Invitation to Bid 2021-84 FINAL.pdf

PDF 479 KB Posted

Attached to
ITB 2021-84 Bolton Pump Station: Flygt Pumps Purchase
Solicitation number
S-C01010-00000801
Issued by
Clackamas County, Oregon

About this file

This document is an Invitation to Bid (ITB) issued by the Clackamas County Procurement Division in Oregon for the Bolton Pump Station: Flygt Pumps Purchase. Clackamas County is requesting bids for purchasing three (3) new Flygt pumps for the Bolton pump station located in West Linn, Oregon. The pumps are needed to regain the pump station's firm capacity before the next wet weather season. The ITB specifies the required pump specifications, bid submittal requirements, evaluation criteria, and contract terms. Bids are due on October 6, 2021 by 2:00 PM PST, and the anticipated contract start date is in December 2021.

The sample contract includes insurance requirements of $1 million per occurrence and $2 million aggregate for general liability, professional liability, and automobile liability coverage. Bidders must be able to provide the Flygt N-Impeller Pumps by Xylem as specified, as no equals will be considered. The county will award the contract to the lowest responsive and responsible bidder based on the evaluation criteria outlined in the ITB.

View the file

Other files

File Type Posted
2021-10-22_Int Awd Ltr.pdf PDF
Notice of Intent to Award- ITB 2021-84.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

ITB # 2021-84

Bolton Pump Station: Flygt Pumps Purchase

ISSUE DATE: September 21, 2021

BID DUE DATE AND TIME

October 6, 2021 (2:00 PM, PST)

SUBMITTAL LOCATION:

Clackamas County Procurement Division

Procurement@clackamas.us mailto:Procurement@clackamas.us

Rev 11/2016 Page | 1

1.0 GENERAL

1.01 SCHEDULE OF EVENTS:

Invitation to Bid Issue Date ............................................................................ September 21, 2021 Protest of Specifications Deadline ................................................................. September 28, 2021 Request for Clarification or Change Deadline ..................................................... October 5, 2021 Bid Due Date and Time...................................................................................... October 6, 2021 Deadline for Protest of Award ................................................................ 7 calendar days after date on Notice of Award letter Anticipated Contract Begin Date .......................................................................... December 2021

This Schedule of Events is subject to change. Any changes will be made through the issuance of Written Addenda.

1.02 ISSUING OFFICE:

Bidding Documents can be downloaded from OregonBuys at the following address:

https://oregonbuys.gov/bso/view/login/login.xhtml Document No. S-C01010-00000801. Prospective Bidders will need to sign in to download the information and that information will be accumulated for a Plan Holder's List. Prospective Bidders are responsible for obtaining any Addenda from Website listed above.

The Procurement Division of Clackamas County (“County”) is the issuing office and is the sole point of contact for this Invitation to Bid (“ITB”). All questions regarding this ITB should be directed to the Administrative Contact person identified below:

Name: Tralee Whitley Title: Procurement and Contract Analysist Email: TWhitley@clackamas.us

1.03 DEFINITIONS

As used in this ITB, the terms set forth below are defined as follows:

1. "Addenda" means an addition to, deletion from, a material change in, or general interest explanation of the ITB.

2. "Exhibits" means those documents which are attached to and incorporated as part of the ITB.

3. "Bid" means an offer, binding on the Bidder and submitted in response to an Invitation to Bid.

4. "Bidder" means an entity that submits a Bid in response to an ITB.

5. "Bid Due Date and Time" means the date and time specified in the ITB as the deadline for submitting Bids.

6. "Invitation to Bid" or “ITB” means a Solicitation Document for the solicitation of competitive, Written, signed and sealed Bids in which Specifications, price, and delivery (or project completion) are the predominant award criteria.

7. “LCRBR” means the Clackamas County Local Contract Review Board Rules found at:

https://www.clackamas.us/code

8. "Responsible" means an entity that demonstrates their ability to perform satisfactorily under a contract by meeting the applicable standards of responsibility outlined in LCRBR C-047-0500.

9. "Responsive" means a Bid that has substantially complied in all material respects with the criteria outlined in the ITB.

10. “Written or Writing” means letters, characters, and symbols inscribed on paper by hand, print, type, or other method of impression intended to represent or convey particular ideas or meanings.

https://oregonbuys.gov/bso/view/login/login.xhtml mailto:TWhitley@clackamas.us https://www.clackamas.us/code

2.0 INTRODUCTION AND BACKGROUND

2.01 INTRODUCTION:

Water Environment Services (“WES”) had an emergency repair on the force main of the Bolton pump station last spring that reduced the firm capacity of the pump station. WES needs to pre-purchase three (3) new Flygt pumps in order to regain the pump station firm capacity before the next wet weather season, by the year 2022.

2.02 BACKGROUND:

WES is a special district operating under an ORS 190 Partnership that produces clean water and protects water quality for more than 190,000 people living and working in Clackamas County, Oregon. WES owns and operates five resource recovery facilities, 23 pumping stations and more than 350 miles of pipes. WES serves the Cities of Milwaukie, Happy Valley, Oregon City, West Linn, Gladstone, Johnson City, and unincorporated areas within Clackamas County.

Clackamas County sought brand specification approval per ORS 279B.215 on March 9, 2020, the County issued a Notification of Brand Name Specification specifically for this project. The notification was published for fourteen (14) days and received no protests. The Clackamas County Board of County Commissioners approved the brand specification at the Board of County Commissioners’ Business Meeting held June 4, 2020.

2.03 SCOPE OF WORK:

Water Environment Services (“WES”) is requesting bids for purchasing three (3) new Flygt pumps for the Bolton pump station. WES has standardized their pumps on Flygt N-Impeller Pumps by Xylem, therefore, no equals will be considered. Bolton pump station located at 6615 Failing Street, West Linn, OR 97068. Coordination pump delivery with Project Manager.

3.0 SPECIFICATIONS / STATEMENT OF WORK

3.01 REQUIRED SPECIFICATIONS:

In order to qualify as a Responsive Bidder, the Bid needs to meet the required specifications per Exhibit A, attached and hereby incorporated by reference.

3.02 TERMS AND CONDITIONS:

Sample Contract: Submission of a Proposal in response to this ITB indicates Proposer’s willingness to enter into a contract containing substantially the same terms (including insurance requirements) of the sample contract identified below. No action or response to the sample contract is required under this ITB. This ITB and all supplemental information in response to this ITB will be a binding part of the final contract.

The applicable Sample Goods and Services Contract.

The following insurance requirements will be applicable.

Professional Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence, with an annual aggregate limit of $2,000,000 for damages caused by error, omission or negligent acts.

Commercial General Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence, with an annual aggregate limit of $2,000,000 for Bodily Injury and Property Damage.

Automobile Liability: combined single limit, or the equivalent, of not less than $500,000 per occurrence for Bodily Injury and Property Damage.

Rev 11/2016 Page | 1

4.0 BIDDER QUALIFICATIONS

4.01 MINIMUM QUALIFICATIONS:

In order to qualify as a Responsive Bidder, the Bidder needs to meet the minimum qualifications below:

Supplier shall provide Flygt N-Impeller Pumps by Xylem as specified. No equals will be considered.

5.0 REQUIRED SUBMITTALS

5.01 SUBMISSION OF BID AND QUANTITY:

Submit one (1) sealed copy of the Bid by email to the address below. The subject line of the email must identify ITB# 2021-84 Bolton Pump Station: Flygt Pumps Purchase. Bidders are encouraged to contract Procurement to confirm receipt of the Bid. The Bid must contain all of the required information and must have signatures on the required forms and be received by the Closing Date and time indicated in Section 1.01 of the ITB.

Submit Bids (including all required documents) by 2:00 PM PT to:

procurement@clackamas.us

Late Bids will not be accepted.

5.02 REQUIRED SUBMITTALS:

It is the Bidder’s sole responsibility to submit information in fulfillment of the requirements of this ITB.

If pertinent information or required submittals are not included within the Bid, it may cause the Bid to be rejected.

Bidders should submit the following information:

• Description of how the goods or services offered specifically meet the required specifications described in Exhibit A.

• Exhibit B, Certifications, fully completed.

• Exhibit C, References, fully completed.

• Exhibit D, Bid Price Form, fully completed.

6.0 EVALUATION AND AWARD

6.01 EVALUATION:

Bids will be evaluated to determine the lowest Responsive Responsible Bidder based upon the ITB, Exhibits and Addenda. County may engage in any of the processes identified in the applicable LCRBR to determine the Contract award.

6.02 BEST AND FINAL OFFER:

In accordance with LCRBR C-047-0261, the County may request best and final offers from those Bidders determined by County to be reasonably viable for contract award. However, County reserves the right to award a contract on the basis of initial bid received. Therefore, each bid should contain the Bidder’s best terms from a price and technical standpoint. Following evaluation of the best and final offers, County may select for final contract negotiations/execution the offers that are most advantageous to County, considering cost and the evaluation criteria in this ITB.

mailto:procurement@clackamas.us

Rev 11/2016 Page | 2

6.03 INTERGOVERNMENTAL COOPERATIVE PROCUREMENT STATEMENT:

Pursuant to ORS 279A and LCRBR, other public agencies shall have the ability to purchase the awarded goods and services from the awarded contractor(s) under terms and conditions of the resultant contract. Any such purchases shall be between the contractor and the participating public agency and shall not impact the contactor’s obligation to County. Any estimated purchase volumes listed herein do not include other public agencies and County makes no guarantee as to their participation. Any proposer, by written notification included with their proposal, may decline to extend the prices and terms of this solicitation to any and/or all other public agencies. County grants to any and all public serving governmental agencies, authorization to purchase equivalent services or products described herein at the same submitted unit bid price, but only with the consent of the contractor awarded the contract by the County.

6.04 INVESTIGATION OF REFERENCES:

County reserves the right to investigate and to consider the references and the past performance of any Bidder with respect to such things as its performance or provision of similar goods or services, compliance with specifications and contractual obligations, and its lawful payment of suppliers, subcontractors, and workers. County further reserves the right to consider past performance, historical information and facts, whether gained from the Bid, interviews, references, County or any other source.

County may postpone the award or execution of the Contract after the announcement of the notice of intent to award in order to complete its investigation.

7.0 INSTRUCTIONS TO BIDDERS

7.01 APPLICABLE STATUTES AND RULES:

This ITB is subject to the applicable provisions and requirements of the Oregon Revised Statutes, and the LCRBR.

7.02 MANUFACTURER’S NAMES AND APPROVED EQUIVALENT:

No equivalent substitutions for the identified brand name will be accepted.

7.03 REQUEST FOR CLARIFICATION OR CHANGE:

Requests for clarification or change of the ITB must be in Writing and received by the issuing office no later than the Request for Clarification or Change Deadline as specified in the Schedule of Events. Such requests for clarification or change must include the reason for the Bidder’s request. County Tech will consider all timely requests and, if acceptable to County, amend the ITB by issuing an Addendum. An Addendum will be posted on OregonBuys. Envelopes or e-mails containing requests should be clearly marked as a Request for Clarification or Change and include the ITB Number and Title.

7.04 PROTESTS OF THE BID/SPECIFICATIONS:

Protests must be in accordance with LCRBR C-047-0730. Protests of Specifications must be received in writing on or before 5:00 p.m. (Pacific Time), on the date indicated in the Schedule of Events, or within three (3) business days of issuance of any addendum, at the Procurement Services Division address listed in Section 1 of this ITB. Protests may not be faxed. Protests of the ITB specifications must include the reason for the protest and any proposed changes to the requirements.

7.05 ADDENDA:

If any part of this ITB is changed, an addendum will be provided to Proposers that have provided an address to the Procurement Division for this procurement. It shall be Proposers responsibility to regularly check projects OregonBuys listing for any published Addenda or response to clarifying questions.

Rev 11/2016 Page | 3

7.06 PREPARING AND SIGNATURE:

All Required Submittals must be Written and signed by an authorized representative with authority to bind the Bidder. Signature certifies that the Bidder has read, fully understands, and agrees to be bound by the ITB and all Exhibits and Addenda to the ITB.

7.07 PUBLIC RECORD:

Upon completion of the ITB process, information in your Bid will become subject records under the Oregon Public Records Law. Only those items considered a “trade secret” under ORS 192.501(2), may be exempt from disclosure. If a Bid contains what the Bidder considers a “trade secret” the Bidder must mark each sheet of information as such. Only bona fide trade secrets may be exempt and only if public interest does not require disclosure.

7.08 MODIFICATION:

Prior to submittal, Bidders should initial modifications or erasures in ink by the person signing the Bid.

After submittal but prior to the Bid Due Date and Time, Bids may be modified by submitting a Written notice indicating the modifications and a statement that the modification amends and supersedes the prior Bid. After the Bid Due Date and Time, Bidders may not modify their Bid.

7.09 WITHDRAWLS:

A Bidder may withdraw their Bid by submitting a Written notice to the issuing office identified in this ITB prior to the Bid Due Date and Time. The Written notice must be on the Bidder’s letterhead and signed by an authorized representative of the Bidder. The Bidder, or authorized representative of the Bidder, may also withdraw their Bid in person prior to the Bid Due Date and Time, upon presentation of appropriate identification and evidence of authority to withdraw the Bid satisfactory to County.

7.10 LATE SUBMITTALS:

Bids and Written notices of modification or withdrawal must be received no later than the Bid Due Date and Time. County may not accept or consider late Bids, modifications, or withdrawals except as permitted in LCRBR C-047-0330(6).

7.11 BID OPENING:

Bids will be opened immediately following the Bid Due Date and Time at the Submittal Location.

The base bid results will be posted to OregonBuys.

7.12 BIDS ARE OFFERS:

The Bid is the Bidder’s offer to enter into a contract pursuant to the terms and conditions specified in the ITB, its Exhibits, and Addenda. The offer is binding on the Bidder for one hundred twenty (120) days. County’s award of the Contract constitutes acceptance of the offer and binds the Bidder. The Bid must be a complete offer and fully Responsive to the ITB.

7.13 CONTINGENT BIDS:

Bidder shall not make its Bid contingent upon County’s acceptance of specifications or contract terms that conflict with or are in addition to those in the ITB, its Exhibits, or Addenda.

7.14 RIGHT TO REJECT:

County may reject, in whole or in part, any Bid not in compliance with the ITB, Exhibits, or Addenda, if upon County’s Written finding that it is in the public interest to do so. County may reject all Bids for good cause, if upon County’s Written finding that it is in the public interest to do so. Notification of

Rev 11/2016 Page | 4 rejection of all Bids, along with the good cause justification and finding of public interest, will be sent to all who submitted a Bid.

7.15 AWARDS:

County reserves the right to make award(s) by individual item, group of items, all or none, or any combination thereof. County reserves the right to delete any item from the award when deemed to be in the best interest of County.

7.16 LEGAL SUFFICIENCY REVIEW:

Prior to execution of any Contract resulting from this ITB, the Contract may be reviewed for legal sufficiency by a qualified attorney for County pursuant to the applicable Oregon Revised Statutes and County Policy. Legal sufficiency review may result in changes to the terms and conditions specified in the ITB, Exhibits, and Addenda.

7.17 BID RESULTS:

A notice of intent to award containing the Bid results will be issued to all Bidders and posted to OregonBuys. The Bid file will be available for Bidder’s review during the protest period at the Procurement Division. Bidders must make an appointment with the issuing office to view the Bid file.

After the protest period, the file will be available by making a Public Records Request to County through the Procurement Division.

7.18 BID PREPARATION COST:

County is not liable for costs incurred by the Bidder during the ITB process.

7.19 BID CANCELLATION:

If an ITB is cancelled prior to the Bid Due Date and Time, all Bids that may have already been received will be returned to the Bidders. If an ITB is cancelled after the Bid Due Date and Time or all Bids are rejected, the Bids received will be retained and become part of County’s permanent Bid file.

7.20 COLLUSION:

By responding, the Proposer states that the proposal is not made in connection with any competing Proposer submitting a separate response to the ITB, and is in all aspects fair and without collusion or fraud. Proposer also certifies that no officer, agent, elected official, or employee of County has a pecuniary interest in this Proposal.

7.21 NONDISCRIMINATION;

The successful proposer agrees that, in performing the work called for by this ITB and in securing and supplying materials, contractor will not discriminate against any person on the basis of race, color, religious creed, political ideas, sex, age, marital status, sexual orientation, gender identity, veteran status, physical or mental handicap, national origin or ancestry, or any other class protected by applicable law.

7.22 PROTEST OF CONTRACTOR SELECTION, CONTRACT AWARD:

An eligible Bidder who feels adversely affected or aggrieved may submit a protest within seven (7) calendar days after County issues a notice of intent to award a Contract. The protest must be clearly identified as a protest, identify the type and nature of the protest, and include the ITB number and title.

The rules governing protests are at LCRBR C-047-0740.

Rev 11/2016 Page | 5

EXHIBIT A

REQUIRED SPECIFICATIONS

19-2679 Submittal Procedures 01 33 00 - 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

A. This Section contains administrative and procedural requirements for submittals for review, information, and for Project closeout.

B. Section includes:

1. Schedule of Submittals.

2. Submittal requirements.

3. Submittal procedures.

4. Engineer review.

5. Resubmittal procedures.

6. Product data.

7. Shop Drawings.

8. Samples.

9. Design data.

10. Test reports.

11. Certificates.

12. Manufacturer's instructions.

13. Manufacturer's field reports.

14. Operation and maintenance (O&M) instructions.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Engineer's responsive action.

B. Informational Submittals: Written and graphic information and physical Samples that do not require Engineer's responsive action. Submittals may be rejected for not complying with requirements.

1.3 SCHEDULE OF SUBMITTALS

A. Within 10 days after the Effective Date of the Contract, Contractor shall submit to Engineer a preliminary Schedule of Submittals, including proposed list of major products proposed for use, with specification section reference, name of manufacturer, supplier, trade name, subcontractor and model number of each product. Provide a schedule of specific target dates for the submission and return of submittals and shop drawings required by the Contract Documents.

01 33 00 - 2

B. For products specified only by reference standards, indicate manufacturer, trade name, model or catalog designation, and reference standards.

C. The list and schedule shall be updated and resubmitted when requested by the Engineer.

D. Contractor’s Schedule of Submittals will be acceptable to the Engineer if it provides a workable arrangement for reviewing and processing the required submittals.

1.4 SHOP DRAWING AND SAMPLE SUBMITTAL REQUIREMENTS

A. Before submitting a Shop Drawing or Sample, Contractor shall have:

1. reviewed and coordinated the Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents;

2. determined and verified all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto;

3. determined and verified the suitability of all materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and

4. determined and verified all information relative to Contractor’s responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto.

B. Each submittal shall bear a stamp or specific written certification that Contractor has satisfied Contractor’s obligations under the Contract Documents with respect to Contractor’s review of that submittal, and that Contractor approves the submittal.

C. With each submittal, Contractor shall give Engineer specific written notice of any variations that the Shop Drawing or Sample may have from the requirements of the Contract Documents. This notice shall be set forth in a written communication separate from the Shop Drawings or Sample submittal; and, in addition, in the case of Shop Drawings by a specific notation made on each Shop Drawing submitted to Engineer for review of each such variation.

1.5 SUBMITTAL PROCEDURES

A. Contractor shall submit Shop Drawings and Samples to Engineer for review in accordance with the accepted Schedule of Submittals.

B. Transmit each submittal with Engineer-accepted transmittal form certifying compliance with requirements of Contract Documents.

01 33 00 - 3

C. Sequentially number transmittal forms. Mark transmittal forms for resubmittals with original number and sequential alphabetic suffix.

D. Show each Submittal with the following numbering and tracking system:

1. Submittals shall be numbered according to specification section. For example, the first product submittal for Section 055000 would be “055000-1”. Resubmittals of that submittal would be “055000-1.1”, followed by “055000-1.2”, and so on. The second product submittal for that Section would be “055000-2”.

2. Submittals containing product information from multiple sections of the specifications will not be reviewed. Contractor and/or their supplier shall divide submittals in a manner that meets the numbering and tracking system requirements stated herein.

3. Alternative method of numbering may be used if acceptable to Engineer.

E. Identify: Project, Contractor, subcontractor and supplier, pertinent drawing and detail number, and specification Section number appropriate to submittal.

F. Apply Contractor's stamp, signed or initialed, certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is according to requirements of the Work and Contract Documents.

G. Coordinate submission of related items.

1. All shop drawings for interrelated items shall be scheduled for submission at the same time.

2. The Engineer may hold shop drawings in cases where partial submission cannot be reviewed until the complete submission has been received or where shop drawings cannot be reviewed until correlated items affected by them have been received.

When such shop drawings are held, the Engineer will advise the Contractor in writing that the shop drawing submitted will not be reviewed until shop drawings for all related items have been received.

H. When hard copies of submittals are provided by the Contractor, six (6) copies of all materials shall be provided to the Engineer. Two (2) copies of reviewed submittals will be kept by the Engineer, two (2) copies of reviewed submittals will be transmitted to the Owner, and two (2) copies of reviewed submittals will be returned to the Contractor. If the Contractor requests that more than two (2) copies of the reviewed submittal be returned, then the Contractor shall submit the appropriate quantity of submittals.

01 33 00 - 4

I. When electronic transmittals of submittals are provided by the Contractor under established protocols described elsewhere in the Contract Documents or as jointly developed by the Owner, Engineer and Contractor, provide electronic submittals in portable document format (PDF) in addition to the source document format (Word, Excel, AutoCAD, etc.). Reviewed submittals will be returned to the Contractor as PDF electronic files.

J. For each submittal for review, allow not less than fourteen (14) days for Engineer review, excluding delivery time to and from Contractor.

K. Identify variations in Contract Documents and product or system limitations that may be detrimental to successful performance of completed Work.

L. Allow space on submittals for Contractor and Engineer review stamps or comments.

M. When revised for resubmission, the Contractor shall identify changes made since previous submission. A narrative of changes shall be provided, and shop drawings or calculations shall indicate that a revision was made.

N. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with review comments.

O. Submittals not requested will not be recognized nor processed.

P. Incomplete Submittals: Engineer will not review. Complete submittals for each item are required. Delays resulting from incomplete submittals are not the responsibility of Engineer.

1.6 ENGINEER REVIEW

A. Informational submittals and other similar data are for Engineer's information, do not require Engineer's responsive action, and will not be reviewed or returned with comment.

B. The Engineer’s review of submittals and shop drawings is not a check of any dimension or quantity and will not relieve the Contractor from responsibility for errors of any sort in the submittals and shop drawings.

C. Submittals made by Contractor that are not required by Contract Documents may be returned without action.

D. The Engineer will review the submitted data and shop drawings and return to the Contractor with notations thereon indicating "No Exception Taken", "Make Corrections Noted", "Rejected", "Revise and Resubmit", or "Submit Specified Item".

01 33 00 - 5

E. If more than two (2) submissions of an item are required to meet the Project specifications, Contractor shall be responsible for Engineer’s charges to Owner for its review time, and Owner may impose a set-off against payments due to Contractor to secure reimbursement for such charges, unless the need for such change is beyond the control of Contractor.

F. Engineer will provide timely review of Shop Drawings and Samples in accordance with the Schedule of Submittals acceptable to Engineer. Engineer’s review will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents.

G. Engineer’s review will not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions or programs incident thereto.

H. Engineer’s review of a separate item as such will not indicate approval of the assembly in which the item functions.

I. Engineer’s review of a Shop Drawing or Sample shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Paragraph 1.4.C and Engineer has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample. Engineer will document any such accepted variation from the requirements of the Contract Documents in a Field Order.

J. Engineer’s review of a Shop Drawing or Sample shall not relieve Contractor from responsibility for complying with the requirements of Paragraph 1.4 A. and B.

K. Engineer’s review of a Shop Drawing or Sample, or of a variation from the requirements of the Contract Documents, shall not, under any circumstances, change the Contract Times or Contract Price, unless such changes are included in a Change Order.

L. Neither Engineer’s receipt, review, return of a Shop Drawing, Sample, or other submittal shall result in such item becoming a Contract Document.

1.7 RESUBMITTAL PROCEDURES

A. Contractor shall make corrections required by Engineer and shall return the required number of corrected copies of Shop Drawings and submit, as required, new Samples for review. Contractor shall direct specific attention in writing to revisions other than the corrections called for by Engineer on previous submittals.

B. Contractor shall furnish required submittals with sufficient information and accuracy to obtain required review of an item with no more than two submittals. Engineer will

01 33 00 - 6 record Engineer’s time for reviewing a third or subsequent submittal of a Shop Drawings, sample, or other item requiring review, and Contractor shall be responsible for Engineer’s charges to Owner for such time. Owner may impose a set-off against payments due to Contractor to secure reimbursement for such charges.

C. If Contractor requests a change of a previously reviewed submittal item, Contractor shall be responsible for Engineer’s charges to Owner for its review time, and Owner may impose a set-off against payments due to Contractor to secure reimbursement for such charges, unless the need for such change is beyond the control of Contractor.

PART 2 PRODUCTS

2.1 PRODUCT DATA

A. Product Data: Action Submittal: Submit to Engineer for review for assessing conformance with information given and design concept expressed in Contract Documents. Submitted data shall be sufficient in detail for determination of compliance with the Contract Documents.

B. Mark each copy to identify applicable products, models, options, and other data.

Supplement manufacturers' standard data to provide information specific to this Project.

1. Note submittal will be returned to Contractor without review of submittal if products, models, options and other data are not clearly marked or identified.

C. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

2.2 SHOP DRAWINGS

A. Shop Drawings: Action Submittal: Submit to Engineer for assessing conformance with information given and design concept expressed in Contract Documents.

B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

C. When required by individual Specification Sections, provide Shop Drawings signed and sealed by a professional Engineer licensed in the state of Project responsible for designing components shown on Shop Drawings.

1. Include signed and sealed calculations to support design.

2. Submit Shop Drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction.

01 33 00 - 7

3. Make revisions and provide additional information when required by authorities having jurisdiction.

D. All dimensioned shop drawings shall be scalable and provided as full-sized (22” x 34”) sheets. PDF electronic files shall print as scalable full-sized sheets.

E. After review, produce copies and distribute according to Paragraph 1.5.M and for record documents.

2.3 DESIGN DATA

A. Informational Submittal: Submit data for Engineer's knowledge as Contract administrator or for Owner.

B. Submit information for assessing conformance with information given and design concept expressed in Contract Documents.

2.4 TEST REPORTS

A. Informational Submittal: Submit reports for Engineer's knowledge and records as Contract administrator or for Owner.

B. Submit test reports for information for assessing conformance with information given and design concept expressed in Contract Documents.

2.5 CERTIFICATES

A. Informational Submittal: Submit certification by manufacturer, installation/application Subcontractor, or Contractor to Engineer, in quantities specified for Product Data.

B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

C. Certificates may be recent or previous test results on material or product but must be acceptable to Engineer.

2.6 MANUFACTURER'S INSTRUCTIONS

A. Informational Submittal: Submit manufacturer's installation instructions for Engineer's knowledge as Contract administrator or for Owner.

B. Submit printed instructions for delivery, storage, assembly, installation, startup, adjusting, and finishing, to Engineer in quantities specified for Product Data.

C. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

01 33 00 - 8

2.7 MANUFACTURER'S FIELD REPORTS

A. Informational Submittal: Submit reports for Engineer's knowledge and records as Contract administrator or for Owner.

B. Submit report within 48 hours of observation to Engineer for information.

C. Submit reports for information for assessing conformance with information given and design concept expressed in Contract Documents.

2.8 OPERATION AND MAINTENANCE (O&M) INSTRUCTIONS

A. Submit preliminary O&M materials for review by Engineer. The equipment manufacturer may furnish instruction manuals prepared specifically for the equipment furnished or standard manuals may be used if statements like "if your equipment has this accessory..." or listings of equipment not furnished are eliminated. O&M materials will be returned to the Contractor for resubmittal if the O&M materials do not clearly indicate what specific equipment was furnished and all items not provided being clearly crossed out. Poorly reproduced copies are not acceptable. Operation and maintenance instructions shall contain the following as a minimum:

1. Reviewed shop drawings and submittal data;

2. Model, type, size and serial numbers of equipment furnished;

3. Equipment and driver nameplate data;

4. List of parts showing replacement numbers;

5. Recommended list of spare parts;

6. Complete operating instructions including start-up, shutdown, adjustments, cleaning, etc.;

7. Maintenance and repair requirements including frequency and detailed instructions; and

8. Name, address and phone numbers of local representative and authorized repair service.

B. Following review of the preliminary O&M materials by the Engineer and before acceptance of the Work, submit four (4) copies of complete final operation and maintenance instructions for all equipment supplied. Submit items in 8-1/2 x 11-inch heavy-duty three-ring binders when appropriate, or in 8-1/2 x 11-inch file folders. All binders and folders shall have clear plastic pockets on the front of the cover and the spine to allow for insertion of identifying information.

01 33 00 - 9

PART 3 EXECUTION - Not Used

END OF SECTION

19-2679 Liquid Pumps 43 21 00 - 1

SECTION 43 21 00

LIQUID PUMPS

PART 1 GENERAL

1.1 SUMMARY

A. The provisions of this Section shall apply to all pumps and pumping equipment except where otherwise indicated.

B. Where two or more pump systems of the same type or size are required, all pumps shall all be produced by the same manufacturer.

C. Provide all labor, equipment and materials and perform all operations in connection with the installation and testing of pumps selected by the OWNER.

D. Coordinate and utilize all factory testing, installation, start-up and field testing services supplied in conjunction with the pumping equipment.

E. All work performed under this Section shall be in accordance with all approved trade practices and manufacturer's recommendations.

F. Section includes:

1. General design requirements for liquid pumps.

2. Factory testing.

G. Related Requirements:

1. Section 43 21 39 - Submersible Liquid Pumps.

1.2 SUBMITTALS

A. Section 01 33 00, Submittal Procedures: Requirements for submittals.

B. Shop Drawings: Provide the following information:

1. Pump name, identification number and applicable Section number from Project specifications.

2. Performance Data Curves:

a. Showing head, capacity, horsepower demand, NPSH required and pump efficiency over the entire operating range of the pump.

43 21 00 - 2

b. Pump manufacturer shall indicate separately the head, capacity, horsepower demand, overall efficiency and minimum submergence required at the design flow conditions and the maximum and minimum flow conditions.

c. A family of performance curves at intervals of 100 rpm from minimum speed to maximum speed shall be provided for each centrifugal pump equipped with a variable speed drive, and a curve for each speed on two-speed pumps.

3. The limits on the performance curves recommended for stable operation without surge, cavitation or excessive vibration.

4. Assembly and Installation Drawings: Including shaft size, seal, coupling, bearings, anchor bolt plan, part nomenclature, material list, outline dimensions, and shipping weights.

C. Complete motor nameplate data as defined by NEMA, motor manufacturer and any motor modifications.

D. Operation and Maintenance Manual: Containing the required information for each pump section.

E. Spare Parts List: Containing the required information for each pump section.

F. Factory Test Data: Signed, dated and certified for each pump system which requires factory testing submitted before shipment of equipment.

G. Certifications:

1. Manufacturer’s certification of proper installation.

2. CONTRACTOR’s certification of satisfactory field testing.

H. Pump motor information .

PART 2 PRODUCTS

2.1 GENERAL

A. Materials and equipment shall be standard products of a manufacturer and distributor regularly engaged in the manufacture and distribution of such products for at least 2 (two) years and shall be suitable for the service intended.

B. All materials and equipment shall be new and unused except for the testing specified herein.

C. Compliance with the requirements of the individual pump sections may necessitate modifications to the manufacturer’s standard equipment.

43 21 00 - 3

D. All centrifugal pumps shall have a continuously rising performance curve. In no case shall the required horsepower at any point on the performance curve exceed the rated horsepower of the motor or engine or encroach on the service factor.

E. All components of each pump system provided under the pump sections shall be entirely compatible. Each unit of pumping equipment shall incorporate all basic mechanisms, couplings, electric motors or engine drives, variable speed controls, necessary mountings and appurtenances.

F. The pumps shall be supplied by a distributor authorized to service them throughout the warranty period and beyond. The distributor shall be located within a 100-mile radius of the site.

G. The pumps shall be warranted by the manufacturer for a minimum of one (1) year from the date of installation.

H. All materials and coatings coming in contact with potable water shall be ANSI/NSF Standard 61 approved.

I. The pumping units shall all be supplied by one manufacturer and shall be complete including pumps, motors, suction cans, baseplates, couplings, guards and other accessories.

J. The complete pump assembly shall be designed and built for continuous service at any and all points within the specified range of operation, without overheating, without damaging cavitation, and without excessive vibration or noise.

2.2 MATERIALS

A. All materials shall be suitable for the intended application; materials not specified shall be high-grade, standard commercial quality, free from all defects and imperfection that might affect the serviceability of the product for the purpose for which it is intended, and shall conform to the following requirements:

1. Cast iron pump casings and bowls shall be of close-grained gray cast iron, conforming to ASTM A 48 - Gray Iron Casings, Class 30, or equal.

2. Stainless steel pump shafts shall be Type 416 or 316.

3. Miscellaneous stainless steel shall be of Type 316, except in a septic environment.

4. Anchor bolts, washers, and nuts supplied by the CONTRACTOR for non-corrosive applications shall be galvanized steel in accordance with the following:

43 21 00 - 4

a. General: Zinc-coated, ASTM A153.

b. Structural Connections: ASTM A307, Grade 2 (60 ksi), hot-dip galvanized.

c. Anchor Bolts: ASTM A307, Grade 2 (60 ksi), hot-dip galvanized.

d. Pipe and Equipment Flange Bolts: ASTM A193, Grade B-7.

e. High Strength Bolts: ASTM F3125, Heavy Hex Head.

5. Anchor bolts, washers and nuts in corrosive service applications shall be Type 316 stainless steel, Class 2; ASTM A193 for bolts; ASTM A194 for nuts.

a. Where stainless steel bolts are in contact with dissimilar metals, glass epoxy insulating sleeves and washers shall be used to electrically isolate the bolts.

2.3 PUMP COMPONENTS, GENERAL

A. Flanges: Suction and discharge flanges shall conform to ANSI/ASME B16.1 - Cast Iron Pipe Flanges and Flanged Fittings, Class 12, 125, 250, and 800 or B16.5 - Flanges and Flanged Fittings dimensions.

B. Handholes: Handholes on pump casings shall be shaped to follow the contours of the casing to avoid any obstructions in the water passage.

2.4 PUMP APPURTENANCES

A. Nameplates: Each pump shall be equipped with a stainless steel nameplate indicating serial numbers, rated head and flow, impeller size, pump speed and manufacturer’s name and model number.

B. Gauges: Provide and install pressure gauges as shown on the Drawings.

1. All pumps (except sample pumps, sump pumps, hot water circulating pumps and chemical metering pumps) shall be equipped with pressure gauges on the pump discharge.

2. Pump suction lines shall be provided with compound gauges.

3. Gauges shall be located in a representative location, where not subject to shock or vibrations, in order to achieve true and accurate readings.

4. Isolation diaphragms shall be provided for all gauges except where pumping potable water.

43 21 00 - 5

5. Where subject to shock or vibrations, the gauges shall be wall-mounted or attached to galvanized channel floor stands and connected by means of flexible connectors.

2.5 FACTORY TESTING

A. The following tests shall be conducted on each indicated pump system:

1. Pump Systems: All centrifugal pump systems 50 hp and larger shall be tested at the pump factory in accordance with the American National Standard for Centrifugal Pump Tests (ANSI/HI 1.6) or the American National Standard for Vertical Pump Tests (ANSI/HI 2.6) as approved by ANSI and published by the Hydraulic Institute.

2. Tests shall be performed using the complete pump system to be furnished, including the motor.

3. The following minimum test data shall be submitted:

a. Hydrostatic test data.

b. A minimum of five hydraulic test readings between shutoff head and 25 percent beyond the maximum indicated capacity, recorded on data sheets as defined by the Hydraulic Institute.

c. Pump curves showing head, flow, bhp, efficiency and NPSH requirements.

d. Certification that the pump horsepower demand did not exceed the rated motor hp beyond the 1.0 service rating at any point on the curve.

e. Pump test data curves showing head, flowrate, bhp, and efficiency. Acceptance level shall be Grade 2B as defined by ANSI/HI 14.6.

4. Factory Witnessed Tests: Factory witnessed testing for this project not required.

5. Acceptance: In the event of failure of any pump to meet any of the requirements, the CONTRACTOR and Pump Manufacturer shall make all necessary modifications, repairs or replacements to conform to the requirements of the Contract Documents and the pump shall be retested at no additional cost to the OWNER until found satisfactory.

43 21 00 - 6

PART 3 EXECUTION

3.1 SERVICES OF PUMP MANUFACTURER

A. An authorized service representative of the manufacturer shall visit the Site to witness the following and to certify in writing that the equipment and controls have been properly installed, aligned, lubricated, adjusted and readied for operation:

1. Installation of the equipment.

2. Inspection, checking and adjusting the equipment.

3. Startup and field testing for proper operation.

4. Performing field adjustments to ensure that the equipment installation and operation comply with requirements.

5. Requirements are more specifically detailed herein and in individual pump specifications.

B. Instruction of the OWNER’s Personnel:

1. An authorized training representative of the manufacturer shall visit the Site to instruct the OWNER’s personnel in the operation and maintenance of the equipment, including step-by-step troubleshooting with necessary test equipment.

2. Instruction shall be specific to the models of equipment provided.

3. The pump manufacturer’s representative shall have at least two years’ experience in training.

4. Training shall be scheduled a minimum of three weeks in advance of the first session.

5. Proposed training material and a detailed outline of each lesson shall be submitted for review. Comments shall be incorporated into the material.

6. The training materials shall remain with the trainees.

7. The OWNER may videotape the training for later use with the OWNER’s personnel.

3.2 INSTALLATION

A. General: Pumping equipment shall be installed in accordance with the manufacturer’s written recommendations.

43 21 00 - 7

B. Alignment:

1. All equipment shall be field tested to verify proper alignment, operation as specified and freedom from binding, scraping, vibration, shaft runout or other defects.

2. Pump drive shafts shall be measured just prior to assembly to ensure correct alignment without forcing.

3. Equipment shall be secure in position and neat in appearance.

C. Lubricants: Provide the necessary oil and grease for initial operation.

3.3 FIELD TESTS

A. Each pump system shall be field tested after installation to demonstrate satisfactory operation without excessive noise, vibration, cavitation or overheating of bearings.

B. Field testing methods and allowable tolerances shall comply with current version of the Hydraulics Institute standards for the type of pumps installed.

C. Field testing will be witnessed by the ENGINEER. The CONTRACTOR shall furnish three days advance notice of field testing.

D. In the event any pumping system fails to meet the test requirements, it shall be modified and retested as above until it satisfies the requirements.

E. After each pumping system has satisfied the requirements, the CONTRACTOR shall certify in writing that it has been satisfactorily tested and that all final adjustments have been made. Certification shall include the date of the field tests, a listing of all persons present during the tests and the test data.

19-2679 Submersible Liquid Pumps 43 21 39 - 1

SECTION 43 21 39

SUBMERSIBLE LIQUID PUMPS

PART 1 GENERAL

1.1 SUMMARY

A. This Section includes furnishing, start-up, testing, and operation training for submersible sewage pumps.

B. Section includes:

1. Submersible sewage sump pumps.

C. Related Sections

1. Section 43 21 00, Liquid Pumps.

1.2 REFERENCE STANDARDS

A. ASTM International:

1. ASTM A48 - Standard Specification for Gray Iron Castings.

2. ASTM A276 - Standard Specification for Stainless Steel Bars and Shapes.

B. National Electrical Manufacturers Association:

1. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum).

1.3 SUBMITTALS

A. Per the requirements of Section 43 21 00, Liquid Pumps.

B. Applicable material certifications and testing certificates.

1.4 CLOSEOUT SUBMITTALS

A. Project Record Documents: Record actual locations and final orientation of equipment and accessories.

B. Pump Supplier: Manufacturer’s installation and operation certificate. Statement that the equipment is suitable for the intended use.

1.5 FACTORY TESTING

A. Pump manufacturer shall provide the following factory tests in accordance with Section 43 21 00, Liquid Pumps:

43 21 39 - 2

1. Performance test.

2. Hydrostatic test.

3. Submersible motor integrity test.

4. Vibration test.

1.6 COORDINATION

A. Like items of equipment specified herein shall be the end product of one manufacturer.

1.7 WARRANTY

A. Submersible sewage pumps shall be warranted by the manufacturer for a minimum of five (5) years and shall meet or exceed the following warranty requirements:

1. Full warranty for the first 2 years.

2. Limited 50% warranty for any claim during years 3 and 4.

3. Limited 25% warranty for any claim during the 5th year.

PART 2 PRODUCTS

2.1 DESCRIPTION

A. Manufacturers:

1. Xylem, Flygt, Model NT 3301 MT with MiniCAS II monitoring and status unit.

2. Approved equal.

B. Identification:

Location Bolton Pump Station

Pump Label(s) P-1, P-2, P-3

Quantity 3

C. Power and Motor Requirements:

Voltage 460

Phase 3

Frequency 60 Hz

Motor Speed 1,185 rpm

Motor Horsepower 70 hp

D. Performance Requirements at Full Pump Speed, Two Pumps Running

Duty Point 1 Minimum Flow Capacity 1,750 gpm (per pump)

Duty Point 1 Total Dynamic Head 82.5 feet

43 21 39 - 3

Duty Point 1 Minimum Pump Efficiency 69.2%

Maximum NPSH required at Duty Point 1 18.5 feet

E. Operating Conditions:

Duty Continuous

Drive Variable Frequency Drive

Ambient Environment Wet Well - Corrosive

Ambient Temperature 33 - 104 F

Fluid Service Municipal wastewater, raw and unscreened, containing rags, grit, fats, oil, and debris.

Minimum Solids Passing Capability Flygt N-Impeller

Fluid Temperature 50 - 90 F

Fluid pH Range 6.0 to 8.0

Fluid Specific Gravity 1.0

Net Positive Suction Head Available 33 feet

F. Pumping System Dimensions:

Minimum Pump Discharge Size 10-inch

Base Elbow Suction Inlet Size 12-inch

Discharge Flange Rating (ANSI) Class 125

Minimum Submersible Cable Length 50-ft

2.2 PUMP CONSTRUCTION

A. Pump, General:

1. Heavy-duty, vertical, submersible pump with integral drive motor, single suction, centrifugal, sewage type, suitable for a permanent-type wet well…

This is the start of the file's text. The full file is on GovTribe.