ITB 2022-013 2022 Street Resurfacing - Phase 2

This Invitation to Bid (ITB) document is issued by the City of Tucker, Georgia for a street resurfacing project. The City of Tucker requests bids for the milling, patching, and resurfacing of 31 streets across multiple subdivisions within the city. The scope of work includes milling asphalt pavement at depths ranging from 1.5 to 3 inches across approximately 249,358 square yards, placing recycled asphalt concrete in multiple grades (9.5mm, 12.5mm, and 19mm Superpave) totaling approximately 17,886 tons, performing patching and leveling work, and installing thermoplastic pavement markings including traffic stripes, arrows, raised pavement markers, and skips. The bid was issued on May 31, 2022, with a question deadline of June 14, 2022, responses posted on June 16, 2022, and a bid submission deadline of June 28, 2022 at 1:00 p.m. EDT. Award was projected for July 11, 2022 at a City Council meeting, with a contract completion timeline of 120 calendar days from the Notice to Proceed. No pre-bid conference was scheduled. The work must be substantially completed within 120 calendar days, with normal work hours from 8:00 a.m. to 7:00 p.m., Monday through Friday, excluding national holidays.

Bids must be submitted electronically to procurement@tuckerga.gov and must include a unit price bid proposal, W-9 form, certificate of insurance, contractor and subcontractor affidavits, bid bond of at least 5 percent of the total bid amount, contact information, proposed subcontractor list, and related experience references. Upon award, the successful contractor must provide a Performance Bond and Payment Bond each equal to 100 percent of the total contract price and maintain a General Liability Insurance Policy with minimum limits of $1,000,000 per person and $1,000,000 per occurrence. This is a unit price contract with payment made based on actual work completed; 10 percent retainage will be withheld until final acceptance. Liquidated damages of $200 per calendar day apply for failure to complete work within 120 calendar days and for failure to complete punch list work within 45 calendar days. The contractor is responsible for all labor, materials, equipment, permits, and licenses necessary to perform the work in accordance with Georgia Department of Transportation specifications, City of Tucker ordinances, OSHA standards, and MUTCD guidelines. Materials must be from GDOT-approved sources and will be tested by an approved consultant or lab hired by the City. The contractor must demonstrate verifiable experience with at least three reference projects of similar scope.

Text of this file

City of Tucker

Invitation to Bid

ITB # 2022-013

2022 STREET RESURFACING – PHASE 2

BID MANUAL

City of Tucker 1975 Lakeside Parkway, Suite 350

Tucker, Georgia 30084

City of Tucker Invitation to Bid

ITB #2022-013

2022 STREET RESURFACING – PHASE 2

INVITATION: The City of Tucker, Georgia requests that interested parties submit proposals for the 2022 Street Resurfacing – Phase 2Project. Proposals will be accepted until the date and time listed below and will be awarded to the responsive and responsible bidder whose bid, conforming with all the material terms and conditions of the ITB, is the lowest in price. Addenda and updates to this bid manual will be posted on the City of Tucker website http://tuckerga.gov or may be requested by email procurement@tuckerga.gov.

BID ACTIVITY SCHEDULE

Bid Issued May 31 2022 Pre-Bid Conference N/A Deadline for Questions June 14, 2022, at 5:00 p.m.

Responses to Questions Posted (Addenda) June 16, 2022 Bid Deadline June 28, 2022, at 1:00 p.m. EDT Award at Council Meeting TBD – projected July 11, 2022 Completion from Notice to Proceed 120 calendar days

SCOPE OF WORK: Refer to Exhibit A.

QUESTIONS: Submit all questions in writing to procurement@tuckerga.gov reference Bid #2022-013.

PRE-BID CONFERENCE: A pre-bid conference will not be scheduled for this project.

ADDENDA: Responses to questions received will be by addenda and will be posted on the City website www.tuckerga.gov. The signed acknowledgement issued with each addendum must be submitted with the proposal. It is the vendors responsibility to verify if any addenda were created.

SUBMITTAL REQUIREMENTS: Vendor shall submit ITB Response electronically to procurement@tuckerga.gov with the subject line ITB #2022-013. The email must contain the vendor contact information.

BID TABULATON: Preliminary Bid results will be posted on the City’s website, http://tuckerga.gov, following the opening of bids.

Your response must be received by the date and time specified. (Addenda will show any schedule updates) Late receipt of bids will not be considered regardless of postmark/carrier or email issues.

Proposals received after the opening time will be filed unopened. The City of Tucker reserves the right to reject any and all proposals or any part, to waive any formalities or informalities to make an award and to re-advertise in the best interest of the City. No proposals received orally/phone.

http://tuckerga.gov/ mailto:procurement@tuckerga.gov mailto:procurement@tuckerga.gov http://www.tuckerga.gov/ mailto:procurement@tuckerga.gov http://tuckerga.gov/

Exhibit A:

Project Specifications / Scope of Work ITB #2022-013 2022 Street Resurfacing – Phase 2

PURPOSE, INTENT AND PROJECT DESCRIPTION

The City of Tucker (City), requests that interested parties submit formal electronic bids for the milling, patching, and resurfacing of 31 streets.

The complete scope, specifications, and other relevant information for ITB 2022-013 2022 Street Resurfacing – Phase 2 is available for download on the City of Tucker website: http://tuckerga.gov or request via email to procurement@tuckerga.gov .

GENERAL CONDITIONS

The contractor shall execute the work according to and meet the requirements of the following:

• Georgia Department of Transportation (GDOT) Specifications, Standards, and Details

• The Contract Documents including but not limited to the scope of work, plans, and specifications

• City of Tucker ordinances and regulations

• OSHA standards and guidelines

• MUTCD Guidelines

• Any other applicable codes, laws and regulations including but not limited to Section 45- 10-

20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990.

The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work. This is a unit price bid. Payment will be made based on actual work completed.

The contractor is responsible for inspecting the jobsite prior to submitting a bid. No change orders will be issued for differing site conditions.

Materials must come from GDOT approved sources. The contractor will be required to submit in writing for approval a list of proposed sources of materials. When required, representative samples will be taken for examination and testing prior to approval. The materials used in the work shall meet all quality requirements of the contract. Materials will not be considered as finally accepted until all tests, including any to be taken from the finished work have been completed and evaluated.

Standard Specification 106 – Control of Materials will be used as a guide. All materials will be tested according to the GDOT Sampling, Testing, and Inspection Manual by an approved consultant/lab hired by the City.

The successful bidder must have verifiable experience at construction of similar projects in accordance with these specifications. Bidder shall provide at least three examples and reference information (including company name, project name, contact name, phone number and email address) demonstrating experience successfully completing projects of similar scope.

10% retainage will be withheld from the total amount due the contractor until Final Acceptance of work is issued by the City. The City will inspect the work as it progresses.

mailto:procurement@tuckerga.gov

PROSECUTION AND PROGRESS

The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by 120 calendar days. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work).

Upon Notice of Award, the Contractor will be required to submit a Progress Schedule.

Normal workday for this project shall be 8:00AM to 7:00PM and the normal workweek shall be Monday through Friday. The City will consider extended workdays or workweeks upon written request by the Contractor on a case-by-case basis. No work will be allowed on national holidays (i.e. Memorial Day, July 4th, Labor Day, etc.).

The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor at contractor’s expense prior to issuance of Final Acceptance.

The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by 120 calendar days. Liquidated damages shall be deducted from the 10% retainage held by the City. The contractor will also be assessed liquidated damages in the amount of $200.00 per calendar day for not completing any required Punch List work within 45 calendar days.

The contractor shall provide all material, labor, and equipment necessary to perform the work without delay until final completion.

The contractor shall provide a project progress schedule by subdivision prior to or at the preconstruction meeting. This schedule should accurately represent the intended work and cannot be vague or broad such as listing every road in the contract.

The contractor shall submit a two-week advance schedule every Friday by 2:00p.m, detailing scheduled activities for the following week.

PERMITS AND LICENSES

The contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.

BONDING AND INSURANCE REQUIREMENTS

No bid may be withdrawn for a period of forty-five (45) days after the time has been called on the date of opening.

All bids must be accompanied by a Bid Bond of a reputable bonding company authorized to do business in the State of Georgia, in an amount equal to at least five percent (5%) of the total amount of the bid.

Upon Notice of Award, the successful contractor shall submit a Performance Bond payable to the

City of Tucker in the amount of 100% of the total contract price. The successful contractor shall also submit a Payment Bond in the amount of 100% pursuant to O.C.G.A. § 36- 91-70 and 90.

Upon Notice of Award, the successful contractor shall procure and maintain a General Liability Insurance Policy with minimum limits of $1,000,000 per person and $1,000,000 per occurrence.

MATERIALS

The City will provide a Construction Engineering & Inspections (CEI) Consultant to inspect the work and provide materials testing. All materials will meet appropriate GDOT specifications.

Materials quality control test types will meet GDOT specifications at a frequency equal to or exceeding that set by those specifications. Contractor will be responsible for replacing any work performed with material from rejected sample lot at no cost to the City.

PUBLIC NOTIFICATION

The contractor shall be responsible for posting signs at subdivision entrances. The City will be responsible for notification to individual property owners.

EXISTING CONDITIONS / DEVIATION OF QUANTITIES

All information given in this ITB concerning quantities, scope of work, existing conditions, etc. is for information purposes only. It is the Contractor’s responsibility to inspect the project site to verify existing conditions and quantities prior to submitting their bid. This is a Unit Price bid and no payment will be made for additional work without prior written approval from the City. At no time will Contractor proceed with work outside the prescribed scope of services for which additional payment will be requested without the written authorization of the City.

The City reserves the right to add, modify, or delete quantities. The City may also elect to add or eliminate certain work locations at its discretion. The Contractor will not be entitled to any adjustment of unit prices or any other form of additional compensation because of adjustments made to quantities and/or work locations. Contractor will be paid for actual in-place quantities completed and accepted for pay items listed in the Bid Schedule. All other work required by this ITB, plans, specs, standards, etc. but not specifically listed in the Bid Schedule shall be considered “incidental work” and included in the bid prices for items on the Bid Schedule.

TRAFFIC CONTROL

The contractor shall, at all times, conduct his work so as to assure the least possible obstruction of traffic. The safety and convenience of the general public and the residents along the roadway and the protection of persons and property shall be provided for by the contractor as specified in the State of Georgia, Department of Transportation Standard Specifications Sections 104.05,

107.09 and 150.

Traffic whose origin and destination is within the limits of the project shall be provided ingress and egress at all times unless otherwise specified by the City. The ingress and egress includes entrances and exits via driveways at various properties, and access to the intersecting roads and streets. The contractor shall maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project at all times, particularly during inclement weather, to ensure that ingress and egress are safely provided when and where needed.

Two-way traffic shall be maintained at all times, unless otherwise specified or approved by the City. In the event of an emergency situation, the Contractor shall provide access to emergency vehicles and/or emergency personnel through or around the construction area. Any pavement damaged by such an occurrence will be repaired by the Contractor at no additional cost to the City.

The contractor shall furnish, install, and maintain all necessary and required barricades, signs and other traffic control devices in accordance with the MUTCD and DOT specifications, and take all necessary precautions for the protection of the workers and safety of the public.

All existing signs, markers and other traffic control devices removed or damaged during construction operations will be reinstalled or replaced at the contractor’s expense, except as otherwise called for in the plans. At no time will contractor remove regulatory signing which may cause a hazard to the public. The Contractor shall, within 24 hours place temporary pavement markings (paint or removable tape) to match existing pavement markings. No additional payment will be made for this work. Payment for temporary pavement markings shall be included in the items for the permanent thermoplastic markings.

PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE

The contractor shall be responsible for the preservation of all public and private property, crops, fishponds, trees, monuments, highway signs and markers, fences, grassed and sodded areas, etc.

along and adjacent to the highway, road or street, and shall use every precaution necessary to prevent damage or injury thereto, unless the removal, alteration, or destruction of such property is provided for under the contract.

When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect or misconduct in the execution of the work, or in consequence of the non-execution thereof by the contractor, he shall restore, at his/her own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise restoring as may be directed, or she/he shall make good such damage or injury in an acceptable manner. The contractor shall correct all disturbed areas before retainage will be released.

ADJUSTING UTILITY STRUCTURES TO GRADE

All sewer manholes and water valves are to be adjusted by the DeKalb County Department of Watershed Management. The contractor shall coordinate required utility adjustments with the CEI inspector.

THERMOPLASTIC PAVEMENT MARKINGS

This work shall include Thermoplastic Pavement Markings. Final (thermoplastic) pavement markings shall be placed at least 15 calendar days but no more than 60 calendar days after placement of final asphalt lift. These final pavement markings shall match the pre-existing markings including center lines, lane lines, turn arrows, crosswalks, stop bars, etc. unless specifically directed otherwise by the City. Final pedestrian crosswalk markings shall adhere to the latest standards. Pavement marking materials shall meet GDOT standard specifications and be on the qualified products list.

Temporary pavement markings, where required, shall be included in the pay item for thermoplastic pavement markings. There is no separate pay item for temporary pavement markings.

CLEANUP

All restoration and clean-up work shall be performed daily. Operations shall be suspended if the contractor fails to accomplish restoration and clean-up within an acceptable period of time. Asphalt and other debris shall be removed from gutters, sidewalks, yards, driveways, etc. Failure to perform clean-up activities may result in suspension of the work. Milling operation shall be followed immediately by clean-up at which the contractor is to provide power brooms, vacuum sweepers, power blowers, or other means to remove loose debris or dust. Do not allow dust control to restrict visibility of passing traffic or to disrupt adjacent property owners. All pavement areas shall be clean and dry prior to placing tack coat, asphaltic concrete, or other materials.

SAFETY

Beginning with mobilization and ending with acceptance of work, the contractor shall be responsible for providing a clean and safe work environment at the project site. The contractor shall comply with all OSHA regulations as they pertain to this project.

SPECIAL CONDITIONS

1. There are 7 speed humps in the Brownlee subdivision. The contractor is leaving these in place and shall mill and resurface to the edge of the speed humps.

BID DOCUMENT SUBMITTAL REQUIREMENTS:

1. Unit Price Bid Proposal Form (Exhibit B)

2. W-9 Form (Exhibit C)

3. Certificate of Insurance (Exhibit D)

4. Contractor Affidavit (Exhibit E-1)

5. Subcontractor Affidavit (Exhibit E-2)

6. Bid Bond Form

7. Contact Form (Exhibit F)

8. Proposed List of Subcontractors

9. Related Experience and References

10. Acknowledgement of Addendum issued with each Addendum

Exhibit B: Cost Proposal

ITEM

# Item Description UNIT QTY UNIT COST TOTAL COST

1 Mill Asphalt Conc. Pavement, 2" (inch) Depth SY 97,486

2 Recycled Asphalt Conc., 9.5mm Superpave, Incl. Bitum. Material, H Lime & Tack Coat TN 10,726

3 Recycled Asphalt Conc. Patching, Incl. Bitum.

Material, H Lime & Tack TN 2,921

4 Recycled Asphalt Conc. Leveling, Incl. Bitum.

Material, H Lime & Tack TN 80

5 THERMOPLASTIC SOLID TRAFFIC

STRIPE, 24" WHITE LF 200

TOTAL

(Cost Proposal continued on next page)

Item

# Item Description UNIT Qty UNIT

COST

TOTAL

COST

Mill Asphalt Conc. Pavement, 3" (inch) Depth SY 29282

Mill Asphalt Conc. Pavement, 1.5" (inch) Depth SY 122590

Recycled Asphalt Conc., 9.5mm Superpave, Incl. Bitum. Material, H Lime & Tack Coat TN 11080

Recycled Asphalt Conc., 12.5mm Superpave, Incl. Bitum. Material, H Lime & Tack Coat TN 3080

Recycled Asphalt Conc., 19mm Superpave, Incl. Bitum. Material, H Lime & Tack Coat TN 2950

Recycled Asphalt Conc. Patching, Incl.

Bitum. Material, H Lime & Tack TN 5980

Recycled Asphalt Conc. Leveling, Incl.

Bitum. Material, H Lime & Tack TN 200

8 6' x 40' Traffic Signal Loop EA 10

9 6' X 6' Traffic Signal Loop EA 2

THERMOPLASTIC SOLID TRAFFIC

STRIPE, 5" YELLOW LF 7400

THERMOPLASTIC SOLID TRAFFIC

STRIPE, 5" WHITE LF 10600

THERMOPLASTIC SOLID TRAFFIC

STRIPE, 8" WHITE LF 3325

THERMOPLASTIC SOLID TRAFFIC

STRIPE, 12" WHITE LF 1560

14 18" SKIPS WHITE EA 150

15 5' SKIPS WHITE EA 175

THERMOPLASTIC PVMT.MARKING,

ARROW, TP 1 EA 4

THERMOPLASTIC PVMT.MARKING,

ARROW, TP 2 EA 19

THERMOPLASTIC PVMT.MARKING,

ARROW, TP 3 EA 2

RAISED PAVEMENT MARKERS, TP 1

& 3 (NORTHLAKE) EA 275

6" Round Raised Pavement Marker (Yellow) EA 60

TOTAL

Company Name:

Address:

Contact Person:

Phone Number:

Email Address:

Signature:

*In case of discrepancy between the unit price and the total price on the completed Bid Schedule, the unit price will prevail, and the total price will be corrected.

Detailed Street List

# Street Name From To Length SY 2" MILL Leveling Patching Tn 9.5 MM Thermo

LF

24" White

BROWNING

CHASE DR

1 WILLOW CHASE

CT

BROWNING

CHASE DR END 990 2750 2750

151 303

2 BROWNING CHASE

DR

IDLEWOOD

RD WILLOW CHASE CT 1565 4347 4347

112 478 48

3 RAYLENE CT BROWNING

CHASE DR END 200 556 556

20 61

4 LAWHON DR LAWHON CT BROWNING CHASE

DR 1390 3861 3861

149 425

5 LAWHON CT WILLOW

CHASE CT END 1250 3472 3472

134 382

6 JEANNINE CT LAWHON DR END 215 597 597 18 66

LAKESIDE CT Local

7 CAIN CIR

OLD

NORCROSS

RD

END 1055 2931 2931

322 24

8 LAKESIDE CT CAIN CIR END 1625 4514 4514 209 497

WALTON WOODS

CIR

Local

9 WALTON WOODS

CIR RAMAH LN END 2075 5764 5764

106 634

10 WALTON WOODS

CT

WALTON

WOODS CIR END 175 486 486

12 53

11 CARTHAGE RD WOBURN DR END 2815 7819 7819 412 860

12 OBERLIN CT CARTHAGE

RD END 1380 3833 3833

64 422 24

13 WOBURN DR BROCKETT RD WALTON WOODS

CIR 2370 6583 6583

288 724

14 WOBURN CT WOBURN DR END 290 806 806 36 89

15 BROCKEN WAY WOBURN DR OBERLIN CT 710 1972 1972 36 217

16 ALLENWOOD WAY BROCKETT RD CARTHAGE RD 920 2556 2556 54 281 24

BROWNLEE DR Local

17 BROWNLEE DR BROCKETT RD SMITHFIELD DR 2640 7333 7333 80 393 807 24

18 AVIS LN BROWN RD END 1335 3708 3708 65 408

19 SMITHFIELD DR FELLOWSHIP

RD AVIS LN 1480 4111 4111

94 452 24

PRESIDENTS

WALK

Local

20 PRESIDENTS WAY

MOUNTAIN

INDUSTRIAL

BLVD

END 855 2375 2375

261 32

21 PRESIDENTS

WALK

PRESIDENTS

WAY END 915 2542 2542

58 280

TROTTERS LN

22 TILLING WAY END END 2180 6056 6056 126 667

23 KINGSTON CROSS TILLING WAY TROTTERS LN 600 1667 1667 34 183

24 TROTTERS LN END END 3915 10875 10875 148 1,197

25 TROTTERS CT TROTTERS LN END 700 1944 1944 40 214

26 SMOKERISE SMT SILVER HILL

RD TILLING WAY 1450 4028 4028 48 443

45 6

11 16

10 15

18 19

EXHIBIT "C"

GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT

Contractor’s Name:

Solicitation/Contract No./ Call No.

or Project Description:

CONTRACTOR AFFIDAVIT

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, entity or corporation which is engaged in the physical performance of services on behalf of the Georgia Department of Transportation has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10- 91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number Date of Authorization (EEV/E-Verify Company Identification Number)

Name of Contractor

I hereby declare under penalty of perjury that the foregoing is true and correct

Printed Name (of Authorized Officer or Agent of Contractor) Title (of Authorized Officer or Agent of Contractor)

Signature (of Authorized Officer or Agent) Date Signed

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE

DAY OF , 20_

Notary Public

My Commission Expires:

[NOTARY SEAL]

EXHIBIT E-1

GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT

Contractor’s Name:

Subcontractor’s (Your) Name:

Solicitation/Contract No./ Call No.

or Project Description:

SUBCONTRACTOR AFFIDAVIT

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. §13-10-91, stating affirmatively that the individual, entity or corporation which is engaged in the physical performance of services under a contract with ________________________________________ (name of contractor) on behalf of the Georgia Department of Transportation has registered with, is authorized to use and uses the federal work authorization program commonly known as E- Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b).

Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice that a sub-subcontractor has received an affidavit from any other contracted sub-subcontractor, the undersigned subcontractor must forward, within five business days of receipt, a copy of the notice to the contractor. Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number Date of Authorization (EEV/E-Verify Company Identification Number)

Name of Subcontractor

I hereby declare under penalty of perjury that the foregoing is true and correct

Printed Name (of Authorized Officer or Agent of Contractor) Title (of Authorized Officer or Agent of Contractor)

Signature (of Authorized Officer or Agent) Date Signed

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE

_____ DAY OF ______________________, 20______

[NOTARY SEAL]

Notary Public

My Commission Expires: ________________________

EXHIBIT E-2

BID BOND

KNOW ALL MEN BY THESE PRESENTS, THAT

(Name of Contractor) at

(Address of Contractor)

(Corporation, Partnership and / or Individual) hereinafter called Principal, and

(Name of Surety)

(Address of Surety)

A corporation of the State of __________________ , and a surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held, and firmly bound unto

(Name of Obligee) City of Tucker Georgia

(Address of Obligee) 1975 Lakeside Parkway, Suite 350, Tucker, Georgia 30084

Hereinafter referred to as Obligee, in the penal sum of Dollars ($_______________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

WHEREAS, the Principal is about to submit, or has submitted, to the City of Tucker, Georgia, a proposal for furnishing materials, labor, and equipment for:

ITB # 2022-013

2022 Street Resurfacing Phase 2

WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder’s check otherwise required to accompany this Proposal.

NOW, THEREFORE, the conditions of this obligation are such that if the bid is accepted, the Principal shall within ten days after receipt of notification of the acceptance execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth in the form and manner required by the City of Tucker, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to the City of Tucker, Georgia, each in an amount of 100% of the total Contract Price, in form and with security satisfactory to said the City of Tucker, Georgia, and otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Tucker, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.

PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant, to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. SS 13-10-1, et. Seg. And SS 36- 86-101, et. Seg. And is intended to be and shall be constructed as a bond in compliance with the requirements thereof.

Signed, sealed, and dated this _________day of _______________________A.D., 20____.

ATTEST:

(Principal Secretary) (Principal)

(SEAL) BY:

(Witness to Principal) (Address)

(Address) (Surety)

ATTEST:

BY:

(Attorney-in-Fact) and Resident Agent

(Attorney-in-Fact)

(SEAL)

(Address)

(Witness as to Surety)

Contact Information Form

Please fill out this sheet with the appropriate contact information for your company.

Full Legal Name of Company:

Contractor Information:

Primary Contact Person:

Title:______________________________Telephone Number:

Secondary Contact Person:

Title:______________________________Telephone Number:

Address:

City / State / Zip:

Mailing Address (If different than above):

City / State / Zip:

E-mail Address:

Federal Employee ID Number (FEIN):

EXHIBIT F

12.2021 Version Page 1 of 13

CONTRACT AGREEMENT ITB# 2022-013

2022 Street Resurfacing – Phase 2

This Agreement made and entered into this __ day of ____ in the year 202_; by and between the City of Tucker, Georgia, having its principal place of business at 1975 Lakeside Pkwy Suite 350, Tucker, Georgia 30084 and ___________. ("Contractor"), located at

WHEREAS, the City of Tucker is charged with the responsibility for the establishment of contracts for the acquisition of goods, materials, supplies and equipment, and services by the various departments of the City of Tucker; and

WHEREAS, the City of Tucker has caused Invitation to Bid #2022-013 to be issued soliciting proposals from qualified Contractors to furnish all items, labor services, materials and appurtenances called for by them in accordance with this proposal. Selected ("Contractor") is required to provide the services as called for in the specifications; and

WHEREAS, the Contractor submitted a response to the ITB #2022-013; and

WHEREAS, the Contractor’s submittal was deemed by the City of Tucker to be the most qualified submittal to the City per the scope of services.

NOW THEREFORE, in consideration of the mutual covenant and promises contained herein, the parties agree as follows:

1.0 Scope of Work

That the Contractor has agreed and by these present does agree with the City to furnish all equipment, tools, materials, skill, labor of every description, and all things necessary to carry out as delineated in “Exhibit A” (Scope of Services) and complete in a good, firm, substantial and workmanlike manner, the Work in strict conformity with the specifications which shall form an essential part of this agreement. In addition to the foregoing, and notwithstanding anything to the contrary stated herein, the following terms and conditions, amendments, and other documents are incorporated by reference and made a part of the terms and conditions of this Agreement as is fully set out herein:

EXHIBIT A – SCOPE OF SERVICE

EXHIBIT B – COST PROPOSAL

EXHIBIT C – W-9

EXHIBIT D – CERTIFICATE OF INSURANCE

12.2021 Version Page 2 of 13

EXHIBIT E – IMMIGRATION & SECURITY FORM

EXHIBIT F – CONTACT INFORMATION

EXHIBIT G – ADDENDUMS

EXHIBIT H – PERFORMANCE AND PAYMENT BOND (if applicable)

2.0 Key Personnel

The City of Tucker enters into this Agreement having relied upon Contractor's providing the services of the Key Personnel, if any, identified as such in the body of the Agreement. No Key Personnel may be replaced or transferred without the prior approval of the City's authorized representative. Any Contractor personnel to whom the City objects shall be removed from City work immediately. The City maintains the right to approve in its sole discretion all personnel assigned to the work under this Agreement.

3.0 Compensation

3.1. Pricing. The Contractor will be paid for the goods and services sold pursuant to the Contract in accordance with the RFP and final pricing documents as incorporated into the terms of the Contract.

Unless clearly stated otherwise in the Standard Contract, all prices are firm and fixed and are not subject to variation. Prices include, but are not limited to freight, insurance, fuel surcharges and customs duties.

The prices quoted and listed on the attached Cost Proposal, a copy of which is attached hereto as Exhibit "B" (Cost Proposal) and incorporated herein, shall be firm throughout the term of this Contract.

3.2. Billings. If applicable, and unless the RFP provides otherwise, the Contractor shall submit, on a regular basis, an invoice for goods and services supplied to the City under the Contract at the billing address specified in the Purchase Instrument or Contract. The invoice shall comply with all applicable rules concerning payment of such claims. The City shall pay all approved invoices in arrears and in accordance with applicable provisions of City law. Unless otherwise agreed in writing by the parties, the Contractor shall not be entitled to receive any other payment or compensation from the City for any goods or services provided by or on behalf of the Contractor under the Contract. The Contractor shall be solely responsible for paying all costs, expenses and charges it incurs in connection with its performance under the Contract. Standard payment terms: Net-30.

Invoices are to be emailed to invoice@tuckerga.gov. A W-9 Request for Taxpayer Identification Number and Certification Form must be submitted: “Exhibit C”.

3.3. Delay of Payment Due to Contractor's Failure. If the City in good faith determines that the Contractor has failed to perform or deliver any service or product as required by the Contract, the Contractor shall not be entitled to any compensation under the Contract until such service or product is performed or delivered. In this event, the City may withhold that portion of the Contractor's compensation which represents payment for services or products that were not performed or delivered. To the extent that the Contractor's failure to perform or deliver in a timely manner causes the City to incur costs, the City may deduct the amount of such incurred costs from any amounts payable to Contractor. The City's authority to deduct such incurred costs shall not in any way affect the City’s authority to terminate the Contract.

3.4. Set-Off Against Sums Owed by the Contractor. In the event that the Contractor owes the City any sum under the terms of the Contract, pursuant to any judgment, or pursuant to any law, the City may set mailto:invoice@tuckerga.gov.

12.2021 Version Page 3 of 13

off the sum owed to the City against any sum owed by the City to the Contractor in the City’s sole discretion.

4.0 Duration of Contract

4.1. Contract Term. The Contract between the City and the Contractor shall begin and end on the dates specified, unless terminated earlier in accordance with the applicable terms and conditions.

Pursuant to O.C.G.A. Section 50-5-64, except as allowed by law, this Contract shall not be deemed to create a debt of the City for the payment of any sum beyond the fiscal year of execution or, in the event of a renewal, beyond the fiscal year of such renewal. All invoices postmarked by the City during said term shall be filled at the contract price.

4.2. Contract Extension. In the event that this Standard Contract shall terminate or be likely to terminate prior to the making of an award for a new contract for the identified goods and ancillary services, the City may, with the written consent of Contractor, extend this Contract for such period as may be necessary to afford the City a continuous supply of the identified goods and ancillary services.

If not set forth in the RFP and/or Contractor's submittal, the City will determine the basic period of performance for the completion of any of Contractor's actions contemplated within the scope of this Agreement and notify Contractor of the same via written notice. If no specific period for the completion of Contractor's required actions pursuant to this Agreement is set out in writing, such time period shall be a reasonable period of time based upon the nature of the activity. If the completion of this Contract is delayed by actions of the City, then and in such event the time of completion of this Contract shall be extended for such additional time within which to complete the performance of the Contract as is required by such delay.

This Contract may be extended by mutual consent of both the City and the Contractor for reasons of additional time, additional services and/or additional areas of work.

5.0 Independent Contractor

5.1. The Contractor shall be an independent Contractor. The Contractor is not an employee, agent or representative of the City of Tucker. The successful Contractor shall obtain and maintain, at the Contractor's expense, all permits, license or approvals that may be necessary for the performance of the services. The Contractor shall furnish copies of all such permits, licenses or approvals to the City of Tucker Representative within ten (10) day after issuance.

5.2 Inasmuch as the City of Tucker and the Contractor are independent of one another neither has the authority to bind the other to any third person or otherwise to act in any way as the representative of the other, unless otherwise expressly agreed to in writing signed by both parties hereto. The Contractor agrees not to represent itself as the City's agent for any purpose to any party or to allow any employee of the Contractor to do so, unless specifically authorized, in advance and in writing, to do so, and then only for the limited purpose stated in such authorization. The Contractor shall assume full liability for

12.2021 Version Page 4 of 13

any contracts or agreements the Contractor enters into on behalf of the City of Tucker without the express knowledge and prior written consent of the City.

6.0 Indemnification

6.1 To the extent allowed by law, the Contractor agrees to indemnify, hold harmless and defend the City, its public officials, officers, employees, and agents from and against any and all liabilities, suits, actions, legal proceedings, claims, demands, damages, costs and expenses (including reasonable attorney's fees) to the extent rising out of any act or omission of the Contractor, its agents, subcontractors or employees in the performance of this Contract except for such claims that arise from the City's sole negligence or willful misconduct.

6.2 Notwithstanding the foregoing indemnification clause, the City may join in the defense of any claims raised against it in the sole discretion of the City. Additionally, if any claim is raised against the City, said claim(s) cannot be settled or compromised without the City's written consent, which shall not be unreasonably withheld.

7.0 Performance

Performance will be evaluated on a monthly basis. If requirements are not met, City of Tucker Procurement will notify the Contractor in writing stating deficiencies, substitutions, delivery schedule, and/or poor workmanship.

A written response from the Contractor detailing how correction(s) will be made is required to be delivered to the City. Contractor will have thirty (30) days to remedy the situation.

If requirements are not remedied City of Tucker has the right to cancel this Agreement with no additional obligation to Contractor.

7.1 Final Completion, Acceptance, and Payment

A. Final Completion shall be achieved when the work is fully and finally complete in accordance with the Contract Documents. The City shall notify Contractor once the date of final completion has been achieved in writing

B. Final Acceptance is the formal action of City acknowledging Final Completion. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the City's right under any warranty or guarantee. Prior to Final Acceptance, Contractor shall, in addition to all other requirements in the Contract Documents submit to City a Notice of any outstanding disputes or claims between Contractor and any of its Subcontractors, including the amounts and other details thereof. Neither Final Acceptance, final payment shall release Contractor or its sureties from any obligations of these Contract Documents or the bond, or constitute a waiver of any claims by City arising Contractor's failure to perform the work in accordance with the Contract Documents.

C. Acceptance of final payment by Contractor, or any Subcontractor, shall constitute a waiver and release to City of all claims by Contractor, or any such Subcontractor, for an increase in the Contract Sum or the Contract Time, and for every act or omission of City relating to or arising out of the work, except for those Claims made in accordance with the procedures, including the time limits, set forth in section 8.

12.2021 Version Page 5 of 13

8.0 Changes

City, within the general scope of the Agreement, may, by written notice to Contractor, issue additional instructions, require additional services or direct the omission of services covered by this Agreement.

In such event, there will be made an equitable adjustment in price, but any claim for such an adjustment must be made within thirty (30) days of the receipt of said written notice.

9.0 Change Order Defined

Change order shall mean a written order to the Contractor executed by the City issued after the execution of this Agreement, authorizing and directing a change in services. The Price and Time may be changed only by a Change Order.

10.0 Insurance

10.1 The Contractor shall, at its own cost and expense, obtain and maintain worker's compensation and commercial general liability insurance coverage covering the period of this Agreement, such insurance to be obtained from a responsible insurance company legally licensed and authorized to transact business in the State of Georgia. The minimum limit for Worker's Compensation Insurance shall be the statutory limit for such insurance. The minimum limits for commercial general liability insurance, which must include personal liability coverage will be $2,000,000 per person and $2,000,000 per occurrence for bodily injury and $500,000 per occurrence for property damage.

10.2 Contractor shall provide certificates of insurance evidencing the coverage requested herein before the execution of this agreement, and at any time during the term of this Agreement, upon the request of the City, Contractor shall provide proof sufficient to the satisfaction of the City that such insurance continues in force and effect. “Exhibit D” (Certificate of Insurance).

11.0 Termination

11.1. Immediate Termination. Pursuant to O.C.G.A. Section 50-5-64 and 36-60-13, this Contract will terminate immediately and absolutely if the City determines that adequate funds are not appropriated or granted or funds are de-appropriated such that the City cannot fulfill its obligations under the Contract, which determination is at the City's sole discretion and shall be conclusive. Further, the City may terminate the Contract for any one or more of the following reasons effective immediately without advance notice:

(i) In the event the Contractor is required to be certified or licensed as a condition precedent to providing goods and services, the revocation or loss of such license or certification may result in immediate termination of the Contract effective as of the date on which the license or certification is no longer in effect;

(ii) The City determines that the actions, or failure to act, of the Contractor, its agents, employees or subcontractors have caused, or reasonably could cause, life, health or safety to be jeopardized;

(iii) The Contractor fails to comply with confidentiality laws or provisions; and/or

12.2021 Version Page 6 of 13

(iv) The Contractor furnished any statement, representation or certification in connection with the Contract or the bidding process which is materially false, deceptive, incorrect or incomplete.

11.2. Termination for Cause. The occurrence of any one or more of the following events shall constitute cause or the City to declare the Contractor in default of its obligations under the Contract:

(i) The Contractor fails to deliver or has delivered nonconforming goods or services or fails to perform to the City's satisfaction, any material requirement of the Contract or is in violation of a material provision of the Contract, including, but without limitation, the express warranties made by the Contractor;

(ii) The City determines that satisfactory performance of the Contract is substantially endangered or that a default is likely to occur;

(iii) The Contractor fails to make substantial and timely progress toward performance of the contract;

(iv) The Contractor becomes subject to any bankruptcy or insolvency proceeding under federal or state law to the extent allowed by applicable federal or state law including bankruptcy laws; the Contractor terminates or suspends its business; or the City reasonably believes that the Contractor has become insolvent or unable to pay its obligations as they accrue consistent with applicable federal or state law;

(v) The Contractor has failed to comply with applicable federal, state and local laws, rules, ordinances, regulations and orders when performing within the scope of the Contract;

(vi) The Contractor has engaged in conduct that has or may expose the City to liability, as determined in the City's sole discretion; or

(vii) The Contractor has infringed any patent, trademark, copyright, trade dress or any other intellectual property rights of the State, the City, or a third party.

11.3. Notice of Default. If there is a default event caused by the Contractor, the City shall provide written notice to the Contractor requesting that the breach or noncompliance be remedied within the period of time specified in the City's written notice to the Contractor. If the breach or noncompliance is not remedied by the date of the written notice, the City may:

(i) Immediately terminate the Contract without additional written notice; and/or

(ii) Procure substitute goods or services from another source and charge the difference between the Contract and the substitute contract to the defaulting Contractor; and/or,

(iii) Enforce the terms and conditions of the Contract and seek any legal or equitable remedies.

11.4. Termination for Convenience. The City may terminate this Agreement for convenience at any time upon thirty (30) day written notice to the Contractor. In the event of a termination for convenience, Contractor shall take immediate steps to terminate work as quickly and effectively as possible and shall terminate all commitments to third-parties unless otherwise instructed by the City. Provided that no damages are due to the City for Contractor's failure to perform in accordance with this Agreement, the

12.2021 Version Page 7 of 13

City shall pay Contractor for work performed to date in accordance with Section herein. The City shall have no further liability to Contractor for such termination.

11.5. Payment Limitation in the event of Termination. In the event termination of the Contract for any reason by the City, the City shall pay only those amounts, if any, due and owing to the Contractor goods and services actually rendered up to and including the date of termination of the Contract and for which the City is obligated to pay pursuant to the Contract or Purchase Instrument. Payment will be made only upon submission of invoices and proper proof of the Contractor's claim. This provision in no way limits the remedies available to the City under the Contract in the event of termination. The City shall not be liable for any costs incurred by the Contractor in its performance of the Contract, including, but not limited to, startup costs, overhead or other costs associated with the performance of the Contract.

11.6. The Contractor's Termination Duties. Upon receipt of notice of termination or upon request of the City, the Contractor shall:

(i) Cease work under the Contract and take all necessary or appropriate steps to limit disbursements and minimize costs, and furnish a report within thirty (30) days of the date of notice of termination, describing the status of all work under the Contract, including, without limitation, results accomplished, conclusions resulting therefrom, and any other matters the City may require;

(ii) Immediately cease using and return to the City, any personal property or materials, whether tangible or intangible, provided by the City to the Contractor;

(iii) Comply with the City's instructions for the timely transfer of any active files and work product produced by the Contractor under the Contract;

(iv) Cooperate in good faith with the City, its employees, agents and Contractors during the transition period between the notification of termination and the substitution of any replacement Contractor; and

(v) Immediately return to the City any payments made by the City for goods and services that were not delivered or rendered by the Contractor.

12.0 CLAIMS and DISPUTE RESOLUTION

12.1 Claims Procedure

A. If the parties fail to reach agreement regarding any dispute arising from the Contract Documents, including a failure to reach agreement on the terms of any Change Order for City-directed work as provided in section 8, or on the resolution of any request for an equitable adjustment in the Contract Sum or the Contract Time, Contractor's only remedy shall be to file a Claim with City as provided in this section.

B. Contractor shall file its Claim within the earlier of: 120 Days from City's final in accordance with section 8; or the date of Final Acceptance, C. The Claim shall be deemed to cover all changes in cost and time (including direct, indirect) impact, and consequential) to which Contractor may be entitled. It shall be fully substantiated and documented. The Claim shall contain a detailed factual statement of the Claim for additional

12.2021 Version Page 8 of 13

compensation and time, if any, providing all necessary dates, locations, and items of work affected by the Claim.

D. If an adjustment in the Contract Time is sought: the specific Days and dates for which it is sought; the specific reasons Contractor believes an extension in the Contract Time should be granted; and Contractor's analysis of its Progress Schedule to demonstrate the reason for the extension in Contract Time.

E. If any adjustment in the Contract Sum is sought: the exact amount sought and a breakdown of that amount into the categories; and a statement certifying, under penalty of perjury, that the Claim is made in good faith, that the supporting cost and pricing data are true and accurate bot he best of Contractor's knowledge and belief, that the Claim is fully supported by the accompanying data, and that the amount requested accurately reflects the adjustment in the Contract Sum or Contract Time for which Contractor believes City is liable.

F. After Contractor has submitted a fully documented Claim that with all applicable provisions of section 8, City shall respond, in writing, to Contractor with a decision within sixty (60) Days the date the Claim is received. or with notice to Contractor of the date by which it will render its decision.

12.2 Arbitration

A. If Contractor disagrees with City's decision rendered in accordance with section 12. If, Contractor shall provide City with a written demand for arbitration. No demand for arbitration of any such Claim shall be made later than thirty (30) Days after the date of City's decision on such Claim, failure to demand arbitration with said thirty (30) Day period shall result in City's decision being final and binding upon Contractor and its Subcontractors.

B. Notice of the demand for arbitration shall be filed with the American Arbitration Association (AAA), with a copy provide to City.

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Award Information —
ADD.#2 Responses to Questions —
ADD.#1 REV COST PROPOSAL FORM —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .