121_010D_SL_closure_post_closure_plan_April_2016_REV9.pdf
PDF 13 MB Posted
- Attached to
- FORT GORDON LANDFILL CLOSURES
- Solicitation number
- ISO0169-19
- Issued by
-
Department of Justice Bureau of Prisons
About this file
121 010D SL CLOSURE POST CLOSURE PLAN APRIL 2016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND_3_-_ISO0169-19_signed.pdf | ||
| AMEND_2_-_ISO0169-19.doc | DOC document | |
| ISO0169-19_Site_Visit_Participant_Listing_2-12-19.pdf | ||
| AMEND_1_-_ISO0169-19.pdf | ||
| ISO0169-19_Business_Management_Questionaire.pdf | ||
| SF25-16a.pdf | ||
| SF25A-16a.pdf | ||
| SF24.pdf | ||
| DDR_Cut_Sheet.pdf | ||
| DDR_Appnd_A.pdf | ||
| GRLF_Landfill_Cover_Minor_Modification_GA_EPD.pdf | ||
| DDR_Permit_Landfill_CAD_Drawing_Elevations_.jpg | JPG image | |
| DDR_Gibson_Rd_LF_Minor_Modification_GA_EPD.pdf | ||
| DDR_CAD_Sheet_Cover_plan_and_final_closure.jpg | JPG image | |
| Old_School_SWMP.doc | DOC document | |
| Carter_Road_closeout_opt.pdf | ||
| DDR_Sheet_LF_Design_CAD_.jpg | JPG image | |
| DDR_Appnd_D.pdf | ||
| ISO0169-19.PDF | ||
| Criminal_and_Drivers_History_Consent_Form_190-6.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DECEMBER 2010 REVISED AUGUST 2012
CLOSURE AND POST CLOSURE CARE PLAN
FORT GORDON
SOLID WASTE PERMIT NUMBER: 121-010D(SL)
17TH STREET LANDFILL AND C&D ANNEX
RICHMOND COUNTY, GEORGIA
(REVISED JUNE 2013)
(REVISED APRIL 2016)
Channel
Pipe Outlet to Well-defined
9"
Section AA
A
Plan
A
No Well-defined Channel
Pipe Outlet to Flat Area-
A
13 ft
Plan
A
Section AA
9"
13 FT
Figure 6-24.3 - RIPRAP Outlet Protection (Modified From VA SWCC)
Filter non-woven geotextile
(Mirafi 180N or equal)
Filter non-woven geotextile
(Mirafi 180N or equal)
NOTES:
1. FULL FLOW CHARACTERISTICS:
FLOW RATE (Q) = 11.61 CFS
VELOCITY (V) = 11.97 FPS
TAILWATER (Tw) = <0.5 DIA.
2. APRON DIMENSIONS:
LENGTH (La) = 11 FT
HEADWALL WIDTH (W1) = 6 FT
DOWNSTREAM WIDTH (W2) = 13 FT
AVERAGE STONE DIA. (d50) = 6 INCHES
STONE DEPTH (D) = 9 INCHES
Channel
Pipe Outlet to Well-defined
9"
Section AA
A
Plan
A
No Well-defined Channel
Pipe Outlet to Flat Area-
A
13 ft
Plan
A
Section AA
9"
13 ft
Filter non-woven geotextile
(Mirafi 180N or equal)
Filter non-woven geotextile
(Mirafi 180N or equal)
NOTES:
1. FULL FLOW CHARACTERISTICS:
FLOW RATE (Q) = 3.99 CFS
VELOCITY (V) = 8.39 FPS
TAILWATER (Tw) = >0.5 DIA.
2. APRON DIMENSIONS:
LENGTH (La) = 11 FT
HEADWALL WIDTH (W1) = 6 FT
DOWNSTREAM WIDTH (W2) = 13 FT
AVERAGE STONE DIA. (d50) = 6 INCHES
STONE DEPTH (D) = 9 INCHES
Diversion diversion pipe outlet corrugated
Stabilized stakes dike
3:1
Diversion
Hold-down
Level section
4' min
Plastic
Min. 10' spacing
Top of
Inlet Detail
Outlet Pipe
1.5' min
3:1
0.5' min fill (island) hand-compacted
Top of
4' min
1' min channel ground
Natural
Channel
Pipe Outlet to Well-defined
9"
Section AA
A
Plan
A
No Well-defined Channel
Pipe Outlet to Flat Area-
A
13 ft
Plan
A
24"
6 ft
Section AA
9"
13 ft
Filter non-woven geotextile
(Mirafi 180N or equal)
Filter non-woven geotextile
(Mirafi 180N or equal)
NOTES:
1. FULL FLOW CHARACTERISTICS:
FLOW RATE (Q) = 13.34 CFS
VELOCITY (V) = 10.7 FPS
TAILWATER (Tw) = >0.5 DIA.
2. APRON DIMENSIONS:
LENGTH (La) = 11 FT
HEADWALL WIDTH (W1) = 6 FT
DOWNSTREAM WIDTH (W2) = 13 FT
AVERAGE STONE DIA. (d50) =6 INCHES
STONE DEPTH (D) = 9 INCHES
24"
6 ft
24"
6 ft
TABLE #1
NOTES:
- AREAS WITHOUT FINAL COVER THAT WILL BE EXPOSED FOR MORE THAN 3 MONTHS WILL BE PLANTED WITH
TEMPORARY GRASS
- SEEDING RATES ARE BASED ON 100% PURE LIVE SEED SCHEDULES FROM THE MANUAL FOR EROSION AND
SEDIMENT CONTROL IN GEORGIA
- A TEMPORARY COVER SHOULD BE USED WHEN PLANTING UNHULLED BERMUDA GRASS AND PENSACOLA
BAHIAGRASS
ANNUAL RYEGRASS
TEMPORARY SEEDING
FESCUE
BERMUDA GRASS-UNHULLED
BERMUDA GRASS-HULLED
PERMANENT SEEDING
PLANTINGCOVER (INCHES)PER ACRESEEDING
PENSACOLA BAHIAGRASS
BROWNTOP MILLET
VEGETATION PLAN
DATE OFDEPTH OFPOUNDS
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
0.25 - 0.5
YEAR ROUND
3/1 - 7/1
10/1 - 3/1
8/15 - 11/1
4/1 - 7/15
8/1 - 4/15
FERTILIZER REQUIREMENTS
SPECIES
BERMUDA GRASS-HULLED
SECOND
MAINTENANCE
NOTES:
A SPLIT THE APPLICATION WHEN HIGH RATES ARE USED
B APPLY WHEN PLANT GROW TO HEIGHT OF 2 TO 4 INCHES
C APPLY IN THE SPRING AFTER SEEDING
N-P-K = NITROGEN-PHOSPHORUS-POTASH
TABLE #2
RATERATEN-P-KYEAR
TOP-DRESSINGEQUIVALENT
NITROGEN ANALYSIS OR
10-10-10
6-12-12
FIRST
6-12-12
50-100
1.500 50-100
A
MAINTENANCE
SECOND
BERMUDA GRASS-UNHULLED FIRST
6-12-12
10-10-10
6-12-12
400 30
50-100
1.500 50-100
A,C
MAINTENANCE
SECOND
PENSACOLA BAHIAGRASS FIRST
6-12-12
10-10-10
6-12-12
400 30
50-100
1.500 50-100
B
MAINTENANCE
SECOND
FESCUE FIRST
6-12-12
10-10-10
6-12-12
400 30
50-100
1.500 50-100
A
CLOSURE/POST CLOSURE PLAN
ANNUAL POST-CLOSURE CARE COST ESTIMATE
(PRE-ESTABLISHED VEGETATION)
1.
2.
3.
4.
NOTES:
MOBILIZATION LS 1 $36,000 $36,000
EARTHWORK CY 60,000 $8 $480,000
TOPSOIL CY 16,000 $16 $256,000
MATTING AND SEEDING SF 525,000 $0.26 $136,500
NOTES:
CLOSURE COST ESTIMATE
ASSUME TWO (2) FOOT MATERIAL WILL BE OBTAINED WITHIN A FIVE MILE RADIUS
ALL UNIT PRICES INCLUDE INSURANCE COSTS
ALL COSTS ARE IN 2016 DOLLARS
CLOSURE COSTS WILL BE ADJUSTED FOR INFLATION EVERY YEAR.
1.
2.
3.
ASSUMES THE DISTURBANCE OF A CUMULATIVE AREA OF 0.25 ACRES/YEAR.
ASSUMES A MOBILIZATION FEE OF $250.
ASSUMES SEMI-ANNUAL SAMPLING OF SIX SURFACE MONITORING LOCATIONS AND 16
GROUNDWATER MONITORING WELLS.
ASSUMES QUARTERLY METHANE MONITORING AT NINETEEN LOCATIONS.
ROUTINE INSPECTIONS/REPAIRS: ASSUME THE REPLACEMENT OF 0.25 ACRES OF TOPSOIL AND
CLAY MATERIAL ONCE A YEAR.
CUTTING VEGETATION AT LEAST 2 TIMES PER YEAR.
ALL COSTS ARE IN 2016 DOLLARS.
4.
6.
BMPs LS 1 $80,000
$80,000
METHANE MONITORING PROBES EA 17 $34,000
METHANE VENTS LVF 630
$120
$75,600
ENGINEERING AND CLOSURE CERT (10%) LS 1
$113,930
$113,930
SUB-TOTAL $1,255,230
SUB-TOTAL X 15% CONTINGENCY = TOTAL $188,285
TOTAL $1,443,515
7.
$2,000
GROUNDWATER MONITORING WELLS EA 9
$4,800
$43,200
ITEM UNITS QUANTITY UNIT PRICE TOTAL
REPAIR 5 ACRES OF SOIL COVER YEARLY YR 5 $20,000 $100,000
ROUTINE EROSION CONTROL YR $5,000 $150,000
MOWING 2 TIMES / YEAR YR $2,000 $60,000
SURFACE WATER MONITORING $25,000 $75,000
WATER QUALITY REPORTS
$5,000
$150,000
METHANE MONITORING $240,000
TOTAL $2,085,000
AVERAGE YEARLY COST $69,500
$8,000
ITEM UNITS QUANTITY UNIT PRICE TOTAL
MAINTENANCE
FINAL COVER REPAIR YRS 1-5
REPAIR 1 ACRE OF SOIL COVER YEARLY YR 25 $5,000 $125,000
FINAL COVER REPAIR YRS 6-30
SED POND CLEANOUT EVERY YEAR LS 30 $4,500 $135,000
SURFACE WATER MANAGEMENT
GROUNDWATER MONITORING $35,000 $1,050,000
MONITORING
YR
YR
YR
YR
5.
NSA FACILITY
5'-0"