This document appears to be a blank pricing schedule template related to the USCGC ISAAC MAYO DOCKSIDE REPAIR FY24 federal contract opportunity.
The template provides a format for bidders to submit pricing for various line items, including maintenance services, labor rates, travel/per diem, and potential over and above/growth work. It outlines specific pricing requirements, such as unit prices, unit quantities, and extended pricing. The template also includes a breakdown of the composite labor rate, with assumed G&A and profit factors. This pricing schedule would likely be a required submission as part of the overall proposal response to the USCGC ISAAC MAYO DOCKSIDE REPAIR FY24 solicitation, which is being issued by the Department of Homeland Security US Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08024QPBPL0036_0_US Mayo.pdf | ||
| 5. ISAAC MAYO (WPC 154) DS FQ4 JMB 24R1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of services
| PRICING SCHEDULE FOR: | |||||
| USCGC ISAAC MAYO (WPC-1112) DOCKSIDE AVAILABILITY FY2024 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | MDE, 16000 Hour Maintenance (QL3+), Perform | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 1 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | $0.00 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||
| OA/G-001 | **Provide breakdown, as follows: |
Over and Above/Growth Labor Rate
| Unit Price: $________; Quantity: 707; Unit of Issue: Hour; Extended Price: $____________ | Hour | 707 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee |
Unit Price: $31,822.50; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$31,822.50 X percentage quoted]: $______________ | $31,822.50 | % | 0 | |
| Total Price of Over and Above/Growth | $0.00 |
&C(2/7/2024) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate