This is a Statement of Work (SOW) for a Blanket Purchase Agreement (BPA) establishing support for the U.S. Air Force 309th Maintenance Support Group (MXSG) at Hill Air Force Base, Utah. The SOW defines requirements for contractors to provide installation, relocation, repair, and modification services for industrial plant equipment including CNC machines, HVAC systems, hydraulic equipment, robotic systems, welding equipment, test stands, and numerous other specialized machinery and control systems used in aircraft maintenance operations.
Contractors must submit detailed quotes addressing all project requirements using a standardized format that includes materials, labor (with hourly rates from BPA pricelists), subcontractor costs, training, rental equipment, fees, overhead, and other direct costs. Upon project completion, contractors must provide comprehensive documentation including fabrication drawings, source code (where applicable), operating and maintenance instructions, spare parts lists, and onsite training for operators and maintenance personnel. The SOW establishes mandatory requirements for Hill AFB compliance including security protocols (DBIDS badges, controlled area access authorization, in/out-processing procedures), operations security (OPSEC) training within 30 days, controlled unclassified information (CUI) handling, foreign national sponsorship procedures, antiterrorism awareness training, tool control and foreign object damage (FOD) prevention per AFI 21-101, environmental hazard awareness, safety program implementation with mishap reporting within one business day, manpower reporting via SAM.gov by October 31 annually, and environmental compliance. Normal work hours are Monday through Friday 0530-1600 excluding federal holidays and base closures, with contractors required to follow Air Force energy conservation policies, hazardous materials awareness training, and communication security (COMSEC) procedures when contacting DoD organizations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IPE BPA Pricelist.xlsx | XLSX spreadsheet | |
| Combo_Solicitation IPE BPA Add Contractors.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
INDUSTRIAL PLANT EQUIPMENT
U.S AIR FORCE
309TH MAINTENANCE SUPPORT GROUP (MXSG)
[Version #2]
10/21/2025
INDUSTRIAL PLANT EQUIPMENT
i
TABLE OF CONTENTS
| 309TH MAINTENANCE SUPPORT GROUP (MXSG) | i | |
| 1 | SCOPE | 1 |
| 2 | EQUIPMENT INSTALLATION, RELOCATION, REPAIR, OR MODIFICATIONS | 2 |
| 3 | CONTRACT DATA REQUIREMENTS LIST (CDRL) | 3 |
| 4 | ADDITIONAL REQUIREMENTS | 4 |
| 5 | SECURITY: | 5 |
| 6 | GENERAL INFORMATION | 14 |
| Appendix A – ACRONYMS AND ABBREVIATIONS | 19 | |
| Appendix B – SAFETY | 20 |
SCOPE
This Statement of Work (SOW) is designed to define the expectations and deliverables for those individuals and companies that will assist the 309 Maintenance Support Group (309 MXSG) with equipment installation, relocation, repair, or modification. Depending upon the specific call requirements of each individual action, all or part of this document will apply.
For the purpose of this SOW, equipment refers to equipment and control/monitoring systems installed for 309 MXSG. Examples of equipment installation, relocation, repair, or modifications may include but not limited to the following:
· Air Compressors
· Associated Duct Work
· Audio/Visual Equipment
· Backflow water systems
· Battery Charging Equipment
· Bead Blasting Machines and Associated Systems
· Bench Lighting Fixtures
· Booth Painting Equipment
· Chillers
· CNC Boring Machine
· CNC Machining Center 4-Axis
· CNC Power Metal Shear or Press
· CNC Robotic Polisher
· CNC Turning Center
· CNC Vertical Machining Center
· Collectors, Dust
· Cranes (Lifting Devices)
· Cutting
· Drill Press
· Electrical Controls (AC/DC Electrical Components)
· Emergency Lighting 10 ft and below
· Exit Lighting
· Fuel Systems
· Fall Protection
· Fencing
· Grinders, belt driven
· Grinders, cylindrical
· Grinder, gap
· Grinder, horizontal
· Grinder, jig
· Grinder, planetary
· Grinder, universal
· Hoist, Bridge
· Hoist, Jib
· Hoist, Monorail
· Hush houses
· Hydraulic systems
· HVAC controls
· HVAC units (climate control of clean rooms & equipment)
· Jig Boring Machines
· Lasers, Fixed and Portable
· Lathes, Bench
· Lathes CNC 4 Axis Turret
· Lathe CNC Wheel
· Lathe, Engine
· Lathe, Swing
· Lathe, Tool
· Lathe, Turret
· Milling Machine CNC
· Milling Machine Horizontal
· Milling Machine Tracer
· Milling Machine Vertical
· Modular Office Furniture
· Ovens, Drying
· Ovens, Heat Treat
· Parts Cleaners
· Pneumatic Controlled Equipment
· Portable Offices
· Press Brake
· Refrigeration Units
· Robotic Equipment and Controls
· Roof Mounted HVAC
· Saw, Band
· Saw, Horizontal
· Saw, Table
· Sound Barriers
· Tanks, Degreasing
· Tanks, Dip
· Tanks, Etching
· Tanks, Plating
· Test Stands (Hydraulic, Pneudraulic, and electronic)
· UPS, Emergency Lighting
· Washers, Parts
· Water Treatment Systems
· Welders
· X-Ray Equipment
EQUIPMENT INSTALLATION, RELOCATION, REPAIR, OR MODIFICATIONS
For each new project, 309 MXSG will develop a detailed SOW that includes all project requirements, specifications, drawings, safety information, and other necessary details. This SOW will also be presented to the contractor at the time of bidding.
To ensure fair and consistent evaluation of all bids, the contractor shall submit a quote to the Point of Contact (POC) listed on the Request for Quote (RFQ), addressing all requirements outlined in the SOW, using the prescribed format detailed in this section; this standardized format is mandatory for all submissions, and any deviations may result in disqualification. The quote must demonstrate understanding of the required work through inclusion of preliminary drawings, schematics, parts lists, or technical data, and if subcontracting is used, the associated indirect costs/fees must be clearly identified; quotes shall include a breakdown of line items referencing hourly rates from the submitted BPA pricelists or relevant subcontracting information.
Project Information MXSG Project/Work Order Number Project Summary Location of Performance Quote Date Quote Expiration Date Cost Breakdown Materials (Description, Quantity, Unit Price, Total)
1.1.1.1 Labor (Labor Category, Hours, Hourly Rate (pricelist), Total)
1.1.1.2 Subcontractor Costs (Subcontractor Name, Description of Work, Cost + Fee + Profit = Total)
1.1.1.3 Training (if required) (Description, Cost)
1.1.1.4 Rental equipment (Description, Cost)
1.1.1.5 Fees (Description, Cost)
1.1.1.6 Overhead (Calculated Percentage or Fixed Amount)
1.1.1.7 Other Direct Costs (Description, Cost)
1.1.1.8 Total Quote Price (The sum of all cost categories listed above.)
After receiving the quote from the contractor, 309 MXSG will evaluate each quote based upon cost, and how well the quote addresses the customer’s requirements.
Upon acceptance of quote by 309 MXSG, the contractor will be contacted by an authorized GPC cardholder, or individual on the authorized BPA caller list. The authorized individual will initiate all work by giving the contractor GPC purchase information and the BPA call number.
Interim Review: the contractor shall provide status reports as requested at the call level, to the project engineer/manager on the progress of each awarded project, as well as estimated completion dates. (CDRL A001) Final Project Report: upon completion of a project the contractor shall complete the project report and submit copies of documentation to the project engineer/manager for review. The required documentation for the project report will be provided at the call level but could include the following: (CDRL A002)
1.1.2 As required, complete fabrication drawings shall include assembly drawings, fully dimensioned part drawings, schematics, bills of materials, etc.
1.1.3 As required, complete source code. This may include PLC, Wonder Ware, or Lab View Source Code in electronic format.
1.1.4 As required, set up instructions, operation instructions, maintenance recommendations etc.
1.1.5 As required, recommended spare parts list for those critical or hard to acquire parts that may improve cycle time for future repair or maintenance.
The contractor shall provide onsite/ hands-on training for operators and maintenance personnel, if necessary, upon completion of project. Training for maintenance personnel shall be all encompassing and suitable to enable them to perform future work without contractor assistance.
CONTRACT DATA REQUIREMENTS LIST (CDRL)
| Data Item |
| Title |
| PWS Paragraph |
| Delivery |
| A001 |
| Progress Report |
| 2.5 |
| As required in Statement of Work provided at the call level |
| A002 |
| Final Project Report |
| 2.6 |
| At the conclusion of project. |
| A003 |
| Contractors Safety Plan |
| Appendix C, 6.6.1 |
| Prior to commencement of work. |
| A004 |
| Accident/Incident |
| 5.3.3.2, 6.6.2 |
| No Later than 1 business day after mishap. |
Quality Control. In compliance with the applicable contract clauses FAR 52.246-4 thru FAR 52.246-5, entitled, “Inspection of Services (Fixed Price and Cost-Reimbursement),” or FAR 52.212-4(a) Commercial Terms and Conditions Inspection/Acceptance, develop and maintain an effective quality control program to ensure services are performed IAW this PWS, applicable laws and regulations and IAW best commercial practices.
ADDITIONAL REQUIREMENTS
Government provided support The Government will provide necessary working space, including heat, light, ventilation, and electrically powered outlets for the use of contractors’ maintenance personnel. The Government shall provide access to the necessary facilities where the equipment resides. The place of performance shall be Hill Air Force Base (AFB), UT.
Government telephones shall be used for official business only.
The contractor shall be responsible for safeguarding all Government property provided for contractor use.
Manpower Reporting:
The Contractor shall report ALL Contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract via a secure data collection site. The Contractor is required to completely fill in all required data fields at http://www.SAM.gov Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs from 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the Contractor Manpower Reporting Application (CMRA) help desk.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data. User Manuals: Data for Air Force service requirements must be input at the ECMRA link. User manuals for Government personnel and Contractors are available at the ECMRA link at http://www.SAM.gov
SECURITY:
Security Review Control Number: SS20241121 Security Review Date: 11/21/2024 Reviewed By: Sam Samuleson
Conflicts of Interest The contractor shall not assign to contract or task order performance any person, including any employee of the U.S. Government, if employing that person would create a conflict of interest under any law, regulation or policy of the United States Government. Additionally, the contractor shall not assign to contract or task order performance, any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD Directive 5500.7-R, Ethics and Standards of Conduct, and any other applicable regulation or policy of the Department of the Air Force or its subordinate commands, as applicable, including but not limited to Air Force Materiel Command.
Contractors will not use any other form of identification to access any government installation or facility while working on a government contract except the issued credentials associated with the awarded contract or task order. Example: using a military retiree card to access an installation to work on a contract.
Security Requirements Government telephones, computers, fax machines, copy machines, and other equipment shall be used only for official Government business Foreign nationals (FN) will not be escorted, or sponsored, onto the installation without being properly vetted. Any request must follow 309 MXSG OI 16-102, Security Requirements section 7. FNs must be approved for access via the Foreign Disclosure Office and Air Force Office of Special Investigations (AFOSI).
The contractor shall comply with all security, force protection, operation security and antiterrorism requirements at each installation.
The contractor shall comply with MXSG in and out-processing procedures for all contractor personnel to ensure required security-related briefings and debriefings are accomplished. Specific in and out-processing checklists may be included at the task order level.
The contractor will use the MXSG EN POC as the primary means of reviewing and approving forms and for communicating with necessary government representatives.
Issued credentials shall be removed and/or concealed from plain sight when outside the installation and shall not be left in vehicles or unprotected. Badges and passes will not be duplicated, photographed, or copied. Lost or stolen identification badges, vehicle passes etc. will be immediately reported to MXSG Security, the MXSG EN, and Security Forces Office.
Communications Security All communications with DoD organizations are subject to Communications Security (COMSEC) review.
The DoD authorizes the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
The Government advises the contractor that at any time they place a call to, or receive a call from, a DoD organization, they are subject to COMSEC procedures.
The contractor assumes the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DoD information.
Operations Security (OPSEC) Requirements During the course of this contract, in addition to those restrictions, instructions and guidelines delineated in the SOW and/or other references provided, the contractor will adhere to the following minimum requirements.
Introduction of personnel electronic devices into government spaces, laptops, tablet Personal Computers (PCs), cellular phones, cameras, recording devices, and data recording/storage devices is strictly controlled and forbidden in most cases. Company issued equipment required for the performance of work must be approved by the government MXSG Security Manager (SM) or SM where work is being performed. Photography and recordings are not allowed in restricted areas and controlled areas except for official use and by approved photography letter only. NOTE: Unless otherwise stipulated in the contract, contact the Installation Public Affairs or SM for approval.
Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Official Business controlled unclassified information (CUI) may only be transmitted as directed in the SOW as it adheres to CUI Guidelines.
The Contractor shall not post to company websites, publications, newsletters, or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or CUI. When in doubt, company press releases related to this contract will be coordinated through the Public Affairs Office prior to release.
Contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including all Social Networking sites) any images, data or information that reveals sensitive government operations, personnel, equipment, including, but not limited to: Tactics, techniques and procedures, production or work schedules, any visible or concealed modifications, upgrades, additions to Air Force installations, property or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, project schedules, logistics or material delivery schedules; specialized equipment orders, deliveries, shipments, etc. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.); Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the SM and/or installation SFS, COR, and, if applicable, the company FSO and/or the Defense Counterintelligence Security Agency National Industrial Security Program Office.
Practice OPSEC and implement countermeasures to protect Critical Information (CI) and other sensitive unclassified information and activities vigilance or degrade the planning and execution of military operations performed or supported by the contractor in support of the mission. Protection of CI will include the adherence to and execution of countermeasures which the contractor initiates or as provided by OPSEC manager or installation OPSEC Program Manager, for CI on or related to the SOW.
The contractor must mark and protect any information IAW CUI, to include E-mail, and adhere to all CUI standards and policies.
Contractors who have access to the Ogden Air Logistics Complex (OO-ALC) and Government Servicing Units (GSU)s facilities or critical information shall have OPSEC training IAW Air Force Instruction (AFI) 10-701, Operations Security (OPSEC) and the OO-ALC Operations Security (OPSEC) Plan. Initial training will be approximately one (1) hour, and follow-on recurring annual training will be approximately 1/2 (0.5) hour. OPSEC training will be conducted within 30 days of assignment.
Contractor Identification & Badges All contractor management, staff and contractor personnel shall be clearly identified as such at ALL times. Contractor identification shall include visible badges, conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication whether with government personnel, other contractor personnel, or with the public when supporting this contract where their status as contractor employees might not otherwise be apparent or where they might be mistaken for civil service employees. At a minimum, contractor management staff or contractor personnel shall clearly identify themselves using the label “contractor” in email addresses in accordance with Federal Acquisition Regulation (FAR) 37.114(c), Special Acquisition Requirements; opening ALL phone conversations with a statement materially the same as, “[office name], I am [employee name], a [prime contractor’s company name] employee,” including the employing contractor’s name in the letterhead and/or signature block of any written correspondence; and any other means necessary.
The Contractor shall utilize the Defense Biometric Identification System (DBIDS) Badge/Controlled/Area Badge (CAB) In Accordance With (IAW) Hill Air Force Base (AFB) Air Force Instruction (AFI) Air Force Material Command (AFMC)_Hill Air Force Base (AFB) Supplement 31-101-0, Hill Installation Defense Plan (IDP) Interim Change (IC) 1.
1. Defense Biometric Identification System (DBIDS) Cards DBIDS Cards may be issued after contractor submits completed AFMC Form 496, Application for AFMC Identification Card, to their assigned MXSG SM. The MXSG POC ensures Form 496 is complete, to include: all requestor personal information, company name and address, current and valid driver license information, valid contract number and expiration date, current copy of the requestors’ State issued ID, requestor E-mail, days and times for access and a digital signature from the MXSG SM. The MXSG POC forwards Form 496 to MXSG SM for signature and processing. The MXSG SM will notify Contractor after Form 496 is approved/disapproved with instructions for obtaining a DBIDS. Contractors will return completed Form 496 to MXSG SM to begin in-processing. Incomplete Form 496s will not be processed. NOTE: Escort authority is not authorized, and Force Protection Condition “Bravo” is the minimum established by Security Forces Squadron (SFS). Contractors with a current DBIDS have authority to sponsor (not escort) onto the installation and must follow installation procedures for doing so. Contractors who do not require access to DoD IT systems will be issued a DBIDS annually unless contract end date is sooner.
New contractor employees approved for DBIDS will schedule an appointment at https://calendly.com/75sfs and may require an escort to the Southgate Visitor Center or Building 430 to receive a DBIDS. Employees going to Building 403 without a sponsor are considered to be on the installation illegally and may be detained and removed. MXSG EN can escort the employee/s, or the employee/s may be sponsored onto the installation by a current CAC holder and are required to meet all access requirements by SFS. A temporary visit request can be made for 1-60 days on the Visitor Control Website and requires the contractor employee name, driver’s license number and state of issue: https://usaf.dps.mil/sites/HillAFB/vcc/SitePages/Home.aspx Contractors with reported issues associated with background information on Form 496 will be disapproved for DBIDS and will not be granted access to the installation. Contractors that are denied access will have all issued credentials, keys, key cards or vindicator cards taken away and the employee removed from the installation immediately. Denied contractor/s are required to adhere to the appeal process established by SFS and 75 ABW Director. If employee is approved for access, they must obtain the approval letter and keep it on file for initial and future renewal of any credentials. Security forces will be notified if the employee, or anyone affiliated with the contractor, is uncooperative.
Controlled Area Badge The contractor shall provide written justification as to why controlled area access is needed and must include for each person: employee’s First, MI, Last name, current DBIDS ID number, Height, Weight, Eye Color, Hair Color, company name, contract number with expiration date, date of last completed training and areas needing access to the MXSG SM to complete an AF Form 2586.
Controlled area badge (CAB) requests shall be requested through the MXSG SM and completed by the group SM, who completes an AF Form 2586, Unescorted Entry Authorization Certificate, for each employee requiring entry into controlled areas. The contractor employee shall hand carry the AF Form 2586 to Security Forces (Hill AFB, building 430). The AF Form 2586 will be returned to the issuing SM for accountability and before receiving a vindicator access card. NOTE: CAB/RABs will not be issued for the inconvenience of having to be escorted. Expiring cards will need to be reissued prior to expiration date, require all training to be current, and require at least a two-week notification from the contractor employee to allow for time to prepare a new Form 2586.
Contractor employees must meet the minimum background requirements prior to submitting for a CAB/RAB: Favorable Local File Check (LFC) located on a current Form 496, within the last cycle year, or a Form 2583, Request for Personal Security Action, within the last 30 days; have a current background investigation; or current security clearance verifiable through the Defense Information Security System (DISS) or subsequent system.
While in any Controlled Areas, contractor employees shall display the CAB/RAB, in a company issued lanyard or badge holder, between the shoulders and above the waist in front of the body whenever inside an identified controlled area. NOTE: When outside any controlled area the CAB will be placed out of sight.
Contractor employees requesting unescorted access into a controlled area will have a valid DBIDS card prior to receiving Form 1199, Controlled Area Badge.
The contractor shall complete, initially and annually, Security Education and Motivation Phases I and II training prior to submitting an AF Form 2586 and any additional required training, based on access requirements. Those issued a DBIDS will schedule a time with the Group SM to complete the training and testing requirements initially and annually thereafter and should expect at least two (2) hours for completion.
The contractor shall establish and implement methods of making sure that all keys, vindicator cards, and building badges issued by the Government are not lost, misplaced, or used by unauthorized persons. Vindicator card and pin number are issued to each person and are not to be shared with anyone nor duplicated.
Lost Credential/s or Access Card/s Lost/stolen badges shall be reported to the issuing Group SM within one working day of loss. After receiving a Lost Identification Letter from the issuing security office, the contractor is required to fill out an AF Form 1168, Statement of Suspect Witness Complaint, through the SFS Office located in the West side of Building 408. The contractor must then bring a lost letter report and/or AF Form 2586 to the SF Offices to be issued a new badge then return all forms to the Group SM.
The contractor shall create an Incident/Mishap report when a contract employee loses a DBIDS, CAB, or Vindicator. The Incident/Mishap report must be submitted no later than one business day. (CDRL A004).
In/Out-Processing All contractors are required to in/out-process from each respective organization regardless of if they are issued a DBIDS, CAB, or CAC.
Contractor employees transferring between contracts, groups or companies will return DBIDS or CAB and vindicator card. New credentials will be issued by the receiving organization. The contractor shall have three days to return DBIDS or CAB and vindicator card to issuing organization. NOTE: Contractor employees are required to be sponsored and escorted while on the installation until new credentials are issued.
Contractor employees will complete the same in/out processing checklist from the assigned organization. Employees removed from the contract will be required to return all government issued credentials and vindicator key to the issuing office within the same day of separation. If employee is unable to return the credentials and vindicator key, then the supervisor will ensure that all credentials are returned to the issuing SM the same day.
Security Incident Should a security incident occur, the contractor shall: immediately report to the site location SM all available facts related to each instance, take such precautions as the SM may reasonably require for security purposes, take reasonable and prudent action to establish control of the scene; prevent further violation, to preserve evidence until released by proper authority; and cooperate fully and assist Government personnel as the Government conducts an investigation of the violation. NOTE: Participation shall last until the investigation is complete.
Training Requirements SM will administer and maintain all individual training and records, for compliance purposes, associated with this SOW. Training records must be made available during self-inspections and other oversight activities. The initial and annual training required will be scheduled with the SM and may take up to four (4) hours.
Contractors are required to complete the following trainings as applicable and administered electronically, whenever possible, or in-person for non-CAC holders:
Training required for all personnel Operations Security (OPSEC) Awareness – Frequency: Initially upon assignment (within 30-days) and annually thereafter IAW AFI 10-701, Operations Security (OPSEC). Presentation/Means: Unit Security Manager or TSS Course #MHPSEC9800301BR.
Controlled Unclassified Information (CUI) Frequency: Initially upon assignment (within 30-days) and annually thereafter. Presentation/Means: Unit Security Manager IAW DoDI 5200.48_AFI 16-1403, Controlled Unclassified Information (CUI).
Unit Indoctrination and Orientation Training – Frequency: within 30 calendar days of assignment. Presentation/Means: Unit Security Manager or CDSE Course at https://securityawareness.usalearning.gov/initialorientation/index.htm. 309 MXSG initial security orientation TSS course #MHPSEC9803600BR (NOTE: for cleared personnel, initial security briefing TSS Course #MHPSEC9803601BR is required before access to classified information is granted).
Counter-Insider Threat (C-InT) Training - This training covers procedures for C-InT awareness and reporting IAW AFI 16-1402, Counter-Insider Threat Program Management. Frequency: Initially upon assignment (within first 30 days) and annually thereafter. Presentation/Means: Unit Security Manager or CDSE Course at https://securityawareness.usalearning.gov/itawareness/index.htm.
Antiterrorism (AT) Requirements Contractor personnel who require routine physical access to a Federally controlled facility or military installation shall complete Level I antiterrorism awareness training within 30 days of requiring access and annually thereafter. IAW DoDIO-2000.16V1_AFI10-245-O_AFMCSUP, Antiterrorism Program Implementation. Training can be completed under instruction of a level 1 AT awareness instructor.
Training for Controlled Area Access Security Education & Motivation Phase I/II - This training covers the rules and regulations regarding Controlled areas and the AF Form 1199. Audience: all unit personnel with access to controlled areas. Frequency: initially and annually until CAB turn in/surrender. Presentation/Means: Unit Security Manager. NOTE: If three people or less are trained a test is required with a passing grade of 70% or better.
Anti-Robbery – This course covers the rules governing the AF resource protection program for accessing the Munitions Storage Areas (MSA)s. Audience: all personnel working with Arms, Ammunition & Explosives (AA&E), funds and drugs. Frequency: Initially upon appointment and annually thereafter. Presentation/Means: Unit Security Manager.
Initial Explosive Safety & Awareness – This course is required for all MSA access. Audience: all personnel working with Arms, Ammunition & Explosives (AA&E), funds and drugs. Frequency: Initially before CAB issuance. Course is held on Monday afternoons at 14:30 in building 180, room 226, and there is a standing meeting and no appointment is needed. If Monday is a holiday, then the class is taught the next day, Tuesday, at same time and location.
Force Protection – Audience: Contractors when identified in Statement of Work. Frequency: Initially upon assignment and annually thereafter. Presentation/Means: Unit Security Manager.
Additional resources are available for training and can be provided by Unit Security Manager.
GENERAL INFORMATION
Hours of Operation Normal Hours of Operation: The contractor shall perform the services required under this contract during the following hours: Monday through Friday 0530-1600 – EXCEPT FEDERAL HOLIDAYS and other base closures.
Federal Holidays: Unless otherwise required by the Government, the contractor shall not have access to the Government facilities on the following federal holidays: New Year’s Day, Martin Luther King’s Birthday, Washington’s Birthday, Memorial Day, Independence Day, Juneteenth, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If a holiday falls on Saturday, it is observed on Friday and working hours are Monday through Wednesday for that week. If the holiday falls on a Sunday, it is observed on Monday. Any other circumstances that may prompt base closure, such as Days of National Mourning, may also restrict opportunity to perform the exchanges. In the event of a base closure, exchanges shall be performed on the next business day. There may also be up to six AFMC Goal Days and four Wingman Days per year awarded to Government civilian employees, as well as possible weather-related days and Government directed holidays. On these days, the contractor shall not generally be required to work, and the Government shall not be billed for work not performed.
NOTE: Good Friday is regarded as a holiday by the Utah Wage Determination; however, Good Friday is not a Federal Holiday so the Government facilities will be open for work that day. The contractor shall plan on employees working business as usual on that day, unless the Government supervisor or section chief determines that such services are either unnecessary or will be less than a full normal workday.
Down Days/Weather Days: The Government will notify the contractor when official notice has been given for Energy/Weather Down days. The contractor is not expected to work on any Energy/Weather Down days.
Rescheduling: Down Days/Weather days may be rescheduled if conditions/emergency operations require.
Environmental Controls Hazardous Work Environment: The Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas. The industrial complex at Hill AFB has the potential to expose workers to hazardous materials which may include, but are not limited to hexavalent, chrome, cadmium, beryllium, lead, and others. While the Contractor shall not perform duties in a regulated area (where exposure is expected to exceed the permissible exposure limits set by 29 CFR1910.10xx), there may be contact hazards with these materials. The contractor shall ensure proper protective measures and training is taken to ensure contracted employees are protected from hazards. The 75th Air Base Wing (ABW) Bio-Environmental Engineering Flight produces BIO Survey of these areas which will be made available upon award.
Compliance with Laws and Regulations.
The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.
Conservation of Utilities The contractor shall ensure that contractor employees follow applicable Air Force base utilities conservation practices to reduce waste as much as practicable. The contractor shall be aware of OO-ALC Energy Policy. A copy shall be provided upon request. (See: ePubs>Units>OO-ALC21-110 para. 9.2). Contractors contribute to the effectiveness of the OO-ALC Energy Management System (EnMS), including the achievement of its objectives and energy targets. Through this contribution, the benefits of improved energy efficiency are realized. It is expected that the contractor ensures their activities are in line with improving OO-ALC energy performance. Contractors found negligent of these requirements can have a negative impact.
The contractor shall be responsible for operating under conditions that prevent the waste of utilities, which include the following:
A. Lights shall be used only in areas where and when work is being performed.
B. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
C. Water faucets or valves shall be turned off after the required use.
Notification of Environmental Spills If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the MXSG EN. The liability for the spill or release of such substance’s rests solely with the contractor and its agent.
Safety Program The contractor shall implement a safety program that ensures protection of Government personnel and property. (See Appendix C) In the event of an accident/mishap, the contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. An email copy of the mishap / incident notification shall be sent within one business day to the MXSG EN Shop Supervisor, who will forward it to OO-ALC safety. (CDRL A004) Government Observations During the period that the contractor is working on equipment, government personnel, other than CO, may, from time-to-time, observe contractor operations. However, these personnel may not interfere with contractor performance.
Foreign Object Damage (FOD) and Tool Control The contractor shall follow the applicable guidance in chapters/paragraphs/sections of AFI 21-101 and HQ AFMC, Hill AFB, and 309 MXW supplements to the AFI 21-101 concerning base tool (chapter 10 section B), and FOD control policies (chapter 14, and sub paragraphs designated as 41), daily. Cloth rags are considered tools and will follow the same regulations and procedures as tools.
If tools, and/or equipment are lost, the contractor will report the loss to the GM/COR no later than two hours after discovery. If tools are lost or not accounted for, then the contractor shall implement the lost tool procedures of AFMC supplement to AFI 21-101, chapter 10, section B.
Contractors performing functions in industrial areas on the center shall have a method for controlling and accounting for all tools used. All contractors working on the center shall inventory their tools at the beginning and end of each shift and at the end of each task to check for any lost or missing tools.
Environmental Weather Hazards. Workers may encounter hazardous weather conditions including snow, heavy rain, lightning, extreme dust, and other conditions that warrant appropriate precautions.
Inclement Weather. If the base closes due to inclement weather, the contractor will be released, by the installation commander, with the general population of the base at no decrement to contract price. The contractor will follow the local procedures for reporting inclement weather as advertised on local television and radio stations.
Miscellaneous Notification of Debarment/Suspension Status. The contractor shall provide immediate notice to the CO in the event of being suspended, debarred or declared ineligible by any other federal department or agency, or upon receipt of a notice of proposed debarment from another DoD Agency, during the performance of this contract.
Data Rights. The government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be government owned and are the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO. All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.
Appendix A – ACRONYMS AND ABBREVIATIONS Acronym/Abbreviation Definition
| ABW | Air Base Wing | |
| AF | Air Force | |
| AFB | Air Force Base | |
| AFMC | Air Force Material Command | |
| BPA | Blanket Purchase Agreement | |
| CAB | Controlled Area Badge | |
| CDRL | Contract Data Requirements List | |
| CI | Critical Information | |
| CO | Contracting Officer | |
| COMSEC | Computer Security | |
| DBIDS | Defense Biometric Identification System | |
| DOD | Department of Defense | |
| GPC | Government Purchase Card | |
| GSU | Geographically Separated Unit | |
| HAFB | Hill Air Force Base | |
| IAW | In Accordance With | |
| IDP | Installation Defense Plan | |
| IT | Information Technology | |
| JPAS | Joint Personnel Accountability System | |
| LFC | Local File Check | |
| MXSG | Maintenance Support Group | |
| NLT | No Later Than | |
| OM | OPSEC Measures | |
| OPSEC | Operational Security | |
| POC | Point of Contact | |
| POP | Period of Performance | |
| RFP | Request for Purchase | |
| SFS | Security Forces Squadron | |
| SM | Security Manager | |
| SOW | Statement of Work |
Appendix B – SAFETY
SAFETY, FIRE PROTECTION AND HEALTH
SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
OGDEN AIR LOGISTICS COMPLEX
UNITED STATES AIR FORCE
HILL AIR FORCE BASE, UTAH 84056
02 Dec 2024 Reviewed by:
Alec Green
OO-ALC/SE
801-586-5304
Control Number: AG241201
A. Safety Program Requirements The contractor shall implement a safety program plan that ensures protection of Government personnel and property. (CDRL A003) (DI-SAFT-82313) The program shall consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B1 below.
2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific Requirements and shall be used during the performance of the work described in the contract. The Safety Plan shall be approved by OO-ALC/SE (Safety Office) prior to commencement of any work described in this contract.
3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.
4. Competent personnel to provide surveillance of the Safety Plan.
5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.
6. All contractor personnel shall be trained and qualified to perform their duties safely.
7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify OO-ALC/SE Workflow (OO-ALC.SE.Workflow@us.af.mil) or the Hill AFB Command Post (801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of ALL the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.
Mishap notifications shall contain, as a minimum, the following information:
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (Events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. The contractor shall cooperate with any and all government mishap investigations. Additionally, if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
4. The contractor shall support and comply with the safety investigation and reporting requirements of DAFI 91-204, Chapters 1 – 5.
C. General Safety Requirements:
| If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative. |
| The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force Occupational Safety and Health Standards (AFOSH STD), to include DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards, DAFI 91-204, Safety Investigations and Reports, Contract Safety, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. |
| The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels. |
| Compliance with OSHA |
and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
SECTION II – SPECIFIC REQUIREMENTS
The contractor’s prepared Safety Plan shall:
· Provide contact information for on-site personnel
· Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures
· Identify employee safety and health training requirements and the documentation process
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:
PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic-controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already on the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4; DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07; Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition: AFI 13-213, Airfield Management, 29 Jan 08, Paragraphs 1.3.6 and 4.4.2.1 applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.
HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.