ITB_12-25_Addendum_2.pdf

PDF 2 MB Posted

Attached to
ITB #12-25 Mens Bathroom Facility
Solicitation number
ITB 12-25
Issued by
Volusia County, Florida

About this file

This document is Addendum No. 2 for Invitation to Bid (ITB) No. 12-25 issued by New Smyrna Beach Utilities for a Mens Bathroom Facility renovation project. The addendum addresses two key questions from potential vendors: first, confirming that original building plans are attached as as-built drawings, and second, affirming that the awarded general contractor will be required to produce signed and sealed construction documents for permitting. Vendors are instructed to acknowledge receipt of this addendum by signing and returning the included form with their proposal.

The attached architectural drawings provide comprehensive details for the renovation, including site plans, floor plans, foundation plans, electrical and HVAC layouts, and technical specifications. The drawings indicate a two-story facility with detailed room finish schedules, door and window schedules, and specific construction requirements. The site plan shows the building location on Slaton Street, with surrounding infrastructure including parking areas, transformers, storage, and administrative spaces. The technical drawings suggest a complex renovation project requiring precise engineering and construction expertise to meet New Smyrna Beach Utilities' specifications.

View the file

Other files

File Type Posted
BID_TAB_ITB_12-25.pdf PDF
ITB_12-25_Addendum.pdf PDF
Sign-in_sheet_ITB_12-25_5-14-25.pdf PDF
ITB_12-25_Mens_Bathroom_Facility.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW SMYRNA BEACH UTILITIES

200 CANAL STREET

P.O. BOX 100

NEW SMYRNA BEACH, FL 32170-010

MENS BATHROOM FACILITY

ITB 12-25

ADDENDUM NO 2

Page 1 ITB 12-25 Addendum No 2

DATE: 5-30-25

RE: ITB No. 12-25 ADDENDUM NO. 02

To prospective vendors:

New Smyrna Beach Utilities is issuing the following addendum. As such it becomes an integral part of the proposal and must be acknowledged by the return of this signed form, with your proposal form, acknowledging receipt of the addendum.

1. Will there be as-built drawings provided prior to the bid due date?

- Attached are copies of the original building plans of the building.

2. Will the awarded GC be required to produce signed and sealed construction documents for permitting?

- Yes

A Copy of This Signed Form Must Accompany Your Proposal

Acknowledgment of Receipt of Addenda No. 2

Company_______________________________________

Title___________________________________________

Signature_______________________________________ jschwadron New Stamp

T&D Drawings.pdf
RETURN
Untitled
H-8220 1 OF 8.pdf
RETURN

File details come from the government source that posted it. Updated .