This Invitation to Bid document is issued by the City of Snellville, Georgia for the construction of The Grove Pavilion, a new signature park pavilion designed to accommodate small bands and performances as part of a larger development project currently under construction. The work encompasses steel superstructure and framing, a three-tiered roof with tongue and groove decking and composite cedar shake shingles, concrete foundations with slab flooring and steps, comprehensive pavilion lighting systems with line and low voltage options including spot lights, wall wash lights, stage lights, and festeon lights with dimmer controls, power requirements consisting of six outdoor GFCI quad outlets with twelve dedicated circuits, and minor landscaping and site work. The project must achieve Substantial Completion within six months or 180 calendar days from the notice to proceed. A non-mandatory pre-bid conference with an accompanying site visit will be held on Thursday, September 15, 2022 at 10:00 AM EST at the City of Snellville, 2342 Oak Road. Bidding documents became available in digital format on Friday, September 2, 2022 through the Project Landscape Architect Michael Kidd. The deadline for submitting questions is Wednesday, September 21, 2022 at 2:00 PM EST, with responses posted by Tuesday, September 27, 2022 at 2:00 PM EST. Sealed bids are due Friday, September 30, 2022 at 2:00 PM EST, with contract award anticipated at the Regular Council Meeting on Monday, October 10, 2022.
Bidders must provide a 5% bid bond, along with a 100% Performance Bond and 110% Labor & Material Payment Bond. Liquidated damages of $150 per day will be assessed for each consecutive calendar day the project is delayed beyond the schedule, except for quantifiable weather events. The City reserves the right to reject any or all bids and to waive technicalities and informalities. Contract award will be made to the bidder offering the "best value" to the City, with consideration given to bid amount, qualifications, project approach, and references. All selected bidders must ensure non-discrimination in employment practices regarding gender, race, color, genetic information, religion, national origin, political affiliation, age, handicapped status, sexual orientation, sexual preference, and gender identity and expression.
Text of this file
INVITATION TO BID
THE CITY OF SNELLVILLE, GEORGIA
THE GROVE PAVILION
ITB# 09012022
Invitation: The City of Snellville will receive sealed bids for all material, labor, equipment, and services to successfully accomplish THE GROVE PAVILION project. This work generally entails the construction of a new signature park pavilion, which will accommodate small bands and performances.
This project is part of a much larger development, which is currently under construction, and will require close coordination with all on-site contractors.
The project shall be Substantially Complete within six (6) months 180 calendar days from the date of notice to proceed. Liquidated damages of $150 per day will be assessed for each and every consecutive calendar day for which the completion of the project is delayed beyond the project schedule, except for quantifiable weather events.
The City will receive bids until 2:00 PM EST, Friday, September 30, 2022 at City of Snellville, 2342
Oak Road, Snellville, Georgia 30078. Bids received after that time and date will not be accepted. Bids are to be submitted in an enclosed & sealed envelope and on the face of the envelope the following shall be shown:
Bid for The Grove Pavilion: ITB# 09012022
City of Snellville
ATTN: Butch Sanders; City Manager
2342 Oak Road
Snellville, GA 30078
Bid Due: 2:00 PM EST, Friday, September 30, 2022
Bids will be publicly opened. Unofficial bid results will be posted on the City web site.
Bonding Requirements:
1. A 5% bid bond is required.
2. A Performance Bond (100%) and Labor & Material Payment Bond (110%) will be required on this project.
Work to Be Performed: The pavilion is an open-air structure with a three-tiered roof. Work to be performed by the General Contractor consists of, but is not limited to, the following items:
1. Steel superstructure and framing.
2. Roof consisting of tongue and groove decking with composite cedar shake shingles.
3. Foundations including concrete footings with a concrete slab floor and concrete steps.
4. Pavilion lighting systems including both line and low voltage for spot lights, wall wash lights, stage lights and festoon lights with dimmer controls.
5. Power requirements including six outdoor GFCI quad outlets (twelve dedicated circuits). Supply power will be stubbed up by others.
6. Minor landscaping and site work.
Non-Mandatory Pre-Bid Conference: A non-mandatory pre- bid conference will be held at the 2nd
Floor Conference Room, City of Snellville, GA; 2342 Oak Road, Snellville, GA 30078 ay 10:00 AM
EST, Thursday, September 15, 2022. There will be a site visit immediately following the conference.
All potential bidders are strongly encouraged to attend.
Specifications and Contract Documents: Bidding documents will be available in digital format from the
Project Landscape Architect starting on Friday, September 2, 2022. Please contact Michael Kidd at mkidd@RootDStudio.com to request a link to download bid documents.
Questions: All questions regarding the bid documents shall be made via email to Matthew Pepper, Assistant City Manager at mpepper@snellville.org. The deadline to submit questions is no later than
2:00 PM EST, Wednesday, September 21, 2022. The City will post all “Responses to Questions and/or Addenda”, if applicable, on the city web site; www.snellville.org, by no later than 2:00 PM
EST, Tuesday, September 27, 2022. It is incumbent that those submitting questions follow-up with the Assistant City Manager to ensure that questions were received.
Equal Opportunity: The selected bidder must ensure that all employees and applicants for employment are not discriminated against because of their gender, race, color, genetic information, religion, national origin, political affiliation, age, handicapped status, sexual orientation, sexual preference, or gender identity and expression.
BID ACTIVITY SCHEDULE
Listed below are the important dates and times by which the actions noted must be completed. All dates are subject to change. If the City finds it necessary to change any of these dates or times prior to the proposal due date, the change will be accomplished by addendum.
TASK DATE
Issue RFP Friday, September 2, 2022
Pre-Bid Conference (non-mandatory) Thursday, September 15, 10:00 AM
Deadline for Questions Wednesday, September 21, 2:00 PM
Answers Posted by the City (Addendum) Tuesday, September 27, 2:00 PM
Proposals Due / Bid Opening Friday, September 30, 2:00 PM
Award Contract Monday, October 10 (at Regular Council Meeting)
NOTE: PLEASE CHECK THE CITY WEBSITE (http://www.snellville.org) FOR ADDENDA
AND SCHEDULE UPDATES.
The Owner reserves the right to reject any or all bids and to waive technicalities and informalities. If the contract is awarded, it will be awarded to the bidder that offers the “best value” to the City where bid amount, qualifications, project approach and references will be considered in the selection process.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .