Page 1 of 72ORDER NUMBER:
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
Coll. No.
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
Page 2 of 72ORDER NUMBER:
Page 3 of 72ORDER NUMBER:
Page 4 of 72ORDER NUMBER:
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date
Page 5 of 72ORDER NUMBER:
Page 6 of 72ORDER NUMBER:
Page 7 of 72ORDER NUMBER:
Page 8 of 72ORDER NUMBER:
Page 9 of 72ORDER NUMBER:
Page 10 of 72ORDER NUMBER:
Page 11 of 72ORDER NUMBER:
Page 12 of 72ORDER NUMBER:
Page 13 of 72ORDER NUMBER:
Page 14 of 72ORDER NUMBER:
Page 15 of 72ORDER NUMBER:
Page 16 of 72ORDER NUMBER:
Page 17 of 72ORDER NUMBER:
Page 18 of 72ORDER NUMBER:
Page 19 of 72ORDER NUMBER:
Page 20 of 72ORDER NUMBER:
Page 21 of 72ORDER NUMBER:
Page 22 of 72ORDER NUMBER:
Page 23 of 72ORDER NUMBER:
Page 24 of 72ORDER NUMBER:
Page 25 of 72ORDER NUMBER:
Page 26 of 72ORDER NUMBER:
Page 27 of 72ORDER NUMBER:
Page 28 of 72ORDER NUMBER:
Page 29 of 72ORDER NUMBER:
Page 30 of 72ORDER NUMBER:
Page 31 of 72ORDER NUMBER:
Page 32 of 72ORDER NUMBER:
Page 33 of 72ORDER NUMBER:
Page 34 of 72ORDER NUMBER:
Page 35 of 72ORDER NUMBER:
Page 36 of 72ORDER NUMBER:
Page 37 of 72ORDER NUMBER:
Page 38 of 72ORDER NUMBER:
Page 39 of 72ORDER NUMBER:
Page 40 of 72ORDER NUMBER:
Page 41 of 72ORDER NUMBER:
Page 42 of 72ORDER NUMBER:
Page 43 of 72ORDER NUMBER:
Page 44 of 72ORDER NUMBER:
Page 45 of 72ORDER NUMBER:
Page 46 of 72ORDER NUMBER:
Page 47 of 72ORDER NUMBER:
Page 48 of 72ORDER NUMBER:
Page 49 of 72ORDER NUMBER:
Page 50 of 72ORDER NUMBER:
Page 51 of 72ORDER NUMBER:
Page 52 of 72ORDER NUMBER:
Page 53 of 72ORDER NUMBER:
Page 54 of 72ORDER NUMBER:
Page 55 of 72ORDER NUMBER:
Page 56 of 72ORDER NUMBER:
Page 57 of 72ORDER NUMBER:
Page 58 of 72ORDER NUMBER:
Page 59 of 72ORDER NUMBER:
Page 60 of 72ORDER NUMBER:
Page 61 of 72ORDER NUMBER:
Page 62 of 72ORDER NUMBER:
Page 63 of 72ORDER NUMBER:
Page 64 of 72ORDER NUMBER:
Page 65 of 72ORDER NUMBER:
Page 66 of 72ORDER NUMBER:
Page 67 of 72ORDER NUMBER:
Page 68 of 72ORDER NUMBER:
Page 69 of 72ORDER NUMBER:
Page 70 of 72ORDER NUMBER:
Page 71 of 72ORDER NUMBER:
Page 72 of 72ORDER NUMBER:
Page of
ORDER NUMBER:
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PAGE 1 OF
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO
16. ADMINISTERED BY
CODE
18a. PAYMENT WILL BE MADE BY
CODE
17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ
IFB
RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS
UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE:
% FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE
ARE NOT ATTACHED
ARE
ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA \\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg Right Arrow Pointing to Call the Contact Point for this Solicitation/Contract/Order 8 (A)
EDWOSB
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SMALL BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
SMALL BUSINESS
Page of Printing C:\FORMFLOW\FORMS\SF\S1449_3.FRP BarbMWilliams
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date
| LV_TITLE: Request for Quotation |
| CurrentSheet: |
| SheetCount: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000056 |
| 1. REQUISITION NUMBER: |
| PAGE 1 OF: |
| 2. CONTRACT NUMBER: |
| 4. ORDER NUMBER: |
| 5. SOLICITATION NUMBER: ISO195-22 |
| 31b. NAME OF CONTRACTING OFFICER (Type or print): Jason Morgan |
| 31b. NAME OF CONTRACTING OFFICER (Type or print): Jason Morgan |
| 7. FOR SOLICITATION INFORMATION CALL: b. TELEPHONE NUMBER (No collect calls): |
| 15. DELIVER TO CODE: COCO |
| 15. DELIVER TO CODE: COCO |
| % For : 100 |
| 12. DISCOUNT TERMS: |
| 13b. RATING: |
| 15. DELIVER TO: |
| 17a. CONTRACTOR/ OFFEROR CODE: 321000101 |
| 17a. CONTRACTOR/ OFFEROR CODE: 321000101 |
| 17a. CONTRACTOR/ OFFEROR CODE: 321000101 |
| 17a. CONTRACTOR/ OFFEROR: Misc |
400 First Street NW Washington DC 20534
| 17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER: |
| 18a. PAYMENT WILL BE MADE BY: |
| 19. ITEM NUMBER. Line 1 of 8.: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: See Section B |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 19. ITEM NUMBER. Line 2 of 8.: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 19. ITEM NUMBER. Line 3 of 8.: |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 19. ITEM NUMBER. Line 4 of 8.: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: ISO195-22 |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: ISO195-22 |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 19. ITEM NUMBER. Line 5 of 8.: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 19. ITEM NUMBER. Line 6 of 8.: |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 19. ITEM NUMBER. Line 7 of 8.: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 19. ITEM NUMBER. Line 8 of 8.: |
| 20. SCHEDULE OF SUPPLIES/ SERVICES: |
| 21. QUANTITY: |
| 22. UNIT: |
| 23. UNIT PRICE: |
| 25. ACCOUNTING AND APPROPRIATION DATA: |
| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY |
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED. INITIALS :
| 29. AWARD OF CONTRACT: REFERENCE OFFER: |
| DATE. YOUR OFFER ON SOLICITATION |
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS.:
| 30b. NAME OF SIGNER (Type or print): |
| 30b. TITLE OF SIGNER (Type or print): |
| 10. THIS ACQUISITION IS UNRESTRICTED: 0 |
| 10. THIS ACQUISITION IS SET ASIDE:: 1 |
| 11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED SEE SCHEDULE: X |
| 13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700): 0 |
| 14. METHOD OF SOLICITATION RFQ: 0 |
| 10. THIS ACQUISITION IS NAICS:: 236220 |
| 14. METHOD OF SOLICITATION IFB: |
| 14. METHOD OF SOLICITATION RFP: 1 |
| 18a. PAYMENT WILL BE MADE BY CODE: |
| 17a. CONTRACTOR/ OFFEROR TELEPHONE NUMBER: |
| 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA: 0 |
| 29. AWARD OF CONTRACT : |
| 27a. ARE ATTACHED: 0 |
| 29. AWARD OF CONTRACT DATE Enter 2 digit month, 2 digit day and 4 digit year.: |
| 30c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.: |
| 6. SOLICITATION ISSUE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2022-08-01 |
| 8. OFFER DUE DATE Enter 2 digit month, 2 digit day and 4 digit year.: 2022-09-12 |
| 8. OFFER LOCAL TIME: 2:00 PM |
| 9. ISSUED BY: UNICOR, FPI CENTRAL OFFICE |
400 1ST ST NW
WASHINGTON DC 20534-0004
| 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK IS CHECKED SEE ADDENDUM: |
| 26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00 |
| 26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00 |
| 26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00 |
| 26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00 |
| 26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00 |
| 17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN |
OFFER :
| 31A. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) : |
| 10. THIS ACQUISITION IS SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS: 0 |
| 10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0 |
| 27a. ARE ATTACHED: |
| 6. SOLICITATION ISSUE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2022-08-01 |
| 10. THIS ACQUISITION IS SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS: 0 |
| 10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 1 |
| 10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0 |
| 10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0 |
| 23. UNIT PRICE: |
| 23. UNIT PRICE: |
| 23. UNIT PRICE: |
| 23. UNIT PRICE: |
| 23. UNIT PRICE: |
| 23. UNIT PRICE: |
| 23. UNIT PRICE: |
| 23. UNIT PRICE: |
| 27a. ARE ATTACHED: 0 |
| 10. THIS ACQUISITION IS NAICS:: 39.5 M Ann Rece |
| LV_TERMS_OF_DELIV: Terms: |
| INCO1: |
| INCO2: |
| LV_TARGET_VALUE_CHAR: |
| TDLINE: Demo: |
| TDLINE: To include removal and disposal of asbestos containing material, |
| TDLINE: carpeting, and vinyl tile floor. |
| TDLINE: Construction: |
| TDLINE: To include patching and painting walls, install epoxy flooring, adding |
| TDLINE: a telecommunication room, breakroom and HVAC modifications. |
| TDLINE: Utilities: |
| TDLINE: To include disconnecting NMCI, RDT<(>&<)>E, phone, and electrical |
| TDLINE: connections, adding a new power panel, circuits and power drops, make |
| TDLINE: power poles connections, install new NMCI / RDT<(>&<)>E drops, new phone |
| TDLINE: drops |
| TDLINE: Other Direct Costs: |
| TDLINE: To include general, administrative, management and incidentals |
| TDLINE: Section A: Optional Form 308 or SF33 |
| TDLINE: Section B: Supplies or Services Pricing or Cost (Line Items) |
| TDLINE: 1. The following information pertains to the SF1442, Solicitation, |
| TDLINE: Offer, and Award: |
| TDLINE: OMB Clearance Number 1103-0018 |
| TDLINE: Block 8: Emailed, Hand carried or Overnight Express to: |
| TDLINE: UNICOR, FPI |
| TDLINE: ATTN: Jason Morgan, UNICOR Contracting Officer<(>,<)> |
| TDLINE: 3301 LEESTOWN RD<(>,<)> |
| TDLINE: LEXINGTON, KY 40511 |
| TDLINE: 859-255-6812 EXT 3002 |
| TDLINE: Block 17: LUMP SUM (ENTER THE AMOUNT IN SECTION B. |
| TDLINE: Block 24, and 27, See Section H. |
| TDLINE: GENERAL INTENTION: It is the intent of this solicitation to result in a |
| TDLINE: Firm Fixed Price, Construction Type Contract for a project at the Naval |
| TDLINE: Service Warfare Center (NSWC Crane) Building 41-1st floor acquisition |
| TDLINE: office renovation, 2nd and 3rd floor modifications as outlined in the |
| TDLINE: attached Statement of Work. |
| TDLINE: The solicitation is 100% set aside for small business. The North |
| TDLINE: American Industrial Classification System (NAICS) Code applicable to |
| TDLINE: this project is 236220, commercial and institutional buildings and |
| TDLINE: related structure construction. |
| TDLINE: Contract Line Item: Offerors shall enter unit price and amount for |
| TDLINE: contract line item. |
| TDLINE: QUESTIONS WILL ONLY be accepted in writing and WILL NOT BE ACCEPTED |
| TDLINE: AFTER 08/24/2022 at 10:00 AM EST. Responses to questions and site visit |
| TDLINE: sign in sheet will be posted via www.sam.gov |
| TDLINE: NO PHONE CALLS PLEASE. |
| TDLINE: Proposal due date is 09/12/2022,at 2:00 PM EST. Late offers will not be |
| TDLINE: accepted. |
| TDLINE: QUESTIONS PERTAINING TO THIS SOLICITATION WILL ONLY BE ADDRESSED IN |
| TDLINE: WRITING VIA EMAIL TO:jason.Morgan2@USDOJ.GOV |
| TDLINE: THE NAICS CODE FOR THIS PROJECT IS: 236220 COMMERCIAL AND INSTITUTIONAL |
| TDLINE: BUILDING CONSTRUCTION |
| TDLINE: SITE VISIT IS MANDATORY. |
| TDLINE: Mandatory Site visit has been scheduled for 08/18/2022, at 11:00 AM EST. |
| TDLINE: Participants will meet at Building 41 on 1st floor Room 127 B, 2nd floor |
| TDLINE: Rooms 211, 212, 214, 215 and 3rd floor Room 355 for Naval Surface |
| TDLINE: Warfare Center (NSWC Crane), JXY. |
| TDLINE: The Contractor shall inspect the site where services are to be |
| TDLINE: performed. This site review shall satisfy the Contractor's need to |
| TDLINE: identify all general and local conditions that may affect the cost of |
| TDLINE: the contract. Failure to inspect the site will not constitute grounds |
| TDLINE: for claims after contract award. UP to two (2) people per company may |
| TDLINE: attend. |
| TDLINE: Mandatory attendance is required for award. Company Name, Name of |
| TDLINE: attendees, and phone number for attendees must be submitted with |
| TDLINE: completed SECNAV Form for Base Access to Jason.Morgan2@USDOJ.GOV by |
| TDLINE: 08/16/2022, at 10:00 AM EST. |
| TDLINE: NOTE: If you have clearance to access the base - you are still required |
| TDLINE: to submit your names for the site visit by the deadline of 08/16/2022, |
| TDLINE: at 10:00 AM EST. in order to attend the site visit. |
| TDLINE: Physical access to the Government’s facility at Naval Support Activity |
| TDLINE: (NSA), Crane shall be through the use of the Defense Biometric |
| TDLINE: Identification System (DBIDS) and associated data processing/information |
| TDLINE: services for purposes of protecting U.S./Coalition/allied |
| TDLINE: government/national security areas of responsibility and information. |
| TDLINE: The contractor shall obtain employee personal identity verification |
| TDLINE: credentialing (badge) by submitting to the NSA Crane Visitor Center, 103 |
| TDLINE: Furlong St, Crane, IN 47522, form SECNAV 5512/1 (APR 2014), for each |
| TDLINE: contractor employee. Upon Base Registrar authorization of form 5512/1 |
| TDLINE: the contractor shall submit form NSA Crane 5512/47 DBIDS Badge |
| TDLINE: Application Record to the NSWC Crane Security Division (812)-854-1213. |
| TDLINE: The Contractor shall retrieve badges of employed personnel upon |
| TDLINE: separation. A background check will be conducted as part of the process |
| TDLINE: and two forms of identification are required. A visitor's pass will be |
| TDLINE: provided if the background check is cleared. Please allow an |
| TDLINE: significant time (1-2 hours) for the entire process. |
| TDLINE: PROJECT MUST BE COMPLETED BY 03/31/2023 |
| TDLINE: THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE OFFEROR: |
| TDLINE: VENDOR'S Unique Entity Identifier:___________________________ |
| TDLINE: VENDOR'S POINT OF CONTACT: _____________________________________ |
| TDLINE: VENDOR'S TELEPHONE & FAX NUMBER: ______________________________ |
| TDLINE: VENDOR'S EMAIL ADDRESS: ________________________________________ |
| TDLINE: VENDOR'S BUSINESS SIZE (i.e. SMALL,LARGE,ETC.): ________________ |
| TDLINE: By submission of an offer, the offeror acknowledges the requirement that |
| TDLINE: a prospective awardee shall be registered in the SAM database (System |
| TDLINE: Award Management) prior to award, during performance and through final |
| TDLINE: payment of any contract resulting from this solicitation. |
| TDLINE: _______________________________________________ signature |
| TDLINE: ,,,,,,,,,,,, |
| TDLINE: Demo: |
| TDLINE: To include removal and disposal of asbestos containing material, |
| TDLINE: carpeting, and vinyl tile floor. |
| TDLINE: Construction: |
| TDLINE: To include patching and painting walls, install epoxy flooring, adding |
| TDLINE: a telecommunication room, breakroom and HVAC modifications. |
| TDLINE: Utilities: |
| TDLINE: To include disconnecting NMCI, RDT<(>&<)>E, phone, and electrical |
| TDLINE: connections, adding a new power panel, circuits and power drops, make |
| TDLINE: power poles connections, install new NMCI / RDT<(>&<)>E drops, new phone |
| TDLINE: drops |
| TDLINE: Other Direct Costs: |
| TDLINE: To include general, administrative, management and incidentals |
| TDLINE: Section C: Description, Spec & SOW |
| TDLINE: Building 41-1st floor acquisition office renovation, 2nd and 3rd floor |
| TDLINE: modification |
| TDLINE: 1.0 SCOPE |
| TDLINE: The scope of this project is to renovate Building 41 on 1st floor Room |
| TDLINE: 127 B, 2nd floor Rooms 211, 212, 214, 215 and 3rd floor Room 355 for |
| TDLINE: Naval Surface Warfare Center (NSWC Crane), JXY. Project consists of |
| TDLINE: removal and disposal of asbestos containing material, patch and paint |
| TDLINE: walls, remove and replace carpets and cove base, remove vinyl tile |
| TDLINE: floor, scarify existing floor, apply new epoxy flooring, disconnect |
| TDLINE: NMCI, RDT<(>&<)>E, phone and electrical from all existing cubicles, add |
| TDLINE: new power panel, circuits and power drops, power poles connections, |
| TDLINE: install new NMCI / RDT<(>&<)>E drops, new phone drops, build new |
| TDLINE: enclosed telecommunication room, new breakroom and HVAC modifications. |
| TDLINE: These renovations are required to improve the workspace area and |
| TDLINE: building conditions. |
| TDLINE: 2.0,,Acronym Table Refer to Attachment 01 for details |
| TDLINE: 3.0,,APPLICABLE DOCUMENTS Refer to Attachment 02 for details |
| TDLINE: The following documents of the revision or issue in effect at the date |
| TDLINE: of award, form a part of this SOW for reference. In the event of |
| TDLINE: conflict between the documents referenced herein and the contents of |
| TDLINE: this SOW, the contents of this SOW shall prevail. |
| TDLINE: 4.0 PERFORMANCE REQUIREMENTS |
| TDLINE: The Contractor shall furnish the required material, equipment and labor |
| TDLINE: to renovate Building 41 on 1st floor Room 127 B, 2nd floor Rooms 211, |
| TDLINE: 212, 214, 215 and 3rd floor Room 355. The Contractor shall utilize new |
| TDLINE: material; no postconsumer or recovered material will be authorized for |
| TDLINE: use. The Contractor shall adhere to all State and Federal building |
| TDLINE: codes. |
| TDLINE: 4.1 REQUIREMENTS |
| TDLINE: The scope of this project will be performed on first, second and third |
| TDLINE: floors of B-41. |
| TDLINE: 4.1.1 Room 127B |
| TDLINE: A) Demolition: There is an approximated 150 linear feet (LF) of existing |
| TDLINE: cove base and 599 square feet (SF) of existing carpet that shall be |
| TDLINE: removed and discarded. There is no asbestos containing material |
| TDLINE: identified. |
| TDLINE: B) Electrical: The Contractor shall disconnect electrical connections |
| TDLINE: from the existing cubicles. The Contractor shall provide all electrical |
| TDLINE: components required to supply power for the new cubicle and printer |
| TDLINE: station. Power pole (1EA) and 20A, 120V circuit breakers (1EA) shall be |
| TDLINE: installed. |
| TDLINE: C) Flooring: New 24”x 24” tufted nylon carpet tiles (approximately 67 |
| TDLINE: SY) shall be installed. Transition strips shall be installed in the |
| TDLINE: doorways as appropriate (2 EA). Flooring shall be prepared as per |
| TDLINE: manufacturers requirements prior to the new carpet installation. The |
| TDLINE: Contractor shall install new 4” vinyl base cove (approximately 150 LF). |
| TDLINE: The Contractor shall provide carpet tile, cove base and transition |
| TDLINE: strips samples (neutral colors, blues and greys) for selection after |
| TDLINE: award. (CDRL A016) |
| TDLINE: D) Walls: All holes within the walls of Room 127B shall be patched or |
| TDLINE: filled. The Contractor shall apply 2 coats |
| TDLINE: (rolled) of new high quality paint (approximately 1,350 SF). New paint |
| TDLINE: color shall be “Rising Tide”, Valspar, 4008- |
| TDLINE: 3A. Reference Rooms 356 & 357 for the paint color. Contractor shall |
| TDLINE: provide paint color samples for selection after |
| TDLINE: award. (CDRL A016) |
| TDLINE: E) NMCI/ RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and phone |
| TDLINE: connections shall be disconnected from the existing |
| TDLINE: cubicles, pulled back to the communication room and removed from the |
| TDLINE: patch panel (approximately 6 EA). The |
| TDLINE: Contractor shall install new drops for NMCI (1EA), RDT<(>&<)>E Cat 6 |
| TDLINE: (1EA) and Phone (1EA) for the new cubicle. |
| TDLINE: The new drops shall be installed and punched down back in the |
| TDLINE: appropriate communication room. |
| TDLINE: F) See Figure #1 and Figure #4. |
| TDLINE: 4.1.2 Rooms 211, 212, 214 and 215 |
| TDLINE: A) Demolition: Existing cove base (approximately 1,000 LF) and existing |
| TDLINE: VCT (approximately 8,404 SF) in Rooms 211, 212 and 215 shall be removed |
| TDLINE: and discarded. All floors in Rooms 211, 212 and 215 shall be scarified |
| TDLINE: (approximately 8,404 SF). There is no asbestos containing material |
| TDLINE: identified. |
| TDLINE: B) Electrical: The Contractor shall provide all electrical components |
| TDLINE: required to supply power for the new cubicles, new kiosks, existing |
| TDLINE: cubicles, existing kiosks, new modular collaboration room, new modular |
| TDLINE: conference room, new break room area and new person call/meeting office |
| TDLINE: added to the space in Room 211, Room 212 and Room 215.The Contractor |
| TDLINE: shall disconnect existing cubicle and kiosk power poles (approximately |
| TDLINE: 12 EA) and connect new cubicle and kiosk power poles (approximately 14 |
| TDLINE: EA). The Contractor shall install 1-pole, 20A,120V circuit breakers |
| TDLINE: (approximately 4 EA) , #12 AWG THHN/THWN solid copper conductor |
| TDLINE: (approximately 500c), ¾” EMT hangers (approximately 15 EA), ¾” EMT SS |
| TDLINE: insulated connectors (approximately 10 EA), 3/4” EMT SS couplings |
| TDLINE: (approximately 10 EA), ¾” EMT conduit (approximately 100 LF) and |
| TDLINE: receptacle 15A duplex w/accessories and branch circuit (approximately 12 |
| TDLINE: EA), A new power feed 120VAC, 20A (1EA) shall be installed to serve a |
| TDLINE: 120VAC-24VDC transformer to serve the VAV controller in the New Modular |
| TDLINE: Collaboration Room (Room 212). |
| TDLINE: C) HVAC: The Contractor shall provide HVAC improvements to exceed |
| TDLINE: cooling and airflow available in the New Modular Collaboration Room |
| TDLINE: (Room 212). New VAV box 600 CFM (1 EA) including HW coils, damper, |
| TDLINE: actuator and thermostat shall be installed to supply the room. VAV box |
| TDLINE: shall be located above the ceiling on the third floor due to the ceiling |
| TDLINE: space above the second floor being too tight. |
| TDLINE: Use round duct, steel, galvanized, 10” diameter, 26 ga from VAV box to |
| TDLINE: diffuser branches (approximately 25 LF). Fire dampers |
| TDLINE: shall be used where ducts pass through the floors (2 EA). Duct access |
| TDLINE: doors are needed to allow fire dampers inspection and maintenance (2 |
| TDLINE: EA). DDC Programming shall be installed with at least four points each |
| TDLINE: VAV (Space temp, VAV discharge temp, VAV flow rate and HW valve |
| TDLINE: position). Install controls wiring for the DDC Controller. Install a |
| TDLINE: temperature sensor (1EA). Install a ball valve with actuator (1EA). |
| TDLINE: Install a TAB for air (VAV box, supply diffusers, return grilles) (1EA) |
| TDLINE: and a TAB for water side (HW coils) (1EA). Install HW piping extended |
| TDLINE: from the existing HW loop (approximately 10 LF). All HW piping shall |
| TDLINE: have insulation (approximately 10 LF). Diffuser, 4 way cone, 24” x 24”, |
| TDLINE: shall be installed at ceiling level (1EA). Install round duct, steel, |
| TDLINE: galvanized, 8” diameter, 26 ga for diffuser branches (approximately 13 |
| TDLINE: LF). Use insulated (1” thick) flexible duct 14” diameter for diffuser |
| TDLINE: runouts (approximately 10 LF). Return grill, eggcrate, 24” x 24” shall |
| TDLINE: be installed at ceiling level (1EA). Install round duct, steel, |
| TDLINE: galvanized, 8” diameter, 26 ga from return grill back to plenum |
| TDLINE: (approximately 12 LF). All ductwork shall have insulation (approximately |
| TDLINE: 50 SF). |
| TDLINE: D) Flooring: The Contractor shall apply new epoxy flooring of Seal Krete |
| TDLINE: 1000, Rust-Oleum in Rooms 211, 212 and 215 (approximately 8,404 SF). |
| TDLINE: Flooring shall be prepared as per manufacturers requirements prior to |
| TDLINE: apply new epoxy flooring. Transition strips shall be installed in the |
| TDLINE: doorways as appropriate (approximately 10 EA). New 4” vinyl base cove |
| TDLINE: (approximately 1,000 LF) shall be installed in Rooms 211, 212 and 215. |
| TDLINE: The Contractor shall provide samples for colors and style of cove base, |
| TDLINE: new epoxy color and flake broadcast and transition strips (neutral |
| TDLINE: colors, blues and greys) for selection after award. (CDRL A016) |
| TDLINE: E) Walls: All holes within the walls of Rooms 211, 212, 214 and 215 and |
| TDLINE: surrounding hallways shall be patched orfilled (approximately 12,000 |
| TDLINE: SF). The Contractor shall apply 3 coats (rolled) of new high quality |
| TDLINE: paint in Rooms 211, 212, 214 and 215 and surrounding hallways |
| TDLINE: (approximately 12,000 SF). New paint color shall be “Rising Tide”<(>,<)> |
| TDLINE: Valspar, 4008-3A. Reference Rooms 356 & 357 for the paint color. |
| TDLINE: Contractor shall provide paint color samples for |
| TDLINE: selection after award. (CDRL A016) |
| TDLINE: F) NMCI, RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and Phone |
| TDLINE: connections shall be disconnected from the existing |
| TDLINE: cubicles and kiosks, pulled back to the communication room and removed |
| TDLINE: from the patch panel (approximately 6 |
| TDLINE: EA). The Contractor shall install new drops for NMCI (approximately 83 |
| TDLINE: EA), RDT<(>&<)>E Cat 6 (approximately 83 EA) |
| TDLINE: and Phone drops (approximately 77 EA) to accommodate 21 net seats in |
| TDLINE: Rooms 211, 212 and 215. Kiosks will not |
| TDLINE: require phone drops. The Contractor shall install new NMCI, RDT<(>&<)>E |
| TDLINE: and Phone wall jacks CAT 6 on the Modular |
| TDLINE: Collaboration Room (1 EA), Modular Conference Room (1 EA) and Person |
| TDLINE: Call/Meeting Office (1 EA). |
| TDLINE: The new drops shall be installed and punched down back in the |
| TDLINE: appropriate communication room. |
| TDLINE: G) Breakroom: 13’-2” of new base cabinets with Formica countertop and |
| TDLINE: cabinet door and drawer pulls shall be |
| TDLINE: provided and installed. 5’ of new upper wall cabinets shall be provided |
| TDLINE: and installed to include 1 microwave shelve<(>,<)> |
| TDLINE: cabinet doors and drawer pulls. Figure #5 and Figure #6. Contractor |
| TDLINE: shall provide cabinet and Formica countertop |
| TDLINE: samples for selection after award. (CDRL A016) |
| TDLINE: H) Cabinetry for Storage Area: 9’-6” of new base cabinets with Formica |
| TDLINE: countertop and cabinet door and drawer |
| TDLINE: pulls shall be provided and installed. Figure #5 and Figure #7. |
| TDLINE: Contractor shall provide cabinet and Formica |
| TDLINE: countertop samples for selection after award. (CDRL A016) |
| TDLINE: I) See Figure #2, Figure #5, Figure #6 and Figure #7. |
| TDLINE: 4.1.3 Room 355 |
| TDLINE: A) Demolition: Existing cove base (approximately 700 LF) and existing |
| TDLINE: carpet (approximately 12,086 SF) in Room 355 shall be removed and |
| TDLINE: discarded. The Contractor shall remove and dispose approximated 12,086 |
| TDLINE: SF of asbestos containing material identified on tan carpet mastic with |
| TDLINE: black mastic under the existing carpet. The carpet shall also be abated |
| TDLINE: since it is considered contaminated with asbestos floor mastic (floor |
| TDLINE: mastic is partially adhered to the carpet). |
| TDLINE: B) Electrical: The Contractor shall provide all electrical components |
| TDLINE: required to supply power for the new cubicles, new kiosks, existing |
| TDLINE: cubicles, existing kiosks, new modular collaboration room, new modular |
| TDLINE: conference room, new break room area and new person call/meeting office |
| TDLINE: added to the space in Room 355A and to serve HVAC system in the New |
| TDLINE: Modular Conference Room. The Contractor shall disconnect approximately |
| TDLINE: 25 EA of existing cubicle power poles and connect approximately 25 EA |
| TDLINE: new cubicle power poles. The Contractor shall install 1-pole, 20A,120V |
| TDLINE: circuit breakers (approximately 56 EA), 3-pole, 90A. 480V circuit |
| TDLINE: breaker (1 EA), 225A main breaker 120/208V 3P-4W panel board (1 EA), |
| TDLINE: 3-phase 480V pri-120/208V Sec 75 KVA dry-type transformer (1EA), 3-pole, |
| TDLINE: 480 V, 100A enclosed circuit breaker (1 EA), 2-1/2” EMT conduit ( |
| TDLINE: approximately 150 LF), 2-1/2” EMT SS coupling ( approximately 15 EA), 3” |
| TDLINE: EMT SS insulated connector (approximately 2 EA), 2-1/2” EMT 90 elbow |
| TDLINE: (approximately 3 EA), 2-1/2” EMT hanger (approximately 23 EA), #4/0 AWG |
| TDLINE: THHN/THWN stranded copper conductor (approximately 680 C), ), #3 AWG |
| TDLINE: THHN/THWN stranded copper conductor (approximately 170 C), ¾” EMT |
| TDLINE: conduit (approximately 675 LF), ¾” EMT SS coupling (approximately 68 |
| TDLINE: EA), ¾” EMT SS Insulated connector (approximately 80 EA), ¾” EMT hanger |
| TDLINE: (approximately 75 EA), #12 AWG THHN/THWN solid copper conductor |
| TDLINE: (approximately 3,000 C) and Receptacle 15A duplex w/accessories and |
| TDLINE: branch circuits (approximately 25 EA) . The Contractor shall utilize as |
| TDLINE: many of the existing circuits as possible to feed the new cubicles. |
| TDLINE: Contractor shall rewire new cubicles and workstations to 3 cubicles per |
| TDLINE: circuit. New power for cubicle area shall be fed from new power poles |
| TDLINE: from the suspended ceiling. All new circuits shall be ran above the |
| TDLINE: suspended ceiling. |
| TDLINE: A new power feed 120VAC, 20A (1EA) shall be installed to serve a |
| TDLINE: 120VAC-24VDC transformer to serve the VAV controller in the New Modular |
| TDLINE: Conference Room. |
| TDLINE: A 225A main breaker 120/208V 3P-4W panel board and its components to |
| TDLINE: supply power to the new cubicles and kiosks shall be located in a wall |
| TDLINE: of the new enclosed telecommunication room face outward into the open |
| TDLINE: office area. This panel board shall supply power to the mini-split HVAC |
| TDLINE: unit for the new enclosed telecommunication room. All wiring shall ran |
| TDLINE: from indoor mini-split HVAC unit to outdoor unit and wiring to outdoor |
| TDLINE: unit from the new panel board. |
| TDLINE: C) HVAC: The Contractor shall provide HVAC improvements to exceed |
| TDLINE: cooling and airflow available in the New Modular Conference Room. VAV |
| TDLINE: box 1250 CFM (1 EA) including HW coils, damper, actuator and thermostat |
| TDLINE: shall be installed to supply the room. Use round duct, steel, |
| TDLINE: galvanized, 16” diameter, 24 ga from VAV box to diffuser branches |
| TDLINE: (approximately 25 LF). DDC Programming shall be installed with at least |
| TDLINE: four points each VAV (Space temp, VAV discharge temp, VAV flow rate and |
| TDLINE: HW valve position). Install controls wiring for the DDC Controller. |
| TDLINE: Install a temperature sensor (1EA). Install a ball valve with actuator |
| TDLINE: (1EA). Install a TAB for air (VAV box, supply diffusers, return |
| TDLINE: grilles) (1EA) and a TAB for water side (HW coils) (1EA). Install HW |
| TDLINE: piping extended from the existing HW loop (approximately 10 LF). All HW |
| TDLINE: piping shall have insulation (approximately 10 LF). Diffusers, 4 way |
| TDLINE: cone, 24” x 24”, shall be installed at ceiling level (2 EA). Install |
| TDLINE: round duct, steel, galvanized, 12” diameter, 26 ga for diffuser branches |
| TDLINE: (approximately 13 LF). Use insulated (1” thick) flexible duct 14” |
| TDLINE: diameter for diffuser runouts (approximately 10 LF). Return grill, |
| TDLINE: eggcrate, 24” x 24” shall be installed at ceiling level (1EA). Install |
| TDLINE: round duct, steel, galvanized, 12” diameter, 26 ga from return grill |
| TDLINE: back to plenum (approximately 12 LF). All ductwork shall have insulation |
| TDLINE: (approximately 50 SF). |
| TDLINE: D) Flooring: New 24”x 24” tufted nylon carpet tiles (approximately 1,343 |
| TDLINE: SY) shall be installed. Flooring shall be prepared as per manufacturers |
| TDLINE: requirements prior to the new carpet installation. Transition strips |
| TDLINE: shall be installed in the doorways as appropriate (approximately 18 EA). |
| TDLINE: The Contractor shall install new 4” vinyl cove base (approximately 700 |
| TDLINE: LF). The Contractor shall provide carpet tile, cove base and transition |
| TDLINE: strips samples (neutral colors, blues and greys) for selection after |
| TDLINE: award. (CDRL A016) |
| TDLINE: E) NMCI/ RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and phone |
| TDLINE: connections shall be disconnected from the existing cubicles, pulled |
| TDLINE: back to the communication room and removed from the patch panel |
| TDLINE: (approximately 127 EA). The Contractor shall install new drops for NMCI |
| TDLINE: (approximately 146 EA), RDT<(>&<)>E Cat6 (approximately 146 EA) and |
| TDLINE: Phone (approximately 146 EA) to accommodate 19 net seats in Room 355A. |
| TDLINE: Kiosks will not require phone and RDT<(>&<)>E drops. The Contractor |
| TDLINE: shall install new NMCI (approximately 4 EA), RDT<(>&<)>E Cat 6 |
| TDLINE: (approximately 4EA) and Phone (approximately 4 EA) on Conference Rooms |
| TDLINE: (approximately 4 EA) and Person Call/Meeting Office (1 EA). The new |
| TDLINE: drops shall be installed and punched down back in the new enclosed |
| TDLINE: telecommunication room. |
| TDLINE: F) Enclosed Telecommunication Room: |
| TDLINE: The Contractor shall construct a new enclosed telecommunication room to |
| TDLINE: accommodate new network and phone equipment. Figure # 8.The Contractor |
| TDLINE: shall comply with the Unified Facilities Criteria (UFC) 3- 580-1 |
| TDLINE: TELECOMMUNICATIONS INTERIOR INFRASTRUCTURE PLANNING AND DESIGN |
| TDLINE: (1-JUNE-2016). |
| TDLINE: F.1 Architectural |
| TDLINE: •,,Construct 3-5/8”metal stud walls. |
| TDLINE: •,,Install 5/8” drywall (Hang, tape, and finish). |
| TDLINE: •,,Paint all new walls 2 coats eggshell white color. |
| TDLINE: •,,Install a painted 3’-0” x 7’-0” hollow metal entry door with |
| TDLINE: appropriate ADA lock and hardware with knock down metal jamb. |
| TDLINE: •,,Provide and install new 4’ x 6’ x ¾” thick sheet of plywood fire |
| TDLINE: rated for the new phone equipment. |
| TDLINE: •,,The telecommunication room shall be enclosed up to the existing |
| TDLINE: ceiling. |
| TDLINE: •,,Existing sprinklers shall be aligned on the interior of the |
| TDLINE: telecommunication room. |
| TDLINE: •,,Existing lights shall be aligned on the interior of the |
| TDLINE: telecommunication room. |
| TDLINE: •,,Existing concrete floor shall be cleaned and finished to accommodate |
| TDLINE: the new network and phone equipment. |
| TDLINE: F.2 HVAC |
| TDLINE: The Contractor shall install an indoor wall mounted ductless mini split |
| TDLINE: system, 6000 BTU. Refrigerant piping |
| TDLINE: shall go through roof to outdoor unit. A condensate pump shall be |
| TDLINE: installed from indoor wall unit to the nearest |
| TDLINE: drain. An outdoor unit shall be mounted on roof in and wind baffles |
| TDLINE: around outdoor unit. |
| TDLINE: F.3 Electrical |
| TDLINE: The Contractor shall provide all electrical components required to |
| TDLINE: supply power to three cabinets to be utilized for |
| TDLINE: NMCI, RDT<(>&<)>E and Phone and to supply power to the mini-split HVAC |
| TDLINE: unit. The Contractor shall install a standard |
| TDLINE: quad receptacle outlet in each of the three cabinets. The Contractor |
| TDLINE: shall install a 100A panel to be utilized only for |
| TDLINE: the three cabinets. The Contractor shall install a new 225A electrical |
| TDLINE: panel to supply power to the workstations and |
| TDLINE: the mini-split HVAC unit as indicated in Section 3.1.3. Room 355. The |
| TDLINE: Contractor shall install a stand-alone light |
| TDLINE: switch to isolate the lighting in the telecommunication room versus the |
| TDLINE: lightings in the rest of Room 355. A 4” |
| TDLINE: diameter EMT conduit shall be install on top of each of the three |
| TDLINE: cabinets in the data closet. Each conduit shall |
| TDLINE: terminate just above the ceiling and shall serve as a path for data |
| TDLINE: cables to run from the ceiling area down into the |
| TDLINE: cabinets. |
| TDLINE: G) See Figure #3 and Figure # 8. |
| TDLINE: The following requirements listed, but not limited to, are not |
| TDLINE: applicable to this project: |
| TDLINE: A),,New FF<(>&<)>E, existing cubes and existing kiosks will be provided |
| TDLINE: and installed by others and are not part of this Contract. |
| TDLINE: B),,Existing FF<(>&<)>E will be disassembling by others and are not part |
| TDLINE: of this Contract. |
| TDLINE: Additional Notes: |
| TDLINE: A),,Contractor shall provide a Weekly Production Reports every Monday |
| TDLINE: (CDRL A006). |
| TDLINE: B),,Contractor shall clean the worksite at the end of each work day. The |
| TDLINE: Contractor shall dispose of any scrap material and clean any spills that |
| TDLINE: may occur. |
| TDLINE: C),,Contractor shall supply Operation and Maintenance (O<(>&<)>M) |
| TDLINE: manuals (CDRL A007) and as-built drawings for all equipment installed. |
| TDLINE: D),,Contractor shall provide training for all systems installed. |
| TDLINE: E),,Contractor shall provide a complete Bill of Materials (BOM) before |
| TDLINE: material is purchased for approval by RTA (CDRL A016). |
| TDLINE: F),,Contractor shall disconnect all NMCI, RDT<(>&<)>E, Phone and |
| TDLINE: Electrical connections prior existing FF<(>&<)>E being |
| TDLINE: disassembled. |
| TDLINE: G),,Contractor shall connect all NMCI, RDT<(>&<)>E, Phone and Electrical |
| TDLINE: after new FF<(>&<)>E and existing cubes and existing kiosks being |
| TDLINE: installed. |
| TDLINE: H),,The Contractor shall provide to the COR all Networking and Phone |
| TDLINE: testing results after cables being installed. (CDRL A006) |
| TDLINE: I),,The Contractor shall submit to the COR a Visual Clearance Form, |
| TDLINE: worker personal air monitoring results, clearance air monitoring |
| TDLINE: results, and asbestos waste manifest after asbestos abatement |
| TDLINE: being completed. (CDRL A015) |
| TDLINE: J),,The Contractor shall provide access to all personnel working on |
| TDLINE: Rooms 213, 214, and 218 during renovations. |
| TDLINE: K),,The Contractor shall coordinate with the RTA and Building 41 POC to |
| TDLINE: get access to Room 214. |
| TDLINE: L),,The Contractor shall provide 5 percent (%) of total square yards of |
| TDLINE: each carpet type, pattern, and color for future maintenance. The extra |
| TDLINE: carpets shall be wrapped and clearly labeled with manufacturer’s name, |
| TDLINE: brand name, size and project related information including project name |
| TDLINE: and room number. (CDRL A016). |
| TDLINE: 4.2 Installation Access |
| TDLINE: Physical access to the Government’s facility at Naval Support Activity |
| TDLINE: (NSA), Crane shall be through the use of the Defense Biometric |
| TDLINE: Identification System (DBIDS) and associated data processing/information |
| TDLINE: services for purposes of protecting U.S./Coalition/allied |
| TDLINE: government/national security areas of responsibility and information. |
| TDLINE: The contractor shall obtain employee personal identity verification |
| TDLINE: credentialing (badge) by submitting to the NSA Crane Visitor Center, 103 |
| TDLINE: Furlong St, Crane, IN 47522, form SECNAV 5512/1 (APR 2014), for each |
| TDLINE: contractor employee. Upon Base Registrar authorization of form 5512/1 |
| TDLINE: the contractor shall submit form NSA Crane 5512/47 DBIDS Badge |
| TDLINE: Application Record to the NSWC Crane Security Division (812)-854-1213. |
| TDLINE: The Contractor shall retrieve badges of employed personnel upon |
| TDLINE: separation. Each employee shall affix their badge on their person above |
| TDLINE: the waste at all times while on the Activity. Badges may only be |
| TDLINE: removed for safety reasons and must be reaffixed when work is completed. |
| TDLINE: DBIDS information can be found at the following website: |
| TDLINE: http://dbids.dmdc.mil/ |
| TDLINE: For Contract employees or subcontractors requiring infrequent access to |
| TDLINE: the Activity, one day temporary passes MAY be authorized. Requests for |
| TDLINE: temporary passes shall be submitted to the COR at least 2 working days |
| TDLINE: prior to the requested base access day. |
| TDLINE: Be advised that the DBIDS process and temporary pass process both |
| TDLINE: involve a background check. Persons with a Felony conviction in the |
| TDLINE: last 10 years will not be issued badges or passes. |
| TDLINE: Individuals supporting these efforts shall comply with the latest |
| TDLINE: security regulations applicable to the government facility/installation. |
| TDLINE: a.,,Depending on the facility/installation regulations, contractor |
| TDLINE: personnel shall present a proper form of identification(s) and vehicle |
| TDLINE: proof of insurance or vehicle rental agreement. |
| TDLINE: b.,,All contractor persons engaged in work while on government property |
| TDLINE: shall be subject to inspection of their vehicles at any time by the |
| TDLINE: government, and shall report any known or suspected security |
| TDLINE: violations to the local host Security Department. |
| TDLINE: Failure to obtain entry approval will not affect the contract price or |
| TDLINE: the time of completion. |
| TDLINE: 4.3 Program Management |
| TDLINE: The Contractor shall comply with the manufacturer’s recommendations in |
| TDLINE: installation of all materials and equipment. The Contractor shall be |
| TDLINE: responsible for field verification of actual conditions prior to |
| TDLINE: commencement of work. The Contractor shall be responsible for quality |
| TDLINE: control of all work that is performed via this task order. The |
| TDLINE: Contractor is responsible for compliance with the U.S. Army Corps of |
| TDLINE: Engineers Safety and Health Requirements Manual, EM 385-1-1, and shall |
| TDLINE: maintain a safe working environment at all times during the performance |
| TDLINE: of this task order. Although this document is intended to identify all |
| TDLINE: significant features of work to be accomplished in the performance of |
| TDLINE: this task order, it should not be considered absolutely inclusive of all |
| TDLINE: minor tasks required for completion of the major work described herein. |
| TDLINE: 4.3.1 Design and Construction Quality Control (QC) Plan |
| TDLINE: The Contractor shall establish and maintain a Quality Control program |
| TDLINE: that is administered by a Design and Construction Quality Control |
| TDLINE: organization, using Quality Control (Design and Construction) Plans, |
| TDLINE: (CDRL A004) Commissioning Plans and Reports, meetings, a Coordination |
| TDLINE: and Mutual Understanding Meeting, three phases of control, submittal |
| TDLINE: review and approval, testing, completion inspections, and QC |
| TDLINE: certifications, Inspections in accordance with Section 01 45 35.05 20 |
| TDLINE: SPECIAL INSPECTIONS FOR DESIGN-BUILD or Section 01 45 35.05 10 SPECIAL |
| TDLINE: INSPECTIONS FOR DESIGN-BID-BUILD and documentation necessary to provide |
| TDLINE: design, materials, equipment, workmanship, fabrication, construction and |
| TDLINE: operations which comply with the requirements of this contract. The QC |
| TDLINE: program must cover on-site and off-site work. (CDRL A006) No |
| TDLINE: construction work or testing may be performed unless the Contractor’s QC |
| TDLINE: Manager is on the work site. |
| TDLINE: 4.3.2 Inspection Benchmarks |
| TDLINE: A) Periodic quality/ safety checks at Government determined frequency. |
| TDLINE: B) NMCI, RDT<(>&<)>E, Phone and electrical disconnections (Existing |
| TDLINE: cubicles and kiosks ready to be disassembled and removed from the |
| TDLINE: workplace) |
| TDLINE: C) Pre-carpeting installation (Existing vinyl composite tiles (VCT), |
| TDLINE: existing carpet removed, asbestos containing material removed and |
| TDLINE: concrete surface flooring completion prior to install new carpet) |
| TDLINE: D) Pre-painting (Walls patched or filled prior to apply paint) |
| TDLINE: E) Inspect floor preparation (prior to epoxy installation) |
| TDLINE: F) NMCI, RDT<(>&<)>E, Phone and electrical connections (After new FF |
| TDLINE: <(>&<)>E and existing FF<(>&<)>E being installed) |
| TDLINE: G) Pre-Final |
| TDLINE: The Government and QC Manager will perform this inspection to verify |
| TDLINE: that the facility is complete and ready to be occupied. A Government |
| TDLINE: "Pre-Final Punch List" will be documented by the QC Manager as a result |
| TDLINE: of this inspection. The QC Manager will ensure that all items on this |
| TDLINE: list are corrected prior to notifying the Government that a "Final" |
| TDLINE: inspection with the Client can be scheduled. Any items noted on the |
| TDLINE: "Pre-Final" inspection must be corrected in a timely manner and be |
| TDLINE: accomplished before the contract completion date for the work or any |
| TDLINE: particular increment thereof, if the project is divided into increments |
| TDLINE: by separate completion dates. |
| TDLINE: H) Final (At completion) |
| TDLINE: Notify the COR at least 5 working days prior to the date a final |
| TDLINE: acceptance inspection can be held. State within the notice that all |
| TDLINE: items previously identified on the pre-final punch list will be |
| TDLINE: corrected and acceptable, along with any other unfinished Contract work, |
| TDLINE: by the date of the final acceptance inspection. The Contractor must be |
| TDLINE: represented by the QC Manager, the Project Superintendent, and others |
| TDLINE: deemed necessary. Attendees for the Government may include the PCO, COR, |
| TDLINE: Construction Management personnel, and personnel representing the |
| TDLINE: Client. |
| TDLINE: 4.4 Safety and Health |
| TDLINE: 4.4.1 Activity Hazard Analysis (AHA) |
| TDLINE: Before beginning each activity, task, or Definable Feature of Work |
| TDLINE: (DFOW) involving a type of work presenting hazards not experienced in |
| TDLINE: previous project operations, or where a new work crew or subcontractor |
| TDLINE: is to perform the work, the Contractor(s) performing that work activity |
| TDLINE: must prepare an AHA. Format the AHA in accordance with EM 385-1-1, |
| TDLINE: Section 1 or as directed by the KO. Submit the AHA for review within 10 |
| TDLINE: working days after the PAK meeting. (CDRL A002) The Government |
| TDLINE: reserves the right to require the Contractor to revise and resubmit the |
| TDLINE: AHA if it fails to effectively identify the work sequences, specific |
| TDLINE: anticipated hazards, site conditions, equipment, materials, personnel |
| TDLINE: and the control measures to be implemented. |
| TDLINE: 4.4.2 Standard Lift Plan (SLP) |
| TDLINE: Plan lifts to avoid situations where the operator cannot maintain safe |
| TDLINE: control of the lift. Prepare a written SLP in accordance with EM |
| TDLINE: 385-1-1, Section 16.A.03, and using Form 16-2 for every lift or series |
| TDLINE: of lifts (if duty cycle or routine lifts are being performed). Submit |