ITB_15-26-AIR_-_DRAWINGS.pdf
PDF 29 MB Posted
- Attached to
- Precision Approach Path Indicator (PAPI) Navigational Aid Systems on Runways 7, 25, and 29
- Solicitation number
- 15-26-AIR
- Issued by
- Volusia County, Florida
About this file
This is a set of bid document drawings for the City of New Smyrna Beach Municipal Airport in New Smyrna Beach, Florida, prepared by AVCON, INC. Engineers & Planners. The project involves the replacement of Precision Approach Path Indicator (PAPI) navigational aid systems on Runways 7, 25, and 29, along with associated electrical vault upgrades and civil infrastructure improvements. The scope of work includes demolition of existing electrical infrastructure, installation of new four-box PAPI systems at each runway end, establishment of concrete maintenance pads, installation of new conduit, counterpoise and cable, replacement of the emergency backup generator, modifications to the airfield electrical vault, tree cutting operations, and minor grading and restoration. The project is divided into five work areas with specific durations: Work Areas A and B (Runway 7-25) are limited to 21 consecutive calendar days each with Monday through Friday, 7:00 AM to 5:00 PM working hours; Work Area C (Runway 11-29) is limited to 14 consecutive calendar days; and Work Areas D and E (electrical vault upgrades and cable installation) must be completed within the overall 60 to 90-day project duration. The contractor must coordinate FAA flight checks for each runway's new PAPI system before demolishing existing systems, with completion and FAA approval required prior to operation of new equipment.
The project is funded through FDOT, FAA, and local City funds, with the contract award contingent upon receipt of bids and funding availability. The contractor is responsible for all utility location and verification, site restoration, dust control, FOD (Foreign Object Debris) checks, airfield pavement maintenance, and emergency maintenance of airport hazard lighting and runway closure markers. Sealed bids are to be submitted through the City's eProcurement Portal, and the contract requires compliance with 49 CFR Part 26 regarding nondiscrimination practices. The contractor must provide a Safety Plan Compliance Certification (SPCC) prior to Notice to Proceed and maintain continuous radio communication with Air Traffic Control Tower personnel on frequency 121.325 during all construction operations. Contractor vehicles and equipment must be equipped with aviation safety flags or flashing amber beacons, and all construction activities must remain within designated work areas on airport property. The contractor bears responsibility for all failed quality assurance testing, payment of utility location costs, repair of any damage to existing facilities or pavement, and restoration of surveyed monumentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TL
O
FA
E
C
C O
TC
W M
I I
C
W M
I I
NEW SMYRNA BEACH MUNICIPAL AIRPORT
NEW SMYRNA BEACH, FLORIDA
PAPI REPLACEMENT ON RUNWAYS 7, 25 AND 29
AND ELECTRICAL VAULT UPGRADES
BID DOCUMENTS
AVCON, INC.
ENGINEERS & PLANNERS
5555 EAST MICHIGAN ST, SUITE 200 - ORLANDO, FLORIDA 32822
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
www.avconinc.com
2023.287.05
APRIL 2026DATE
REVISIONS
DESCRIPTIONDATENO.
NORTH
N.T.S.
VICINITY MAP
MIAMI
FT.PIERCE
ZEPHYRHILLS
AIRPORT LOCATION
ST.PETERSBURG
TAMPA
TALLAHASSEE
PENSACOLA
PANAMA CITY
KEY WEST
ORLANDO
JACKSONVILLE
TITUSVILLE
DAYTONA BCH.
NEW SMYRNA BEACH, FL
N.T.S.
LOCATION MAP
ITB 15-26-AIR
453565-1-94-01
3-12-0054-029-2023FAA AIG NO.
FDOT FM NO.
NEW SMYRNA BEACH
PROJECT NO.
AVCON PROJECT NO.
N.T.S.
PROJECT MAP
PLANS PREPARED BY:
NEW SMYRNA
BEACH AIRPORT
PONCE DE
LEON INLETTURNBULL
BAY
NORTH
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
AutoCAD SHX Text
PB
AutoCAD SHX Text
AutoCAD SHX Text
RUNWAY 7 PAPI LOCATION
AutoCAD SHX Text
RUNWAY 25 PAPI LOCATION
AutoCAD SHX Text
AIRFIELD ELECTRICAL VAULT LOCATION
AutoCAD SHX Text
RUNWAY 29 PAPI LOCATION
AutoCAD SHX Text
TREE CLEARING AREA
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
NEW SMYRNA BEACH
MUNICIPAL AIRPORT
NEW SMYRNA BEACH,
FLORIDA
PAPI REPLACEMENT ON
RUNWAYS 7, 25 AND 29
AND ELECTRICAL VAULT
UPGRADES
202328705_GI SERIES
PROFESSIONAL SEAL
CADD:
AVCON PROJECT NO.
FAA AIG NO.
FDOT FM NO. 453565-1-94-01
3-12-0054-029-2023
2023.287.05
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
APRIL 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
T
H
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
B
ID
D
O C
U M
EN
TS
A1 GENERAL NOTES A3 ABBREVIATIONS
ABAN. - ABANDONED
APP. - APPROXIMATE
ASP - ASPHALT
BL - BASELINE
BLDG - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IRON PIPE
CMP - CORRUGATED METAL PIPE
CONC. - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELL - ELBOW / ARM
ELEV. - ELEVATION
FND. - FOUNDATION
HP - HIGH POINT
INV. - INVERT
JCP - JUNCTION CAN PLAZA
LT- LEFT
LP - LOW POINT
MAX. - MAXIMUM
MES - MITERED END SECTION
M.E.G - MEET EXISTING GRADE
MIN. - MINIMUM
ML - MATCHLINE
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION
ASSOCIATION
OFA - OBJECT FREE AREA
O.C - ON CENTER
PVMT - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE
PAVEMENT
PI - POINT OF INTERSECTION
PL - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PET - CROSSLINKED POLYETHYLENE
PRESSURE
TUBING
PVT - POINT OF TANGENCY (VERTICAL
CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR - SHOULDER
SICPP - SMOOTH INTERIOR
CORRUGATED POLYETHYLENE PIPE
STA. - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
ABAN. - TYPICAL
UG - UNDERGROUND
SHEET NOTES
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES
AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION
AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL
FIELD LOCATE, VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND
DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES
(IDENTIFIED ON THE PLANS OR NOT) AFFECTING ANY COMPONENT OF WORK HEREIN
PRIOR TO THE START OF ANY CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR
POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
PRIOR TO THE START OF ANY CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR
TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH
THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS
OR NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN
COMPONENTS (I.E., AIRFIELD ELECTRICAL, STORM SEWERS, SANITARY SEWERS,
WATER MAINS, COMMUNICATION LINES, HIGH POWER TRANSMISSION LINES, BUILDING
FOUNDATIONS, ETC) AND ANY DISCREPANCIES, CONFLICTS, OR POTENTIAL
DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE
START OF ANY CONSTRUCTION. ANY COST ASSOCIATED WITH THE LOCATION OF
EXISTING UTILITIES AS OUTLINED ABOVE IS THE RESPONSIBILITY OF THE
CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR
OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY
THE ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH
CORRECTIONS AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL
SPIRIT AND INTENT OF THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED
UTILITIES AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY
COMPANIES PRIOR TO CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING
UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING
FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE
WORK PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SURVEY
MONUMENTATION, AND ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT
CONTRACTOR'S EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.
6. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR
INSPECTION REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE IMPROVEMENT
CONSTRUCTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS
AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL
AGENCIES AND THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY
PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE INSPECTIONS AND TESTING
ACCORDING TO AGENCY REQUIREMENTS.
8. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS, REGULATIONS
AND REQUIREMENTS OF THE BREVARD COUNTY LAND DEVELOPMENT CODE AND
ENGINEERING STANDARDS, PLUS THE CURRENT EDITION OF THE FDOT STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE AND UTILITY CONSTRUCTION, PLUS THE
REGULATIONS AND ORDINANCES OF THE VARIOUS OTHER GOVERNMENTAL AGENCIES
HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND
MANUFACTURED ITEMS TO THE ENGINEER FOR APPROVAL. FAILURE TO OBTAIN
APPROVAL BEFORE INSTALLATION COULD RESULT IN REMOVAL AND REPLACEMENT
AT CONTRACTOR'S EXPENSE. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS IS
FOR CONFORMITY WITH THE CONTRACT DOCUMENTS AND DOES NOT INCLUDE AN
IN-DEPTH CHECK FOR THE ABILITY OF THE CONTRACTOR TO PERFORM THE WORK IN
A SAFE OR EFFICIENT MANNER. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS
DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DIMENSIONAL
ACCURACY TO ENSURE FIELD FIT AND CONFORMITY OF THE VARIOUS COMPONENTS
AND DETAILS.
10. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE
CHANGES SO THAT ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO
JURISDICTIONAL AGENCIES.
11. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH
OTHER WORK BEING PERFORMED ON OR ADJACENT TO THE SITE BY OTHER
CONTRACTORS AND UTILITY COMPANIES. IT WILL BE NECESSARY FOR THE
CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES, WHERE NECESSARY,
WITH OTHER CONTRACTORS AND UTILITY COMPANIES.
12. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL
SAFETY REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR
REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE
TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY
REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE
FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION.
13. DURING THE COURSE OF THIS PROJECT, THE CONTRACTOR WILL BE EXPECTED TO
CROSS ACTIVE AIRPORT PAVEMENT TO MAINTAIN SAFETY EQUIPMENT AND
MEASURES AROUND THE SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
UNDERGO THE PROPER RADIO TRAINING NECESSARY TO EFFECTIVELY
COMMUNICATE WITH THE AIRPORT TOWER STAFF VIA RADIO WHEN CROSSING ACTIVE
PAVEMENT.
14. "AS-BUILT" PLANS FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON
THE COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE
OWNER'S ENGINEER WITH COMPLETE "AS-BUILT" INFORMATION CERTIFIED BY A
FLORIDA REGISTERED PROFESSIONAL SURVEYOR. AS-BUILT DRAWINGS SHALL BE
COMPLETED ON EXISTING DRAWINGS AND ALL PROPOSED LOCATIONS AND
ELEVATIONS SHALL BE UPDATED WITH AS-BUILT INFORMATION.
15. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS
AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO
BE RELIABLE, THOSE UTILIZING THE INFORMATION ON THESE DRAWINGS ARE
ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE USING IT
FOR ANY PURPOSE.
16. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND
CONSTRUCTION OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN
ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
17. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED
FROM ALL PAVED SURFACES DURING THIS CONTRACT.
18. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT
ALL TIMES. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON
ADJACENT PROPERTY.
19. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN
COST OF UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION
WHEN PREPARING UNIT PRICES FOR BID.
20. THE CITY OF NEW SMYRNA BEACH RESERVES THE RIGHT TO ELIMINATE ANY ITEMS OF
THE CONTRACT AND PERFORM THESE ITEMS WITH COUNTY SUPPLIED FORCES AND
MATERIALS IN ACCORDANCE WITH SECTION 40 OF THE GENERAL PROVISIONS.
21. ALL ELEVATIONS REFER TO NAVD 88 VERTICAL DATUM. COORDINATES REFER NAD 83
HORIZONTAL DATUM.
22. THE TOPOGRAPHIC FEATURES SHOWN HEREON WERE COMPILED FROM A FIELD
SURVEY PERFORMED BY DEWBERRY DATED 11-03-2023.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QA
TESTING REGARDLESS OF THE REASON FOR FAILURE. THE CONTRACTOR SHALL
ENSURE AREAS ARE PASSING OR ABLE TO PASS PRIOR TO REQUESTING QA TESTING.
24. THE CONTRACTOR SHALL HAVE A REPRESENTATIVE ON CALL AT ALL TIMES FOR
EMERGENCY MAINTENANCE OF ON AIRPORT HAZARD LIGHTING, RUNWAY CLOSURE
MARKERS, AND BARRICADES.
25. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL ACTIVATE ANY
ELECTRICAL FIXTURES WITHIN THE INTENDED OVERALL PROJECT WORK AREA AND
TAKE NOTE OF ITS EXISTING CONDITIONS. AFTER CONCLUDING THE OVERALL
PROJECT, CONTRACTOR SHALL REACTIVATE ANY ELECTRICAL FIXTURES WITHIN THE
INTENDED OVERALL PROJECT WORK AREA AND TAKE NOTE OF ITS FINAL CONDITIONS.
GRADING NOTES
1. SELECTIVE GRADING SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER AND WILL
BE PAID IN ACCORDANCE WITH ITEM P-152.
2. ALL EARTHWORK AND UNCLASSIFIED EXCAVATION QUANTITIES FOR THE PROPOSED
WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONSTRUCTION AND
ESTABLISHMENT OF THE PROPOSED CONCRETE PAPI PADS.
3. ALL SPOIL MATERIAL WHICH IS SUITABLE FOR EMBANKMENT AND EXCESS TOPSOIL
SHALL BE DISPOSED OF ON AIRPORT PROPERTY AS SHOWN ON THE CONTRACT
DRAWINGS, UNLESS OTHERWISE DIRECTED BY THE AIRPORT AUTHORITIES. SPOIL
MATERIAL WHICH IS NOT SUITABLE FOR EMBANKMENT SHALL BE DISPOSED OF OFF
AIRPORT.
4. EMBANKMENTS SHALL BE CONSTRUCTED WITH SUITABLE ON-SITE MATERIAL UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
5. THE LIMITS FOR HYDROSEEDING OR SODDING ARE THE LIMITS OF GRADING SHOWN
ON THE GRADING PLANS. ALL AREAS OUTSIDE OF THE GRADING LIMITS WHICH ARE
DISTURBED SHALL BE RESTORED, WITH SOD, BY THE CONTRACTOR AT HIS OR HER
EXPENSE.
6. THE COST OF MEASURES AND PRACTICES FOR COMPLIANCE WITH POLLUTION,
EROSION, AND SILTATION CONTROL SUCH AS AIR POLLUTION PREVENTION, WATER
POLLUTION PREVENTION, TEMPORARY SEEDING, TEMPORARY MULCHING,
CONSTRUCTION ROAD STABILIZATION, DUST CONTROL, PROTECTING VEGETATION,
AND EROSION AND SILTATION CONTROL PRACTICES DUE TO THE CONTRACTOR'S
MEANS AND METHODS, SHALL BE INCLUDED IN ITEM C-102 UNDER PAYMENT FOR
TEMPORARY AIR & WATER POLLUTION, SOIL EROSION AND SILTATION CONTROL.
7. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN
PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED
UNTIL THE NEW SLOPES ARE STABILIZED WITH SODDING AND/OR SLOPE PROTECTION.
8. ALL GRADING AREAS SHALL BE RESTORED WITH SOD. ALL AREAS OF SODDING SHALL
BE SMOOTH AND FREE OF RUTTING AT THE COMPLETION OF THE PROJECT.
9. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ADEQUATE GROWTH
OF GRASS FOR ALL AREAS RESTORED WITH SOD. CONTRACTOR SHALL WATER AND
MAINTAIN THE SOD AS NECESSARY TO ENSURE CURRENT AND FUTURE GROWTH.
FINAL PAYMENTS SHALL NOT BE MADE UNTIL FULL GRASS IS ACHIEVED AS
DETERMINED BY THE CONTRACTOR.
A4 SHEET INDEX
GENERAL NOTES,
ABBREVIATIONS
AND SHEET INDEX
GI002
DJN
JCW
ALB
SHEET INDEX TABLE
SHEET
NUMBER SHEET TITLE
GI001 COVER
GI002 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
GC100 GENERAL SITE PLAN
GC101 CONSTRUCTION SAFETY AND PHASING PLAN
GC102 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA A
GC103 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA B
GC104 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA C
GC105 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA D
GC106 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA E
GC107 CONSTRUCTION SAFETY AND PHASING PLAN NOTES AND DETAILS
GC108 PAPI LSCS AND OCS OBSTACLE OBSTRUCTION MITIGATION PLAN
E001 AIRFIELD ELECTRICAL GENERAL NOTES
E002 AIRFIELD ELECTRICAL SYMBOL LEGEND
E003 AIRFIELD ELECTRICAL KEY PLAN
E004 FOD MITIGATION DETAILS AND NOTES
E101 EXISTING CONDITIONS AND DEMOLITION PLAN
E102 EXISTING CONDTIONS AND DEMOLITION PLAN
E103 EXISTING CONDITIONS AND DEMOLITION PLAN
E104 EXISTING CONDITIONS AND DEMOLITION PLAN
E105 EXISTING CONDITIONS AND DEMOLITION PLAN
E106 EXISTING CONDITIONS AND DEMOLITION PLAN
E107 EXISTING CONDITIONS AND DEMOLITION PLAN
E108 EXISTING CONDITIONS AND DEMOLITION PLAN
E201 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E202 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E203 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E204 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E205 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E206 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E207 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E208 AIRFIELD LIGHTING LAYOUT AND CIRCUITING PLAN
E301 RW 7 PAPI SITING AND LAYOUT
E302 RW 25 PAPI SITING AND LAYOUT
E303 RW 29 PAPI SITING AND LAYOUT
E304 PAPI LIGHT HOUSING ASSEMBLY INSTALLATION DETAILS
E305 PAPI DISTRIBUTION EQUIPMENT RACK DETAILS
E306 PAPI EQUIPMENT GROUNDING DETAILS
E307 PAPI INSTALLATION DETAILS
E308 PAPI INSTALLATION DETAILS
E309 PAPI INSTALLATION DETAILS
E310 PAPI INSTALLATION DETAILS
E311 PAPI INSTALLATION DETAILS
E312 PAPI FOUNDATION DETAILS
E313 DUCT AND ID TAG DETAILS
EV101 EXISTING AIRFIELD LIGHTING VAULT FLOOR PLAN
EV102 EXISTING AIRFIELD LIGHTING GENERATOR EQUIPMENT
EV103 EXISTING AIRFIELD LIGHTING VAULT DISTRIBUTION PANEL SCHEDULE
EV104 EXISITING PANEL A (ATCT) DISTRIBUTION PANEL SCHEDULE
EV105 EXISTING AIRFIELD LIGHTING VAULT AND ATCT ONE-LINE DIAGRAM
EV201 PROPOSED AIRFIELD LIGHTING VAULT AND GENERATOR PLAN
EV202 PROPOSED GENERATOR WIRING PLAN
EV203 PROPOSED AIRFIELD LIGHTING VAULT AND ATCT ONE-LINE DIAGRAM
EV204 GENERATOR PAD DETAIL AND GAS LINE CONNECTION PLAN
CG101 GRADING PLAN
CG102 GRADING PLAN
V:\2023\2023.287.05 - EVB - PAPI Replacement\2023.287.05 - CADD\202328705_GI Series.dwg 4/17/2026 4:46 PM 4/17/2026 4:46 PM
TOFA
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
TC
W M
I I
TOFA
TOFA
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C O
TC
W M
I I
GRAPHIC SCALE (FT)
700350175
NORTH
A1 SHEET LEGEND A2 SHEET NOTES
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
NEW SMYRNA BEACH
MUNICIPAL AIRPORT
NEW SMYRNA BEACH,
FLORIDA
PAPI REPLACEMENT ON
RUNWAYS 7, 25 AND 29
AND ELECTRICAL VAULT
UPGRADES
202328705_GC SERIES
PROFESSIONAL SEAL
CADD:
AVCON PROJECT NO.
FAA AIG NO.
FDOT FM NO. 453565-1-94-01
3-12-0054-029-2023
2023.287.05
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
T
H
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
B
ID
D
O C
U M
EN
TS
SEAL
GENERAL SITE PLAN
GC100
DJN
JW
ALB
B1 GENERAL SITE PLAN
1. THE PROJECT GENERALLY CONSISTS OF THE REPLACEMENT OF THE PRECISION APPROACH PATH INDICATOR FIXTURES FOR RUNWAYS 7, 25, AND 29 AT THE NEW SMYRNA BEACH MUNICIPAL AIRPORT. ASSOCIATED ELECTRICAL INFRASTRUCTURE IMPROVEMENTS SHALL INCLUDE BUT NOT BE LIMITED TO REPLACEMENT OF THE APPLICABLE PAPI POWER AND CONTROL SERVICES, NEW CONDUIT, COUNTERPOISE AND CABLE INSTALLATIONS, REPLACEMENT OF THE EMERGENCY BACKUP GENERATOR, ANY NECESSARY MODIFICATIONS IN THE AIRFIELD ELECTRICAL VAULT TO ACCOMMODATE THE NEW PAPI INSTALLATIONS, AND INSTALLATION OF NEW CONCRETE PAPI MAINTENANCE PADS. ADDITIONALLY CIVIL RELATED ITEMS ASSOCIATED WITH THIS PROJECT INCLUDE BUT IS NOT LIMITED TO TREE CUTTING OPERATIONS AND MINOR GRADING AND RESTORATION OPERATIONS.
2. INSTALLATION OF NEW PAPI SYSTEMS SHALL OCCUR ONLY WHEN THE CORRESPONDING RUNWAY IS CLOSED AND UNAVAILABLE TO AIRCRAFT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER ONE WEEK PRIOR TO ANY RUNWAY CLOSURES SO THAT THE APPROPRIATE NOTAMS MAY BE ISSUED.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING ALL NEW ELECTRICAL FIXTURES IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING OR RESTORING THE CONSTRUCTION ACCESS ROUTES SEEN ON SHEETS GC101-GC106 AS NEEDED TO MAINTAIN SAFE AND
EFFICIENT ACCESS TO THE PROJECT SITE.
5. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND LANDSIDE) CLEAN AND FREE OF DEBRIS. A POWER BROOM OR EQUIVALENT SHALL BE ON SITE AND AVAILABLE AT ALL TIMES FOR CLEANING OF PAVEMENT SURFACES. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND MAINTAINING OF EXISTING PAVEMENT SURFACES, AS
IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK.
6. UPON APPROVAL FROM THE ENGINEER OF RECORD AND THE OWNER, THE CONTRACTOR SHALL BE PERMITTED TO PERFORM NIGHTTIME CONSTRUCTION. IF APPROVED, THE CONTRACTOR SHALL PROVIDE A NIGHTTIME LIGHTING PLAN TO BE APPROVED BY THE ENGINEER. THE LIGHTING PLAN SHALL ADHERE TO REQUIREMENTS SET FORTH IN THE FAA
AIRPORT CIRCULAR 150-5370-2(CURRENT EDITION).
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE DETAILED AS-BUILTS OF THE RUNWAY 7, 25, AND 29 PAPI CIRCUITRY AND ANY ELECTRICAL INFRASTRUCTURE ASSOCIATED WITH
THE NEW INSTALLATION.
8. THE CONTRACTOR SHALL LOCATE AND UTILIZE EXISTING DUCTS WHERE SHOWN ON PLANS. IF NECESSARY, THE CONTRACTOR SHALL MANDREL EXISTING DUCTS TO DETERMINE ACCEPTABILITY FOR USE. IF EXISTING DUCTS SHOWN ARE DAMAGED, NONEXISTENT, OR ROUTED DIFFERENTLY, CONTACT THE ENGINEER.
9. THE CONTRACTOR SHALL POSITION THE NEW PAPI LHA WITH SURVEY INSTRUMENTS IN ACCORDANCE WITH SHEETS E301-E303. THE CONTRACTOR SHALL STAKE THE LOCATIONS OF ALL NEW BASE CANS PRIOR TO INSTALLATION TO DEMONSTRATE ACCURACY OF LAYOUT, SPACING INTERVALS, AND COORDINATION WITH SITE FEATURES AS NECESSARY. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO BRING CONFLICTS TO THE ATTENTION OF THE ENGINEER.
AIRFIELD ELECTRICAL
VAULT
MAINTENANCE
HANGER
RUNWAY 7-25 (5,000' X 75')
RUNWAY 2-
(4 ,00
0' X 10
0')
RUNWAY 11-29 (4,319' X 75')
TAXIWAY B
TAXIW
AY B
TAXIWAY A
TAXIWAY A
TAXIW
AY D
TAXIW
AY E
TAXIW
AY C
ATCT
AIRGATE
AVIATION
FBO
AIRPORT
ADMIN
BUILDING
AIRPORT PROPERTY
LINE, (TYP.)
EXISTING FENCELINE,
(TYP.)
HANGAR
HANGAR
HANGAR
H
AN
G
AR
AIRCRAFT
PARKING
APRON
M
AIN
TEN
AN
C E
H
AN
G
AR
FRANKLIN
INTERNATIONAL
H W
Y A1A/U .S. R
O U
TE 1/N
D
IXIE FW
Y
TURNBULL
BAY RD
SUNSET D
RIVE
SOUTH STREET SOUTH STREET
VOLUSIA COUNTY
MOSQUITO
SERVICES
RUNWAY
OBJECT FREE
AREA, (TYP.)
RUNWAY SAFETY
AREA, (TYP.)
TAXIWAY OBJECT
FREE AREA, (TYP.)
SUNSET
DRIVE
NEW SMYRNA
BEACH
SPORTS
COMPLEX
LOST LAGOON
RESTAURANT
EXISTING AIRPORT
AWOS
AER
O
C
IR
C
LE
SKYLINE DRIVE
NEW PAPI HOMERUN ELECTRICAL
INFRASTRUCTURE TO BE INSTALLED.
NEW FOUR BOX PRECISION APPROACH PATH
INDICATOR (PAPI) SYSTEM LOCATION, (TYP.)
NEW ELECTRICAL AIRFIELD VAULT
UPGRADES AS NECESSARY TO
ACCOMMODATE AIRFIELD PAPI
INSTALLATIONS.
PROPOSED RUNWAY
7 PAPI LOCATION
PROPOSED RUNWAY
25 PAPI LOCATION
PROPOSED RUNWAY
29 PAPI LOCATION
TAXIW
AY D
TAXIW
AY E
TAXIWAY A
RUNWAY 7 PAPI CIRCUIT HOMERUN
JUNCTION CAN PLAZA LOCATION
RUNWAY 29 PAPI CIRCUIT
HOMERUN JUNCTION CAN PLAZA
LOCATION
RUNWAY 25 PAPI CIRCUIT
HOMERUN ELECTRICAL
MANHOLE LOCATION
PROPOSED TREE CLEAR
CUTTING AREA, SEE
SHEET GC108 FOR MORE
INFORMATION.
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
V:\2023\2023.287.05 - EVB - PAPI Replacement\2023.287.05 - CADD\202328705_GC Series.dwg 4/17/2026 4:46 PM 4/17/2026 4:46 PM
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
TC
W M
I I
TOFA
TOFA
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C O
TC
W M
I I
GRAPHIC SCALE (FT)
700350175
NORTH
A1 SHEET LEGEND A4 HDPE LOW PROFILE BARRICADEA2 SHEET NOTES
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
NEW SMYRNA BEACH
MUNICIPAL AIRPORT
NEW SMYRNA BEACH,
FLORIDA
PAPI REPLACEMENT ON
RUNWAYS 7, 25 AND 29
AND ELECTRICAL VAULT
UPGRADES
202328705_GC SERIES
PROFESSIONAL SEAL
CADD:
AVCON PROJECT NO.
FAA AIG NO.
FDOT FM NO. 453565-1-94-01
3-12-0054-029-2023
2023.287.05
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
T
H
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
B
ID
D
O C
U M
EN
TS
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN
GC101
DJN
JW
ALB
B1 CONSTRUCTION SAFETY AND PHASING PLAN
NOTES:
1. BARRICADES SHALL BE 6" X 8' AIRPORT LOW PROFILE BARRICADE (ORANGE) AS
MANUFACTURED BY NEUBERT AERO CORP OR AN APPROVED EQUIVALENT.
2. FLAT, BIDIRECTIONAL WARNING LIGHTS WILL NOT BE ACCEPTABLE.
3. EXACT LOCATIONS SHALL BE DETERMINED DURING CONSTRUCTION BY THE ENGINEER.
4. BARRICADES SHALL BE WATER FILLED OR WEIGHTED IN A WAY TO PREVENT
MOVEMENT DUE TO WIND , JET BLAST, OR PROP WASH.
5. PLACEMENT, MAINTENANCE, AND REMOVAL OF BARRICADES SHALL NOT BE PAID
SEPARATELY AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND
PHASING PLAN COMPLIANCE (MOT).
360° SOLAR-POWERED
FLASHING RED WARNING
LIGHT
SAFETY ORANGE AND
WHITE, HIGH IMPACT, UV
RESISTANT, HDPE
WATER-FILLED BARRICADE
6" X 6' ORANGE AND WHITE
REFLECTIVE SHEETING,
CLASS B
CONNECTOR TO
NEXT UNIT, (TYP.)
8' (TYP.)
6" (T
YP
CONSTRUCTION SAFETY, PHASING AND SITE ACCESS NOTES:
1. ANY STOCKPILED MATERIALS AND EQUIPMENT VEHICLES ON SITE ARE NOT
PERMITTED WITHIN THE RSA OR ROFA OF AN OPERATIONAL RUNWAY, UNLESS
GIVEN PROPER APPROVAL FROM THE RPR, AIRPORT STAFF AND ATCT.
2. THE CONTRACTOR SHALL BE REQUIRED TO HAVE A QUALIFIED REPRESENTATIVE
ON SITE THAT CAN PROPERLY COMMUNICATE WITH THE ATCT STAFF VIA RADIO
COMMUNICATIONS AT ALL TIMES. RADIO FREQUENCY SHALL BE SET TO 121.325 AT
ALL TIMES DURING CONSTRUCTION OPERATION DAYS. ANY CONTRACTOR
VEHICLES PRESENT ON THE CONSTRUCTION SITE WILL BE REQUIRED TO HAVE
THEIR VEHICLES EQUIPPED WITH RADIOS. BASED ON THE RESPECTIVE WORK
AREA, PORTIONS OR ALL OF THE AIRPORT WILL REMAIN OPEN AND ACTIVE
DURING THE COURSE OF THIS PROJECT. MAINTAINING OPEN LINES OF
COMMUNICATION WITH THE TOWER IS REQUIRED AT ALL TIMES.
3. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE MARKED WORK
AREA WITHOUT PRIOR APPROVAL OR COORDINATE PROPERLY WITH THE
REQUIRED PARTIES MAY RESULT IN PERMANENT EXPULSION FROM THE AIRPORT.
4. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO ACTIVE WORK AREAS SHALL BE
CONTINUALLY SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT
ACTIVE AIRFIELD PAVEMENT SURFACES ARE CLEAR AND FREE OF CONSTRUCTION
DEBRIS, DUST, OR FOD. SELECTIVE SWEEPING AND AIRFIELD PAVEMENT
MAINTENANCE MAY BE DIRECTED BY THE RPR AND SHALL BE INCIDENTAL TO ITEM
GP-80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE (MOT).
5. THE CONTRACTOR SHALL HAVE A REPRESENTATIVE ON CALL AT ALL TIMES FOR
EMERGENCY MAINTENANCE OF ON AIRPORT HAZARD LIGHTING, RUNWAY
CLOSURE MARKERS, AND BARRICADES.
6. THE CONTRACTOR SHALL ACTIVELY MONITOR THE STATUS OF ANY RUNWAY
CLOSURE MARKERS ON SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP
ALL ACTIVE RUNWAY CLOSURE MARKERS OPERATIONAL AND FULLY FUNCTIONING
WHILE IN USE.
7. DURING THE COURSE OF THIS PROJECT THE CONTRACTOR WILL HAVE TO CROSS
OVER EXISTING ASPHALT PAVEMENT AREAS TO ACCESS THE DESIGNATED PLAN
WORK AREAS. THE CONTRACTOR SHALL TAKE EXTRA PRECAUTIONS TO AVOID
PAVEMENT DAMAGES. ANY PAVEMENT AREAS OUTSIDE OF THE PROJECT SCOPE
OF WORK THAT HAS BEEN ALTERED OR DAMAGED AS A RESULT OF WORK WILL BE
RESTORED TO ORIGINAL CONDITION OR BETTER, AT THE CONTRACTOR'S
EXPENSE.
8. THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS
DIRECTED BY THE ENGINEER FOR DUST CONTROL. NO DIRECT PAYMENT SHALL BE
MADE FOR CONSTRUCTION SITE DUST CONTROL, AS IT IS A NECESSARY AND
INCIDENTAL PORTION OF THE WORK. THE CONTRACTOR SHALL BE REQUIRED TO
COORDINATE WITH THE AIRPORT OR THE COUNTY TO ACQUIRE A CONSTRUCTION
WATER METER.
9. THROUGHOUT THE COURSE OF THE PROJECT THE CONTRACTOR SHALL HAVE
ACCESS TO THE SITE VIA MULTIPLE AIRPORT SECURITY GATES. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO COORDINATE ACCESS THROUGH THESE
GATES WITH THE ENGINEER OF RECORD AND AIRPORT STAFF AS NECESSARY TO
FACILITATE THE FLOW OF WORK IN A SAFE AND ORDERLY MANNER. ANY ACCESS
GATE THAT IS DAMAGED OVER THE COURSE OF THE PROJECT SHALL BE
RESTORED TO EXISTING CONDITIONS OR BETTER.
WORK AREA A
WORK AREA B
WORK AREA C
WORK AREA D
WORK AREA E
CONTRACTOR STAGING, STORAGE,
EQUIPMENT LAYDOWN AREA, STOCKPILE
AREA, AND PERSONAL VEHICLE PARKING
AREA
LIGHTED CLOSED RUNWAY MARKER
COLOR CODED BASED ON WORK
AREA, SEE DETAIL C3/GC107. SEE
SHEETS GC102-GC106 FOR
ADDITIONAL INFORMATION.
CONTRACTOR ACCESS ROUTE,
(TYP.)
TAXIWAY B
CONTRACTOR ACCESS
TO SITE SHALL BE
THROUGH AN EXISTING
20' DOUBLE SWING
GATE.CONTRACTOR
ACCESS TO SITE
SHALL BE
THROUGH AN
EXISTING 16'
SWING GATE.
LOW-PROFILE BARRICADES,
SEE DETAIL A4 THIS SHEET
CONTRACTOR ACCESS TO
SITE SHALL BE THROUGH AN
EXISTING CANTILEVER SLIDE
GATE
CONTRACTOR ACCESS TO SITE
SHALL BE THROUGH AN
EXISTING AUTOMATIC
CANTILEVER SLIDE GATE
AIRFIELD ELECTRICAL
VAULT
MAINTENANCE
HANGAR
RUNWAY 7-25 (5,000' X 75')
RUNWAY 2-
(4 ,00
0' X 10
0')
RUNWAY 11-29 (4,319' X 75')
TAXIWAY B
TAXIW
AY B
TAXIWAY A
TAXIWAY A
TAXIW
AY D
TAXIW
AY E
TAXIW
AY C
ATCT
AIRGATE
AVIATION
FBO
AIRPORT
ADMIN
BUILDING
AIRPORT PROPERTY
LINE, (TYP.)
EXISTING FENCELINE,
(TYP.)
HANGAR
HANGAR
HANGAR
H
AN
G
AR
AIRCRAFT
PARKING
APRON
M
AIN
TEN
AN
C E
H
AN
G
AR
FRANKLIN
INTERNATIONAL
H W
Y A1A/U .S. R
O U
TE 1/N
D
IXIE FW
Y
TURNBULL
BAY RD
SOUTH STREET SOUTH STREET
VOLUSIA COUNTY
MOSQUITO
SERVICES
RUNWAY
OBJECT FREE
AREA, (TYP.)
TAXIWAY OBJECT
FREE AREA, (TYP.)
SUNSET
DRIVE
NEW SMYRNA BEACH
SPORTS COMPLEX
LOST LAGOON
RESTAURANT
EXISTING
AIRPORT
AWOS
SKYLINE DRIVE
TAXIW
AY D
TAXIW
AY E
TAXIWAY A
SUNSET
DRIVE
AERO CRICLE
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
V:\2023\2023.287.05 - EVB - PAPI Replacement\2023.287.05 - CADD\202328705_GC Series.dwg 4/17/2026 4:46 PM 4/17/2026 4:46 PM
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
TC
W M
I I
TOFA
TOFA
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C O
TC
W M
I I
GRAPHIC SCALE (FT)
700350175
NORTH
A1 SHEET LEGEND A2 CONSTRUCTION SAFETY AND PHASING PLAN NOTES
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
NEW SMYRNA BEACH
MUNICIPAL AIRPORT
NEW SMYRNA BEACH,
FLORIDA
PAPI REPLACEMENT ON
RUNWAYS 7, 25 AND 29
AND ELECTRICAL VAULT
UPGRADES
202328705_GC SERIES
PROFESSIONAL SEAL
CADD:
AVCON PROJECT NO.
FAA AIG NO.
FDOT FM NO. 453565-1-94-01
3-12-0054-029-2023
2023.287.05
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
T
H
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
B
ID
D
O C
U M
EN
TS
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN -
WORK AREA A
GC102
DJN
JW
ALB
B1 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA A
CONSTRUCTION SAFETY, PHASING AND SITE ACCESS NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB
SITE AT ALL TIMES.
2. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO
AIRCRAFT AT ALL TIMES.
3. UNDER NO CIRCUMSTANCE SHALL CONTRACTOR LEAVE THE MARKED WORK AREA
WITHOUT PRIOR APPROVAL OR COORDINATE PROPERLY WITH THE REQUIRED
PARTIES MAY RESULT IN PERMANENT EXPULSION FROM THE AIRPORT.
4. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT
OWNED ACCESS GATE THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED,
ANY EXISTING AIRPORT GATE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL
CONDITIONS. ANY ACCESS GATE USED THROUGHOUT THE DURATION OF THE
PROJECT SHALL BE LOCKED BY THE CONTRACTOR WHEN NOT IN USE, UNLESS
MONITORED BY A QUALIFIED CONTRACTOR REPRESENTATIVE.
5. WORK AREA A SHALL BE LIMITED TO 21 CONSECUTIVE CALENDAR DAYS. THE
WORKING HOURS FOR WORK AREA A SHALL BE MONDAY THROUGH FRIDAY, 7:00
AM - 5:00 PM. WORK AREA A SHALL INCLUDE A FULL CLOSURE OF RUNWAY 7-25
AND A PARTIAL CLOSURE OF TAXIWAY A, TAXIWAY B, AND TAXIWAY C. WORK IN
WORK AREA A SHALL TAKE PLACE CONCURRENTLY WITH WORK WITHIN WORK
AREA B.
6. SCHEDULING AND COORDINATION OF A FAA FLIGHT CHECK FOR THE PROPOSED
RUNWAY 7 PAPI SYSTEM IS A NECESSARY PART OF THE PROPOSED WORK.
COMPLETION AND APPROVAL OF THE FAA FLIGHT CHECK IS NECESSARY PRIOR TO
THE DEMOLITION OF THE EXISTING RUNWAY 7 PAPI SYSTEM AND THE OPERATION
OF THE NEW RUNWAY 7 PAPI SYSTEM. THE CONTRACTOR SHALL NOTIFY THE
AIRPORT AND ENGINEERING STAFF OF THE PROPOSED FAA FLIGHT CHECK DATE
ONCE ACQUIRED.
7. THE CONTRACTOR SHALL BE AWARE OF POTENTIAL WET OR SOFT SUBGRADE
CONDITIONS WITHIN THE VICINITY OF THE PROPOSED STAGING AREA. IT IS THE
CONTRACTOR'S RESPONSIBILITY EVALUATE AND VERIFY THE EXISTING SITE
CONDITIONS AND TO ENSURE THE PROPOSED STAGING AREA IS VIABLE FOR
CONSTRUCTION OPERATIONS.
8. WORK AREA A SHALL CONSIST OF ALL CIVIL AND ELECTRICAL SCOPE INCLUDING
BUT NOT LIMITED TO DEMOLITION OF EXISTING ELECTRICAL INFRASTRUCTURE,
ESTABLISHMENT OF NEW CONCRETE MAINTENANCE PADS, INSTALLATION OF A
NEW PAPI FIXTURE, INSTALLATION OF NEW CONDUIT, COUNTERPOISE AND CABLE,
TREE CUTTING OPERATIONS, TREE CUTTING AND MINOR GRADING AND
RESTORATION OPERATIONS.
9. FOD CHECKS AND AIRFIELD LIGHTING FIXTURE CHECKS SHALL BE COMPLETED
PRIOR TO COMPLETING A WORK AREA AND TURNING BACK OVER TO THE OWNER
AND ATCT FOR AIRCRAFT USE.
10. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY
CIRCUMSTANCES WITHIN THE AOA. ONLY PROPERLY MARKED AND LIGHTED
CONTRACTOR VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED IN
THE AOA OR THE ACTIVE WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.
11. BARRICADES SHALL BE PLACED IN THE LOCATIONS IDENTIFIED ON THE PLANS AND
APPROVED BY THE RPR. BARRICADES SHALL BE WATER FILLED OR WEIGHTED IN A
MANNER ACCEPTABLE TO THE OWNER OR RPR. 2 LIGHTS PER BARRICADE SHALL BE
REQUIRED, WITHOUT EXCEPTION, AND MAXIMUM SPACING BETWEEN BARRICADES
SHALL NOT EXCEED THE LENGTH OF 1 FULL BARRICADE.
12. THE CONTRACTOR IS REQUIRED TO SUPPLY AND MAINTAIN ALL LIGHTED RUNWAY
CLOSURE MARKERS FOR THE DURATION OF THE WORK AREA/PROJECT. RUNWAY
CLOSURE MARKERS SHALL BE PLACED AT BOTH ENDS OF RUNWAY 7-25 CENTERED
DIRECTLY ABOVE THE RUNWAY 7 AND RUNWAY 25 LANDING DESIGNATORS UNLESS
OTHERWISE DIRECTED BY THE RPR, OWNER, OR ATCT MANAGER. LIGHTED CLOSED
RUNWAY MARKERS SHALL REMAIN ON AND IN GOOD WORKING CONDITION IN
ACCORDANCE WITH THE REQUIREMENTS OF THE CSPP.
13. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO ACTIVE WORK AREAS SHALL BE
CONTINUALLY SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT
ACTIVE AIRFIELD PAVEMENT SURFACES ARE CLEAR AND FREE OF CONSTRUCTION
DEBRIS, DUST, OR FOD. SELECTIVE SWEEPING AND AIRFIELD PAVEMENT
MAINTENANCE MAY BE DIRECTED BY THE RPR AND SHALL BE INCIDENTAL TO ITEM
GP-80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE (MOT).
CONTRACTOR ACCESS
TO SITE SHALL BE
THROUGH AN EXISTING
16' SWING GATE.
WORK AREA A
CONTRACTOR STAGING, STORAGE,
EQUIPMENT LAYDOWN AREA,
STOCKPILE AREA, AND PERSONAL
VEHICLE PARKING AREA
LIGHTED CLOSED RUNWAY
MARKER, SEE DETAIL C3/GC107
CONTRACTOR ACCESS
ROUTE, (TYP.)
CONTRACTOR ACCESS
ROUTE, (TYP.)
AIRCRAFT TAXI
ROUTES, (TYP.)
HDPE LOW PROFILE
BARRICADE, SEE
DETAIL A4/GC101
TAXIWAY B
AIRFIELD
ELECTRICAL
VAULT
MAINTENANCE
HANGAR
RUNWAY 7-25 (4,856' X 75')
RUNWAY 2-
(4 ,00
0' X 10
0')
RUNWAY 11-29 (4,319' X 75')
TAXIWAY B
TAXIW
AY B
TAXIWAY A
TAXIWAY A
TAXIW
AY D
TAXIW
AY C
ATCT
AIRGATE
AVIATION
FBO
AIRPORT
ADMIN
BUILDING
AIRPORT PROPERTY
LINE, (TYP.)
EXISTING FENCELINE,
(TYP.)
HANGAR
HANGAR
HANGAR
H
AN
G
AR
AIRCRAFT
PARKING
APRON
M
AIN
TEN
AN
C E
H
AN
G
AR
FRANKLIN
INTERNATIONAL
H W
Y A1A/U .S. R
O U
TE 1/N
D
IXIE FW
Y
TURNBULL
BAY RD
SOUTH STREET SOUTH STREET
VOLUSIA COUNTY
MOSQUITO SERVICES
RUNWAY OBJECT
FREE AREA, (TYP.)
TAXIWAY OBJECT
FREE AREA, (TYP.)
SUNSET
DRIVE
LOST LAGOON
RESTAURANT
EXISTING
AIRPORT
AWOS
SKYLINE DRIVE
TAXIW
AY D
TAXIW
AY E
SUNSET
DRIVE
AERO CRICLE
TAXIW
AY E
NEW SMYRNA BEACH
SPORTS COMPLEX
PLEASE REFER TO SHEET
GC108 FOR MORE
INFORMATION ON PROPOSED
TREE CUTTING OPERATIONS.
SEE NOTE 7.
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
V:\2023\2023.287.05 - EVB - PAPI Replacement\2023.287.05 - CADD\202328705_GC Series.dwg 4/17/2026 4:46 PM 4/17/2026 4:46 PM
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
TC
W M
I I
TOFA
TOFA
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C O
TC
W M
I I
GRAPHIC SCALE (FT)
700350175
NORTH
A1 SHEET LEGEND A2 CONSTRUCTION SAFETY AND PHASING PLAN NOTES
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
NEW SMYRNA BEACH
MUNICIPAL AIRPORT
NEW SMYRNA BEACH,
FLORIDA
PAPI REPLACEMENT ON
RUNWAYS 7, 25 AND 29
AND ELECTRICAL VAULT
UPGRADES
202328705_GC SERIES
PROFESSIONAL SEAL
CADD:
AVCON PROJECT NO.
FAA AIG NO.
FDOT FM NO. 453565-1-94-01
3-12-0054-029-2023
2023.287.05
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
T
H
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
B
ID
D
O C
U M
EN
TS
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN -
WORK AREA B
GC103
DJN
JW
ALB
B1 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA B
CONSTRUCTION SAFETY, PHASING AND SITE ACCESS NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB
SITE AT ALL TIMES.
2. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO
AIRCRAFT AT ALL TIMES.
3. UNDER NO CIRCUMSTANCE SHALL CONTRACTOR LEAVE THE MARKED WORK AREA
WITHOUT PRIOR APPROVAL OR COORDINATE PROPERLY WITH THE REQUIRED
PARTIES MAY RESULT IN PERMANENT EXPULSION FROM THE AIRPORT.
4. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT
OWNED ACCESS GATE THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED,
ANY EXISTING AIRPORT GATE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL
CONDITIONS. ANY ACCESS GATE USED THROUGHOUT THE DURATION OF THE
PROJECT SHALL BE LOCKED BY THE CONTRACTOR WHEN NOT IN USE, UNLESS
MONITORED BY A QUALIFIED CONTRACTOR REPRESENTATIVE.
5. WORK AREA B SHALL BE LIMITED TO 21 CONSECUTIVE CALENDAR DAYS. THE
WORKING HOURS FOR WORK AREA B SHALL BE MONDAY THROUGH FRIDAY, 7:00
AM - 5:00 PM. WORK AREA B SHALL INCLUDE A FULL CLOSURE OF RUNWAY 7-25
AND A PARTIAL CLOSURE OF TAXIWAY A, TAXIWAY B, AND TAXIWAY C. WORK IN
WORK AREA B SHALL TAKE PLACE CONCURRENTLY WITH WORK WITHIN WORK
AREA A.
6. SCHEDULING AND COORDINATION OF A FAA FLIGHT CHECK FOR THE PROPOSED
RUNWAY 25 PAPI SYSTEM IS A NECESSARY PART OF THE PROPOSED WORK.
COMPLETION AND APPROVAL OF THE FAA FLIGHT CHECK IS NECESSARY PRIOR TO
THE DEMOLITION OF THE EXISTING RUNWAY 25 PAPI SYSTEM AND THE OPERATION
OF THE NEW RUNWAY 25 PAPI SYSTEM. THE CONTRACTOR SHALL NOTIFY THE
AIRPORT AND ENGINEERING STAFF OF THE PROPOSED FAA FLIGHT CHECK DATE
ONCE ACQUIRED.
7. WORK AREA B SHALL CONSIST OF ALL CIVIL AND ELECTRICAL SCOPE INCLUDING
BUT NOT LIMITED TO DEMOLITION OF EXISTING ELECTRICAL INFRASTRUCTURE,
ESTABLISHMENT OF NEW CONCRETE MAINTENANCE PADS, INSTALLATION OF A
NEW PAPI FIXTURE, INSTALLATION OF NEW CONDUIT, COUNTERPOISE AND CABLE,
AND MINOR GRADING AND RESTORATION OPERATIONS.
8. WORK IN WORK AREA B MAY POTENTIALLY TAKE PLACE IN THE VICINITY OF AN
ACTIVE TOFA AREA. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMMUNICATE
WITH THE ATCT STAFF, WORK ON A PULL BACK BASIS, OR SUBMIT A REQUEST FOR
TAXIWAY CLOSURE IF NEEDED SO THAT AIRPORT OPERATIONS CONTINUE TO
OPERATE SAFELY AND EFFICIENTLY.
9. FOD CHECKS AND AIRFIELD LIGHTING FIXTURE CHECKS SHALL BE COMPLETED
PRIOR TO COMPLETING A WORK AREA AND TURNING BACK OVER TO THE OWNER
AND ATCT FOR AIRCRAFT USE.
10. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY
CIRCUMSTANCES WITHIN THE AOA. ONLY PROPERLY MARKED AND LIGHTED
CONTRACTOR VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED IN
THE AOA OR THE ACTIVE WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.
11. BARRICADES SHALL BE PLACED IN THE LOCATIONS IDENTIFIED ON THE PLANS AND
APPROVED BY THE RPR. BARRICADES SHALL BE WATER FILLED OR WEIGHTED IN A
MANNER ACCEPTABLE TO THE OWNER OR RPR. 2 LIGHTS PER BARRICADE SHALL
BE REQUIRED, WITHOUT EXCEPTION, AND MAXIMUM SPACING BETWEEN
BARRICADES SHALL NOT EXCEED THE LENGTH OF 1 FULL BARRICADE.
12. THE CONTRACTOR IS REQUIRED TO SUPPLY AND MAINTAIN ALL LIGHTED RUNWAY
CLOSURE MARKERS FOR THE DURATION OF THE WORK AREA/PROJECT. RUNWAY
CLOSURE MARKERS SHALL BE PLACED AT BOTH ENDS OF RUNWAY 7-25 CENTERED
DIRECTLY ABOVE THE RUNWAY 7 AND RUNWAY 25 LANDING DESIGNATORS UNLESS
OTHERWISE DIRECTED BY THE RPR, OWNER, OR ATCT MANAGER. LIGHTED CLOSED
RUNWAY MARKERS SHALL REMAIN ON AND IN GOOD WORKING CONDITION IN
ACCORDANCE WITH THE REQUIREMENTS OF THE CSPP.
13. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO ACTIVE WORK AREAS SHALL BE
CONTINUALLY SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT
ACTIVE AIRFIELD PAVEMENT SURFACES ARE CLEAR AND FREE OF CONSTRUCTION
DEBRIS, DUST, OR FOD. SELECTIVE SWEEPING AND AIRFIELD PAVEMENT
MAINTENANCE MAY BE DIRECTED BY THE RPR AND SHALL BE INCIDENTAL TO ITEM
GP-80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE (MOT).
CONTRACTOR STAGING, STORAGE,
EQUIPMENT LAYDOWN AREA,
STOCKPILE AREA, AND PERSONAL
VEHICLE PARKING AREA
LIGHTED CLOSED RUNWAY
MARKER, SEE DETAIL C3/GC107
CONTRACTOR ACCESS
ROUTE, (TYP.)
WORK AREA B
CONTRACTOR ACCESS
TO SITE SHALL BE
THROUGH AN EXISTING
20' DOUBLE SWING
GATE.
CONTRACTOR ACCESS
ROUTE, (TYP.)
AIRCRAFT TAXI
ROUTES, (TYP.)
HDPE LOW PROFILE
BARRICADE, SEE
DETAIL A4/GC101
TAXIWAY B
AIRFIELD
ELECTRICAL
VAULT
MAINTENANCE
HANGAR
RUNWAY 7-25 (4,856' X 75')
RUNWAY 2-
(4 ,00
0' X 10
0')
RUNWAY 11-29 (4,319' X 75')
TAXIWAY B
TAXIW
AY B
TAXIWAY A
TAXIWAY A
TAXIW
AY D
TAXIW
AY C
ATCT
AIRGATE
AVIATION
FBO
AIRPORT
ADMIN
BUILDING
AIRPORT PROPERTY
LINE, (TYP.)
EXISTING FENCELINE,
(TYP.)
HANGAR
HANGAR
HANGAR
H
AN
G
AR
AIRCRAFT
PARKING
APRON
M
AIN
TEN
AN
C E
H
AN
G
AR
FRANKLIN
INTERNATIONAL
H W
Y A1A/U .S. R
O U
TE 1/N
D
IXIE FW
Y
TURNBULL
BAY RD
SOUTH STREET SOUTH STREET
RUNWAY OBJECT
FREE AREA, (TYP.)
TAXIWAY OBJECT
FREE AREA, (TYP.)
SUNSET
DRIVE
LOST LAGOON
RESTAURANT
EXISTING
AIRPORT
AWOS
SKYLINE DRIVE
TAXIW
AY D
TAXIW
AY E
SUNSET
DRIVE
AERO CRICLE
TAXIW
AY E
NEW SMYRNA BEACH
SPORTS COMPLEX
VOLUSIA COUNTY
MOSQUITO SERVICES
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text st
AutoCAD SHX Text
PB
V:\2023\2023.287.05 - EVB - PAPI Replacement\2023.287.05 - CADD\202328705_GC Series.dwg 4/17/2026 4:46 PM 4/17/2026 4:46 PM
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
TC
W M
I I
TOFA
TOFA
TOFA
TOFA
RSA
RSA
RSA RSA
RSA
RSA
RSA RSA RSA RSA
RSA
RSA
RSA
RSA RSA
RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA ROFA ROFA
ROFA
ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
TOFA
TO
FA
TO
FA
TL
O
FA
TLO
FA
TOFA
TOFA
TOFA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
E
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C
TOFA TOFA
TOFA
TOFA TOFA
TOFA
C O
TC
W M
I I
GRAPHIC SCALE (FT)
700350175
NORTH
A1 SHEET LEGEND A2 CONSTRUCTION SAFETY AND PHASING PLAN NOTES
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
NEW SMYRNA BEACH
MUNICIPAL AIRPORT
NEW SMYRNA BEACH,
FLORIDA
PAPI REPLACEMENT ON
RUNWAYS 7, 25 AND 29
AND ELECTRICAL VAULT
UPGRADES
202328705_GC SERIES
PROFESSIONAL SEAL
CADD:
AVCON PROJECT NO.
FAA AIG NO.
FDOT FM NO. 453565-1-94-01
3-12-0054-029-2023
2023.287.05
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
MARCH 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
T
H
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
B
ID
D
O C
U M
EN
TS
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN -
WORK AREA C
GC104
DJN
JW
ALB
B1 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA C
CONSTRUCTION SAFETY, PHASING AND SITE ACCESS NOTES:
1. THE CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE
AT ALL TIMES.
2. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT
AT ALL TIMES.
3. UNDER NO CIRCUMSTANCE SHALL CONTRACTOR LEAVE THE MARKED WORK AREA
WITHOUT PRIOR APPROVAL OR COORDINATE PROPERLY WITH THE REQUIRED
PARTIES MAY RESULT IN PERMANENT EXPULSION FROM THE AIRPORT.
4. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT
OWNED ACCESS GATE THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY
EXISTING AIRPORT GATE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL
CONDITIONS. ANY ACCESS GATE USED THROUGHOUT THE DURATION OF THE
PROJECT SHALL BE LOCKED BY THE CONTRACTOR WHEN NOT IN USE, UNLESS
MONITORED BY A QUALIFIED CONTRACTOR REPRESENTATIVE.
5. WORK AREA C SHALL BE LIMITED TO 14 CONSECUTIVE CALENDAR DAYS. THE
WORKING HOURS FOR WORK AREA B SHALL BE MONDAY THROUGH FRIDAY, 7:00 AM -
5:00 PM. WORK AREA C SHALL INCLUDE A FULL CLOSURE OF RUNWAY 11-29. DURING
WORK WITHIN WORK AREA C, AREAS OF RUNWAY 11-29, TAXIWAY C AND TAXIWAY E
SOUTH OF TAXIWAY ALPHA SHALL BE CLASSIFIED AS NON-MOVEMENT AREAS. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO HAVE RADIO TRAINED PERSONNEL AT ALL
TIMES. THE CONTRACTOR SHALL YIELD TO AIRCRAFT AT ALL TIMES.
6. SCHEDULING AND COORDINATION OF A FAA FLIGHT CHECK FOR THE PROPOSED
RUNWAY 29 PAPI SYSTEM IS A NECESSARY PART OF THE PROPOSED WORK. THE
CONTRACTOR SHALL NOTIFY THE AIRPORT AND ENGINEERING STAFF OF THE
PROPOSED FAA FLIGHT CHECK DATE ONCE ACQUIRED. IF NECESSARY, THE
CONTRACTOR SHALL COORDINATE WITH THE EOR AND AIRPORT STAFF TO PLACE
NOTAMS TO OPERATE THE RUNWAY IN A LIMITED CAPACITY BASED ON THE
REQUIRED FAA FLIGHT CHECK DATE.
7. WORK AREA C SHALL CONSIST OF ALL CIVIL AND ELECTRICAL SCOPE INCLUDING BUT
NOT LIMITED TO DEMOLITION OF EXISTING ELECTRICAL INFRASTRUCTURE,
INSTALLATION OF A NEW PAPI FIXTURE, INSTALLATION OF NEW CONDUIT,
COUNTERPOISE AND CABLE, AND MINOR GRADING AND RESTORATION OPERATIONS.
8. FOD CHECKS AND AIRFIELD LIGHTING FIXTURE CHECKS SHALL BE COMPLETED PRIOR
TO COMPLETING A WORK AREA AND TURNING BACK OVER TO THE OWNER AND ATCT
FOR AIRCRAFT USE.
9. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY
CIRCUMSTANCES WITHIN THE AOA. ONLY PROPERLY MARKED AND LIGHTED
CONTRACTOR VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED IN THE
AOA OR THE ACTIVE WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.
10. BARRICADES SHALL BE PLACED IN THE LOCATIONS IDENTIFIED ON THE PLANS AND
APPROVED BY THE RPR. BARRICADES SHALL BE WATER FILLED OR WEIGHTED IN A
MANNER ACCEPTABLE TO THE OWNER OR RPR. 2 LIGHTS PER BARRICADE SHALL BE
REQUIRED, WITHOUT EXCEPTION, AND MAXIMUM SPACING BETWEEN BARRICADES
SHALL NOT EXCEED THE LENGTH OF 1 FULL BARRICADE.
11. THE CONTRACTOR IS REQUIRED TO SUPPLY AND MAINTAIN ALL LIGHTED CLOSURE
MARKERS FOR THE…