IT_building_Tenant_improvement.pdf
PDF 419 KB Posted
- Attached to
- IT building Tenant improvement
- Solicitation number
- 31-2106b
- Issued by
- Kittitas County, Washington
About this file
This is a capital infrastructure invitation for bid issued by Lewis County, Washington for an IT Building Tenant Improvement project (Bid 31-2106b). The project consists of interior renovation of approximately 4,740 square feet within the Rainier North Building at 185 NW Chehalis Avenue in Chehalis, Washington to house the County's Information Technology Department. The scope includes construction of new offices, meeting rooms, help desk and reception areas, break room facilities, storage rooms, restrooms, server and electrical rooms, interior metal stud framing, drywall, doors, finishes, casework, ceilings, flooring, painting, accessibility improvements, installation of a new VRF HVAC system with dedicated outdoor air ventilation, new electrical distribution equipment, lighting controls, power and data rough-ins, and structural modifications. The project was released on November 24, 2026, with a mandatory pre-proposal meeting scheduled for December 7, 2026 at 11:00 a.m. at the project site. Questions must be submitted by December 14, 2026 at 5:00 p.m., and completed bid proposals are due electronically through the Lewis County procurement portal by December 22, 2026 at 1:00 p.m. Pacific Time. The apparent low bidder will be evaluated based on responsiveness and bidder responsibility criteria, with the contract award contingent upon meeting all submittal requirements.
Bidders must submit a 5% bid proposal deposit in the form of a bid bond, cash, postal money order, certified check, or cashier's check by the bid submission deadline. The project is subject to Washington State Prevailing Wage Laws (RCW 39.04 and WAC 296-127), and the successful contractor and subcontractors must file Statements of Intent to Pay Prevailing Wages, Affidavits of Wages Paid, and Certified Payroll Records as required by the Department of Labor and Industries. Successful bidders must provide a 100% payment and performance bond before commencing work and maintain comprehensive insurance coverage including Commercial General Liability with limits of not less than $2,000,000 each occurrence and $4,000,000 general aggregate, Commercial Automobile Liability of $1,000,000, Workers' Compensation as required by Washington State law, and Umbrella or Excess Liability of $4,000,000. The contractor must also comply with prevailing wage requirements, provide names and proof of license for HVAC, plumbing, and electrical subcontractors at the time of bid if the base bid plus additive alternates exceeds $1,000,000, and comply with all applicable federal, state, and local regulations including the ADA, non-discrimination requirements, and public records law. Progress payments will be made following completion of work supported by applications for payment, with the County retaining 5% of work value as retainage until final acceptance. Liquidated damages are set at $500 per day for work not completed by the agreed-upon deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lewis_County_Rainier_North_Building_TI_-_Bid_Set.pdf | ||
| Insurance_(2).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Capital Infrastructure
Invitation For Bid
31-2106b
IT BUILDING TENANT IMPROVEMENT
Lewis County
CAPITAL INFRASTRUCTURE
Project: IT building Tenant improvement, 31-2106b
Effective Date: undefined
1. Introduction
Project Description
1.1. Summary
Lewis County is seeking qualified contractors to complete an IT Building Tenant Improvement
Bid Set. The project consists of the interior renovation of approximately 4,740 square feet within the Rainier North Building, located at 185 NW Chehalis Avenue in Chehalis, Washington. The renovated space will house the County’s Information Technology Department and includes construction of new offices, meeting rooms, help desk and reception areas, break room facilities, storage rooms, restrooms, server and electrical rooms, and supporting circulation spaces.
The work includes architectural, structural, mechanical, and electrical improvements necessary to create a modern and functional office environment. Major components include interior metal stud framing, drywall, doors and finishes, casework, ceilings, flooring, painting, accessibility improvements, installation of a new VRF HVAC system with dedicated outdoor air ventilation, new electrical distribution equipment, lighting and lighting controls, power and data rough-ins, and associated structural modifications required to support the improvements.
This project offers contractors the opportunity to deliver a comprehensive commercial tenant improvement for a public-sector client while coordinating closely with the County and design team to provide a complete, code-compliant, and operational facility for County staff.
1.2. Background
Lewis County is seeking contractors with experience delivering high-quality tenant improvement projects. A successful project will be completed with strong coordination, proactive communication, attention to detail, and a commitment to delivering a fully functional, code-compliant facility that meets the County's schedule, quality, and operational objectives.
1.3. Contact Information
Project Contact:
Matt Patana
Specialist
351 NW North Street
Chehalis, WA 98532
Email: matt.patana@lewiscountywa.gov
Phone: (360) 219-5134
Procurement Contact:
Matt Patana
Specialist
351 NW North Street
Chehalis, WA 98532
Email: matt.patana@lewiscountywa.gov
Phone: (360) 219-5134
Department:
Capital Infrastructure
Department Head:
Matt Patana
Capital Infrastructure Specialist
1.4. Timeline
Release Project Date November 24, 2026
Pre-Proposal Meeting (Mandatory) December 7, 2026, 11:00am
185 NW Chehalis Ave, Chehalis, WA 98532
Question Submission Deadline December 14, 2026, 5:00pm
Proposal Submission Deadline December 22, 2026, 1:00pm
BOCC Hearing room @ 351 NW North St.
Chehalis
2. Call for Bids (Formal)
NOTICE
CALL FOR BIDS
For
IT building Tenant improvement 31-2106b
Lewis County is soliciting bids from qualified firms to provide bids for the IT building Tenant improvement 31-2106b, located in Chehalis WA.
mailto:matt.patana@lewiscountywa.gov tel:(360)219-5134 mailto:matt.patana@lewiscountywa.gov tel:(360)219-5134
Firms desiring consideration shall submit a complete bid package in accordance with the plans, specifications, and contract documents available through the Lewis County procurement portal at https://procurement.opengov.com/portal/lewiscountywa.
Bids must be submitted electronically through the procurement portal no later than 1:00 p.m.
Pacific Time on Tuesday, December 22, 2026. Late submissions will not be accepted.
Each bid shall be accompanied by a bid proposal deposit in the form of a bid bond, cash, postal money order, certified check, or cashier's check in an amount equal to five percent (5%) of the total bid amount. Bid proposal deposits must be received by Lewis County no later than the bid submission deadline. Certified checks, cashier's checks, and money orders shall be made payable to the Lewis County Treasurer. Bid security may be delivered in person or by mail to:
Board of County Commissioners Office
Lewis County Historic Courthouse, Second Floor
351 NW North Street
Chehalis, WA 98532
Failure to provide the required bid security by the deadline may render the bid non-responsive.
Should the successful bidder fail to execute the contract and provide the required contract bond within the time prescribed in the contract documents, the bid proposal deposit shall be forfeited to the Lewis County Capital Fund 3010.
The Lewis County Capital Infrastructure Department, in accordance with Title VI of the Civil
Rights Act of 1964 (78 Stat. 252; 42 U.S.C. 2000d et seq.) and applicable regulations, hereby notifies all bidders that it will affirmatively ensure that disadvantaged business enterprises are afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for contract award.
Lewis County is an Equal Opportunity and Affirmative Action Employer. Minority-owned, women-owned, veteran-owned, and disadvantaged business enterprises are encouraged to submit bids.
3. Instructions To Bidders
FOR LEWIS COUNTY Capital Infrastructure CONSTRUCTION PROJECTS
PART 0 - GENERAL CONDITIONS
FOR LEWIS COUNTY FACILITIES CONSTRUCTION PROJECTS
EXPLANATION TO PROSPECTIVE BIDDERS
A. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit a request in writing to the Architect/Engineer (A/E) or owner if no A/E, 7 calendar days before the bid due date. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders by https://procurement.opengov.com/portal/lewiscountywa addendum to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
B. In accordance with the legislative findings and policies set forth in Chapter 39.19 RCW, the
State of Washington encourages participation in all of its contracts by Minority and Women’s
Business Enterprises (MWBE) firms certified by the Office of Minority and Women’s Business
Enterprises (OMWBE). Participation may be either on a direct basis in response to this invitation or as a subcontractor to a bidder. However, unless required by federal statutes, regulations, grants, or contract terms referenced in the contract documents, no preference will be included in the evaluation of bids, no minimum level of MWBE participation shall be required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis.
C. Any affirmative action requirements set forth in federal regulations or statutes included or referenced in the contract documents will apply.
D. In accordance with RCW 39.04.320 the State of Washington requires 15% Apprenticeship
Participation for all projects estimated to cost $1,500,000 or more. On applicable projects the bid advertisement and Bid Proposal form shall establish a minimum required percentage of apprentice labor hours compared to the total labor hours. Bidders may contact the Department of
Labor and Industries, Specialty Compliance Services Division, Apprenticeship Section, P.O. Box
44530, Olympia, WA 98504-4530, by phone (360) 902-5320, and e-mail at thum235@lni.wa.gov, to obtain information on available apprenticeship programs.
PREPARATION OF BIDS – CONSTRUCTION
A. Bids must be: (1) submitted on the bid proposal forms, or copies of forms, furnished by the
Owner or the Owner’s agent, and (2) signed in ink. The person signing a bid must initial each change appearing on any bid form. If the bid is made by a corporation, it shall be signed by the corporation’s authorized designee. The address of the bidder shall be typed or printed on the bid form in the space provided. Forms shall be scanned and uploaded through the OpenGov portal.
B. The bid form may require bidders to submit bid prices for one or more items on various bases, including: (1) lump sum base bid; (2) lump sum bid alternate prices; (3) unit prices; or (4) any combination of items (1) through (3) above.
C. If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid. If bidding on all items is not required, bidders should insert the words “no bid” in the space provided for any item on which no price is submitted.
D. Substitute bid proposals will not be considered unless this solicitation authorizes their submission.
BID GUARANTEE
FORMAL BID (BOCC Bid Call)
A bid guarantee in the amount of 5% of the base bid amount is required. Failure of the bidder to provide bid guarantee when required shall render the bid non-responsive.
A. Acceptable forms of bid guarantee are: A bid bond or postal money order, or certified check or cashier’s check made payable to the Lewis County Treasurer. The envelope shall be clearly marked and delivered to (351 NW North St. Chehalis WA, 98532 c/o BOCC Office, located on the second floor of the historic courthouse). The Owner will return bid guarantees (other than bid bond) to unsuccessful bidders as soon as practicable, but not sooner than the execution of a contract with the successful bidder. The successful bidder’s bid guarantee will be returned to the successful bidder with its official notice to proceed with the work of the contract.
B. The bidder will allow 60 days from bid opening date for acceptance of its bid by the
Owner. The bidder will return to the Owner a signed contract, insurance certificate and bond or bond waiver within 15 days after award of the contract. If the apparent successful bidder fails to sign all contractual documents or provide the bond and insurance as required or return the documents within 15 days after award of the contract, the Owner may terminate the award of the contract.
C. In the event a bidder discovers an error in its bid following the bid opening, the bidder may request to withdraw its bid under the following conditions:
1. Written notification is received by the Owner within 24 hours following bid opening.
2. The bidder provides written documentation of the claimed error to the satisfaction of the
Owner within 72 hours following the bid opening. The Owner will approve or disapprove the request for withdrawal of the bid in writing. If the bidder’s request for withdrawal of its bid is approved, the bidder will be released from further obligation to the Owner without penalty. If it is disapproved, the Owner may retain the bidder’s bid guarantee.
ADDITIVE OR DEDUCTIVE BID ITEMS
A. The low bidder, for purposes of award, shall be the responsive bidder offering the low aggregate amount for the base bid item, plus additive or deductive bid alternates selected by the
Owner, and within funds available for the project. The bidder agrees to hold all bid alternate prices until bid award and contract execution.
ACKNOWLEDGEMENT OF ADDENDA
A. Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers in the space provided for this purpose on the bid proposal form. Failure to do so may result in the bid being declared non-responsive.
SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
A. The bidder acknowledges that it has taken steps necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and road; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during the work. The bidder also acknowledges that it has satisfied itself as to character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Owner, as well as from the drawings and specifications made a part of this contract. Any failure of the bidder to take the actions described and acknowledged in this paragraph will not relieve the bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work.
BID AMOUNTS
A. The bid prices shown for each item on the bid proposal shall include all labor, material, equipment, overhead and compensation to complete all of the work for that item.
B. The actual cost of building permit (only) and the public utility hookup fees will be a direct reimbursement to the Contractor or paid directly to the permitting agency by the Owner. Fees for these permits should not be included by the Bidder in the bid amount.
C. The Bidder agrees to hold the base bid prices until bid award and contract execution.
TAXES
A. The bid amounts shall not include Washington State Sales Tax (WSST). All other taxes imposed by law shall be included in the bid amount. The Owner will include WSST in progress payments. The Contractor shall pay the WSST to the Department of Revenue and shall furnish proof of payment to the Owner if requested. [NOTE: Contractor must bond for contract amount plus the WSST.]
SUBMISSION OF BIDS
A. Bid Proposals must be submitted on or before the time specified in the Advertisement for
Bids.
B. If the base bid and the sum of the additive alternates is one million dollars or more, the Bid
Proposal shall comply with the following requirements:
1. Pursuant to RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder shall provide names and proof of license of the
Subcontractors with whom the Bidder will subcontract for performance of heating, ventilation and air conditioning (HVAC), plumbing, and electrical at the time of the bid. For structural-steel-installation and rebar-installation subcontractors, name and proof of license but be submitted within 48 hours after bid time when applicable.
2. The Bidder can name itself for the performance of the work.
3. The Bidder shall not list more than one Subcontractor for each category of work identified
UNLESS Subcontractors vary with bid alternates. In which case the Bidder must indicate which
Subcontractor will be used for which alternate.
4. Failure of the Bidder to submit the NAMES of such Subcontractors as part of the bid or to name itself to perform such work shall render the Bidder's bid nonresponsive and, therefore, void.
C. The Bid Proposal shall be submitted through the OpenGov.com portal https://procurement.opengov.com/portal/lewiscountywa
D. Prior to the bid opening, the Owner’s representative will designate the official bid clock.
Any part of the bid proposal or bid modification not received prior to the times specified, per the designated bid clock, will not be considered and the bid will be returned to the bidder unopened.
E. A bid may be withdrawn in person by a bidder’s authorized representative before the opening of the bids. The Bidder's representative will be required to show ID and sign off on the bid summary sheet before it will be released.
https://procurement.opengov.com/portal/lewiscountywa
F. People with disabilities who wish to request special accommodation, (e.g., sign language interpreters, Braille, etc.) need to contact the Owner ten (10) working days prior to the scheduled bid opening.
BID RESULTS
A. After the Bid Opening, a tabulation of the bids will be posted as a notice for the project in the OpenGov portal. Bidders may obtain the tabulation of apparent bids from Lewis County by
Contacting the procurement contact listed in the bid documents.
LOW RESPONSIBLE BIDDER
A. If applicable, it is the intent of the Owner to award a contract to the low responsible bidder. Upon Owner’s request, the apparent low bidder must supply the requested information within two (2) business days of request by Owner. Withholding information or failure to submit all the information requested within the time provided shall render the bid nonresponsive. If the
Owner determines that the apparent low bidder is not responsible, the Owner will notify the bidder of its preliminary determination in writing. Within three (3) days after receipt of the preliminary determination, the bidder may withdraw its bid or request a hearing. The Owner will schedule a hearing within three (3) working days of receipt of the bidder’s request. The hearing members will include the Internal Services Director, Public Works Director and Capital
Facilities Manager. The Owner will issue a Final Determination after reviewing information presented at the hearing. The Owner’s Final Determination is specific to this project and will have no effect on other or future projects.
B. In accordance with SHB 2010 amending RCW 39.04 the Contractor shall include the language of this paragraph in each of its first tier subcontracts and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this paragraph apply to all subcontractors regardless of tier. At the time of subcontract execution, the
Contractor shall verify that each of its first-tier subcontractors meet the following bidder responsibility criteria:
1. Have a current certificate of registration as a contractor in compliance with chapter 18.27
RCW, which must have been in effect at the time of subcontract bid submittal;
2. Have a current Washington Unified Business Identifier (UBI) number;
3. Have required Washington Accounts and Coverage, when applicable:
-Have Industrial Insurance (workers’ compensation) coverage for the subcontractor’s employees working in Washington, as required in Title 51 RCW;
- A Washington Employment Security Department number, as required in Title 50 RCW;
- A Washington Department of Revenue state excise tax registration number, as required in Title
82 RCW;
- An electrical contractor license, if required by Chapter 19.28 RCW;
- An elevator contractor license, if required by Chapter 70.87 RCW.
8. Not be disqualified or debarred from bidding on any public works contract under RCW
39.06.010 or 39.12.065 (3).
CONTRACT AWARD
The Owner will evaluate bid responsiveness and bidder responsibility.
A bid will be considered responsive if it meets the following requirements:
1. It is received at the proper time and place.
2. It meets the stated requirements of the bid proposal.
3. It is submitted by a licensed/registered contractor within the State of Washington at the time of bid opening and is not banned from bidding by the Department of Labor and Industries.
4. It is accompanied by a bid guarantee and non-collusion affidavit, if required.
A bid will be considered responsible if it meets the following requirements:
1. It meets an overall accounting of the responsibility criteria established for the project.
2. All required documents are completed and signed by a individual with such authority.
3. It is submitted by a licensed/registered contractor within the State of Washington at the time of bid opening and is not banned from bidding by the Department of Labor and Industries.
The Owner reserves the right to accept or reject any or all bid proposals and to waive informalities that do not affect the essential fairness of the bidding process.
The apparent low bidder, for purpose of award, shall be the responsive bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.
The Owner may negotiate bid price adjustments with the low responsive bidder, including changes in the contract documents, to bring the bid within the available funding per RCW
39.04.015.
The Contract will only become effective when signed by the Owner. Prior to the Owner’s signature, any and all costs incurred shall be the sole responsibility of the bidder.
It is the intent of the Owner to award a contract to the low responsible bidder.
Public Agency Debarment
Debarment by any Public agency within the last two (2) years may render bid non-responsive.
4. Scope of Work
4.1. Scope of Work
The successful contractor shall furnish all labor, materials, equipment, tools, transportation, supervision, permits, inspections, testing, and other services necessary to complete the project in accordance with the contract documents, including the bid set drawings and specifications.
The work generally includes, but is not limited to:
• Interior demolition and preparation of existing spaces.
• Construction of new interior offices, meeting rooms, help desk facilities, break room, server room, electrical room, storage areas, restrooms, and supporting circulation areas.
• Installation of metal stud framing, gypsum board assemblies, doors, frames, hardware, glazing, ceilings, flooring, painting, casework, and finish materials.
• Structural modifications and support systems required by the contract documents.
• Installation of a new HVAC system, including VRF equipment, dedicated outdoor air systems, ductwork, controls, piping, and associated mechanical work.
• Electrical improvements including new distribution equipment, lighting, lighting controls, power systems, receptacles, mechanical equipment connections, and associated electrical infrastructure.
• Firestopping, accessibility improvements, code compliance upgrades, testing, commissioning, and final system startup.
• Coordination of all trades necessary to provide a complete, operational, and code-compliant facility.
The Contractor shall field verify all existing conditions and dimensions and coordinate all work necessary to complete the project. Any work reasonably inferable from the drawings and specifications or required for a complete and operational installation shall be included whether specifically referenced herein or not.
5. Specifications
The Contractor shall furnish all labor, materials, equipment, supervision, permits, transportation, testing, commissioning, and incidentals necessary to complete the Lewis County Rainier North
Building Tenant Improvement Project in accordance with the contract documents, plans, specifications, applicable codes, and permitting requirements. The project consists of approximately 4,740 square feet of tenant improvements within the Lewis County Rainier North
Building TI - Bid Set to accommodate the relocation of the Lewis County Information
Technology Department.
Scope of Construction
Work generally includes, but is not limited to:
Architectural
• Selective demolition and preparation of existing spaces.
• New interior wall framing and gypsum board assemblies.
• Doors, frames, glazing, and hardware.
• Acoustical ceilings and ceiling systems.
• Floor finishes, wall finishes, painting, and related finish work.
• Millwork and casework installation.
• Restroom improvements and accessibility upgrades.
Structural
• Structural modifications as shown in the contract documents.
• Installation of new support framing, beams, columns, and related structural elements.
• Coordination with existing building conditions.
Mechanical
• Furnish and install new variable refrigerant flow (VRF) HVAC system.
• Furnish and install dedicated outdoor air system (DOAS).
• Ductwork, refrigerant piping, condensate piping, controls, balancing, startup, and commissioning.
• HVAC equipment supports and associated roof work.
Electrical
• New electrical as required.
• Interior lighting and lighting controls.
• Power distribution and receptacles.
• Connections to mechanical equipment.
• Grounding, surge protection, and system testing.
• Coordination with information technology and owner-provided systems.
General Requirements
• Permit acquisition and inspections.
• Coordination with utility providers and authorities having jurisdiction.
• Testing, balancing, startup, commissioning, and training.
• Final cleaning and punch-list completion.
• Record drawings and closeout documentation.
Contractor Responsibilities
The Contractor shall:
• Verify all existing field conditions before commencing work.
• Review and coordinate requirements between all disciplines.
• Include all work reasonably inferable from the contract documents.
• Coordinate all subcontractors and suppliers.
• Protect existing facilities from damage.
• Maintain safe access around the project area.
• Restore all disturbed conditions to equal or better condition than existed prior to construction.
• Comply with all applicable federal, state, and local regulations.
Project Coordination
The Contractor shall:
• Attend a preconstruction meeting.
• Prepare and maintain a project schedule.
• Participate in progress meetings as requested.
• Provide submittals, shop drawings, and product data as required.
• Coordinate procurement of long-lead materials.
• Immediately notify the Owner of any discrepancies or conflicts within the contract documents.
Closeout Requirements
Prior to final acceptance, the Contractor shall provide:
• Final inspections and approvals.
• Operation and maintenance manuals.
• Equipment warranties.
• Test and balance reports.
• Commissioning documentation.
• As-built drawings and record documents.
• Training for County staff on installed systems as required.
• Final cleanup and removal of temporary facilities.
Special Provision
The drawings, specifications, and technical requirements contained within the Contract
Documents shall govern. The scope summary provided herein is intended to describe the general nature of the work and does not relieve the Contractor of responsibility for providing a complete and fully operational project as shown, specified, or reasonably inferable from the Contract
Documents.
6. Pricing Proposal
PROJECT COSTS
Framing, gypsum, doors, glazing, ceilings, painting, flooring and finishing.
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Electrical 1 lump sum
2 Mechanical 1 lump sum
3 General Construction and Project
Costs 1 lump sum
TOTAL
7. Prevailing Wage
Notice
Prevailing Wage Requirement
This project has been determined to be “Public Works” as defined by RCW 39.04 and WAC
296-127 and is subject to Washington State Prevailing Wage Laws. Current Prevailing Wage
Rates for work performed in Lewis County and can be found at https://secure.lni.wa.gov/wagelookup/. The bid date used is Tuesday, December 22, https://secure.lni.wa.gov/wagelookup/
2026. These rates apply to Lewis County and may not apply to work performed outside Lewis
County.
A printed copy is available in the issuing office and a printed copy may be mailed upon request.
In addition, successful Contractor and any subcontractors are required to file Statement of Intent to Pay Prevailing Wages, Affidavits of Wages Paid and file Certified Payroll Records as per L&I requirements.
Pursuant to RCW 39.12.040 the Contractor and each and every subcontractor from the contractor or a subcontractor must submit to the contract manager a "Statement of Intent to Pay Prevailing
Wages". For a contract in excess of ten thousand dollars, the statement of intent to pay prevailing wages must include:
(i) The contractor's registration certificate number; and
(ii) The prevailing rate of wage for each classification of workers entitled to prevailing wages under RCW 39.12.020 and the estimated number of workers in each classification. A copy of the
Intent approved by L&I must be posted in a location readily visible to workers at the worksite
8. Vendor Questionnaire
8.1. Are you licensed to do this type of work in the State of Washington?*
☐ Yes
☐ No
*Response required
8.2. Non-Collusion Affidavit
Please download the below documents, complete, and upload.
• Non_Collusion_Affidavit.docx
8.3. Bid Bond (if Required
Please upload your bid bond.
Original shall be mailed or hand delivered no later than the bid due date and time. Envelope shall be clearly marked and delivered to:
9. Information
The following sections are provided to bidders to show typical contract provisions in a Lewis
County Personal Services or Construction agreement. These examples of General Conditions, Basic Insurance and Special Conditions are generic. Lewis County reserves the right to make changes to the final contract language on a case by case basis to accurately reflect current conditions.
10. General Conditions of Lewis County Contract (For Reference Only)
10.1. Scope of Contractors Services
The Contractor shall furnish all labor, materials, equipment, tools, supervision, permits, transportation, testing, commissioning, and incidentals necessary to complete the Lewis County
Rainier North Building Tenant Improvement Project in accordance with the contract documents, including the bid documents, plans, specifications, addenda, and associated construction drawings.
Unless specifically identified in the contract documents, the County will not furnish labor, materials, equipment, or facilities for the performance of the Work.
10.2. Accounting and Payment for Contractor Services
Payment to the Contractor shall be based upon the Contractor's accepted bid, executed contract, and any approved change orders. Progress payments shall be made for work satisfactorily completed and incorporated into the project, supported by applications for payment and such documentation as the County may reasonably require, including schedules of values, invoices, https://government-project.s3.us-west-2.amazonaws.com/57949/e622e43f-8c39-4007-b820-c159fe3800a0_Non_Collusion_Affidavit.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4AIZTM4I7%2F20261125%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261125T164501Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOD%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQDKMiFdskBxzbBo%2BY3zmTiNU2CC%2BznZDnPMc%2FuPTVE2BQIgfV0n40wdg4dpis30o%2BJDEX8gXdkB4aD%2BF8sFVBCl1kMqlQUIqf%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAYaa3FKgvF9Y7lnUSrpBKao6gGr8nZKYIMdDnLJm8KlSyqTp8tBPLPr8irMyDnNwAXUEixaSm8UPUuNXIPzGd206NQp7Z8Za%2B8rt%2FCN8EJjefbrplD8jlq9ladxcLHm2qqm3HBj159yxmRUhsSIAZFAmhkz3GOYWoq52AH5NGQuGNHlZzKzasnvyqvzJYUJMEdwot93oM%2FN%2BvSCJsU%2BSqvBAUlve%2B7nXP9nKYWZJ5MwdlOdYi3F%2Fp1o83wEkM9l%2B%2FqJDCnB8zvgRCJPVUBWF58S8zfZiuoNvXGs3qSmc2%2FGd3ImulDgNxK4Q5%2F%2B90LTChrpgSwqhAGkCxPMQOYRQi9L2me%2Ft5Z6i414ksCd52%2FjkGMBF8CX07WUxj93VRqd2yVsVDAyk6dMkg%2Fxdi0KQOb1gnMNeOYaGTVH3MMWFhLmdaxCi%2Bbcve6zDDQ4NAkYyNtj%2FsK3k9stkRTn8ll6OQs0AIopDSDz5WtAuBhk%2FfQziD6MeY%2B%2BU4FApnO8BYFswSAhqjwZtnhMlJyWW2KvT0Bdm8varMoGLyCQzqXg%2FHXfrvZBY7%2BV2KMwDquBXSGJBfWznYzd1THEZNXwdVNUM9hUhxXYDExVUOSa20VqPnQPrGR7%2Fe0MC209XZBBVwsehXcrSJyyZWA1c7OGJI7BWChd%2FhnobgSFBwd47QO3sMGy1Fo8L2VAxSNzHPXnOsesaYt8B6wrbuEVTYbzpfkHlX4vFtsCXrpyBYd1AXYjrx5F5uyhye9kYxd0X8fmbPG2pLqvYMIjG4Bb37MYY%2FgRQ0mArQHSr1nBDY8Sgx1tUnHUlWUTrQZaKR3MTKPYcvzq7rUdxPUsyVT%2FMPqMnNgGOpkBvKtZ39vOo28LaQvd2a2bOU83dxW50GPbJn2PrlR%2FuuZUHilty7KfeQtxG0ALVkbJjbuvuOTO0tg%2FzBCdN74DvcMMqC%2F%2B3IH1dBLxkurJn9iIyd9oGj8Hj12zXtZASwRn4464SgNqfkw3WaShtuF4l4i2X5g2Caqdq2UEzI%2BdSltRuwkaMniHqMMTxhOPizU1mpq0OttprFf%2B&X-Amz-Signature=6d50c0f6e687f3a1081945691a7e68dad12127e33bf968eda528312ec3ae4606&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Non_Collusion_Affidavit.docx%22&x-id=GetObject certified payroll records, lien releases, material documentation, and other records demonstrating the work completed and amounts earned.
Unless specifically authorized by the Contract Documents or approved in writing by the County's
Contracting Officer, the County shall not reimburse the Contractor for costs, expenses, or services beyond those included in the Contract Sum.
The County shall process progress payments in accordance with applicable Washington State law and Lewis County payment procedures following receipt and approval of a properly submitted payment application.
Pursuant to RCW 60.28.011, the County shall retain five percent (5%) of the value of work completed, excluding Washington State sales tax, as retainage until the project has achieved final acceptance and all statutory requirements for release of retainage have been satisfied. In lieu of retainage, the Contractor may provide a retainage bond in accordance with RCW 60.28.011, subject to County approval.
10.3. Assignment and Subcontracting
The Contractor shall not assign or transfer any interest in this Contract without the prior written consent of the County. The Contractor may utilize subcontractors to perform portions of the
Work; however, the Contractor shall remain fully responsible for the performance, acts, omissions, and compliance of all subcontractors, suppliers, and lower-tier subcontractors engaged in the performance of the Contract.
10.4. Labor Standards and Contract Assistance
The Contractor shall comply with the provisions of the Lewis County Contract and Procurement
Assistance Program as applicable, attached hereto as “Special Conditions”.
10.5. Safety; Familiarity with Site
Prior to commencing Work, Contractor shall become familiar with the Site and its conditions.
Contractor shall be solely responsible for the safety of its employees, subcontractors, suppliers, and all persons under its control, and shall comply with all applicable OSHA, WISHA, federal, state, and local safety requirements. Contractor shall prepare and maintain a site-specific safety plan and shall be responsible for all construction means, methods, techniques, sequences, and procedures. Contractor acknowledges that it possesses the experience and expertise necessary to safely perform the Work.
10.6. No Guarantee of Employment
The performance of all or part of this contract by the Contractor shall not operate to vest any employment rights whatsoever and shall not be deemed to guarantee any employment of the
Contractor or any employee of the Contractor or any subcontractor or any employee of any subcontractor by the County at the present time or in the future.
10.7. Regulations and Requirement
This Agreement and the Work shall comply with all applicable federal, state, and local laws, regulations, ordinances, codes, and permitting requirements, together with any Special
Conditions incorporated into the Contract Documents.
10.8. Prevailing Wages
Contractor shall pay the prevailing rate of wages to all workers, laborers, or mechanics employed in the performance of any part of the Work in accordance with RCW 39.12 and the rules and regulations of the Department of Labor and Industries. The schedule of prevailing wage rates for the locality or localities of the Work, is determined by the Industrial Statistician of the
Department of Labor and Industries. It is the Contractor’s responsibility to verify the applicable prevailing wage rate.
Each Application for Payment submitted by Contractor shall state that prevailing wages have been paid in accordance with the pre-filed statement(s) of intent, as approved. Copies of the approved intent statement(s) shall be posted on the job site with the address and telephone number of the Industrial Statistician of the Department of Labor and Industries where a complaint or inquiry concerning prevailing wages may be made.
In compliance with chapter 296-127 WAC, Contractor shall pay to the Department of Labor and
Industries the currently established fee(s) for each statement of intent and/or affidavit of wages paid submitted to the Department of Labor and Industries for certification.
In addition, the Contractor shall file weekly certified payroll records with the Department of
Labor and Industries, as required by RCW 39.12.120
As required by RCW 39.12.030, the hourly minimum rate of wage, not less than the prevailing rate of wage, which may be paid to laborers, workers, or mechanics in each trade or occupation required for such public work employed in the performance of the contract either by the contractor, subcontractor, or other person doing or contracting to do the whole or any part of the work contemplated by the contract can be found at https://secure.lni.wa.gov/wagelookup/ •
Identify the exact wage publication date to use (the effective date). • List the county in which the public works project is located (Note: Off-site work will use the rates for the county where that off-site work is performed). • Provide a statement indicating a printed copy of the wage rates are available for viewing in your office. • Explain that your agency will mail a hard copy upon request. Such laborers, workers, or mechanics shall be paid not less than such specified hourly minimum rate of wage. If you determine the project meets the definition of residential construction, you must state this in your bid and contract documents.
10.9. Right to Review
The County, State Auditor, and any other authorized governmental agency shall have the right to inspect and audit records related to the Contract and performance of the Work. The Contractor shall maintain all financial, payroll, project, and supporting records related to the Contract and shall make such records available for inspection upon reasonable request. Contractor shall retain such records for seven (7) years following final payment, or longer if required by applicable law.
10.10. Modifications
Either party may request changes in the Agreement. Any and all agreed modifications shall be in writing, signed by each of the parties.
10.11. Termination for Default
If the Contractor fails to perform any obligation required by the Contract Documents, fails to maintain any license, registration, certification, or legal authority required to perform the Work, becomes insolvent, is adjudicated bankrupt, makes an assignment for the benefit of creditors, or otherwise defaults in the performance of the Contract, the County may, upon written notice, terminate the Contract for default and complete the Work by whatever means the County deems appropriate. In such event, the Contractor shall not be entitled to further payment until the Work required under the Contract Documents has been completed. Any increased costs, damages, expenses, or losses incurred by the County resulting from the Contractor's default, including costs associated with completing the Work, may be deducted from any amounts due or becoming due to the Contractor, and the Contractor shall be liable for any deficiency. If a termination for default is later determined to have been improper, the termination shall be deemed a Termination for Convenience, and the rights and obligations of the parties shall be governed accordingly.
10.12. Termination for Public Convenience
The County may, at any time and for any reason, terminate the Contract in whole or in part upon written notice to the Contractor when the County determines that such termination is in its best interests. In the event of a termination for convenience, the Contractor shall be entitled to payment for Work properly performed and accepted by the County prior to the effective date of termination, together with reasonable costs incurred for authorized partially completed Work.
The Contractor shall not be entitled to compensation for anticipated profits, overhead, consequential damages, or costs associated with Work not performed as a result of the termination. Upon receipt of a notice of termination, the Contractor shall immediately cease the terminated Work, take reasonable measures to protect and preserve completed and partially completed Work, and submit a final payment request for Work performed through the effective date of termination. Termination of the Contract by the County for convenience or default shall not constitute a breach of contract by the County.
10.13. Defense & Indemnity Agreement
To the fullest extent permitted by law, the Contractor shall indemnify, defend, and hold harmless
Lewis County, its departments, elected and appointed officials, officers, employees, agents, and volunteers from and against any and all claims, demands, damages, losses, liabilities, fines, penalties, costs, and expenses, including reasonable attorneys' fees and costs of litigation or alternative dispute resolution, to the extent arising out of, resulting from, or related to the negligent acts, errors, omissions, or breach of contract by the Contractor, its employees, agents, subcontractors, suppliers, or anyone directly or indirectly employed by them in connection with the performance of the Work.
This indemnification obligation includes, without limitation, claims involving bodily injury, sickness, disease, death, damage to property, or loss of use of property.
Contractor's obligations under this section shall not apply to the extent that a claim, loss, damage, or expense is caused by the sole negligence of Lewis County. In the event of concurrent negligence of the Contractor and Lewis County, this indemnification obligation shall apply only to the extent of the Contractor's negligence and the negligence of those for whom the Contractor is legally responsible.
To the extent necessary to give effect to this provision, the Contractor expressly waives its immunity under RCW Title 51 solely for purposes of this indemnification obligation. This waiver has been mutually negotiated by the parties and is reflected in the compensation provided under the Contract.
10.14. Participation by County – Right to participate; Survival of Contractor’s Indemnity
Obligations; Indemnity for Subcontractors
The County reserves the right, but not the obligation, to participate in the defense of any claim, loss, damage, liability, or expense for which indemnification may be sought under the Contract
Documents, and such participation shall not relieve the Contractor of its defense or indemnification obligations. The Contractor's defense and indemnification obligations shall survive completion, acceptance, expiration, or termination of the Contract. The Contractor shall require all subcontractors of every tier to include indemnification provisions that are substantially equivalent to the indemnification obligations imposed upon the Contractor under the Contract Documents.
10.15. Venue and Choice of Law
In the event that any litigation should arise concerning the construction or interpretation of any of the terms of this Agreement, the venue of such action of litigation shall be in the courts of the
State of Washington in and for the County of Lewis. This Agreement shall be governed by the law of the State of Washington.
10.16. Withholding Payment
In the event the Contractor has failed to perform any substantial obligation to be performed by the Contractor under this Agreement and said failure has not been cured within the times set forth in this Agreement, then the County may, upon written notice, withhold all monies due and payable to Contractor, without penalty, until such failure to perform is cured or otherwise adjudicated.
10.17. Liquidated Damages (Not a Penalty)
Because breach and/or non-performance by Contractor may cause County to incur economic damages and losses of types and in amounts which are incapable or very difficult to ascertain with certainty in advance as a basis for recovery of actual damages, in the event Contractor has not fully completed work pursuant to and by the deadline set forth in this Agreement, Contractor shall pay County liquidated damages in the amount of $500.00 per day for every day past the end date agreed upon by both parties. The parties believe said amount represents a fair, reasonable, and appropriate forecast of just compensation for the harm caused by a breach. Such liquidated damages are intended to represent estimated actual damages as contemplated by the parties at the time of entering into this Agreement and are not intended as a penalty.
10.18. Payment and Performance Bond
The Contractor shall furnish payment and performance bonds in the amount of one hundred percent (100%) of the Contract Sum, including approved Change Orders and Washington State sales tax, in a form acceptable to the County. Bonds shall be provided and approved prior to commencement of the Work.
For contracts eligible under RCW 39.08.010, the County may, at the Contractor's option and as permitted by law, retain the percentage authorized by statute in lieu of requiring a payment and performance bond. Such retainage shall be held until final acceptance of the Work and receipt of all required releases from the Washington State Department of Revenue, the Employment
Security Department, and the Department of Labor and Industries, and resolution of any lien claims, whichever occurs later.
10.19. Future Non-Allocation of Funds
If sufficient funds are not appropriated or allocated for payment under this contract for any future fiscal period, the County will not be obligated to make payments for services or amounts incurred after the end of the current fiscal period. No penalty or expense shall accrue to the
County in the event this provision applies.
10.20. Nature of the Work
Prior to commencing the Work, the Contractor shall familiarize itself with the Site, existing conditions, and any County safety requirements. The Contractor shall be solely responsible for the safety of its employees, subcontractors, suppliers, and all other persons under its control while performing the Work. The Contractor shall comply with all applicable federal, state, and local safety laws and regulations, including OSHA and WISHA requirements, and shall prepare, maintain, and enforce a site-specific safety plan before commencing Work. The Contractor shall be responsible for all construction means, methods, techniques, sequences, procedures, and temporary safety measures necessary to safely complete the Work. The Contractor represents that it has the experience, expertise, personnel, and equipment necessary to safely perform the
Work under the conditions existing at the Site.
10.21. Contractor Commitments, Warranties and Representations
The Contractor shall be bound by all representations, certifications, commitments, and warranties contained in its bid proposal, subcontractor listings, required bid documents, and executed
Contract Documents. Failure to comply with such commitments may constitute a breach of
Contract.
The Contractor warrants that all Work performed under the Contract Documents shall be of good quality, free from defects in workmanship and materials, and fit for its intended purpose. Unless otherwise specified, the Contractor shall correct any defective Work identified within one (1) year after final acceptance of the Project at no cost to the County. This warranty obligation includes repair of defective workmanship and correction of excessive settlement, cracking, or other deficiencies attributable to the Contractor's Work.
10.22. Authority
Contractor acknowledges, represents, and warrants that it has the full right, power, and authority to enter into this agreement. Each person signing this agreement on behalf of an entity represents and warrants that he or she has the full right, power, and authority to bind their respective entity, their respective entity has approved this Agreement and authorized them to sign it, and their respective entity is duly formed and in good standing.
10.23. Patent/Copyright Infringement
Contractor will defend and indemnify the County from any claimed action, cause or demand brought against the County, to the extent such action is based on the claim that information supplied by the Contractor infringes any patent or copyright. The Contractor will pay those costs and damages attributable to any such claims that are finally awarded against the County in any action. Such defense and payments are conditioned upon the following:
A. That Contractor shall be notified promptly in writing by County of any notice of such claim.
B. Contractor shall have the right, hereunder, at its option and expense, to obtain for the
County the right to continue using the information in the event such claim of infringement is made, provided no reduction in performance or loss results to the County.
10.24. Disputes
General
Differences between the Contractor and the County arising under and by virtue of the Contract
Documents shall be brought to the attention of the County at the earliest possible time in order that such matters may be settled or other appropriate action promptly taken. Except for such objections as are made of record in the manner hereinafter specified and within the time limits stated, the records, orders, rulings, instructions, and decisions of the Contracting Officer, shall be final and conclusive.
A. Notice of Potential Claims
The Contractor shall not be entitled to additional compensation which otherwise may be payable, or to extension of time for (1) any act or failure to act by the Contracting Officer or the County, or (2) the happening of any event or occurrence, unless the Contractor has given the County a written Notice of Potential Claim within 10 days of the commencement of the act, failure, or event giving rise to the claim, and before final payment by the County. The written Notice of Potential Claim shall set forth the reasons for which the Contractor believes additional compensation or extension of time is due, the nature of the cost involved, and insofar as possible, the amount of the potential claim.
Contractor shall keep full and complete daily records of the Work performed, Labor and material used, and all costs and additional time claimed to be additional.
B. Detailed Claim
The Contractor is not entitled to claim any such additional compensation, or extension of time, unless within 30 days of the accomplishment of the portion of the work from which the claim arose, and before final payment by the County, the Contractor has given the
County a detailed written statement of each element of cost or other compensation requested and of all elements of additional time required, and copies of any supporting documents evidencing the amount or the extension of time claimed to be due.
10.25. Attorneys Fees, Expenses, and Costs
Should any legal proceeding be commenced between or by the Parties concerning or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .