTS CITY OF
TUCKER TO ADJUST
PROPOSED STORM DRAIN
AS NECESSARY TO
PREVENT CONFLICT WITH
ATT DUCT.
CITY OF TUCKER
TO PLACE HH
CITY OF TUCKER
TO PLACE HH
OVER EXISTING
FIBER CABLE TO
ALLOW CUTOVER.
CITY OF TUCKER
TO PLACE HH
OVER EXISTING
ATT CABLE TO
ALLOW CUTOVER.
CITY OF TUCKER
TO PLACE HH
X
X X XX
CITY OF TUCKER
TO PLACE TWO
(2) 4" PVC CONDUIT
LINKING HANDHOLES
X X
X
ATT TO PLACE TWO
(2) 4" PVC CONDUIT
LINKING MANHOLE TO
NEW HANDHOLE
ATT REQUESTS CITY OF
TUCKER TO ADJUST
PROPOSED STORM DRAIN
AS NECESSARY TO
PREVENT CONFLICT WITH
ATT DUCT.
X X X X XX
XX X
X X
X X
X
X
X
X X
X X X X X
X
X X
CITY OF TUCKER
TO PLACE TWO
(2) 4" PVC CONDUIT
LINKING HANDHOLES
CITY OF TUCKER
TO PLACE TWO
(2) 4" PVC CONDUIT
FROM HANDHOLE AND
TURN ONE UP AT
BASE OF EACH
PROPOSED POWER
POLE.
X
X
X
X
X
X
CITY OF TUCKER TO
PLACE ONE
(1) 4" PVC CONDUIT
LINKING HANDHOLE
AND SERVICE POLE.
CITY OF TUCKER
TO PLACE TWO
(2) 4" PVC
CONDUIT
LINKING NEW
GPC POLE
HANDHOLE
CITY OF TUCKER
TO PLACE TWO
(2) 4" PVC CONDUIT
LINKING HANDHOLES
CITY OF TUCKER
TO PLACE TWO
(2) 4" PVC CONDUIT
LINKING HANDHOLES
CITY OF TUCKER
TO PLACE HH
OVER EXISTING
FIBER CABLE TO
ALLOW CUTOVER.
X
100 PAIR
X X
X X
X X
X X
X X
X
X
24 FOC
(31")
(34")
(46")
(46")
DRAWING SUPPLIED BY AT&T
FOR REFERENCE ONLY
DASHED IS UNDERGROUND
SOLID IS OVERHEAD
GREEN IS ABANDONED
RED IS PROPOSED
AT&T
R39'
R3' R2' R4'R3'
R47'
10'
31.05'
R1 1'
(T
YP
R4' (TYP.)
6'
6'
26' (TYP.)
9'
(TYP.)
R 155'
R 170'
16'
R4'
R96'
R100'
PT 1
PT 2 PT 3
PT 4
PT 5
PT 6
R109.5'
PT 8
PT 9
PT 10PT 11
PT 12
PT 13
PT 14
PT 15
C1
L1
L2
C2 L3
C3
C
C5 C6
C7
C8
C9
C10 C11 C12
C13
C14
C1
L4 L5 C16 C17
L8
16'
PT 46
PT 51
R 20'
R 30'
R 45'
15'
16'
16'
8' 5'
.5'
.5'
M
AT
C H
LI
N
E C
1.
