This is an Addendum #2 document containing responses to bidder questions for the City of Tucker, Georgia's 2022 Street Resurfacing Phase 2 Project (ITB #2022-013). The addendum clarifies technical specifications and project requirements through fifteen question-and-answer pairs addressing contractor obligations, material specifications, and operational parameters. Key clarifications include that tripod signs will be provided by the City, no asphalt compaction testing is required beyond a proof roll, milled surfaces must be topped as soon as possible (generally the next day), finished asphalt need not be flush with curb and gutter lips, patching depth will vary from three to six inches as determined by the City inspector, and leveling will be full-width when required on Brownlee Drive at depths ranging from 1.5 to 2.5 inches. The document confirms work hours are 8:00 AM to 7:00 PM Monday through Friday, with additional hours requiring City authorization, and that DeKalb County will be responsible for all utility adjustments.
The addendum addresses material specifications including confirmation that 9.5mm Type II asphalt will be placed at a two-inch depth and that 19mm mix will be used for patching. Patches will be sized to accommodate standard six to seven-foot milling machines. Contractors must acknowledge receipt of the addendum by completing and submitting the provided form with company name, contact person, address, and signature. This document serves as a binding supplement to the original invitation to bid and must be included with all proposals submitted for the street resurfacing project.
Text of this file
03.2022 Version
CITY OF TUCKER
ACKNOWLEDGE RECEIPT OF ADDENDUM #1 FORM
ITB #2022-013
2022 Street Resurfacing Phase 2
Upon receipt, please print and add to your proposal
I hereby acknowledge receipt of the supplement pertaining to the above referenced bid.
COMPANY NAME:
CONTACT PERSON:
ADDRESS:
CITY: STATE: ZIP:
PHONE: FAX:
EMAIL ADDRESS:
SIGNATURE DATE
ADDENDUM #1
1. Q: Will the contractor be required to post mount the advanced warning signs or can these signs be placed on tripod stands for this project?
A: Tripod signs will be provided by the City.
2. Q: What information should be placed on the Public Notification Signs at the subdivision entrances? Are these signs post mounted or on tripod stands?
A: The City has SPLOST signs that will be provided.
3. Q: Will any asphalt compaction test be required by the contractor on this project?
A: No compaction test will be required other than a proof roll.
4. Q: Will the contractor be required to mill and pave into side roads?
A: The paving will require smooth transition joints at the side streets.
5. Q: How long can a milled surface remain without new asphalt paving?
A: The milled areas need to be topped as soon as possible, generally the next day.
6. Q: Will the finished asphalt need to be flush with the lip of the curb and gutter?
A: Not necessarily. The milling will be 2” and topping will be same depth.
7. Q: What is the depth of the patching?
A: The patching depth can vary from 3”-6”, depending on the condition as determined by the City inspector.
8. Q: What type of mix will be used on the patching?
A: 19mm.
9. Q: The only leveling set up on this project is on Brownlee Dr.. Will this leveling be spot leveling or full width leveling?
A: Leveling will be full width when required.
10. Q: What will be the depth of the leveling on Brownlee Dr.?
A: Leveling depth will vary from 1>5” to 2.5”.
11. Q: What are the work hours for this project?
A: Hours of operation are 8:00 am to 7:00 pm Monday thru Friday.
Additional hours/days must be authorized by the City.
12. Q: Since the roads are being milled 2”, is it the intention of the city to place the 9.5mm type II at 2”?
A: Yes.
13. Q: Just to confirm, Dekalb county will be responsible for all utility adjustments, correct?
A: Correct.
14. Q: What will be average depth of the patching? Will the patching mix be 19mm or 25mm?
A: See questions 7 & 8 above.
15. Q: Will the patches be wide enough to mill out with a 6–7-foot milling machine?
A: Yes, a milling machine is generally used for patching.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Award Information | — | |
| ITB 2022-013 Street Resur PH2 | — | |
| ADD.#1 REV COST PROPOSAL FORM | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .