70Z08024QPBPL0036_0_US Mayo.pdf

PDF 283 KB Posted

Attached to
USCGC ISAAC MAYO DOCKSIDE REPAIR FY24
Solicitation number
70Z08024QPBPL0036
Issued by

About this file

This document is a combined synopsis/solicitation for commercial items for USCGC ISAAC MAYO dockside repairs in fiscal year 2024. The solicitation is issued as a Request for Quotations (RFQ) with a period of performance from September 17, 2024 to October 29, 2024. The contract type is Firm Fixed Price. The acquisition is set aside for Women-Owned Small Businesses (WOSB). The Government will award the contract to the responsible quoter whose quote conforming to the solicitation will be most advantageous based on Technical Capability, Past Performance, and Price. Technical Capability is the most important factor, followed by Past Performance, then Price. Quoters must submit a Technical Capability proposal, Past Performance references, and a completed Price Schedule. The solicitation provides detailed instructions for quoters and outlines the evaluation criteria. Requirements include performing maintenance on the MTU 20V4000 engine, developing a fire safety plan, and providing a detailed project planning document.

View the file

Other files

File Type Posted
ISAAC MAYO DS Attachment 1_Blank Price Schedule.xls XLS spreadsheet
5. ISAAC MAYO (WPC 154) DS FQ4 JMB 24R1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

05/15/2024

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

70Z08024QPBPL0036

TABLE OF CONTENTS:

Section II: Continuation of SF1449 Section III: Contract Clauses Section IV: List of Documents, Exhibits, and other Attachments Section V: Solicitation Provisions

Section II: Continuation of SF1449

Item Number Base Item Number

Supplies/Services Quantity Unit

0001 FY24 CGC ISAAC MAYO– QL3+

Subject to Availability of FundsStart Date: 17SEP2024POC: CWO John

Bowles

0 DO

Contract Type:Firm Fixed Price Unit Price

Extended Price

Description:

Purchase Requisitions 52000PR240004029

IDC Type: Not Applicable

Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address

9/17/24 10/29/24

Section III: Contract Clauses

Clauses incorporated by reference

Article Number Reference Text

52.242-15 52.242-15 STOP-WORK ORDER (AUG 1989)

52.202-1 52.202-1 DEFINITIONS (JUN 2020)

52.203-5 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-7 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

52.203-17 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

52.204-4 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper.

52.204-12 52.204-12 UNIQUE ENTITY IDENTIFIER MAINTENANCE (OCT 2016)

52.204-13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-18 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

52.204-19 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

52.212-4 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2023)

52.212-5 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES

OR EXECUTIVE ORDERS - COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(FEB 2024)

52.223-6 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

52.232-18 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

52.233-3 52.233-3 PROTEST AFTER AWARD (AUG 1996)

52.233-4 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

52.242-5 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)

52.242-13 52.242-13 BANKRUPTCY (JULY 1995)

52.245-1 52.245-1 GOVERNMENT PROPERTY (SEP 2021)

52.245-9 52.245-9 USE AND CHARGES (APR 2012)

3052.223-90 3052.223-90 ACCIDENT AND FIRE REPORTING (DEC 2003)

Clauses incorporated by full text

Ombudsman Language: Notice for Filing Agency Protests

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester's concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.

Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency's goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.

Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum.

If the protest is filed with an external forum, the agency protest will be dismissed.

This is a combined synopsis/solicitation for commercial items prepared in accordance with Federal Acquisition Regulation (FAR) subpart 12.6 and subpart 13.5 as supplemented with additional information included in this notice.

This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. Solicitation number 70Z08024QPBPL0036 is issued as a Request for Quotations (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) through Federal Acquisition Circular (FAC) 2024-05 effective 22 April 2024; Department of Homeland Security Acquisition Regulation (HSAR) effective 21 July 2023; Homeland Security Acquisition Manual (HSAM) 2024- 02 effective 29 December 2023; Coast Guard Acquisition Procedures (CGAP) 2023-01 effective 08 May2023.

Electronic Submission of Payment Requests Electronic Submission of Payment Requests

(a) Definitions. As used in these instructions –

(1) Payment request" means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must: comply with the requirements identified in FAR 32.905(b), "Content of Invoices" and the applicable Payment clause included in this contract. In addition, discount offerings and small business status if available shall be stated. If travel was allowable and approved, components in accordance with FAR 31.205-46 shall be provided.

(b) Except as provided in paragraph (c) of this clause, the contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.

(c) The contractor may submit payment requests using a method other than IPP only when the contracting officer authorizes alternate procedures in writing in accordance with Coast Guard procedures.

(d) If alternate payment procedures are authorized, the contractor shall include a copy of the contracting officer's written authorization with each payment request.

(e) IPP enrollment information is at https://www.uscg.mil/fincen/IPP/.

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV

2021)

(a) Definitions. As used in this clause—

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information ( 44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 transiting through its information system.

(End of clause)

52.217-6 OPTION FOR INCREASED QUANTITY (MAR 1989)

The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within 30. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.

52.246-20 WARRANTY OF SERVICES (MAY 2001)

(a) Definition. "Acceptance," as used in this clause, means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing and identified supplies, or approves specific services, as partial or complete performance of the contract.

(b) Notwithstanding inspection and acceptance by the Government or any provision concerning the conclusiveness thereof, the Contractor warrants that all services performed under this contract will, at the time of acceptance, be free from defects in workmanship and conform to the requirements of this contract. The Contracting Officer shall give written notice of any defect or nonconformance to the Contractor 52.246-20 60 days after end of POP.

This notice shall state either-

(1) That the Contractor shall correct or reperform any defective or nonconforming services; or

(2) That the Government does not require correction or reperformance.

(c) If the Contractor is required to correct or reperform, it shall be at no cost to the Government, and any services corrected or reperformed by the Contractor shall be subject to this clause to the same extent as work initially performed. If the Contractor fails or refuses to correct or reperform, the Contracting Officer may, by contract or otherwise, correct or replace with similar services and charge to the Contractor the cost occasioned to the Government thereby, or make an equitable adjustment in the contract price.

(d) If the Government does not require correction or reperformance, the Contracting Officer shall make an equitable adjustment in the contract price.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Homeland Security Acquisition Regulations (48 CFR 30 ) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

52.212-4:CONTRACT TERMS AND CONDITIONS ADDENDA—COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (DEC 2022)

Addendum to FAR Provision 52.212-4

(c) Changes - ship repair.

(1) The Contracting Officer may, at any time, by written order, and without notice to the sureties, if any, make changes within the general scope of this contract, in any one or more of the following:

(a) Drawings, designs, or specifications, when the supplies to be furnished are to be specially manufactured for the Government in accordance with the drawings, designs, or specifications;(b) Method of shipment or packing;(c) Place of performance of the work;(d) Time of commencement or completion of the work; and(e) Other requirements within the general scope of the contract.

(2) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, whether changed or not changed by the order, the Contracting Officer shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract accordingly.

(3) The contractor must submit any proposal for adjustment under this clause within 5 days from the date of receipt of the written order. At the Contracting Officer's discretion, the 5-day period may be shortened. However, if the Contracting Officer decides that the facts justify it, the Contracting Officer may receive and act upon a proposal submitted before final payment of the contract.

(4) If the contractor's proposal includes the cost of property rendered obsolete or excess by the change, the Contracting Officer shall have the right to prescribe the manner of the disposition of the property.

(5) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the contractor from proceeding with the contract as changed.

(w) Required InsurancePrior to start of performance, the Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.217-95, Liability and Insurance, and 3052.228-70, Insurance the Contractor shall furnish the Contracting Officer with proof of insurance for the duration of the contract, including:(1) Ship Repairer's Liability - $500,000 per occurrence.(2) Comprehensive General Liability - $500,000 per occurrence.(3) Full insurance coverage in accordance with the United States' Longshoremen's and Harbor Worker's Act.(4) Full insurance coverage in accordance with the State's Workmen's Compensation Law (or its equivalent) for all places of performance under this contract.The insurance certificate must provide the name of the US Coast Guard vessel and the contract number as specifically insured.

(x) Schedule of work(1) Notwithstanding other requirements specified in this contract, the contractor shall provide to the Contracting Officer and COR the following documents within three (3) working days of the vessel's arrival at the contractor's facility for dry-dock availabilities and at the arrival conference for dockside availabilities:

a. Production Schedule.b. Work Package Network.c. Total Manpower Loading Curve.d. Trade Manning Curves.e.

Subcontracting List.

(2) The Production Schedule shall list the earliest, latest, and scheduled start and completion date for each work item awarded and shall identify the critical path. The Work Package Network shall show the work items, milestones, key events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve shall show the required manning for the duration of the contract. The Trade Manning Curves shall show the required manning for each trade for the duration of the contract. The Subcontracting List shall show work items, milestones, key events, and activities to be accomplished by subcontractors.

(3) Growth work ordered and agreed upon, whether or not yet formalized via a change order (contract modification), shall be added to the Production Schedule, Trade Manning Curves, and Subcontracting List and submitted to the Contracting Officer and COR at each weekly Progress Meeting. Any anticipated or unanticipated deviation (greater than two (2) calendar days) from the Production Schedule shall be immediately brought to the attention of the Contracting Officer and COR.

(4) Any deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the established performance period completion date may entitle the Government to remedies for late performance under subparagraph (f) of this clause titled Excusable delays.

(y) Access to the Vessel

(1) As authorized by the Contracting Officer, a reasonable number of officers, employees and personnel designated by the Government, or representatives of other contractors and their subcontractors shall have admission to the facility and access to the vessel at all reasonable times to perform and fulfill their respective obligations to the Government on a noninterference basis. The contractor shall make reasonable arrangements to provide access for these personnel to office space, work areas, storage or shop areas, and other facilities and services reasonable and necessary to perform their duties. All such personnel shall comply with contractor rules and regulations governing personnel at its shipyard, including those regarding safety and security.

(2) The contractor further agrees to allow a reasonable number of officers, employees, and designated personnel of contractors on other contemplated work, the same privileges of admission to the contractor's facility and access to the vessel(s) on a noninterference basis, subject to contractor rules and regulations governing personnel in its shipyard, including those regarding safety and security.

(aa) Temporary Services

(1) Temporary services are services incidental to the performance of work, which are required in the schedule or specifications to be provided by the contractor. Temporary services may include the furnishing of water, electricity, telephone service, toilet facilities, garbage removal, office space, parking places or similar facilities.

(2) If performance time is extended due to Government-caused delay, the contractor may request an equitable adjustment for providing temporary services at the rate stated in the Schedule.

AIR Growth Work

(a) This clause applies to Additional Item Requirements (AIR), also known as growth and emergent work ordered by the Contracting Officer pursuant to the Changes - Ship Repair clause or mutually agreed upon by the parties. The contractor shall perform AIR at the labor billing rates designated in the Schedule, as described in paragraph (c) of this clause. The AIR handling fee designated in the Schedule shall be the sole fee used for direct material purchases and subcontractor handling.

The estimated quantity of labor hours and handling fees represent theGovernment's best estimate for growth that may be required throughout the contract performance period. All growth work shall be paid at the prices stated in the Schedule.

(b) The contractor shall take into account the potential for ordering all estimated AIR quantities in developing the Production Schedule. The ordering of any portion of the AIR quantities does not in itself warrant an extension to the original contract completion date; however, for planning purposes, the Government anticipates ordering AIR in accordance with the following schedule:

(1) No more than 75% of the hours during the first half of the contract period of performance.

(2) No more than 50% of the hours during the third quarter of the contract period of performance.

(3) No more than 30% of the hours during the fourth quarter of the contract period of performance.

(c) The AIR labor rate shall be a flat, hourly rate to cover the entire effort and shall be burdened to include:

(1) Direct production labor hour functions only. Direct production labor hours are hours of skilled labor at the journeyman level expended in direct production. Direct production is defined as work performed by a qualified craftsman that is directly related to the alteration, modification, or repair of the item or system identified as needing alteration, modification, or repair. The following functions are identified as direct production: Abrasive Cleaning/Water Blasting, Tank Cleaning, Welding, Burning, Brazing, Blacksmithing, Machining (inside and outside), Carpentry, Electrical/Electronic Work, Crane Operation, Shipfitting, Lagging/Insulating, Painting, Boilermaking, Pipe Fitting, Engineering (Production), Sheetmetal Work, Staging/Scaffolding, and Rigging.

(2) Non-production labor hours (whether charged directly or indirectly by contractor's accounting system) shall be for labor in support of production functions. For purposes of this clause, support functions are defined as functions that do not directly contribute to the alteration, modification, or repair of the item or system identified as needing alteration, modification, or repair.

Necessary support functions should be priced into the burdened rate for production labor hours. Examples of support functions include: Testing, Quality Assurance (inspection), Engineering (support), Planning (including involvement of craft foreman/journeyman in planning a task), Estimating (including determination of necessary materials and equipment needed to perform a task), Material Handling, Set-up (moving tools and equipment from shop to ship to perform a task), Fire Watch, General Labor (including general support of journeyman tasks), Cleaning (including debris pickup and removal), Surveying, Security, Transportation, Supervision, and Lofting (sail/pattern making).

(d) Additional Item Requirements do not include replacement work performed pursuant to the Inspection and Manner of Doing Work or Guarantees clauses.

(e) It is the Government's intention to award any growth work identified during the repair to the contractor, if a fair and reasonable price can be negotiated for such work, based upon Schedule rates. If a fair and reasonable price cannot be negotiated, the Government may, at its discretion, obtain services outside of the contract. Such services may be performed while the ship is undergoing repair in the contractor's facility pursuant to the Access to Vessels clause.

(f) The contractor shall submit to the Contracting Officer the following information in all AIR proposals:

(1) Number of labor hours estimated; broken down by specific direct production labor category.

(2) Material estimates, individually broken out and priced. When requested by the Contracting Officer, material quotes shall be provided.

(3) Subcontractor estimates, individually broken out and priced along with the actual subcontractor quotes. The requirement to submit subcontractor quotes may be waived if deemed appropriate by the Contracting Officer.

(4) Material/subcontractor handling fee and the basis for the fee.

(g) The contractor shall not be entitled to payment for any hours ordered pursuant to this clause until such time as a written contract modification is executed.

Change Request (CR) – Growth Work

(1) The Contractor shall not perform growth work without the Contracting Officer's authorization.

This clause applies to Change Requests (CR), also known as growth and emergent work ordered by the Contracting Officer pursuant to the Changes clause. The Contractor shall perform the CR at the labor billing rates designated in the Schedule, as described in paragraph (2) of this clause. All growth work shall be paid at the prices stated in the Schedule.

(2) The CR composite labor rate is a flat, hourly rate used to price direct production labor hours. Contractors shall provide a detailed breakdown that fully supports the quoted CR composite labor rate. The CR composite labor rate shall be burdened to include the cost of direct production labor, all associated indirect costs, and profit/fee as described below:

a. Direct production labor is defined as work that is directly related to the alteration, modification, and repair tasks performed directly on, or in direct support of, components or systems identified in the CR or elsewhere in the contract. Examples of direct production labor include the following: abrasive cleaning/water blasting, tank cleaning, welding, burning,brazing, blacksmithing, machining (inside and outside), carpentry, electrical/electronic work, crane operation, shipfitting, lagging/insulating, painting, boilermaking, pipe fitting, engineering (production), sheet metal work, installation and removal of staging/scaffolding, rigging, material handling (shop to ship and within the worksite in support of labor task), set-up (moving tools and equipment from shop to ship to perform a task), fire watch, general labor (including general support of journeyman tasks), cleaning (including debris pickup and removal), and pattern making.

b. Indirect costs are defined as all non-direct production costs and support functions, defined as functions that do not directly contribute to the alteration, modification, or repair of the item or system identified. Examples of indirect costs include the following: planning, estimating, supervision, management, ship superintendent functions, clerical, surveying, security, transportation, supervision, labor costs, worker-compensation, taxes, inventory control, warehousing, licensing, insurance, all other support items and functions, fixed asset costs, rentals on items normally owned as fixed assets such as tools and hand operated power tools, electrical generators and compressors for operating tools (for drydocks), jigs and fixtures fabricated and used in shop to support production functions, security, contractor facility upkeep and utilities, workman's compensation, taxes, office supplies, etc.

c. Direct consumables and expendables: supply items, manufactured or procured by the Contractor that are consumed or expended in conjunction with direct production (e.g. rags, gloves, respirators/masks, etc.)

(3) Detailed pricing for the following shall be priced and itemized separately to include all costs and profit/fee as described below and shall not be included in the CR composite labor rate:

a. Direct materials: supply items, manufactured or procured by the Contractor, that are installed in conjunction with direct production, or are otherwise turned over to the Coast Guard (e.g. plate, angle iron, welding rods, paint, pumps, motors, engine and gearbox oil, engine jacket water, etc.)

b. Direct subcontracted services: direct production service items and procured by the Contractor to support the contract (e.g.

gas-free engineering services, rented crane services, rented temporary air conditioning units and other rented tools not normally owned as fixed assets, etc.)

(4) CRs do not include replacement work performed pursuant to HSAR 3052.217- 92 Inspection and Manner of Doing Work clause or HSAR 3052.217-100 Guarantees clause.

(5) It is the Government's intention to award any growth work identified during the contract performance period to the contractor, if a fair and reasonable price can be negotiated for such work, based on Schedule rates. If a fair and reasonable price cannot be negotiated, the Government may, at its discretion obtain services outside of the contract. Such services may be performed while the ship is undergoing repair in the contractor's facility pursuant to the Access to Vessels clause.

(6) Change Requests shall be transmitted electronically via email. The bullets below display the process of how change requests are to be followed during the availability:

CR Process will occur in the following order:

a. Condition Found Report (CFR)- Generated by the Contractor and provided to COR

b. Condition Report Reply (CRR)- Generated by the COR and provided to Contractor

c. Change Request- CR and IGE are generated by the COR and forwarded to KO

d. Contractor's Proposal- Provided to the KO for the identified tasking on CR

e. Negotiations- If needed, take place to establish pricing

f. Approved Work Request- Forwarded to Contractor and COR by the KO

g. KO provides copy of Change Request Authorization to the Contractor.

h. Modification to Contract- the KS/KO will issue a modification covering all CR's.

(7) The contractor shall submit to the Contracting Officer the following information in all CR quotes:

a. The number of direct production labor hours that will be used to accomplish the tasks specified in the CR.

b. A list of each direct material, direct subcontracted service, and direct consumable and expendable item that will be used to accomplish the CR, and a corresponding price for each item. The Contracting Officer may request evidence in support of the offered prices such as material receipts and quotes received from subcontractor.

c. Any proposed changes to the Schedule of Work.

(8) The contractor shall not be entitled to payment for any hours ordered pursuant to this clause until a written contract modification is executed.

(End of Addendum to FAR Provision 52.212-4)

52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions.

U.S. Coast Guard standard specifications can be downloaded by copying the following link to a web browser:

https://www.dcms.uscg.mil/Our-Organization/Assistant-Commandant-for-Engineering-Logistics-CG-4-/Logistic- Centers/Surface-Forces-Logistics-Center/Contracting-Links/Standard-Specifications/Orders. The last day to request drawings regarding this solicitation is 28 May 2024. After this date, further requests may not be accepted due to time constraints. To request drawings, contact the Contract Specialist. All requests should identify the solicitation number 70Z08024QPBPL0036.

Some references listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise restricted distribution and have been deemed "limited access" and "export controlled" packages. In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/. Only those vendors that have current certification by

JCP will be able to be granted explicit access to these packages by the USCG.

QUESTIONS: The last day for questions regarding this solicitation is 28 May 2024. Email all questions in one document to Contract Specialist and Contracting Officer. All questions need to identify the solicitation number 70Z08024QPBPL0036 and will be answered by an Amendment.

52.237-1: Site Visit This RFQ is for the Dockside repairs of the USCGC ISAAC MAYO hereinafter referred to as "vessel." The vessel's home pier is located in Key West, FL. The point of contact for site surveys is MKCS William Noll and MKCS Aaron Frates who can be reached at 305-906-1488 or via email William.J.Noll@uscg.mil or Aaron.J.Frates@uscg.mil. Contractors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Site Visits/Ship Check should be scheduled and completed NLT 28 May 2024.

52.212-1: Instructions To Quoters-Commercial Products and Commercial Services (SEP 2023) Tailored FAR PROVISION 52.212-1: Instructions To Quoters-Commercial Products and Commercial Services (SEP 2023),is incorporated by reference.

Addendum to FAR Provision 52.212-1

(b) Submission of Offers. – Tailored

(1) Submit signed and dated quotes via e-mail to the Contracting Officer and Contract Specialist specified in this solicitation at or before the exact time specified in this solicitation. Quotes shall be submitted in the English language and U.S. dollars.

Quoters are required to include a completed copy of the provision at 52.212-3 Offeror Representations and Certifications – Commercial Items, Alternate I of 52.212-3. Quotes shall include a Cover Letter, Price Schedule and the required Past Performance and Technical Capability submission documentation in accordance with the below instructions:

(i) Cover Letter: Quoters shall submit a Cover Letter (on company letterhead stationery) that is dated and signed by an Authorized Official of the Quoter that includes the following information as a minimum:

• Solicitation Number 70Z08024QPBPL0036;

• The time specified in the solicitation for receipt of quotes;

• The Name, Address, Telephone Number, SAM Unique Entity Identifier (UEI), and CAGE Code of the quoter;

• Name, Title, Phone Number, and E-mail Address of an Authorized Official of the Contractor;

• The date/time the quote expires (which shall be at least 90 calendar days from the date specified for receipt of quotes, unless another time period is specified in an amendment to the solicitation.);

• Acknowledgment all Solicitation Amendments; and

• A statement specifying the following agreement: "Our Company agrees with all the terms, conditions, clauses, and provisions included in Solicitation 70Z08024QPBPL0036."

(ii) Price Schedule.

Quoters shall complete Attachment 1, Schedule of Services and include it in their quote. The Contract Line-Item Numbers (CLINs) assigned by the Government shall not be altered by quoters.

If the Contracting Officer cannot determine whether a quoted price is fair and reasonable, then the Contracting Officer may require a Quoter to submit data other than certified cost or pricing data to support further analysis. This data may include history of sales to non-governmental and governmental entities, cost data, or any other information the Contracting Officer requires to determine the prices fair and reasonable.

Growth Work: Growth work is defined as additional work discovered during contract performance that is associated with an existing work item and determined necessary to accomplish the original scope of that work item successfully. The Contractor shall not perform any growth work without the Contracting Officer's authorization. The contractor must be able to absorb growth within the ship's availability. Changes are inherent to vessel repair contracts and should be expected by Contractors.

The contractor's proposed labor rate and the proposed material percentage will be used for change requests negotiated during the performance of contract as a result of growth. The number of growth labor hours and the material base amount found in the pricing schedule are estimates that are generated for evaluation purposes only.

(iii) Past Performance Submission

The quoter shall identify up to three

(3) recent and relevant contracts or efforts as past performance references. Recent and relevant past performance is defined as similar work being performed within three (3) years of the posting of the solicitation. Quoters should provide a detailed explanation demonstrating the relevance of the contracts or efforts to the requirements of the solicitation.

The quoter should provide the following information for each reference submitted.

• Name of Quoter

• Contract Number, Order Number, or Identifier

• Customer Name and Location

• Customer Point of Contact (Name and Title)

• Telephone and e-mail address of Customer Point of Contact

• Contract Period of Performance

(iv) Technical Capability Submission

The quoter shall address the following items in their technical capability submission-

• Technical Approach Submit a legible planning document (graphical in format) in accordance with SFLC Std Spec 0000 that outlines the strategy to ensure this requirement is completed on or before the contract completion date. The planning document shall include the following characteristics:

1) Proposed schedule, resources, and shows overall period of performance for each CLIN including start and stop dates of major sub tasks within each CLIN including CFR submittals. Contains due dates for Critical inspection reports (CIR) if required by the specification.

2) Identify the critical paths for the project. Show calculations for the float along the critical path, indicating number of delay days the critical path can absorb without affecting the final delivery date.

3) Identify a list of items that may pose the most contract schedule risk and approach to mitigate or eliminate each risk.

NOTE: Negative responses are required for any items listed above that the contractor does not identify (i.e., schedule risk).

• MTU 20V4000 Engine Maintenance Qualification/Experience RequirementsSubmit resume' of at least one on-stie employee or subcontractor serving as the lead technical representative. Submit 4000-03 M3 training certificate of technicians performing the QL3. In addition, submit documentation that one technician is 1B (ECU7) dongle certified for the MTU 20V4000 engine governor. The dongle is in the employee/subcontractor's legal possession. Submit documentation of prior experience performing major 4000-03 maintenance on similar contracts/projects.

• Fire Safety Plan

• Submit a brief description of how you intend to meet Fire Detection/Alarm/Response requirements outlined in SFLC STD SPEC 5550 and para 3.1.1.3 of the General Requirements Work Item. At a minimum address the following:

• What temporary measures will be taken (e.g. temp installation of a contractor-furnished and owned systems, hook up of temp external power to the vessel's installed systems, etc.) to supplement any loss of the vessel's fire detection/alarm, fire-fighting, and shipboard lighting and communication systems.

• Who will fight a fire on the vessel, and how will they be notified of a fire.

• Given the scope of work, what are the anticipated breaches of the cutter's Fire Protection Boundaries (e.g. hull access cuts needed, hull fittings that will be impacted by vessel work, etc.).

• How will the risk caused by the anticipated breaches be mitigated (e.g. removal of cables/hoses/etc. at the end of each work day or installation of quick disconnects, installation of temporary fire curtains, etc.).

The quoter's technical submission shall not exceed 15 pages, excluding the GANTT chart. One page is equivalent to one side of a double-sided printed piece of 8.5" by 11" paper. Font sizes must be no smaller than Times New Roman, size 10 type. Any material submitted, including appendices and attachments, that exceeds the page limitation specified will not be considered during the evaluation process.

(2) General Instructions/Information.

(i) Quoters are expected to examine the entire solicitation (including any exhibits and attachments), and any amendments to this solicitation. Quotes shall be prepared in accordance with these instructions, providing all required information in the format specified. The Quoter shall confine submissions to essential matters, sufficient to define the quote details, in a concise manner, to permit a complete and accurate evaluation of each quote. Proprietary information shall be clearly marked.(ii) Quoters shall furnish all of the information required by this Solicitation; quotes that fail to furnish required representations or information/documents, fails to meet any of the requirements of the Solicitation, or reject the terms and conditions of the solicitation may be excluded from consideration.

(iii) This Solicitation does not obligate the Government to compensate for any costs incurred by the Quoter in the preparation and/or submission of any quote, nor does it obligate the Government to procure for said supplies.

(c) Period for Acceptance of Offers.–Tailored

The quoter agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes unless another time period is specified in an addendum to the solicitation.

(g) Contract award (not applicable to Invitation for Bids.) – Tailored

The Government intends to evaluate quotes and award a contract without exchanges with quoters. Therefore, the quoter's initial quote shall contain the quoter's best terms from a price and technical standpoint. The Government reserves the right to conduct exchanges with all or some of the quoters or with only the best-suited quoter (i.e., the apparent successful quoter), if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest; accept other than the lowest quote; and waive informalities and minor irregularities in quotes received.

(l) A Brief Explanation of the Basis for the Contract Award Decision. – Tailored

If a quoter requests information on an award that was based on factors other than price alone, a brief explanation of the basis for the contract award decision shall be provided.

End of Addendum to FAR Provision 52.212-1

FAR PROVISION 52.212-2: Evaluation – Commercial Products and Commercial Services (NOV 2021). – Tailored

(a) The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes and are listed in descending order of importance:

Technical Capability: The Government will evaluate each quoter's demonstrated capability to provide a sound, compliant approach that meets all the requirements listed in the Specification and demonstrates a thorough knowledge and understanding of the requirements. TheGovernment will evaluate each quoter's experience conducting major repairs/installs on DoD and USCG surface vessels and their workforce capability and capacity to perform the requirements. The Government will evaluate each quoter's project planning document to determine the quoter's understanding of the critical path and sequence of work items. The Government will evaluate quoters' ability to meet qualified technical representative requirements cited on paragraph 3.1.2 in the multiple work items in the specification. The Government will evaluate each quoter's overall approach to quality control. It is the quoter's responsibility to ensure that their quote clearly addresses and demonstrates their ability to perform these requirements. Any quote that does not meet or address all Technical Capability submission requirements will be deemed unacceptable and may not be considered for award.

Past Performance: The Government may utilize any references provided by the quoter, along with information available from past contracts/orders with the USCG and any information found using sources such as Contractor Performance Assessment Reporting System (CPARS) to determine the contractor's past performance within the last three (3) years. The Government reserves the right to limit or expand the number of references it decides to contact and to contact references other than those provided by the quoter. Past performance less than satisfactory may not be considered for award.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .