ITB 1211 Amendment 1 Administrative Document.docx
DOCX document 361 KB Posted
- Attached to
- Combination Sewer Cleaner Truck
- Solicitation number
- 1211
- Issued by
- Kootenai County, Idaho
About this file
This is an Invitation to Bid (ITB) Amendment 01 issued by the State of Idaho Division of Purchasing on behalf of the Idaho Transportation Department for the procurement of one Combination Sewer Cleaner Truck. The solicitation seeks qualified manufacturers or authorized distributors to provide a new, fully assembled sewer cleaning vehicle meeting specified industry standards. The pre-bid conference call is scheduled for April 15, 2026, at 9:00 AM Mountain Time, with a deadline for submitting written questions by April 21, 2026, at 11:59 PM MT. Bids must be submitted electronically through the IPRO eProcurement system by May 5, 2026, at 5:00 PM MT, with a public bid opening on May 6, 2026, at 10:30 AM MT and an anticipated award date of May 13, 2026, at 9:30 AM MT. The contract term commences upon final execution and terminates upon the buyer's formal acceptance of the equipment and remittance of full payment. The truck must be delivered to ITD District 1 Yard in Coeur d'Alene, Idaho, within 180–365 days after receipt of order, with delivery available Monday through Thursday, 8:00 AM to 4:00 PM local time.
The solicitation requires bidders to submit a fully burdened FOB destination price through Submittal Form B, with pricing entered in IPRO as $0.01 during submission. Bidders must be the manufacturer or an authorized distributor of the equipment and must provide proof of manufacturer warranty covering all parts, labor, and freight for a minimum of one year after acceptance. No set-asides, small business preferences, or incumbent vendor information are identified in this procurement. The truck specifications include a six-by-four chassis with 66,000-pound GVWR, turbo-charged diesel engine with minimum 450 horsepower, stainless steel debris tank with 15 cubic yard minimum capacity, 4,500 cubic feet per minute vacuum system, 1,300-gallon water tank, and comprehensive auxiliary systems including jetting, hydraulic, and freshwater wash-down capabilities. Required submission documents include Submittal Forms A, B, and C; authorized dealer letter; warranty coverages letter; product specification sheets; and redacted versions if trade secrets are included. The administrative fee under Article 5 of the State's Standard Contract Terms and Conditions will not apply to the resulting contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 1211 Bidders Questions.xlsx | XLSX spreadsheet | |
| State of Idaho Contract Terms and Conditions ITB 1211.docx | DOCX document | |
| Insurance Requirements ITB 1211.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
DIVISION OF PURCHASING
FOR
Idaho Transportation Department
Invitation To Bid
Combination Sewer Cleaner Truck
ITB Number: 1211 Amendment 01
Table of Contents
| ITB Section 1 – Administrative Information & Overview |
| Page 3 |
| ITB Section 2 – Format & Submission Requirements |
| Page 5 |
| ITB Section 3 – Evaluation & Award Procedures |
| Page 7 |
| Exhibit 1 – Background Information and Scope |
| Page 9 |
| Exhibit 2 – General Requirements |
| Page 10 |
| Exhibit 3 – Specifications |
| Page 13 |
| Exhibit 4 – Pre-Bid Conference Call Registration Form |
| Page 17 |
| Exhibit 5 – Questions |
| Page 18 |
| Exhibit 6 – Contract Modifications and Exceptions |
| Page 20 |
| Exhibit 7 – The Contract |
| Page 24 |
| Submittal Form A – Background, Declarations, and Certifications |
| Page 25 |
| Submittal Form B – Bid Schedule |
| Page 28 |
| Submittal Form C – Product Information Sheet |
| Page 29 |
Section 1 Administrative Information and Overview
1.1 Purpose
The State of Idaho’s (“State”) Division of Purchasing (“DOP”), on behalf of the Idaho Transportation Department (“ITD”) is issuing this Invitation To Bid (“ITB”) to solicit Bids from qualified and experienced firms (“Bidders”), that can provide one (1) Combination Sewer Cleaner Truck. Background information is provided in Exhibit 1. General requirements are set forth in Exhibit 2. Specifications are provided in Exhibit 3.
1.2 Procurement Schedule
Pre-Bid Conference Call:
Deadline to submit questions:
Closing Date (deadline to submit Bid):
Public Opening Date:
Anticipated Award Date:
The State will make every effort to adhere to the schedule below, but reserves the right, at its sole discretion, to adjust the schedule.
April 15th, 2026 @ 9:00 am MT April 21st, 2026 @ 11:59 pm MT May 5th, 2026 @ 5:00 pm MT (Note: in the event of a conflict between this document and the State’s ERP system, the closing date in the ERP system takes precedence.)
May 6th, 2026 @ 10:30 am MT May 13th, 2026 @ 9:30 am MT
1.3 ITB Lead
Name:
Title & Agency:
Email:
The individual listed below (referred to as “ITB Lead”) is responsible for the conduct of this procurement. From the issue date of this ITB, until a contract is awarded, or the ITB is cancelled, Bidders are prohibited from communicating with any State employee, Official, or Evaluators regarding this ITB or procurement.
Matt Batten Purchasing Officer, Idaho Division of Purchasing matt.batten@adm.idaho.gov
1.4 Pre-Bid Conference Call
A non-mandatory pre-bid conference call will be held on Monday, April 15th, 2026 @ 9:00am MT to provide an overview of the ITB process, the scope of work, and submission requirements. While attendance is highly encouraged, it is not mandatory. The meeting will be conducted virtually, with the access link provided to all interested participants who submit Exhibit 3 to the ITB Lead.
To inform the State of your planned interest and attendance, please complete and submit Exhibit 3 to the ITB Lead no later than 5:00 PM, Mountain Time, Friday, April 14th, 2026.
1.5 IPRO eProcurement System
This Solicitation is issued by the State via the State’s eProcurement system, IPRO. It is the Bidder’s responsibility to monitor IPRO for any updates or amendments.
Link: IPRO POWERED BY LUMA
| 1.6 Term of Contract |
| The term of this Contract shall commence upon its final execution by all parties and shall terminate upon the Buyer’s formal acceptance of the Equipment and remittance of full payment therefor. |
1.7 Bid Opening
Link:
A public bid opening will be made available via Microsoft Teams. Below is the information needed to access the call. Please review Section 1.2 for additional details.
https://teams.microsoft.com/meet/22977352026275?p=P38AMXIs7GSBeUnbLt
THE ADMINISTRATIVE FEE DETAILED IN ARTICLE 5 OF THE STATE’S STANDARD CONTRACT TERMS AND CONDITIONS WILL NOT APPLY TO THE CONTRACT(S) THAT RESULT FROM THIS SOLICITATION.
1.8 Questions
The Bidder must review this entire ITB solicitation, including associated documents. All questions, requests for clarification, or other correspondence must be submitted in writing via email to the ITB Lead. See Exhibit 5 for additional instructions. Questions must be submitted using the table provided within Exhibit 5.
1.9 Modifications and Exceptions to Requirements, Terms, and Conditions The Bidder must review the Contract requirements, terms, and conditions. The Bidder is strongly encouraged to submit any proposed modifications, or exceptions to the Contract requirements, terms, or conditions to the ITB Lead prior to the deadline for submitting questions. See Exhibit 6 for additional instructions. Modifications and exceptions must be submitted using the table provided within Exhibit 6.
Any modifications or exceptions that are raised after the Bid has been submitted, may be rejected by the State without further discussion. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period. Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, will be found non-responsive, and no further consideration will be given.
1.10 Amendments
The State may issue amendments to make changes to the ITB, or to respond to any questions. Amendments will be posted on IPRO. Bidders are responsible for monitoring IPRO for updates and amendments. All published amendments must become part of this ITB, and must be considered by the Bidder in its Bid. Oral interpretations or clarifications of this ITB are not binding and should not be relied upon. Any verbal responses provided by the State during the pre-Bid conference are considered unofficial, and will not be binding.
1.11 Authority
This procurement is conducted in accordance with IDAPA 38.05.01 and pursuant to Title 67, Chapter 92 of the Idaho Code.
Section 2 Format & Submission Requirements
2.1 Adherence to Requirements
The Bid must be submitted in accordance with the requirements set forth in this document. Any Bid that does not adhere to the requirements may be deemed non-responsive and rejected. The State reserves the right, in its sole discretion, to overlook any minor informalities that may be non-compliant.
2.2 Deadline to Submit
All Bids are due at the date and time specified in the Procurement Schedule (Section 1.2). Late Bids must not be accepted or considered. The State must not be responsible for any technical issues, difficulties, or delays. Bidders are strongly encouraged to begin the process of submitting the Bid response far enough in advance of the Closing Date/Time to allow for resolution of any technical difficulties.
2.3 General Format Requirements
The Bid response must meet the following requirements:
2.3.1 The Bidder must not embed information, embed files, or embed any links within the Submittals.
2.3.2 The Bidder must not attach additional information to any Submittal Form (unless it has been explicitly requested). Any additional attachments submitted will not be considered in the evaluation process.
2.4 Electronic Submission Instructions
The Bidder must submit the Bid as follows:
2.4.1 The Bid must be submitted electronically through IPRO POWERED BY LUMA. The State will not accept Bids in any other manner (i.e. facsimile, email, or hardcopy submissions). All Bidders participating in this Solicitation must establish an account in the IPRO system, as is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free.
Please make sure that the entity profile under which the Bid is submitted in IPRO, is the same legal entity presented in the uploaded response materials. If there are any discrepancies, the entity information provided within Submittal Form A prevails.
2.4.2 The Bid must be submitted in the following forms:
| Package |
| Contents |
| File Format |
| File Naming Conventions |
| 1 |
| Submittal Form A |
| MS Word/PDF |
| Form A – Insert Bidder Name |
| 2 |
| Submittal Form B |
| MS Excel |
| Form B – Insert Bidder Name |
| 3 |
| Submittal Form C |
| Word / Excel |
| Form C – Product Information Sheet |
| 4 |
| Authorized Dealer Letter |
| Dealer Letter - <Insert Bidder Name> |
| 5 |
| Warranty Coverages Letter |
| Warranty - <Insert Bidder Name> |
| 6 |
| Product Specification Sheets |
| Spec Sheets - <Insert Bidder Name> |
| 7 |
| Redacted Submittal Forms |
| File Name REDACTED 0 Insert Bidder Name |
2.4.3 All electronic files must be in Adobe PDF, Microsoft Word, or Microsoft Excel format as noted in the table above.
2.4.4 The Bid file(s) must not be password protected or locked in any way.
2.4.5 All submission materials must be submitted at the same time. If multiple submissions are received, only the latest timely submission will be considered.
2.4.6 Alternate Bids are not allowed.
2.4.7 The Authorized Dealer Letter (Package 4) must be on manufacturer letterhead, signed by an authorized manufacturer representative, identify the specific product lines the Bidder is authorized to sell, confirm authorization to provide warranty service, and be dated within twelve (12) months of the Bid closing date.
2.4.8 Note: When submitting through IPRO, enter your Cost in IPRO as “$0.01”.
2.4.9 Package 6: If your Bid contains trade secrets (see next Section), submit an additional redacted version. This should be labeled as Package 6 and include 'Redacted' in the file name.
2.5 Trade Secrets and Non-Public Information
The Idaho Public Records Act, Idaho Code title 74, chapter 1 (the “Act”) defines trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” The Act also defines other records that may be exempt from public disclosure.
In addition to marking each page of the document with a trade secret or other exemption notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:
1.
2.
2.1.
2.2.
2.3.
2.4.
2.5.
2.5.1. Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” or “exempt from disclosure” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” or “exempt” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret” or “exempt from disclosure.”
2.5.2. Provide a separate document entitled “List of Redacted Trade Secret and Exempt Information” which provides a succinct list of all trade secret and exempt information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure and how the exempting the material complies with the Act.
2.5.3. Submit a redacted copy of any Bid response document (e.g. Scope of Work Response) with all trade secret and exempt information removed or blacked out. The redacted copy must be submitted electronically in the Supplier Attachments section of IPRO, with the word “redacted” in the file name.
Section 3 Evaluation & Award Procedures
3.1 Mandatory Submission Requirements
All Bids will be reviewed on a "pass" or "fail" basis to ensure compliance with all mandatory submission requirements. Bids determined by the State, at its sole discretion, to be responsive in this regard will proceed to the evaluation process outlined in this Section. Bids that do not meet the mandatory submission requirements will be deemed non-responsive. Mandatory submission requirements include, but are not limited to, the following:
3.1.1 The Bid was submitted prior to the specified Closing Date and Time.
3.1.2 The Bid complies with the submission instructions detailed in Section 2.4.
3.1.3 The Bid includes a fully completed and signed Submittal Form A.
3.1.4 The Bid includes all required Submittal Forms.
3.1.5 Proof of manufacturer warranty covering repair and/or replacement due to defective materials or workmanship.
3.1.6 Proof the Bidder is the manufacturer or a manufacturer-authorized distributor of the proposed Truck Chassis and Sewer Cleaner Equipment.
3.1.7 Manufacturer specification sheets, catalog cut sheets, or equivalent product documentation for Truck Chassis and Sewer Cleaner Equipment demonstrating compliance with the specifications in Exhibit 3.
3.2 Mandatory Responsibility Requirements
The Bidder must meet the following requirements to be eligible for award and perform warranty work.
3.2.1 Bidders must be the manufacturer or a manufacturer-authorized distributor of the equipment being provided.
3.3 Clarification Discussions
The ITB Lead may, in the State’s sole discretion, perform clarification discussions with the Bidder(s) to verify and validate that the Bid will meet the needs of the Agency. At any time during this period, if it is discovered that the Bidder has not met a mandatory requirement or has failed to adequately respond to an item below, the State may find the Bidder non-responsive and disqualify the Bid.
3.3.1 If requested, the Bidder must provide documentation to demonstrate its responsibility, financial capacity, compliance with specifications, or fulfillment capability as applicable to the scope of this solicitation. Failure to provide the requested documentation within the timeframe specified by the ITB Lead may result in the Bidder being deemed non-responsible.
3.3.2 The clarification discussion cannot materially alter the Bid. The State does not expect to negotiate any terms or conditions requested by the Bidder, unless they were submitted by the Bidder prior to the deadline for submitting questions (see Section 1.8), or they provide the State an opportunity to secure more advantageous terms or pricing.
3.4 Best-And-Final-Offer (BAFO)
The ITB Lead, in the State’s sole discretion, may conduct discussions and negotiations with multiple Bidders. The ITB Lead may request that these Bidders provide a Best-And-Final-Offer (BAFO) cost Bid. The State reserves the right to conduct one (1) or more rounds of a BAFO with these Bidders. The revised BAFO cost Bids will be utilized to prioritize and rank the Bidders. If the State anticipates the possibility of awarding multiple contracts from this ITB, the State may engage in concurrent negotiations with apparently successful Bidders as deemed appropriate.
3.5 Award
An award will be made to the lowest responsive and responsible Bidder based on the total evaluated total sum cost as reflected in Submittal Form B – Bid Schedule.
3.6 Resulting Contract
If the State awards Contract(s) from this solicitation, it will do so by issuing a Purchase Order (PO) Contract document(s) from Luma, the State’s ERP system. The State anticipates issuing a single contract document for each awarded Contractor, incorporating the Terms and Conditions, Scope of Work, and Appendices; however, the State reserves the right to determine the form of the resulting Contract(s). A sample contract is provided in Exhibit 7. At its option, the State may memorialize the agreement between the State and each Contractor in one (1) or more final Contract documents.
Important Note: Any modifications or exceptions to the Contract may be rejected by the State. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period (see Section 1.8).
EXHIBIT 1
Background Information
1. About The Department / Agency The Idaho Transportation Department (ITD) is responsible for operating and maintaining an integrated network of over 12,400 centerline miles of highways and roads, 1,850 bridges, 2,523 miles of Idaho Byways, and 32 state backcountry airstrips. The state highway system includes 34 rest areas and 12 ports of entry. The Division of Motor Vehicles registers more than two million vehicles and trailers and is responsible for the credentials of more than a million drivers.
ITD’s mission and vision is to develop and manage a transportation network that is safe, efficient, and enhances Idaho’s economy and quality of life.
1. Summary Specifications The Idaho Transportation Department is soliciting bids for one (1) Combination Sewer Cleaner Truck for delivery to ITD’s District 1 yard located in Coeur d’Alene, Idaho in Calendar 2026. The Specifications detailing the requirements related to the truck chassis and the combination sewer cleaner equipment are found in Exhibit 2 and 3 of this document.
2. Objectives and Expectations The objective is to procure a new, competitively priced Combination Sewer Truck that meets or exceeds industry standards in quality, reliability, and functionality. The specifications have been written to encourage broad vendor participation and competitive bids by aligning with industry standards and specifications.
EXHIBIT 2
General Requirements
1. Warranty
1.1. Warranty must cover all the Combination Sewer Cleaner Components for a minimum period of one (1) year after acceptance of unit by the State.
1.1.1. Standard factory supplied truck chassis warranty must be specified in the Bidder’s response per section 3.1.5.
1.1.2. Manufacturer warranty must include all parts, labor, and freight to replace a defective warranted item.
1.2. Warranty must include all tools, parts, equipment, labor, travel and freight to repair or replace a defective warranted item, which may also include the entire Sewer Cleaner.
1.2.1. All warranty work must be completed within thirty (30) calendars days after receipt of written notice from the State.
1.2.2. If approved by the State, the Contractor may perform warranty work on-site at the delivery location identified in Section 5.6.2, in lieu of pick-up and return.
1.2.3. The Contractor must be responsible for all travel costs and work-site clean-up associated with any necessary repairs.
1.2.4. The timeframe for warranty repair will still be as identified above. If the Contractor is unable to repair the Combination Sewer Cleaner Truck on-site within thirty (30) calendars days, or if the Combination Sewer Cleaner Truck continuously malfunctions and causes it to be out of service on multiple occasions, ITD reserves the right to require the Contractor to pick up, repair, and return the Combination Sewer Cleaner Truck at no additional cost to ITD.
1.3. If any warranty work is to be performed, the Contractor may elect to either have a dealer of its choice perform the work, or authorize ITD to perform the necessary warranty work, in accordance with the manufacturer’s standards.
1.3.1. If ITD is authorized to perform any warranty work, the Contractor must bear all costs associated, and guarantee that the work is completed in accordance with the manufacturer’s standards. Warranty work performed by ITD, which are authorized by the Contractor, will not adversely affect the warranty.
2. Operating Manuals
2.1. The Contractor must provide two (2) operator’s manual, two (2) parts manuals, and two (2) service manuals for the Combination Sewer Cleaner Truck at the time of delivery in paper and PDF format. The manuals must cover all systems and sewer cleaner component parts.
2.2. Electronic manuals must be PDF copies provided via email or free website download (hyperlink must be provided at or before delivery).
3. Training
3.1. The Contractor must provide an authorized technician, within thirty (30) calendar days upon acceptance, to provide training for operations, maintenance, safety, etc. of the Combination Sewer Cleaner Truck. Training must take place at the delivery location Monday through Thursday, 8:00 am to 5:00 pm local time, excluding state of Idaho recognized holidays, as found in this link: https://idaho.gov/about-idaho/state-holidays/.
3.2 The technician must be versed in all aspects of the unit and be able to make any necessary field adjustments to the unit during the training period. Training must be no less than one (1) calendar day, eight (8) hours a day, the Contractor must coordinate training with ITD’s contact for delivery.
4. Post Award Pre-build Meeting
4.1. The Contractor must coordinate and conduct a post award pre-build conference with ITD’s Maintenance Services Manager, or designee, at the ITD Headquarters facility located at 3311 West State Street, Boise, ID 83703. Meeting may also be held via Teams. This conference must be conducted within fourteen (14) calendar days after award of the Contract and prior to beginning the manufacturing process of the Combination Sewer Cleaner Truck. The purpose of this conference is to review the requirements of the Contract, detailed specifications, component placement, and drawings.
4.2. Design drawing(s) of the Combination Sewer Cleaner Truck must be provided to and approved by ITD in order for the Contractor to proceed with the manufacturing process of the Combination Sewer Cleaner Truck. Drawing(s) must show structural design and placement of all installed components. Drawing(s) must be provided at the time of the pre-build conference; Drawing(s) are not required with the bid submittal.
5. Delivery
5.1. The State of Idaho requires the Contractor to deliver the specified equipment within 180 365 days after receipt of order. The State of Idaho will accept delivery within 365 days if the If the Contractor cannot meet the agreed-upon timeline, the Contractor must, upon written mutual agreement with ITD, develop a revised delivery solution that aligns with the State’s best interests.
5.2. The Combination Sewer Cleaner Truck must be fully assembled and adjusted when delivered.
5.3. All equipment, including standard and supplemental equipment, must be installed per the manufacturer’s specifications, and ready for continuous operation at the time of delivery.
5.4. All expenses related to delivering the completed Sewer Cleaner Truck to the delivery location are the responsibility of the Contractor and must be included in its fully burdened cost. The Contractor must provide the necessary labor and equipment to unload the Sewer Cleaner Truck, including any re-assembly of equipment components that were disassembled for delivery or unloading.
5.5. Sewer Cleaner Truck exterior must be washed and interior cleaned prior to delivery.
5.6. If the Contractor’s installation facility is located within a one hundred (100) mile radius of the delivery location, the Contractor may drive the completed Sewer Cleaner Truck to the delivery location. For the Contractor with an installation facility beyond a one hundred (100) mile radius, the Contractor must haul (not drive) and unload ITD’s Sewer Cleaner Truck to the delivery location.
Delivery must be made to the following Location:
5.6.2 ITD District 1 Yard, 600 West Prairie, Coeur d’Alene, ID 83814.
Delivery Times:
5.6.3 Delivery must be made Monday through Thursday from 8:00 am to 4:00 pm local time. Deliveries will not be accepted outside of this timeframe or during state of Idaho recognized holidays, unless otherwise approved in writing by ITD’s Contract Management Team (CMT).
5.7 The delivery driver must be in compliance with all state and federal requirements for operating the Sewer Cleaner Truck and must have a valid driver’s license.
5.8 The Contractor must be responsible for all diesel fuel and DEF (Diesel Exhaust Fluid) required to move the Sewer Cleaner Truck to the specified location in 5.6.2. Contractor must be responsible for all fuel and DEF needed to deliver the Sewer Cleaner Truck to the delivery location. The truck must be full of fuel and DEF when delivered.
6. Records Maintenance
6.1. Contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records must be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
7. Audit Rights
7.1. The Contractor agrees to allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
8. Manufacturer Brand Components
8.1. Any Manufacturer Brand Components referenced in this solicitation are intended to be descriptive not restrictive and serve only to illustrate the quality and characteristics required. Bidders proposing an equivalent Manufacturer Brand Component must provide documentation demonstrating, to the State’s satisfaction, that the offered item(s) meet all minimum requirements outlined in the solicitation.
8.2. If your product offered does not meet any of the specifications, Bidder must provide an explanation of how the product offered is functionally equivalent to the stated specification as well as descriptive literature that supports the product offered.
8.2.1. This explanation must be declared during the question period of this event as stated in Exhibit 5 – Questions of this ITB. State acceptance will be in the form of an amendment.
8.3. In the event documentation is not satisfactory, the State reserves the right to seek clarification from the Bidder. Failure to provide satisfactory documentation or a clarifying response to the State may eliminate the Bidder from further consideration.
EXHIBIT 3
Specifications
1. Sewer Cleaner Truck Specifications The following are the minimum mandatory equipment specifications that your Bid must meet for the State to consider your Bid for award. The Combination Sewer Cleaner Truck must be new, not used. The equipment proposed must be equal to or better than the specifications stated herein.
2. Truck Chassis
2.1 The chassis must be a Six (6) x four (4) configuration; with a minimum Gross Vehicle Weight Rating of Sixty-six thousand (66,000 lb.) pounds.
2.2 Chassis color must be black.
2.3 Backup alarm must be 300 Series Preco-matic self-adjusting, or equal.
3. Truck Cab
3.1 Must be a single cab, of two (2) door design, standard-width, conventional type.
3.2 Cab color must be white.
3.3 Seats must be factory equipped and be air cushion type.
3.4 Drivers and passenger side mirrors must be heated.
4. Wheels
4.1 Wheels must be Alcoa or equal of polished aluminum.
4.2 Mud Flaps located in the front and rear axle must be anti-spray, anti-sail type without logos or writing. Mud flaps must be removable for service work.
4.3 Nylon wheel guards must be between wheels and hubs on all locations and between dual wheels on rear axles.
4.4 Rear fenders must be aluminum and completely cover all rear wheels.
5. Engine
5.1 Engine must be a turbo charged diesel with a minimum horsepower rating of four hundred fifty (450) horsepower.
5.2 Diesel fuel tank must have a minimum capacity of one hundred (100) gallons.
5.3 Diesel Exhaust Fluid (DEF) tank must have a minimum capacity of nine (9) gallons.
6. Transmission
6.1 Transmission must be an automatic Allison 3000 or 4000 series, or equal w/Power Take Off (PTO) Unit drive gear.
6.2 Driveline torque rating must exceed engine’s maximum torque rating.
7. Front Axles and Equipment
7.1 Axle must be rated at a minimum of twenty thousand (20,000) pounds with manufacturers’ standard dual steering gear power steering.
7.2 Springs must be rated at a minimum of twenty thousand (20,000) pounds with shock absorbers.
7.3 Brakes must be drum style with ABS, s-cam, with slack adjusters and rated at a minimum of twenty-two thousand (22,000) pounds.
8. Rear Axles and Equipment
8.1 Tandem axles must be rated at a minimum of forty-six thousand (46,000) pounds with interaxle lock.
8.2 Springs must be rated at a minimum of forty-six thousand (46,000) pounds, fifty-four (54) inch axle spacing.
8.3 Brakes must be drum style with ABS, s-cam, with slack adjusters and rated at a minimum of forty-six thousand (46,000) pounds.
9. Sewer Cleaner Debris Tank
9.1. Debris tank must be stainless steel or corrosion proof; with a minimum fifteen (15) cubic yard capacity and with a digital level indicator or manual level indicator.
9.2. Dump system must have a minimum of fifty (50) inch to sixty (60) inch dump height from the ground and be equipped without an ejector.
9.3. Debris tank door must be a rear hinged door with full hydraulic lock with gasket seal and six (6) inch knife valve with Camloc at the three (3) or five (5) o’clock position.
9.4. Debris tank must have a full-size bottom drain valve or a bottom rear door mounted drain valve and be equipped with auto washdown feature.
9.5. Debris tank must be equipped with centrifugal cyclone type separators or a single separator and safety props installed for both the tank and rear debris door.
9.6. Debris tank must be equipped with vacuum relief and body-up alarm.
10. Vacuum System
10.1 Vacuum system must be positive displacement rotary blower with a minimum flow capacity of four thousand five hundred (4,500) four thousand (4,000) cubic feet per minute.
10.2 Vacuum system must have an automatic float shutoff with mechanical backup and high temp shutdown.
10.3 Drain must have a ball valve installed with stainless steel mesh screen final filter.
11. Water System
11.1. Water Tank must be corrosion proof, aluminum or poly with a digital level indicator located curb side front side and in cab and have a level sight gauge with electronic over fill and low water alarm.
11.2. Water Pump must be single piston or triplex type with variable displacement and include three (3) inch strainers with remote pump line drains on the front and the rear of the truck; and achieve a minimum flow rate of eighty (80) gallons per minute. Wastewater Recycling System is not be specified
11.3. Water pump must be capable of operating at minimum of two thousand five hundred (2,500) PSI with digital pressure gauge located in the front of the truck at ground level.
11.4. Water Tank must have a minimum capacity of one thousand three hundred (1,300) gallons.
12. Hydraulic System
12.1. Hydraulic Pump must be PTO Driven with pressure and return filters.
12.2. Tank must have a minimum capacity of fifty (50) gallons with tank shutoff valves and must include a mounted oil cooler.
13. Jetting System
13.1. Hose must be a minimum of six hundred (600) feet with a minimum rating of two thousand five hundred (2,500) PSI and be one (1) inch inside diameter with a routing and protection package.
13.2. Reel must hydraulically extend and retract or be a direct drive reel with auto level winding and a digital footage counter and hold a minimum of eight hundred (800) feet of one (1) inch inside diameter hose.
13.3. Jetting system must be capable of one hundred eighty-degree (180°) rotation with installed safety covers and pinch roller, pinch points, high pressure connections and hazards around the reel.
14. Boom and Vacuum Hose
14.1. Boom must be telescoping and be able to extend ten (10) feet and must be capable of a minimum one hundred eighty (180°) degrees of rotation with, out of position alarm.
14.2. Boom must be able to reach twenty (22) ft from center of rotation.
14.3. Hose must be rotating inlet type and eight (8) inches in diameter and capable of reaching twenty-two (22) feet below ground surface.
15. Controls
15.1. Truck must include ground level front controls for all functions.
15.2. Must include external or in-cab dash mounted intelligent electronic control panel for all cleaning systems and functions.
15.3. Must include remote wireless pendant controls for all functions and e-stop with 2-way communication and LCD display.
15.4. Must include remote emergency stops on all four sides of the truck.
16. Freshwater Wash Down System
16.1. Freshwater hose must be of a length to reach all parts of truck and must include washing wand and nozzles.
16.2. Freshwater hose reel must be auto retracting.
17. Storage
17.1. Truck must be capable of storing the following pipe dimensions and lengths:
17.1.1. Must include factory type suction tube storage and boom hose storage for 8 pipes (six (6) tubes curbside and two (2) tubes on street side of the truck or,.
17.1.2. Must have fixed rear door pipe rack for two (2), eight (8) inch pipes, five (5) feet in length.
17.1.3. Must have a subframe mounted dual pipe rack or single on the back for two (2), eight (8) inch pipes, five (5) feet in length.
17.1.4. Must have a curbside folding pipe rack for three (3), eight (8) inch pipes, five (5) feet in length.
18. Lights
18.1. Warning lights must be compliant with all State of Idaho requirements and Federal Motor Vehicle Safety Standards (FMVSS). All lights must be rubber grommet mounted in weatherproof enclosures with watertight connections for quick and easy replacement.
18.2. Sewer Cleaner Truck must have the following lights at the specified locations:
18.2.1. Rear of truck with four (4), red Light Emitting Diode (LED) type, six (6) inch oval combination stop, turn and taillight heads.
18.2.2. Rear of truck identification bar with three (3) red, LED type, two and half (2.5) inch round lights.
18.2.3. Rear of truck side clearance lights with two (2) red, LED type, 2 (2) inches with two (2) inch grommet.
18.3. Work Lights:
18.3.1. Two (2) white 1000 700 lumen LED, self-leveling type, located on boom.
18.3.2. Two (2) white 1000 700 lumen LED, located on rear door.
18.3.3. One (1) white 1000 700 lumen LED, located at operators’ station.
18.3.4. One (1) white 1000 700 lumen LED, located at hose reel manhole.
18.3.5. One (1) white 1000 700 lumen LED, located at curbside.
18.3.6. One (1) white 1000 700 lumen LED, located at roadside.
19. Warning Lights
19.1. Lights must be installed at the following locations noted below without diminishing function or effectiveness:
19.2. One (1) LED directional arrow stick, located on rear of truck.
19.3. Two (2) Whelen model IONA, amber lights, or equal. Lights must be horizontally installed inside front grill, forward facing, as high inside grill as possible, each spaced as far apart as vehicle structure will allow. Lights must be installed level with each other in the same row on the grill.
19.4. Two (2) Grote WorkShield #79276 Surface Mount, HINVII, 6-Diode lights, or equal must be horizontally installed inside front grill, forward facing and angled slightly downward, as high as possible, each spaced as far apart as possible. Lights must be installed level with each other in the same row on the grill.
19.5. Lights must be installed on a dedicated auxiliary switch. Lights must be programmed for a steady burn pattern.
19.6. Two (2) Whelen Responder Model R2LPPA, or equal, mounted above cab and as far apart as possible. Lights must be mounted higher than truck cab to allow three-hundred sixty degree (360°) of visibility.
19.7. Two (2) Whelen Responder Model R2LPPA, or equal, amber lights. Installed on each rear of truck, as high as possible and as far apart as possible.
19.8. Two (2) Whelen Model 500, or equal, amber lights. Installed on each rear bumper of truck, as far apart as Possible.
19.9. Two (2) Whelen Model 500, or equal, amber lights. Mounted curbside, as far forward and rear ward as possible.
19.10. Two (2) Whelen Model 500, or equal, amber lights. Mounted roadside, as far forward and rear ward as possible.
20. Safety Placards
20.1. Combination Sewer Cleaner Truck must include all necessary and appropriate safety placards and reflectivity mounted on unit and must be DOT, OSHA, and FMVSS compliant.
21. Accessories
21.1. Fill hose must be twenty-five (25) feet in length and be located on the curb side with three (3) inch strainer.
21.2. Air purge must include winterization feature that uses pressurized air from the truck chassis to blow all water out of the Sewer Cleaner.
21.3. Cold weather recirculator must be PTO driven and capable of twenty-five gallons (25) per minute; and include three (3) nozzles with carbide inserts and rack.
21.4. Truck must have a hydro excavation kit with shielded lances, nozzles, storage tray and vacuum tube.
21.5. There must be a total of six (6) Toolboxes mounted at factory locations must all must be aluminum and / or located at the specified locations:
21.5.1. One (1) aluminum, twenty-four (24) inches (width) x twenty-four (24) inches (height) x twenty-four (24) inches (length), mounted roadside on chassis. An 18” wide, 18” height and 60” long toolbox is acceptable. Or two (2) thirty (30) inch x eighteen (18) inch x eighteen (18) inch passenger side toolboxes with retractable two-step ladder is acceptable
21.5.2. One (1) aluminum, eighteen (18) inches (width) x twenty-four (24) inches (height) x twenty-four (24) inches (Length), mounted roadside on subframe. An 18” wide, 18” height and 60” long toolbox is acceptable. Or two (2) thirty (30) inch x eighteen (18) inch x eighteen (18) inch passenger side toolboxes with retractable two-step ladder is acceptable
21.5.3. One (1) long handle tool storage box, (location to be determined at pre-build meeting). Required
21.5.4. One (1) aluminum, sixteen (16) inches (width) x thirty (30) inches (Height) x ninety-six (96) inches (Length) mounted behind the cab. Or a 24”x42” x 100” toolbox mounted behind the cab.
21.5.5. Two (2) aluminum, sixteen (16) inches (width) x twelve (12) inches (height) x eighteen (18) inches (length) with two (2) LED side markers mounted on front bumper. Storage boxes formed into front bumper with aluminum locking side access covers on Drivers side and open top storage box for tube clamps is acceptable
21.5.6. Must have an auto lube system or ground level remote lube manifold and include a lube chart.
21.5.7. Chassis must have cold weather package that includes all options to prevent sewer cleaner from freezing damage.
21.5.8. Cold weather package must include but is not limited to recirculation system, heated cabinets, air purge and insulated lines. ITD will accept non-heated cabinets. Water lines are required to be insulated, rubber jacketed steel braided lines will not be acceptable
21.5.9. Truck must include a water fill syphoning and hydrant package.
21.5.10. Must include one (1) drop in style cone rack storage and one (1) post style cone rack.
21.5.11. Must have a backup camera system with in-cab monitor and camera mounted top of tank.
EXHIBIT 4
Pre-Bid Conference Call Registration Form
| ITB Number: |
| #1211 |
| ITB Title: |
| Combination Sewer Cleaner Truck |
Instructions: Potential Bidders choosing to participate in the Pre-Bid Conference Call must pre-register by submitting this completed form, via e-mail, to the ITB Lead. Attendees are asked to submit this registration at least 3 days prior to the Pre-Bid Conference Call.
As a reminder, potential Bidders are cautioned against relying on any verbal information shared during the Conference. The ITB may only be amended by written documentation, posted to the state’s eProcurement System, IPRO POWERED BY LUMA.
| Individuals Name |
| Company |
| Email Address |
| Phone Number |
EXHIBIT 5
Questions
General Instructions
· The ITB Lead is the sole point of contact for this solicitation.
· All questions, clarification, or other correspondence must be submitted in writing via email to the ITB Lead.
· The e-mail subject line should include the “ITB Number”, followed by “Questions” (i.e. ITB 12345 Questions).
· Questions must not be submitted through IPRO.
· Questions must be received by the deadline specified in the Procurement Schedule.
· The Bidder must use the table on the following page, to submit all questions or clarifications. The Bidder must adhere to the instructions below.
Instructions Regarding The Table
· Do not change the format, font, font style, or font colors.
· Do not submit any questions related to the State’s Contract Terms or Conditions. Those must be submitted using Exhibit 6.
· Do not identify your name, your company’s name, or product names of intellectual property in your questions.
· Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment 1”) in the “ITB Section” (column 2), and the attachment page number in the “ITB page” field (column 3).
· Add additional rows by hitting the “Tab” key while within the table, and within the final row.
· Do not enter text in the “Response” field (column 5). This is for the State’s use only.
Bidder Questions ITB #1211 – Combination Sewer Cleaner Truck
| No |
| ITB Section |
| ITB Page |
| Question |
| Response |
EXHIBIT 6
Contract Modifications and Exceptions Before requesting modifications or exceptions to the Contract requirements, terms, and conditions, please review this document for greater context and reasoning behind key items.
1. Idaho Terms and Conditions – Background The Division of Purchasing issues solicitations on behalf of State of Idaho agencies. As public entities, the Division and the agencies it serves are subject to statutes, rules and policies that result in terms and conditions unlike those common in contracts between private parties. The Division of Purchasing does not have authority to vary many of these terms and in some instances, variations are void under Idaho law. See IDAPA 38.05.01.112.
Idaho is not unique. Many of the terms in the State of Idaho Standard Terms and Conditions are similar to terms offered by most federal, state, and local government agencies. Vendors who seek to work with government agencies should become familiar with these terms. The discussion below is provided to assist you in becoming familiar with the legal and policy basis for the terms and to provide information for you to evaluate the risks and benefits of working with public entities.
2. Termination – Costs of Re-procurement The State of Idaho Standard Terms and Conditions provision concerning termination specifically identifies the costs of re-procurement as a damage arising from a breach of the contract by a vendor. This damage is identified because of the public agency budgeting process and the competitive solicitation process required by Idaho’s purchasing laws. The Idaho purchasing laws provide a preference for open, competitive procurements. These procurements come at a cost to the agency, which is generally included in the agency budget requested from the Idaho Legislature more than twelve months prior to incurring the expense. Unlike a private business, public agencies cannot independently pass through the costs of re-procurement to Idaho taxpayers, who are the customers of government. Instead, Idaho agencies must submit a request for the costs to the Idaho Legislature in a subsequent budget year, which is usually after the need to secure a replacement vendor for the breaching Contractor arises. As a matter of public policy, the Contractor whose breach caused the damage of requiring re-procurement must pay those costs at the time of breach so that the public can receive the benefit of the contract made on its behalf through re-procurement of a new contract. This policy is reflected in the State of Idaho Standard Terms and Conditions provision concerning termination and the Division of Purchasing does not generally vary this requirement.
3. Termination – Fiscal Necessity Idaho Constitution Article VII, section 11 prohibits an expenditure in excess of a legislative appropriation. Idaho Code section 59-1015 prohibits state agencies and officers from entering into contracts that create any expense or liability in excess of an appropriation. Idaho Code section 59-1016 provides that any such contract is void. IDAPA 38.05.01.112 contains the same provisions. An appropriation can be reduced under Idaho law through “give backs” and “hold backs” issued by the executive branch. When the Division of Purchasing enters into a contract, it must contain the term allowing for termination for fiscal necessity to comply with these provisions. Variation of this term is not offered.
4. Anti-Discrimination/Equal Employment Opportunity Many of the Idaho agencies served by the Division of Purchasing receive federal funding that is subject to a requirement concerning a pass-through to vendors of the obligation to comply with federal civil rights and anti-discrimination laws. The pass-through obligation may extend beyond the specific federal funds to all agency contracts. Variation of this term is not offered to prevent a breach of the State of Idaho’s obligations under its agreements with the United States.
5. Taxes The State of Idaho Standard Terms and Conditions provision concerning taxes identifies that Idaho agencies are exempt from the payment of taxes and provides that the Contractor is responsible for all taxes assessed against the Contractor as a result of doing business with the State of Idaho. State agencies are not granted an appropriation to pay taxes due to the exemptions that apply to government agencies. As discussed above under the heading Termination – Fiscal Necessity, terms in excess of appropriation are void under Idaho law. Variation of this term is not offered.
6. Indemnification Many vendors request the State of Idaho offer an indemnification of the vendor. An indemnification is a promise to pay funds that have not been appropriated in the current budget year or that may occur in a future budget year that has not yet been appropriated by the Idaho Legislature. Idaho Constitution Article VII, section 11 prohibits an expenditure in excess of a legislative appropriation. Idaho Code section 59-1015 prohibits state agencies and officers from entering into contracts that create any expense or liability in excess of an appropriation. Idaho Code section 59-1016 provides that any such contract is void. IDAPA 38.05.01.112 contains the same provisions. Variation of this term is not offered.
In assessing the risk of doing business with the State of Idaho, vendors should consider the following. The State of Idaho has waived its sovereign immunity for torts as described in the Idaho Tort Claims Act, Idaho Code title 6 chapter 9. To the extent that the State or its employees have committed a tort, Contractors have legal remedies available through that act. Tort liability is funded by the Idaho Legislature through an appropriation to the Retained Risk Program and appropriation issues do not arise in actions under the act. In addition, under existing Idaho court decisions, the State does not have sovereign immunity for contract claims arising from a properly entered contract. If the State is in breach of its contract obligations, Contractors have the legal remedies available under any contract. Lastly, States are generally prohibited from the benefits of the federal bankruptcy laws. Unlike private companies, an indemnification clause is not required to preserve a remedy through the company’s insurer should the company declare bankruptcy.
7. Public Records All Idaho agencies are subject to the Idaho Public Records Act, Idaho Code title 74, chapter 1. State agencies cannot by contract vary the requirements of the Act or agree to violate the Act by withholding records properly subject to release under the Act. The State of Idaho Standard Terms and Conditions provision concerning disclosure of public records has been drafted to allow Contractors to designate records as exempt under the provision of the Act if the Contractor agrees to defend that designation and to indemnify the State of Idaho for any costs and penalties imposed under the Act. Variation of this term is not offered.
8. Assignments Idaho code section 67-9230 prohibits the transfer of a contract issued by the Division of Purchasing without written approval by the Administrator and the Idaho Board of Examiners. At the option of the Administrator, a contract transferred in violation of this provision can be annulled. Idaho Code section 67-1027 provides that the Idaho Controller shall not pay an assignee of a contract if the assignment has not been approved by the Idaho Board of Examiners. The State of Idaho Standard Terms and Conditions provision concerning assignment cannot be varied in a way that allows assignment without approval of the Administrator and the Idaho Board of Examiners.
9. Governing Law, Jurisdiction and Venue, Arbitration, Waiver of Jury Trial As a sovereign state, the State of Idaho is not subject to the jurisdiction of the courts of its sister states. The Idaho legislature has not consented to the waiver of this limitation by state agencies. The 11th amendment to the United States Constitution provides limitations on the jurisdiction of federal courts over claims against the State of Idaho. IDAPA 38.05.01.112, approved by the Idaho Legislature in 2015, provides that terms subjecting the State of Idaho to the jurisdiction of the courts of other states are void.
Agencies of the State of Idaho are subject to Idaho law and cannot vary the legal provisions governing the agency by contract. Based on this limitation, the Division of Purchasing will not consent to the application of laws other than the laws of the State of Idaho to all of a contract. Unless the agency certifies to the Division of Purchasing that it has consulted with the Office of the Attorney General and considered its advice, the Division of Purchasing will not consent to the application of laws other than the laws of the State of Idaho to a portion of the contract.
Idaho Code section 29-110 provides that any term of a contract subjecting a party to arbitration conducted outside the State of Idaho is void. IDAPA 38.05.01.112 requires that any agency must consult with the Office of the Attorney General prior to consenting to arbitration. At this time, the Office of the Attorney General does not generally advise agencies to consent to arbitration.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .