- Lake County, Marin County, Mendocino County, Napa County, Sonoma County, Auburn Lake Trails CDP, South Lake Tahoe City, Shaver Lake CDP, Blue Lake City, China Lake Acres CDP, Lake Isabella CDP, Lake of the Woods CDP, Lakeside CDP, Hidden Valley Lake CDP, Lakeport City, Lower Lake CDP, North Lakeport CDP, Upper Lake CDP, Elizabeth Lake CDP, Lake Hughes CDP, Lake Los Angeles CDP, Lakewood City, Marina Del Rey CDP, San Marino City, Bass Lake CDP, Yosemite Lakes CDP, Lucas Valley-Marinwood CDP, Marin City CDP, Lake Don Pedro CDP, Mendocino CDP, Lake City CDP, Crowley Lake CDP, June Lake CDP, Mammoth Lakes Town, Twin Lakes CDP, Virginia Lakes CDP, Marina City, Napa City, Lake of the Pines CDP, Lake Wildwood CDP, Lake Forest City, Bucks Lake CDP, Lake Almanor Country Club CDP, Lake Almanor Peninsula CDP, Lake Almanor West CDP, Lake Davis CDP, Canyon Lake City, Lake Elsinore City, Lakeland Village CDP, Lake Mathews CDP, Lake Riverside CDP, Lakeview CDP, Big Bear Lake City, Lake Arrowhead CDP, Silver Lakes CDP, Spring Valley Lake CDP, Lake San Marcos CDP, San Francisco City, Lake Nacimiento CDP, Emerald Lake Hills CDP, Lakehead CDP, Shasta Lake City, Lake Shastina CDP, Sonoma City, Sonoma State University CDP, Lake California CDP, Phoenix Lake CDP, Pine Mountain Lake CDP, Lake Sherwood CDP, Plumas Lake CDP, California
About this file
The Invitation for Bid (IFB) No. 116413 is issued by the California Employment Development Department (EDD) for "As-Needed" Glazing and Film Services at the EDD facility located at 606 Healdsburg Avenue in Santa Rosa, California. The contract term is from July 1, 2025, through June 30, 2028, with a mandatory walkthrough scheduled for May 1, 2025, at 9:00 a.m. at the project site. Bidders must have a valid C-17 State Contractor's License and attend the mandatory walkthrough to be eligible to bid. Bids are due by 3:00 p.m. (PT) on May 8, 2025, and must be submitted to the EDD's Contract Services Group.
The contract will be awarded based on the lowest responsible bidder's hourly rate, which shall be considered full compensation for all labor and travel costs. Material costs may reflect up to a 10% contractor markup. The bid includes provisions for small business and nonprofit veteran service agency certification preferences, with potential five percent bid preferences for certified small businesses. Disabled Veteran Business Enterprise (DVBE) participation and incentive requirements are waived for this IFB. The contractor will be responsible for providing as-needed glazing and film services, including inspections, consultations, work orders, and identifying potential safety hazards or equipment issues at the facility.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 17, 2025
TO PROSPECTIVE BIDDERS
SUBJECT: INVITATION FOR BID (IFB) No. 116413
“As-Needed” Glazing and Film Services for the EDD Facility located at 606 Healdsburg Avenue, Santa Rosa, CA 95401
Term: July 1, 2025 through June 30, 2028
The Employment Development Department (EDD) invites you to submit your bid for the above service in accordance with the attached Specifications.
Mandatory Walkthrough
A mandatory walkthrough will be held at 9:00 a.m. on May 1, 2025, at 606 Healdsburg Avenue, Santa Rosa, CA 95401. You must arrive no later than 9:00 a.m and remain throughout the entire walkthrough to be eligible to bid this service. For further information you may contact Christian Manea at (916) 296-0697.
Special Accommodations
For individuals who need assistance due to a physical impairment, the EDD will provide a reasonable accommodation upon request for the mandatory walkthrough or site inspection. An individual who needs a reasonable accommodation must call Christian Manea at (916) 296- 0697 to arrange for a reasonable accommodation no later than the fifth working day prior to the scheduled date and time of the mandatory walkthrough or site inspection.
If you wish to bid, see the Instructions to Bidders. If you make any additions or modifications to the IFB package, it may result in the rejection of your bid. The EDD reserves the right to reject any or all bids. Disabled Veteran Business Enterprise Participation and Incentive requirements are waived for this IFB.
Bids must be received and date stamped in the Contracts Services Group no later than
Thursday, May 8, 2025, by 3:00 p.m. (PT)
If you have any questions, please do not hesitate to contact me at Cezar.Albor@edd.ca.gov
/s/Cezar Albor Contract Analyst
Enclosures
Cc: Christian Manea mailto:Cezar.Albor@edd.ca.gov
Time: 3:00 p.m.
Exhibit Pages
Instructions to Bidders
A Scope of Work
Attachment A-1, Specifications
Attachment A-2, Asbestos Report
Attachment A-3, State of California Holiday Schedule
B Budget Detail and Payment Provisions……………………………………….. 1
C *General Provisions – 02/2025
D Special Terms and Conditions
E State of California Nondiscrimination Construction Contract Specifications.. 2
F Sample Standard Agreement, STD 213
G Cost Proposal
H Bidder Declaration
I Contractor Contractor Clauses (CCC 04/2017)………………………………. 4
J Darfur Contracting Act Certification……………………………………………. 2
K STD 204, Payee Data Record…………………………………………………. 2
L STD 205, Payee Data Record Supplement …………………………………… 2
M Non-Collusion Declaration ……………………………………………………
*View at: https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language
Employment Development Department 722 Capitol Mall, MIC 62-C
P.O. Box 826880 Sacramento, CA 94280-0001
Invitation for Bid No. 116413
Bid Due Date: May 8, 2025
IFB No. 116413
STATE OF CALIFORNIA
EMPLOYMENT DEVELOPMENT DEPARTMENT
INSTRUCTIONS TO BIDDERS
INVITATION FOR BID (IFB) REQUEST
1. Submission of Bids
a. Failure to read these instructions, the Specifications, and the Terms and Conditions included in this bid package will be at the bidder's risk. Written instruction(s) regarding the submission of bids shall take precedence over any verbal instruction(s).
b. Bidders shall complete, sign, and return all of the following documents listed below:
The exterior of your envelope must clearly be noted: “INVITATION FOR BID, DO NOT
OPEN IN MAIL ROOM, IFB NO. 116413.”
✓ Exhibit G Cost Proposal
✓ Exhibit H Bidder Declaration
✓ Exhibit I Contractor Certification Clauses (CCC 04/2017)
✓ Exhibit J Darfur Contracting Act Certification, if applicable
✓ Exhibit K Payee Data Record, STD 204
✓ Exhibit L Payee Data Record Supplement, STD 205, if applicable
✓ Exhibit M Non-Collusion Declaration
✓ Copy of valid C-17 State Contractor’s License
✓ Copy of Department of Industrial Regulations Public Works Contractor Registration
✓ Secretary of State Certification of Status, is required if your company is a Corporation, Limited Liability Company (LLC), or Limited Partnership (LP). (Refer to Registered To Do Business in California of these Instructions For Bidders).
c. Documents must be signed by an authorized representative of the bidder’s firm. The forms must be completed in ink or typewritten. If errors are made, they must be crossed out and corrections printed in ink or typewritten adjacent to error. Corrections must be initialed in ink by person signing the bid forms.
d. The EDD reserves the right to reject any or all bids and may waive any immaterial deviation or defect in the bid. The EDD’s waiver of any immaterial deviation or defect shall in no way modify the solicitation documents, or excuse the bidder from full compliance with the solicitation specification if awarded the contract. The EDD is not required to award an agreement.
e. Bid packages must be received and time stamped in Contract Services Group no later than 3:00 p.m. (PT) on the bid closing date of May 8, 2025. Signed copies of the sealed bid package are to be mailed or delivered to:
Regular, Overnight and/or Express Delivery:
Employment Development Department Mail Services 722 Capitol Mall, Room 2071 Sacramento, CA 95814 Attn: Cezar Albor, MIC 62-C
Email Delivery:
Cezar.Albor@edd.ca.gov
Bids received and time stamped after 3:00 p.m. (PT) on the bid closing date of May 8, 2025, will be considered "late" and will be returned to sender.
4. Online Small Business (SB) and Disabled Veteran Business Enterprise (DVBE) Certification Process
California’s SB and DVBE firms can now file their applications and get certified online via the Department of General Services website at: https://www.dgs.ca.gov/PD/Services/Page- Content/Procurement-Division-Services-List-Folder/Register-Apply-or-Renew-a-Small- Business-and-Disabled-Veteran-Business-Enterprise. Small Businesses and DVBEs can access the numerous benefits that come along with certification in a more timely and efficient manner.
5. Replacement of Disabled Veteran Business Enterprise Subcontractors
If for this Agreement, Contractor made a commitment to achieve Disabled Veteran Business Enterprise (DVBE) participation, then Contractor must within 60 days of receiving final payment under this Agreement (or within such other time period as may be specified elsewhere in this Agreement) certify in a report to the awarding department: (1) the total amount the prime Contractor received under the Agreement; (2) the name and address of the DVBE(s) that participated in the performance of the Agreement; (3) the amount each DVBE received from the prime Contractor; (4) that all payments under the Agreement have been made to the DVBE(s), and (5) the actual percentage of DVBE participation that was achieved. A person or entity that knowingly provides false information shall be subject to a civil penalty for each violation (Military & Veterans Code section 999.5(d)).
Contractor understands and agrees that should award of this Agreement be based in part on their commitment to use the DVBE subcontractor(s) identified in their bid or offer, per Military and Veterans Code section 999.5(e), a DVBE subcontractor may only be replaced by another DVBE subcontractor and must be approved by the Department of General Services (DGS).
Changes to the scope of work that impact the DVBE subcontractor(s) identified in the bid or offer and approved DVBE substitutions will be documented by contract amendment.
Failure of Contractor to seek substitution and adhere to the DVBE participation level identified in the bid or offer may be cause for contract termination, recovery of damages under rights and remedies due to the State and penalties as outlined in Military and Veterans Code section 999.9; Public Contract Code section 10115.10 or P.C.C. § 4110 (applies to public works only).
mailto:Dannielle.Lecitona@edd.ca.gov
6. Award of the Agreement
a. Award will be made to the lowest responsible bidder meeting specifications and offering to supply the services described. The firm submitting the lowest responsible bid may be required to submit evidence that they have available, as needed, sufficient resources to provide the necessary equipment and personnel to enable them to meet the requirements of the Contract, and may also be required to furnish information as to their financial responsibility.
b. It is understood and agreed that following the award of the Contract, the successful bidder shall agree to comply with all Exhibits attached herein, and provide the required documents requested (i.e., bonds, insurance certificates, etc.) in order for the EDD to complete the execution of a Standard Agreement (STD. 213).
c. Small Business/Microbusiness (SB/MB) and Small Business/Nonprofit Veteran Service Agency (SB/NVSA) Certification Preferences
A SB/MB and SB/NVSA Certification Preferences are applicable to the award of this contract.
(1) Certified SB/MB and SB/NVSAs may claim preference when submitting a bid on this Contract. The preference is equal to five percent (5%) of the lowest responsible bid.
When the lowest responsible bid is not submitted by a certified small business, the preference becomes applicable. Please note that the preference is used for computation purposes only (to a maximum amount of $50,000) in determining the successful bidder. It does not alter the amount of the resulting contract.
(2) To learn more about the SB/MB and SB/NVSA Preference Programs and how your business might qualify, contact the Office of Small Business and DVBE Services at
(916) 375-4940.
d. California Certified Small Business Subcontractor Preference
A five percent (5%) bid preference is available to a non-small business claiming twenty-five percent (25%) California certified small business subcontractor participation. If claiming the non-small business subcontractor preference, the bid response must include a list of the small business(es) with which you commit to subcontract in an amount of at least twenty-five percent (25%) of the net bid price with one or more California certified small businesses. Each listed certified small business must perform a “commercially useful function” in the performance of the contract as defined in Government Code section 14837(d)(4).
The required list of California certified small business subcontractors must be attached to the bid response and must include the following: 1) subcontractor name; 2) address;
3) phone number; 4) a description of the work to be performed and/or products supplied;
5) and the dollar amount or percentage of the net bid price (as specified in the solicitation) per subcontractor.
Bidders claiming the five percent (5%) preference must commit to subcontract at least twenty-five percent (25%) of the net bid price with one or more California certified small businesses. Completed certification applications and required support documents must be submitted to the Office of Small Business and DVBE Services no later than 5:00 p.m.
on the bid due date, and the Office of Small Business and DVBE Services must be able to approve the application as submitted. Questions regarding certification should be directed to the Office of Small Business and DVBE Services at (916) 375-4940.
7. Rejection of Bids
a. If the bid is received after the exact time and date as stipulated in the bid package, the bid shall be rejected.
b. If it is found that a bidder is not responsible (i.e., has not paid taxes; has no business license; has submitted a bid when the bidder’s license is suspended on the date of the bid opening and/or award of the Contract, or during the proposed term of the Agreement;
submitted a bid without an authorized signature; falsified any information in the proposal package or has provided poor performance on a previous contract with EDD, etc.), the bid/proposal shall be rejected.
c. If it is found, upon license verification with the Contractor's State Licensing Board, that a bidder's license is suspended on the date of the bid opening and/or award of the contract, or during the proposed term of the Agreement, the proposal shall be considered nonresponsive and shall be rejected.
d. The EDD reserves the right to reject any and all bids and to waive any immaterial deviation or defect in the bid. The EDD’s waiver of any immaterial deviation or defect shall in no way modify the bid document or excuse the bidder from full compliance with the solicitation document specifications if awarded a Contract.
8. Tie Bids
In the event of a tie between two bidders, a coin toss will be used to determine the winner.
Any coin toss shall be observed by witnesses, and the tied bidders would be invited to have representatives present.
9. Subcontractors
No subcontracting will be allowed to circumvent competitive bidding. A certified Small Business/Microbusiness, Small Business/Nonprofit Veteran Service Agency or a certified Disabled Veteran Business Enterprise will only be permitted to subcontract in order to meet Department requirements and/or preferences. The subcontracting services and amount shall not exceed 25 percent (25%) of the bid. The Contractor shall be solely responsible for fulfilling the requirements of the bid. If it is anticipated that subcontractors will be used, the bid must include the name(s) of person(s) or firm(s), and must specify the portions and monetary percentages of the work to be done by them.
10. Subcontractors Substitution
If EDD gives written approval to subcontract, Public Contract Code section 4107 authorizes an awarding authority to consent to substituting a subcontractor when the subcontractor listed in the bid fails or refuses to execute a written Contract for the Scope of Work specified in the subcontractor's bid, and at the price specified in the subcontractor's bid.
11. Disposition of Bids
All material submitted in response to this bid package will become the property of EDD and will become a public record after Award.
12. Grounds For Protest
a. Those who may protest are as follows:
• For RFQ/IFBs, the lowest responsible bidder meeting the specifications (if not awarded the Contract).
• For RFPs, any proposer who claims he/she should have been awarded the contract if EDD had scored his or her proposal correctly, or if the agency had correctly followed the procedures specified in the P.C.C.
b. There is no protest if the awarding agency rejects all bids or proposals, based on the interest of the State.
13. Protest Exclusions
The State has no jurisdiction to consider a protest when:
• The Contract is considered a public works contract.
• The Contract award is for a type of contract not subject to the protest procedures. This category includes contracts for maintenance, modification, and so forth of real or personal property, including equipment and contracts for professional services under Government Code section 4525.
• The protestant was not the lowest responsible bidder or the highest-scored proposer.
• The protestant was not a bidder or proposer, and seeks to contest the award. The only recourse in this case is through the civil courts.
• The protest was not submitted in a timely manner.
• The grounds for the protest do not meet the permissible grounds stated in the P.C.C.
14. Notification of the Right to Protest
Unsuccessful bidders who wish to protest this award must submit a detailed, written statement of protest, including the IFB/RFP No., the name of the State agency involved, and the agency contact person. The protest must be submitted within five (5) working days following the bid opening. All protests must be submitted to both of the following:
Department of General Services
Office of Legal Services
Attention: Bid Protest Coordinator 707 Third Street, 7th Floor, Suite 7-330
West Sacramento, CA 95605 Bid Protest Coordinator Email address: OLSProtests@dgs.ca.gov
Employment Development Department Contract Services Group
722 Capitol Mall, MIC 62-C Sacramento, CA 95814
FAX: (916) 319-1684
mailto:OLSProtests@dgs.ca.gov
15. Conditions and Commitment
By signing and submitting a bid package, the bidder acknowledges it has read, understood, and agrees to the following provisions:
a. General Provisions – 02/2025 available for viewing at: GTC 02/2025
b. Performing a Commercially Useful Function: In accordance with Government Code section 14837 and Military and Veterans Code section 999, all certified SB/MB or DVBE contractors, subcontractors and suppliers that bid on or participate in a state contract, regardless of whether it is a verbal or written solicitation must perform a Commercially Useful Function (CUF). A certified SB/MB or DVBE is deemed to perform a CUF if the business does all of the following:
• Is responsible for the execution of a distinct element of the work of the Contract.
• Carries out its obligation by actually performing, managing, or supervising the work involved.
• Performs work that is normal for this business services and functions.
• Is responsible, with respect to products, inventories, materials, and supplies required for the contract, for negotiating price, determining quality and quantity, ordering, installing, if applicable, and making payment.
• Is not further subcontracting a portion of the work that is greater than that expected to be subcontracted by normal industry practices.
c. Payee Data Record, STD. 204
Revenue and Taxation Code section 18646 requires state agencies to file information tax returns (IRS Form 1099) for certain types of payments made to vendors. The successful bidder will be required to complete and submit a Payee Data Record, STD. 204 to EDD before processing payment for services. Upon completion of the work in a manner satisfactory to EDD, EDD agrees to make payments in accordance with the contract provisions.
d. California Taxpayer and Shareholder Protection Act of 2003
This solicitation and any resulting contract are subject to all requirements as set forth in the Public Contract Code section 10286 which includes, but is not limited to, providing written submission of a declaration stating that the supplier is eligible to contract with the State of California pursuant to statutory requirements.
Failure of the supplier to comply with and provide information, when requested by the awarding department within the time indicated, will cause the supplier's bid response to be considered nonresponsive and their bid will be rejected.
e. Registered To Do Business In California
Corporations, Limited Liability Companies (LLCs), and Limited Partnerships (LPs) must be registered with the California Secretary of State to be awarded a contract. The Secretary of State Certificate of Status must be included with the bid. The Secretary of State may be contacted as follows:
California Secretary of State Division of Corporate Filing and Services
1500 Eleventh Street, Third Floor Sacramento, CA 95814-5701
Certification Unit: (916) 657-5251 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/GTC-Updates/GTC-225-February-2025.pdf
Required document(s) may also be obtained at the following website:
https://businesssearch.sos.ca.gov/
f. Prohibition of Tax Delinquents from Contracting
The State of California is prohibited from entering into any contracts for the acquisition of goods and services with persons whose name appears on either list of the 500 largest tax delinquencies pursuant to section 7063 or section 19195 of the Revenue and Taxation Code. Reference also to P.C.C. § 10295.4.
Bidder certifies that it is not included on the California Department of Tax and Fee
Administration list at: https://www.cdtfa.ca.gov/taxes-and-fees/top500.htm or the Franchise
Tax Board list at: https://www.ftb.ca.gov/aboutFTB/Delinquent-Taxpayers.shtml
g. Loss Leader
It is unlawful for any person engaged in business within this state to sell or use any article or product as a “loss leader” as defined in California Business and Professions Code section 17030.
h. Declaration Forms
All bidders must complete the Bidder Declaration GSPD-05-105 and include it with the bid response.
Bidders who have been certified by California as a Disabled Veteran Business Enterprise Declaration (DVBE) (or who are bidding rental equipment and have obtained the participation of subcontractors certified by California as a DVBE must also submit a completed form(s) STD. 843 (Disabled Veteran Business Enterprise Declaration).
All disabled veteran owners and disabled veteran managers of the DVBE(s) must sign the form(s). The completed form should be included with the bid response. At the State’s option prior to award, bidders may be required to submit additional written clarifying information. Failure to submit the requested written information as specified may be grounds for bid rejection.
i. Insurance Requirement
Contractor agrees the insurance herein provided for shall be in effect at all times during the term of this Agreement. In the event said insurance coverage expires at any time during the term of this Agreement, Contractor agrees to provide at least 30 days prior to said expiration date, a new certificate of insurance evidencing insurance coverage as outlined below for not less than the remainder of the term of this Agreement, or for a period of not less than one year. New certificates of insurance are subject to the approval of the Department of General Services, and Contractor agrees that no work or services shall be performed prior to the giving of such approval. In the event Contractor fails to keep in effect at all times insurance coverage as herein provided, EDD may, in addition to any other remedies it may have, terminate this Agreement upon the occurrence of such event. The Contractor shall provide written notice to EDD within five (5) business days of any cancellation, non-renewal, or material change that affects required insurance coverage.
The Contractor shall display evidence of the following coverage on an ACORD certificate:
https://businesssearch.sos.ca.gov/ https://www.cdtfa.ca.gov/taxes-and-fees/top500.htm https://www.ftb.ca.gov/aboutFTB/Delinquent-Taxpayers.shtml https://www.ftb.ca.gov/aboutFTB/Delinquent_Taxpayers.shtml http://www.boe.ca.gov/cgi-bin/deliq.cgi
j. General Liability Insurance – The Contractor shall furnish to EDD a certificate of insurance prior to commencement of work stating there is general liability insurance in effect for the Contractor in an occurrence form with limits not less than $1,000,000 per occurrence for bodily injury and property damage combined.
The certificate of insurance must include the following provision stating:
“The State of California, its officers, agents, employees and servants are included as additional insured, but only with respect to work performed for EDD under this Contract.” The additional insured endorsement must accompany the certificate.
k. Workers' Compensation and Employer’s Liability Insurance - The Contractor shall furnish to EDD a certificate of insurance evidencing Workers’ Compensation and Employers Liability Insurance presently in effect with limits not less than $1,000,000 by an insurance carrier licensed to write Workers' Compensation insurance in California. Such certificate shall include the name of the carrier and the policy inception and expiration dates. If the Contractor is self-insured for Workers’ Compensation, a certificate must be presented evidencing Contractor is a qualified self-insurer in the State of California.
l. Automobile Liability Insurance, if applicable - The Contractor shall furnish to EDD a certificate of insurance evidencing automobile liability insurance presently in effect for the Contractor of not less than $1,000,000 per accident while utilizing a motor vehicle in the performance of this contract. Such insurance shall cover liability arising out of a motor vehicle including owned, hired and non-owned motor vehicles.
m. Environmental Liability Insurance, if applicable – The Contractor and any subcontractors shall furnish to EDD a certificate of insurance evidencing environmental liability insurance presently in effect for the Contractor of not less than $1,000,000 per occurrence for bodily injury, property damages and costs incurred for clean-up and removal of substances causing pollution conditions. This requirement can also be met by securing one of the following: (1) an endorsement to the Contractor’s general liability insurance overriding the general liability pollution exclusion or; (2) an endorsement evidencing pesticide/herbicide coverage afforded to the Contractor’s general liability policy.
n. Iran Contracting Act Certification, if applicable
Pursuant to the Iran Contracting Act of 2010 (P.C.C. sections 2200 - 2208 are “the Act”), vendors are ineligible to bid on, submit a bid for, enter into, or renew any contract with the State for goods or services of one million dollars ($1,000,000) or more if the vendor engages in investment activities, in Iran, as defined in the Act.
Bidder certifies that it is not on the current list of Entities Prohibited from Contracting with Public Entities in California per the Act found at:
https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-DivisionResources- List-Folder/List-of-Ineligible-Businesses
o. California Public Records Act (PRA)
Upon award, all documents and information therein, submitted in response to this IFB become property of the State of California and will be regarded as public records under the Public Records Act, pursuant to Government Code section 6250, et seq.
https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-DivisionResources-List-Folder/List-of-Ineligible-Businesses https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-DivisionResources-List-Folder/List-of-Ineligible-Businesses
p. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals.
“Economic Sanctions” refers to sanctions imposed by the U.S. government in response to
Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, the Contractor represents that it is not a target of Economic
Sanctions. Should the State determine the Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to Contract execution, or, if determined after Contract execution, shall be grounds for termination by the State.
q. Generative Artificial Intelligence (GenAI) Technology:
The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
Bidder / Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such nondisclosure.
Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
EXHIBIT A
SCOPE OF WORK
(Standard Agreement)
1. This Agreement is entered into by and between the Employment Development Department, hereinafter referred to as the EDD, and TBD, hereinafter referred to as the Contractor, for the purpose of providing “As Needed” Glazing and Film Services for the EDD facility located at 606 Healdsburg Avenue, Santa Rosa, CA 95401, in accordance with IFB No. 116413.
2. The Project Representatives during the term of this Agreement will be:
State Agency Contractor
Employment Development Department Attn: Christian Manea
TBD
Attn:
722 Capitol Mall, MIC 62-2 Sacramento, CA 95814 Phone: (916) 296-0697 Email: Christian.Manea@edd.ca.gov
Phone:
Email:
3. The services shall be provided in accordance with Attachment A-1, Specifications, Attachment A-2, Asbestos Report, and Attachment A-3, State of California Holiday Schedule, which are incorporated as a part of this Agreement.
4. Health and Safety Requirements
The Contractor when entering the EDD facility and/or property is expected to be familiar with and abide by all statewide and locally mandated health and safety requirements. Such requirements include, but are not limited to, following the California Department of Public Health’s (CDPH) Guidance for the Use of Face Coverings published on March 3, 2023 (along with any subsequent versions) and remaining compliant with personal protective equipment (PPE) and other safety equipment requirements provided under state and federal occupational safety and health laws.
The EDD also requires that the Contractor follow additional guidelines from the CDPH and public health officials, such as avoiding close contact with others and engaging in hygienic practices while working. The EDD reserves the right to require stricter requirements than are recommended by local and state public health authorities. Non-compliance by the Contractor, its employees, or any subcontractors may result in the EDD refusing entry onto, or removal from, the EDD property. A breach of these requirements grants the EDD the right to terminate this Agreement.
mailto:Christian.Manea@edd.ca.gov
ATTACHMENT A-1
SPECIFICATIONS
(Standard Agreement)
“AS NEEDED” GLAZING AND FILM SERVICES
EMPLOYMENT DEVELOPMENT DEPARTMENT
606 Healdsburg Avenue, Santa Rosa, CA 95401
I. GENERAL
The Contractor shall furnish all labor, tools, equipment and materials, and pay all taxes, permits, and/or inspection fees necessary to perform the work at the EDD facility located at 606 Healdsburg Avenue, Santa Rosa, CA 95401, in accordance with these Specifications.
The Contractor shall perform all services per accepted industry standards. Should there be any errors or omissions in any of the instructions, specifications, or exhibits in regards to methods recommended, it shall be the Contractor’s responsibility to notify the EDD Representative, and upon agreement, use the appropriate method or process to obtain the
INTENDED FINISHED PRODUCT.
NOTE: For purposes of this Agreement, the EDD Representative shall be considered the EDD Business Operations, Planning and Support Division, Facilities Management Specialist or Facilities Representative, located at the EDD, 722 Capitol Mall, Sacramento, CA 95814.
The EDD Representative is NOT the Manager of the EDD Office or one of his/her designees.
II. SCOPE OF WORK
A. The intent of this Agreement is for the Contractor to provide as-needed glazing and film services for the EDD-owned facility located at the above-referenced address in accordance with these Specifications.
B. The Contractor will be expected to provide any or all of the following during the term of this Agreement:
• Inspections pertaining to glazing and film replacement services
• Consultation/planning on best method to achieve intended result
• Completion of glazing and film work orders as provided by the EDD Representative
• Identify and report to the EDD Representative any safety hazard, faulty equipment, or other condition encountered during the course of the work at the EDD office which the Contractor determines is needing repair or replacement
• The Contractor shall comply with all federal, state, EDD, and local office policies and procedures while on the premises
C. All work shall be completed in compliance with any related drawings and specifications, and shall comply with all applicable building codes, regulations and ordinances. For final acceptance, all work areas shall be complete and ready for occupancy; all equipment shall be installed, connected and in operating condition, and all utility connections shall be complete and accepted by the city, county or state authority having jurisdiction.
D. The Contractor must have a valid C-17 License. Licenses shall be furnished by the Contractor in accordance with applicable local ordinances and state and federal laws
ATTACHMENT A-1
SPECIFICATIONS
(Standard Agreement) regarding labor on public buildings and specifications contained in this Agreement.
Should any specification in the Agreement fail to comply with such ordinances and laws, the Contractor shall be required to comply with such statutes at no extra cost to the
EDD.
E. The Contractor shall not assign or subcontract any work performed under the terms of this Agreement.
F. Travel time will be at the Contractor’s expense. All travel costs (travel time, mileage, and per diem) associated with work accomplished in this Agreement are to be included in the bid.
III. SPECIFICATIONS
A. SITE WORK: The following are examples of the types of work the Contractor will be required to complete during the course of this Agreement. It is not intended to be “all inclusive.”
1. Analyze broken glass and film.
2. Take measurements of glass and film dimensions.
3. Remove and haul away to an offsite location any damaged glass, materials, film, waste, debris, and other rubbish.
4. Clean and prepare for repairs/installation.
5. Properly operate equipment and tools in a skilled manner using the best technique for this type of work.
6. Furnish and install glass, film, gas, and seal in the correct quality, size, thickness, color (such as Azurlite), and type (such as Tempered or Laminate). Contractor must verify.
7. Glass and film repairs/installations.
8. Custom fabrication.
9. Weatherproofing.
10. Board-up services.
All of the above work shall be done in accordance to industry standards and manufacturer’s guidelines. All manufactured products shall be purchased with respect to existing code requirements. Additionally, all color and pattern specifications must be approved by the EDD Facility Representative prior to the commencement of work.
B. VERIFICATION: All services shall be subject to inspection by the EDD Representative at any and all times during the performance hereof.
C. FINAL: Ensure all cleaning supplies, tools, and materials are picked up. Upon completion of work, the EDD representative and the Contractor will perform a final walkthrough to ensure the project is completed as agreed upon.
D. UTILITY INTERRUPTIONS: Interruptions to any services for the purpose of making or breaking a connection shall be made only after consultation and agreement with the EDD Representative and shall be at such time and such duration as may be directed.
ATTACHMENT A-1
SPECIFICATIONS
(Standard Agreement)
The Contractor shall make necessary provisions as required to maintain existing services to occupied areas with the building.
E. THE CONTRACTOR’S RESPONSIBILITIES:
1. It will be the Contractor’s responsibility to field verify all existing conditions and measurements prior to submitting a bid proposal.
2. The Contractor shall furnish all labor and equipment necessary to perform all of the services presented in the specifications in a professional, orderly, timely, and efficient manner. The Contractor’s employees, equipment, building materials, etc., shall be restricted to the immediate area of work being performed.
3. The Contractor shall be responsible for removal of all debris, parts, and rubbish generated by performing the services of this Agreement. Any cost involved for removal shall be paid for by the Contractor.
F. ASBESTOS: The Contractor shall not disturb any areas/materials containing asbestos.
The Contractor shall coordinate with the EDD Representative prior to working in any area containing asbestos.
G. DISCREPANCIES: Should any error, discrepancy, or doubt arise as to the intent and purpose of these Specifications, the Contractor shall immediately refer the same to the EDD Representative for further instructions before proceeding with the work affected.
H. WORKMANSHIP: All labor shall be journeyman skilled for the particular work involved.
All workmanship must be of high quality level and meet all industry standards.
I. CLEANUP: The Contractor shall keep site clean daily. Upon completion of work, all surfaces (including glass, carpets, walls, furniture, and equipment) shall be clean of any foreign material due to work performed under this Agreement. The Contractor shall be responsible for removing debris from the EDD premises daily unless other provisions are approved on a “task by task” basis to use the EDD dumpster.
J. SITE INSPECTION: It is the Contractor’s responsibility to inspect the work site prior to providing time and individual Task Order cost estimates. The Contractor shall make necessary arrangements through the EDD Representative.
K. ADJACENT SURFACES OR FEATURES: Neatly replace, patch, and finish in kind all adjacent surfaces or features displaced or disturbed in the performance of the work, such as, but not limited to, acoustical tile, rubber base, paint, floor covering, etc. Make joinings of new and existing work as inconspicuous as possible. Upon completion of the task there shall be no noticeable difference between the new and existing surfaces.
L. COORDINATION OF WORK: The Contractor may not be the sole provider of services on certain tasks/work orders. The Contractor and/or the Contractor’s employees will be
ATTACHMENT A-1
SPECIFICATIONS
(Standard Agreement) expected, at times, to work alongside or in conjunction with other trades contractors, as well as EDD Maintenance Mechanics.
M. SUPERVISION: The Contractor shall be onsite at all times to personally supervise all work completed, or employ an authorized supervisor to oversee all work at the EDD office.
IV. SCHEDULE
A. All work shall take place during normal business hours, Monday through Friday, 8 a.m.
to 5 p.m. unless other arrangements have been made with the EDD Representative.
B. A work schedule will be developed upon award of the Contract with the EDD Representative.
V. MATERIALS
A. All materials shall be new, unless otherwise specified, and of good quality, free from damage or defect. After completion and acceptance of work by the EDD, all materials furnished and work performed under this Agreement shall be fully guaranteed by the Contractor against defects for a period of one year unless otherwise specified herein. All material furnished shall become the property of the EDD upon completion. Also, unless otherwise specified, the Contractor shall remedy any defect due thereto and pay for any damages resulting therefrom, which shall appear within a period of one year from the date of acceptance of work.
B. MATERIAL COSTS MAY REFLECT UP TO A 10% CONTRACTOR MARK UP.
C. The Contractor shall not store any materials and or equipment in the EDD facility unless agreement is previously reached with the EDD Representative on a “PER TASK” assignment.
D. The Contractor shall provide adequate dust covers, temporary dust barriers, and pads to protect equipment and furnishings during dusty operations or where damage could occur to existing facilities.
VI. HEALTH, SAFETY, AND SECURITY
A. The Contractor shall be responsible for securing the building in areas of work before, during, and after each workday to prevent unauthorized entry, both during and outside of normal working hours.
B. It shall be the responsibility of the Contractor to make arrangements in advance with the EDD Representative to have any needed parking areas, driveways, and /or sidewalks cleared so that the work can be performed.
ATTACHMENT A-1
SPECIFICATIONS
(Standard Agreement)
C. The Contractor shall use appropriate barriers, warning signs, or cones to notify public and staff of any hazardous condition in the work area.
D. As requested, the Contractor shall provide the local Office Manager or designee and the EDD Representative with copies of Material Safety and Data Sheets.
E. The EDD office area may be occupied during the work to be performed under this Agreement. The Contractor shall make provisions to accomplish the work assigned without undue interference to the occupants of the building and building operations.
Corridors and entrances used by occupants and reasonable access to shall be kept clear of building materials, equipment, refuse, or other debris, unless previously agreed upon. Interference with or inconvenience to occupants shall be kept to a minimum.
VII. GUARANTEES
A. Unless previously agreed upon on a “PER TASK/WORK ORDER” basis or in specific guarantees required elsewhere in this Agreement, the Contractor shall warranty the work in general for one (1) year from the date of acceptance.
B. The Contractor guarantees the work performed to meet industry standards. The Contractor will guarantee all products to be free from defects due to workmanship or materials under normal usage and will replace or repair any product found to be defective as a result of faulty workmanship or materials. The Contractor guarantees the window materials and supplies with a one (1) year materials warranty.
C. After Final Payment: Neither final payment, nor any provision in the Contract documents, will relieve the Contractor of responsibility for faulty material or workmanship. Unless otherwise specified, he shall remedy any defect due thereto and pay for any damage to other work resulting therefrom, which appears within a period of one (1) year from the date of acceptance of the work.
VIII. CORRECTION OF WORK
Prior to Final Payment: Work that does not comply with the requirements of the Contract, either specified in writing or by oral agreement, must be promptly replaced by the Contractor at their own expense with work that does comply. In making such replacement, the Contractor shall also bear all expenses involved in making good all damages or destruction caused to the work of other contractors.
Asbestos Building Inspection/Survey
Santa Rosa Location
606 Healdsburg Avenue Santa Rosa, CA 95401
Presented to:
Rosaura Lacap
EDD, BOPSD
800 Capitol Mall, MIC 62-4 Sacramento, CA 95814
Inspection Date:
December 15, 2018
Conducted by:
Anthony M. De Arcos Certified Asbestos Consultant
Certified Lead Inspector/Assessor Registered Environmental Property Assessor
Justin S. Gardner
Certified Environmental Technician Certified Site Surveillance Technician
National Analytical Laboratories, Inc.
2201 Francisco Dr. Ste.140-261
El Dorado Hills, CA 95762 Office: (916) 361-0555 | Fax: (916) 361-0540
E-Mail: NAL1@NAL1.com | Web Page: www.NAL1.com
ATTACHMENT A-2
ASBESTOS REPORT
(Standard Agreement)
December 17, 2018
Rosaura Lacap
EDD, BOPSD
800 Capitol Mall, MIC 62-4 Sacramento, CA 95814
RE: Asbestos Building Inspection/Survey – Santa Rosa Location 606 Healdsburg Avenue Santa Rosa, CA 94501
Dear Mr. Lacap, The following report is in regards to the building inspection conducted at the above-listed address. Of the thirteen (13) suspected asbestos containing samples collected four (4) were found to contain asbestos containing construction materials (ACCM). Justin Gardner, Certified Site Surveillance Technician, working under the supervision of Anthony M.
De Arcos, Certified Asbestos Consultant and Registered Environmental Property Assessor for National Analytical Laboratories, Inc. (N.A.L.), conducted the inspection on December 15, 2018.
SUMMARY OF FINDINGS -
Based on the sample results, the 12" Tan/Brown Streaked Floor Tile and the Black Mastic were found to contain ACCM.
Note that the lobby was also checked and found to have terrazzo tile under the carpet and was in not suspect for testing.
ASBESTOS INSPECTION –
The inspection was completed according to the EPA’s Asbestos Containing Building Materials (ACBM) In-Schools Rule; 40 CFR 763.85 (Inspection and Re-Inspection). Currently, EPA regulations classify ACBM as materials containing more than 1-percent (1%) of asbestos. Cal- OSHA currently regulates asbestos to 1/10th of 1% (0.1%) and requires that a certified asbestos worker conduct this work.
Upon completion of the visual inspection, the suspect asbestos bulk sample materials were collected in accordance with EPA and OSHA protocol. They were placed into new, airtight, plastic bags, sealed, and identified with unique identification numbers. The bulk samples were transported to the laboratory under the chain of custody protocol for analysis.
ATTACHMENT A-2
ASBESTOS REPORT
(Standard Agreement)
Asbestos Building Inspection/Survey 606 Healdsburg Avenue, Santa Rosa, CA 94501 December 17, 2018
40426
No destructive, only renovation sampling was conducted during the site visit, in the event that future renovation and/or demolition work reveals any unforeseen suspect materials; the contractor shall contact the project manager for further testing.
EMSL Analytical, Inc. (EMSL) in Carle Place, New York, analyzed the bulk suspect asbestos containing samples utilizing the Polarized Light Microscopy (PLM) Method. National Voluntary Laboratory Accreditation Program (NVLAP) Certification #10148-10 and California Environmental Laboratory Accreditation Program (CAELAP) Certification #2339, certifies EMSL.
Although not all the rooms or materials throughout the site were sampled, the like materials that were not tested will be treated as homogeneous to the materials that were tested and will be considered as containing ACCM or Non-ACCM in accordance to the results.
The location and results of suspect samples found to contain ACCM are as follows:
Sample ID# Material Location Category Results
606-5B 12" Tan/Brown Streaked Floor Tile
Conference Room 112 - Southwest Area Floor (Second Layer) (-10,000sf)
I Homogenous to Sample 5C
606-5C Black Mastic Conference Room 112 - Southwest Area Floor (Bottom Layer) (-10,000sf)
I 5% Chrysotile
606-6A 12" Tan/Brown Streaked Floor Tile
Corridor At Redwood Empire Room - Southeast Area Floor (Under Carpet Tile)
I *Trace, <1% Chrysotile
606-6B Black Mastic Corridor At Redwood Empire Room - Southeast Area Floor (Bottom Layer)
I 10% Chrysotile sf = Square Feet; Category I & II are Non-friable/Non-hazardous Materials. Approximate sample locations are depicted in a sample map attached.
Based on the regulatory requirements by the National Emission Standards for Hazardous Air Pollutants (NESHAP), Regulation 40 CFR, Part 61, Subpart M the following must occur “If the asbestos content is less than 10 percent, verification shall be made using the point counting method specified in Appendix A, Subpart F, 40 CFR Part 763, Section 1.7.2.4, Polarized Light Microscopy, Qualification of Asbestos Content.”
The 12" Tan/Brown Streaked Floor Tile and Black Mastic are considered Category I, non-friable/non-hazardous materials that can be removed and disposed of at a non-hazardous waste facility.
ASBESTOS RECOMMENDATION –
Federal and state regulations require that anyone disturbing asbestos containing materials are properly trained certified and have the required respiratory protection and medical surveillance.
ATTACHMENT A-2
ASBESTOS REPORT
(Standard Agreement)
December 17, 2018
40426
N.A.L recommends that a certified asbestos abatement contractor be retained to remove the non-friable and trace materials prior to any scheduled renovation/demolition work being completed at the site. Prior to the work process starting a work plan or specifications in regards to the abatement process should be completed and distributed to the abatement contractors during the job walk at the site.
On-Site Observation should be conducted by N.A.L.’s Certified Asbestos Consultant or Certified Site Surveillance Technician to verify that the work plan/specification is being followed. This will verify that during the abatement work the outside air was clean. Once a certified asbestos contractor has removed the ACCM, following EPA and OSHA requirements; a visual inspection and air clearance sampling should be completed. Clearances will confirm that the general contractor can reoccupy the work area(s), without concern for exposure to asbestos airborne fibers to their employees thus allowing the renovation or demolition work to be completed by the general contractor.
The following samples were non-asbestos containing materials:
Sample ID# Material Location Results
606-1 Tan/Brown Cove Base Mastic
Corridor At Redwood Empire - West End, North Wall (-1100lf)
None Detected
606-2 Tan/Brown Cove Base Mastic
Corridor At Northwest Manager Office - West End, South Wall
None Detected
606-3A Yellow Carpet Glue Conference Room 108 - Northwest Corner (Backing Carpet) (-134sf)
None Detected
606-3B Black Vinyl Vapor Barrier
Conference Room 108 - Northwest Corner (Second Layer) (-134sf)
None Detected
606-3C Tan/Orange Linoleum Conference Room 108 - Northwest Corner (Third Layer) (-134sf)
None Detected
606-3D Gray Float Material Conference Room 108 - Northwest Corner (Bottom Layer) (-134sf)
None Detected
606-4A 12" Tan/Brown Speckled Floor Tile
Center Corridor At Northwest Closets - West Area Floor (-500sf)
None Detected
606-4B Yellow/Black Mastic Center Corridor At Northwest Closets - West Area Floor (-500sf)
None Detected
606-5A Orange Carpet Glue Conference Room 112 - Southwest Area Floor (Backing Carpet) (-10,000sf)
None Detected sf = Square Feet
ATTACHMENT A-2
ASBESTOS REPORT
(Standard Agreement)
December 17, 2018
40426
Included at the end of this report are the laboratory analytical results, chain of custody form(s) and site map. If you have any questions regarding this report or if we can be of further assistance, please contact our office.
Reviewed and Submitted by: Conducted by:
Anthony M. De Arcos Justin S. Gardner Certified Asbestos Consultant Certified Site Surveillance Technician
DOSH# 92-0261 DOSH# 16-5820
Registered Environmental Property Assessor
REPA# 938322039
ATTACHMENT A-2
ASBESTOS REPORT
(Standard Agreement)
ATTACHMENT A-2
ASBESTOS REPORT
(Standard Agreement)
ASBESTOS REPORT
(Standard Agreement)
12/1…