R 14.5'
R 176.3'
Point Table
Point #
Northing
1401466.1428
1401504.9769
1401517.7308
1401491.4157
1401459.0554
1401468.3028
1401416.3951
1401421.9580
1401364.2278
1401358.6639
1401378.6977
1401368.7063
1401418.6336
1401384.9321
Easting
2281772.2648
2281797.7021
2281838.2984
2281867.1862
2281852.7940
2281803.5405
2281630.5539
2281647.4623
2281666.5438
2281650.1637
2281854.8941
2281858.2879
2281882.2093
2281893.6569
Point Table
Point #
Northing
1401335.2452
1401334.4215
1401352.5458
1401384.8012
1401395.5167
1401430.0685
1401431.1889
1401223.2196
1401355.9982
1401358.8932
1401376.1086
1401379.5008
1401385.0086
1401316.9824
Easting
2281419.7987
2281421.6161
2281597.1422
2281641.2596
2281655.9157
2281703.1740
2281890.4876
2281445.3279
2281836.2262
2281844.7499
2281895.4319
2281899.3905
2281906.1039
2281460.2211
Line Table
Line #
L1
L2
L3
L4
L5
L8
Length
54.651
58.542
1.995
412.834
9.001
53.527
Direction
N53° 49' 42.46"E
S53° 49' 42.46"W
N65° 37' 08.61"W
N71° 14' 19.05"E
N71° 14' 25.40"E
N71° 14' 19.18"E
Parcel Table
Line #/Curve #
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
Length
184.947
200.106
39.231
64.904
44.607
50.053
33.445
109.512
35.436
15.266
8.756
20.002
76.608
8.241
37.366
Direction/Delta
060.5525
071.6577
033.5490
055.5051
038.1460
022.4052
014.9709
087.1467
015.8621
011.2140
006.4317
011.1266
042.6149
004.5840
020.7857
Radius
175.000
160.000
67.000
66.998
67.000
127.999
128.000
72.000
128.000
78.000
78.000
103.000
103.000
103.000
103.000
Parcel Table
Line #/Curve #
C16
C17
Length
5.277
8.754
Direction/Delta
030.8476
025.1168
Radius
9.801
19.968
Point Table
Point #
Northing
1401266.5185
1401262.7811
1401263.8574
1401289.9799
1401297.0663
1401324.3348
1401356.2584
1401346.0011
1401345.1123
1401345.9480
1401350.8670
1401400.1041
1401407.5540
1401443.8228
Easting
2281496.9180
2281506.1933
2281549.9676
2281592.2899
2281599.3456
2281618.5462
2281712.5290
2281746.3302
2281761.5462
2281770.2574
2281789.6130
2281845.9951
2281849.5120
2281857.6096
Point Table
Point #
Northing
1401327.3166
1401364.2265
Easting
2281459.5276
2281471.0722
LEGEND
CONCRETE SIDEWALK
ASPHALT PAVEMENT
CONCRETE PAVERS
TU
C
KE
R
T O
W N
G R
EE
N
P
AR
K C
IT
Y
O F
TU
C
KE
R
PROJ. NO.
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
P ac es F er ry
R oa d
Su ite
A tla nt a, G
A
PH
O
N E
(7
) 6
-7
FA
X
(7
) 8
-0
U
SE
R :C
W
EH
M C
KE
FI
LE
:F
:\3 8\
8\
5\
_C
AD
\C
IV
L\
PL
O T\
5_
C 1.
Si te
L ay ou t P la n-
Ad de nd um
2.
dw g
PL
O
TT
ED
:6 /1
4/
SA
VE
D
:6 /1
4/
Know what'sbelow Callbefore you dig.
www.call811.com
Know what'sbelow Callbefore you dig.
www.call811.com
: 3808805
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
C1.01
R
AI
LR
O
AD
A
VE
N
U E, T U
C
KE
R G
EO
R
G
IA
/2
1/
CONTRACTOR IS TO REFERENCE UNITED CONSULTING GEOTECHNICAL EXPLORATION REPORT (10.23.2023) AND ADDENDUM #1 (03.18.2024) FOR THE TUCKER TOWN GREEN PARK SITE FOR SOIL REMEDIATION AREAS.
IS
SU
ED
F
O R
B
ID
SI
TE
L
AY
O U
T
PL
AN
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
PAVILLION
SEE SHEET A100A
EXISTING CONCRETE WALKWAY
EXISTING SITE IMPROVEMENTS
ALREADY IN PLACE
EXISTING SITE IMPROVEMENTS
ALREADY IN PLACE
1 1
ADA PARKING W/ RAMPS
15(TYP.)
FOUNTAIN
SITE KEYNOTES
CONCRETE WALKWAY (SEE DETAIL 1/L7.01) CURB AND GUTTER TRANSITION (SEE DETAIL 2/C7.02)
RIVER ROCK DRY STREAM (SEE DETAIL 8/L7.01) MOUNTABLE CURB AND GUTTER (SEE DETAIL 4/C7.04)
WATER FEATURE (SEE SHEETS WF-0.1 - WF-6.0) WOODEN PRIVACY FENCE (SEE DETAIL 3/L7.06)
TERRACED ENTRY / DINING PLAZA WITH SHADE SAIL
CURB & GUTTER (SEE DETAIL 3/C7.04) SITE LIGHTING (SEE SHEET E100)
DUMPSTER PAD (SEE DETAIL 4/C7.03) RESTROOM FACILITY (SEE ARCHITECTURAL SHEETS)
ADA CURB RAMP W/ DETECTIBLE WARNINGS (SEE DETAIL 5/C7.03) MODERN CONCRETE BENCHES
RECREATION BERMS TREE PIT
SWING PAD DO NOT ENTER SIGN
CONCRETE STAIRWAY (SEE DETAIL 1/L7.02) NO LEFT TURN SIGN MUTCD R3-2
UNDERGROUND
STORMWATER
DETENTION UNIT
LIGHT (TYP.)
SEE SHEET L3.00
LIGHT (TYP.)
SEE SHEET L3.00
TIE INTO
EXISTING CURB
SITE NOTES
1. CONTRACTOR TO FIELD VERIFY LOCATIONS OF
EXISTING UTILITIES PRIOR TO START OF
CONSTRUCTION.
2. CONTRACTOR TO PROVIDE SMOOTH,
STRAIGHT SAW-CUT LINES ALONG ALL AREAS
OF CURB AND PAVEMENT REMOVAL.
3. CONTRACTOR TO PROTECT EXISTING
IMPROVEMENTS WITHIN PROJECT AREA. ANY
AREAS THAT BECOME DAMAGED DURING
CONSTRUCTION ARE THE RESPONSIBILITY OF
THE CONTRACTOR TO REPAIR.
4. CONTRACTOR TO FIELD LOCATE ATT LINE,
CONTACT UTILITY PROVIDER IF RELOCATION
IS REQUIRED.
5. CONTRACTOR IS TO REFERENCE UNITED
CONSULTING GEOTECHNICAL EXPLORATION
REPORT (10.23.2023) AND ADDENDUM #1
(03.18.2024) FOR THE TUCKER TOWN
6. REFER TO GDOT T-3A FOR ALL SIGN HEIGHTS
AND POSTS.
4'x4' TRANSFORMER
PAD, FINAL LOCATION
TO BE COORDINATED
WITH GA POWER
4'x4' TRANSFORMER
PAD, FINAL LOCATION
TO BE COORDINATED
WITH GA POWER
FALL PROTECTION TO BE
PROVIDED AT PROPOSED
STORM HEADWALLS SEE
DETAIL #1 / C7.11
R
AH
R
AH
R C
C W
E
/1 4/
AD
D
EN
D
U M
9 9 9 9
EG:1100.1
DUMP
M
AT
C H
LI
N
E C
1.
LEGEND
CONCRETE SIDEWALK
ASPHALT PAVEMENT
CONCRETE PAVERS
TU
C
KE
R
T O
W N
G R
EE
N
P
AR
K C
IT
Y
O F
TU
C
KE
R
PROJ. NO.
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
P ac es F er ry
R oa d
Su ite
A tla nt a, G
A
PH
O
N E
(7
) 6
-7
FA
X
(7
) 8
-0
U
SE
R :C
W
EH
M C
KE
FI
LE
:F
:\3 8\
8\
5\
_C
AD
\C
IV
L\
PL
O T\
5_
C 1.
Si te
L ay ou t P la n-
Ad de nd um
2.
dw g
PL
O
TT
ED
:6 /1
4/
SA
VE
D
:6 /1
4/
Know what'sbelow Callbefore you dig.
www.call811.com
Know what'sbelow Callbefore you dig.
www.call811.com
: 3808805
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
C1.02
R
AI
LR
O
AD
A
VE
N
U E, T U
C
KE
R G
EO
R
G
IA
/2
1/
CONTRACTOR IS TO REFERENCE UNITED CONSULTING GEOTECHNICAL EXPLORATION REPORT (10.23.2023) AND ADDENDUM #1 (03.18.2024) FOR THE TUCKER TOWN GREEN PARK SITE FOR SOIL REMEDIATION AREAS.
IS
SU
ED
F
O R
B
ID
SI
TE
L
AY
O U
T
PL
AN
20' 40'
SCALE: 1 INCH = 20 FEET
10'20' 0'
SITE KEYNOTES
CONCRETE WALKWAY (SEE DETAIL 1/L7.01)
CURB & GUTTER
ADA CURB RAMP W/ DETECTIBLE WARNINGS (SEE DETAIL 5/C7.03)
SITE NOTES
1. CONTRACTOR TO FIELD VERIFY LOCATIONS OF EXISTING
UTILITIES PRIOR TO START OF CONSTRUCTION.
2. CONTRACTOR TO PROVIDE SMOOTH, STRAIGHT
SAW-CUT LINES ALONG ALL AREAS OF CURB AND
PAVEMENT REMOVAL.
3. CONTRACTOR TO PROTECT EXISTING IMPROVEMENTS
WITHIN PROJECT AREA. ANY AREAS THAT BECOME
DAMAGED DURING CONSTRUCTION ARE THE
RESPONSIBILITY OF THE CONTRACTOR TO REPAIR.
4. CONTRACTOR TO FIELD LOCATE ATT LINE, CONTACT
UTILITY PROVIDER IF RELOCATION IS REQUIRED.
5. CONTRACTOR IS TO REFERENCE UNITED CONSULTING
GEOTECHNICAL EXPLORATION REPORT (10.23.2023) AND
ADDENDUM #1 (03.18.2024) FOR THE TUCKER TOWN.
6. REFER TO GDOT T-3A FOR ALL SIGN HEIGHTS AND
POSTS.
R C
C W
E
/1 4/
AD
D
EN
D
U M
WHITE, TYPE C PAVEMENT
HATCHING. SEE GDOT DETAIL
T-14 (TYP)
PROPOSED 5" SOLID
WHITE LINE (TYP)
MUTCD R6-6 BEGIN ONE WAY
SIGN
MUTCD R1-5c STOP HERE FOR
PEDESTRIAN & MUTCD R3-2
NO LEFT TURN SIGNS
MUTCD R6-1r ONE WAY SIGN MUTCD R5-1 DO NOT
ENTER SIGNS
CONCRETE HEAD WALL
CORE DRILL FOR FALL PROTECTION
RAIL POST, SIZE TO ACCEPT POST,
SET POST W/ 1/4" THICK EXPANSIVE
NON-SHRINK GROUT
FINISH GRADE VARIES,
SEE GRADING PLAN
1 1/2" DIA. GALVANIZED SCH. 40 STEEL
TUBE GUARDRAIL FRAME
3' -6
1 1/2" DIA. GALVANIZED SCH. 40 STEEL
TUBE GUARDRAIL MID-RAIL
1 1/2" DIA. GALVANIZED SCH. 40 STEEL
TUBE GUARDRAIL BOTTOM RAIL
EQ
U
AL
EQ
U
AL
2"
FALL PROTECTION RAIL NOTES:
· CONTRACTOR SHALL SUPPLY SHOP DRAWINGS FOR OWNER'S REPRESENTATIVE'S APPROVAL
· ALL CORNERS TO HAVE MIN. 4" RADIUS
· RAILS SHALL BE 1 1/2" DIAMETER SCHEDULE 40
· GRIND ALL WELDS SMOOTH W/ NO BARBS
· RAILS SHALL BE SHOP PRIMED WITH 1 COAT OF SHERWIN WILLIAMS KEM KROMIK UNIVERSAL METAL PRIMER
B50NZ6. PRIME PER THE MANUFACTURER'S MAXIMUM RECOMMENDED SPREAD RATE PER COAT.
· RAILS SHALL BE PAINTED BLACK WITH 2 COATS OF SHERWIN WILLIAMS INDUSTRIAL ENAMEL PAINT B54B11. PAINT
PER THE MANUFACTURER'S MAXIMUM RECOMMENDED SPREAD RATE PER COAT.
· INTERMEDIATE SUPPORT POSTS SHALL BE 5' O.C. MAX, AND UNIFORMLY SPACED.
· TOP OF GROUT FOR POST SHALL BE ABOVE PAVEMENT LEVEL AND SLOPED TO SHED WATER AWAY FROM POST.
GROUT SHALL MATCH THE FINISH GRADE COLOR.
D
EK
AL
B
ST
AN
D
AR
D D
ET
AI
LS
TU
C
KE
R
T O
W N
G R
EE
N
P
AR
K C
IT
Y
O F
TU
C
KE
R
PROJ. NO.
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
P ac es F er ry
R oa d
Su ite
A tla nt a, G
A
PH
O
N E
(7
) 6
-7
FA
X
(7
) 8
-0
U
SE
R :C
W
EH
M C
KE
FI
LE
:F
:\3 8\
8\
5\
_C
AD
\C
IV
L\
PL
O T\
5_
C 7.
Si te
D et ai ls
.d w g
PL
O
TT
ED
:6 /1
4/
SA
VE
D
:6 /1
4/
: 3808805
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
C7.11
R
AI
LR
O
AD
A
VE
N
U E, T U
C
KE
R G
EO
R
G
IA
/2
1/
CONTRACTOR IS TO REFERENCE UNITED CONSULTING GEOTECHNICAL EXPLORATION REPORT (10.23.2023) AND ADDENDUM #1 (03.18.2024) FOR THE TUCKER TOWN GREEN PARK SITE FOR SOIL REMEDIATION AREAS.
IS
SU
ED
F
O R
B
ID
R
AH
R
AH
1 SCALE: N.T.S.
FALL ZONE PROTECTION RAIL
R C
C W
E
/1 4/
AD
D
EN
D
U M
ROCK
SYMBOL DESCRIPTION DETAIL
DRY STREAM BED
CONCRETE
SYMBOL DESCRIPTION DETAIL
LIGHT DUTY CONCRETE 1/L7.01
LIGHT BROOM FINISH
K-101
P-101
8/L7.01
STANDARD BENCH 1/L7.02
ARBOR SWING 2/L7.04
WASTE RECEPTACLE 3/L7.02
BIKE RACK 2/L7.02
SHADE SAILS 1/L7.04
BOARDWALK 4/L7.02
SF-101
SF-102
SF-103
SF-104
SF-106
SF-107
5/L7.03
SURFACE MATERIALS
SYMBOL DESCRIPTION DETAIL
BRICK PAVER BAND 3/L7.01
PERVIOUS PAVERS
S-101
S-102 2/L7.03
2/L7.01 OR
3L7.01
SYNTHETIC SURFACE
SYMBOL DESCRIPTION DETAIL
SYNTHETIC TURF 3/L7.05T-101LIGHT DUTY CONCRETE
EXPOSED AGGREGATE
FINISH
P-102
MODERN CONCRETE BENCHSF-108
TU
C
KE
R
T O
W N
G R
EE
N
P
AR
K C
IT
Y
O F
TU
C
KE
R
PROJ. NO.
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
P ac es F er ry
R oa d
Su ite
A tla nt a, G
A
PH
O
N E
(7
) 6
-7
FA
X
(7
) 8
-0
U
SE
R :C
W
EH
M C
KE
FI
LE
:F
:\3 8\
8\
5\
_C
AD
\L
AN
D \P
LO
T\
L2 .0
0_ M
AT
ER
IA
LS
A N
D F
U R
N
IS
H
IN
G S.
dw g
PL
O
TT
ED
:6 /1
4/
SA
VE
D
:6 /1
2/
Know what'sbelow Callbefore you dig.
www.call811.com
Know what'sbelow Callbefore you dig.
www.call811.com
: 3808805
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
L2.01
R
AI
LR
O
AD
A
VE
N
U E, T U
C
KE
R G
EO
R
G
IA
/2
1/
G
EORG I A
L A N D S C A P E A R C H I T E C T
R
E G I S T E R E
D
RA I GA N K . CARR
No. 1183
PROFESSIONAL
CONTRACTOR IS TO REFERENCE UNITED CONSULTING GEOTECHNICAL EXPLORATION REPORT (10.23.2023) AND ADDENDUM #1 (03.18.2024) FOR THE TUCKER TOWN GREEN PARK SITE FOR SOIL REMEDIATION AREAS.
IS
SU
ED
F
O R
B
ID
SI
TE
M
AT
ER
IA
LS
A
N D
F U
R N
IS
H
IN
G
P
LA
N
5' 10' 20'
SCALE: 1 INCH = 10 FEET
10' 0'
M
AT
C H
LI
N
E L2
.0 2P-101
S-101
L7.06
P-101
K-101
S-101
SF-102
SF-107
SF-107
SF-103
SF-103
PAVILION, SEE
ARCHITECTURAL
DWGS.
EXISTING
SIDEWALK
EXISTING
SIDEWALK
WOOD PRIVACY FENCE
EXISTING BENCH
SF-102
EXISTING LIGHT POLE (TYP.)
WOOD PRIVACY FENCE
EXISTING LIGHT POLE (TYP.)
LIGHTED BOLLARD (TYP.)
SEE LIGHTING PLAN, SHEET L3.00
SITE MATERIALS LEGEND SITE FURNISHING LEGEND
PEDESTRIAN LIGHT, SEE L3.00
AREA LIGHT, SEE L3.00
PEDESTRIAN LIGHT (TYP.)
SEE L3.00
SF-103
L7.031
L7.03
L7.04
CLIMBING MOUND
P-101
SF-101
LIMITS OF WATER QUALITY
DOUBLE SOLDIER
COURSE PAVER EDGE
DOUBLE SOLDIER
COURSE PAVER EDGE
SINGLE SOLDIER
COURSE PAVER BAND,
SEE 2/L7.01
PLANTER
PLANTER
P-101
P-101
M D
JS
R
C C
W E
/1
4/
AD
D
EN
D U
M
EXISTING PAVERS
PROPOSED PAVERS
ROCK
SYMBOL DESCRIPTION DETAIL
DRY STREAM BED
CONCRETE
SYMBOL DESCRIPTION DETAIL
LIGHT DUTY CONCRETE 1/L7.01
LIGHT BROOM FINISH
K-101
P-101
8/L7.01
STANDARD BENCH 1/L7.02
ARBOR SWING 2/L7.04
WASTE RECEPTACLE 3/L7.02
BIKE RACK 2/L7.02
SHADE SAILS 1/L7.04
BOARDWALK 4/L7.02
SF-101
SF-102
SF-103
SF-104
SF-106
SF-107
5/L7.03
SURFACE MATERIALS
SYMBOL DESCRIPTION DETAIL
BRICK PAVER BAND 3/L7.01
PERVIOUS PAVERS
S-101
S-102 2/L7.03
2/L7.01 OR
3L7.01
SYNTHETIC SURFACE
SYMBOL DESCRIPTION DETAIL
SYNTHETIC TURF 3/L7.05T-101LIGHT DUTY CONCRETE
EXPOSED AGGREGATE
FINISH
MODERN CONCRETE BENCH
P-102
MODERN CONCRETE BENCHSF-108
SITE MATERIALS LEGEND
TU
C
KE
R
T O
W N
G R
EE
N
P
AR
K C
IT
Y
O F
TU
C
KE
R
PROJ. NO.
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
P ac es F er ry
R oa d
Su ite
A tla nt a, G
A
PH
O
N E
(7
) 6
-7
FA
X
(7
) 8
-0
U
SE
R :C
W
EH
M C
KE
FI
LE
:F
:\3 8\
8\
5\
_C
AD
\L
AN
D \P
LO
T\
L2 .0
0_ M
AT
ER
IA
LS
A N
D F
U R
N
IS
H
IN
G S.
dw g
PL
O
TT
ED
:6 /1
4/
SA
VE
D
:6 /1
2/
Know what'sbelow Callbefore you dig.
www.call811.com
Know what'sbelow Callbefore you dig.
www.call811.com
: 3808805
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
L2.02
R
AI
LR
O
AD
A
VE
N
U E, T U
C
KE
R G
EO
R
G
IA
/2
1/
G
EORG I A
L A N D S C A P E A R C H I T E C T
R
E G I S T E R E
D
RA I GA N K . CARR
No. 1183
PROFESSIONAL
CONTRACTOR IS TO REFERENCE UNITED CONSULTING GEOTECHNICAL EXPLORATION REPORT (10.23.2023) AND ADDENDUM #1 (03.18.2024) FOR THE TUCKER TOWN GREEN PARK SITE FOR SOIL REMEDIATION AREAS.
IS
SU
ED
F
O R
B
ID
SI
TE
M
AT
ER
IA
LS
A
N D
F U
R N
IS
H
IN
G
P
LA
N
5' 10' 20'
SCALE: 1 INCH = 10 FEET
10' 0'
SITE FURNISHING LEGEND
M
AT
C H
LI
N
E L2
.0
L7.01
L7.01
L7.01
L7.01
L7.01
EXISTING WALK
P-101
P-101
S-102
P-101
SF-106
RESTROOM BUILDING
SEE ARCHITECTURAL
EXISTING BENCH
EXISTING TRASH RECEPTACLE
EXISTING BIKE RACK
EXISTING BENCH
SF-103SF-103
PAVILION, SEE
ARCHITECTURAL
DWGS.
EXISTING PATH
EXISTING LIGHT POLE, TYP.
RELOCATED BENCHES
L7.01
EXISTING SIDEWALK
TRELLIS STRUCTURE, SEE ARCHITECTURAL
RELOCATED TRASH RECEPTACLE
LAWN WATER FEATURE
WATER FEATURE
LIGHTED BOLLARD (TYP.),
SEE L3.00
SF-105
LIGHT, SEE L3.00
SF-103
SF-103
SF-103
SF-103
ADDITIVE ALTERNATE NO. 4 -
MOGUL AREA, SEE DETAIL 1/L7.05
L7.01
SB1.00
SB1.00
L7.01
L7.01
L7.01
S-101 DOUBLE SOLDIER
COURSE PAVER EDGE
P-101
SINGLE SOLDIER
COURSE PAVER BAND,
SEE 2/L7.01
SEE CIVIL FOR
SIDEWALK EXTENSION
PLANS
M D
JS
L7.07
CHEEKWALL W/
HANDRAIL, SEE 1/L7.01
GUARDRAIL,
SEE 3/L7.07
L7.07
HANDRAIL, SEE
1/L7.07, SIMILAR
SF-103
SF-103
NEW PAVERS BEGIN
EXISTING PAVERS
R C
C W
E
/1 4/
AD
D
EN
D
U M
7' -6
8'-0"
3' -6
ARBOR/TRELLIS W/
SWING,SEE SITE
FURNISHINGS SCHEDULE
FOR INFORMATION
LIGHT-DUTY CONCRETE
PAVING
12'-0"
'-0
2'-0"
L7.01
SINGLE SOLDIER COURSE
PAVER EDGEL7.01
TRELLIS POST, TYP.
CONTROL JOINT, TYP.L7.01
EQ. EQ.
EQ
EQ
EXISTING PATH
6'-6" 3'-6"
POUR TOP OF FOOTING
CONTINUOUS WITH PAD
EXISTING PATH
ARBOR/TRELLIS W/ SWING,
SEE SITE FURNISHING
SCHEDULE FOR
INFORMATION, INSTALL
PER MANUFACTURER'S
RECOMMENDATIONS
CONCRETE FOOTING, PER
MANUFACTURER'S
RECOMMENDATION,
CONTRACTOR TO
PROVIDE SEALED /
STAMPED STRUCTURAL
PLANS
4"
1'-0"
SECTIONPLAN
1.5
TU
C
KE
R
T O
W N
G R
EE
N
P
AR
K C
IT
Y
O F
TU
C
KE
R
PROJ. NO.
C H
K.
D
R
D
AT
E D
ES
C
R
IP
TI
O
N R
EV
P ac es F er ry
R oa d
Su ite
A tla nt a, G
A
PH
O
N E
(7
) 6
-7
FA
X
(7
) 8
-0
U
SE
R :C
W
EH
M C
KE
FI
LE
:F
:\3 8\
8\
5\
_C
AD
\L
AN
D \P
LO
T\
L7
-X X_
SI
TE
D
ET
AI
LS
.d w g
PL
O
TT
ED
:6 /1
4/
SA
VE
D
:6 /1
4/
Know what'sbelow Callbefore you dig.
www.call811.com
Know what'sbelow Callbefore you dig.
www.call811.com
: 3808805
R
EV
IS
IO
N
IN
FO
R
M
AT
IO
N
L7.04
R
AI
LR
O
AD
A
VE
N
U E, T U
C
KE
R G
EO
R
G
IA
/2
1/
G
EORG I A
L A N D S C A P E A R C H I T E C T
R
E G I S T E R E
D
RA I GA N K . CARR
No. 1183
PROFESSIONAL
CONTRACTOR IS TO REFERENCE UNITED CONSULTING GEOTECHNICAL EXPLORATION REPORT (10.23.2023) AND ADDENDUM #1 (03.18.2024) FOR THE TUCKER TOWN GREEN PARK SITE FOR SOIL REMEDIATION AREAS.
IS
SU
ED
F
O R
B
ID
SI
TE
D
ET
AI
LS
ADDITIVE ALTERNATE NO. 1 - SHADE SAILS
SCALE: N.T.S.L7.04
ADDITIVE ALTERNATE NO. 2 - ARBOR SWINGS
SCALE: N.T.S.L7.04
ADDITIVE ALTERNATE NO. 3 - CLIMBING MOUND
1" = 5'-0"
10'
SCALE: 1 INCH = 5 FEET
0' 5'
EXISTING
SIDEW
ALK
EXISTING
LIGHT POLE
LAWN / LANDSCAPING
CONCRETE EMBANKMENT
SLIDE (SEE SITE
FURNISHINGS SCHEDULE)
EMBANKMENT POST &
ROPE CLIMBER (SEE SITE
FURNISHINGS SCHEDULE)
L7.06
L7.05
L7.05
L7.05
L7.05
LIGHTED BOLLARD,
TYP.
LIGHT DUTY
CONCRETE
L7.01
SYNTHETIC TURF
PLAY AREA (T-101)
L7.05
INTERIOR
PEDESTRIAN
LIGHT
6' -0
CLIMBING MOUND
FALL SAFETY ZONE
ADDITIVE ALTERNATE NO. 3 NOTES:
· ADDITIVE ALTERNATE NO. 3 SHALL INCLUDE ALL WORK AND MATERIALS ASSOCIATED WITH THE CLIMBING MOUND CONSTRUCTION, INCLUDING BUT NOT LIMITED TO THE MOUND STRUCTURE, SYNTHETIC TURF & BASE, CONCRETE CURB/EDGE, CONCRETE SLIDE, AND CLIMBING ROPES.
· CLIMBING MOUND LAYOUT AND ASSOCIATED EQUIPMENT5 ARE SHOWN FOR INTENT ONLY. CLIMBING MOUND SHALL BE APPROX. 5' HIGH WITH A CONCRETE EMBANKMENT SLIDE AND (2) POST & ROPE CLIMBING LADDERS. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF CLIMBING MOUND AND EQUIPMENT WITH SPECIFIED MATERIALS, SIZES, SPACING AND LAYOUT, AND SIZING AND LOCATIONS FOR ALL STRUCTURAL ELEMENTS FOR REVIEW.
· INSTALL PRE-ENGINEERED STRUCTURES TO COMPLY WITH MANUFACTURER'S INSTALLATION DETAILS TO MAINTAIN WARRANTY
AS SPECIFIED.
· SYNTHETIC TURF SYSTEM SHALL BE SUITABLE FOR OR DESIGNED FOR PLAYGROUND USE AND SHALL PROVIDE NECESSARY
FALL SAFETY REQUIREMENTS.
0'
1'
2'
3'
4'
+4.5'
6'-0"
L7.04
ADDITIVE ALTERNATE NO. 1 NOTES:
· ADDITIVE ALTERNATE NO. 1 SHALL INCLUDE ALL WORK AND MATERIALS ASSOCIATED WITH THE ABOVE GROUND IMPROVEMENTS FOR THE SHADE SAIL STRUCTURES, INCLUDING, BUT NOT LIMITED TO SUPPORT POSTS, SAILS, HARDWARE & FASTENERS, AND LIGHTING.
· SHADE SAIL FOUNDATIONS AND ELECTRICAL CONDUIT SHALL BE INCLUDED IN THE BASE BID.
ADDITIVE ALTERNATE NO. 2 NOTES:
· ADDITIVE ALTERNATE NO. 2 SHALL INCLUDE ALL WORK AND MATERIALS ASSOCIATED WITH THE ARBOR/TRELLIS
SUPPORT STRUCTURES, BENCH SWINGS, AND PAVING SHOWN ON THIS DETAIL.
M D
C E
MIN. 1" THICK PAD, 6'x6'
UNDER SYNTHETIC TURF
R C
C W
E
/1 4/
AD
D
EN
D
U M
| C1.01.pdf |
| Sheets and Views |
| C1.01 |
| C1.02.pdf |
| Sheets and Views |
| C1.02 |
| C7.11.pdf |
| Sheets and Views |
| C7.11 |
| L2.01.pdf |
| Sheets and Views |
| L2.01 |
| L2.02.pdf |
| Sheets and Views |
| L2.02 |
| L7.04.pdf |
| Sheets and Views |
| L7.04 |
File details come from the government source that posted it. Updated .