This document is a Request for Proposal (RFP) issued by the InterMountain Education Service District (IMESD) in Pendleton, Oregon for a project to install ductless "mini-split" HVAC units throughout their facility. The project scope includes providing the specified equipment, sizes, and quantities detailed in the exhibits, as well as a decommissioning and removal plan for the existing roof-top units. The RFP has a mandatory pre-proposal meeting on September 28, 2022, with proposals due on October 27, 2022. The project is anticipated to be completed in two phases, with substantial completion by December 30, 2022 for phase 2 and January 31, 2023 for phase 3. The successful proposer will be expected to comply with federal and state regulations, as the project is expected to be partially funded by federal grants.
The RFP outlines specific proposal requirements, evaluation criteria focused on cost, references, the proposal itself, and serviceability. It also includes standard contract terms such as prevailing wage requirements, performance bond, insurance, and restrictions on mechanics liens. Pricing terms are not explicitly stated, but the RFP indicates the project may experience cost escalation for equipment purchased in 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IRFP Investigative Tows 2022.docx_final _ w_attachments~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
InterMountain ESD RFP #22-01 Page 1 of 29
InterMountain Education Service District
RFP #22-01
Mini-Split Ductless Heating and Cooling Units
Project 2022/2023
Proposals Due: October 27th, 2022 @ 2:00 PM (PT)
Late Proposals will not be accepted or considered.
Submit Proposals to: Darrick Cope, IMESD Director of Facilities and
Operations; Email: darrick.cope@imesd.k12.or.us
Mandatory Pre-Proposal
Walk:
September 28th, 2022 @ 10:00AM
2001 SW Nye Ave., Pendleton, OR 97801
Site Walk: Call for appointments
Proposals Questions and
Proposal Protests due by:
October 25th, 2022 @ 2:00 PM (PT)
Submit Proposals Questions and Proposals Protests to:
Darrick Cope, IMESD Director of Facilities and
Operations; Email: darrick.cope@imesd.k12.or.us mailto:darrick.cope@imesd.k12.or.us mailto:darrick.cope@imesd.k12.or.us
InterMountain ESD RFP #22-01 Page 2 of 29
TABLE OF CONTENTS
Page
1 RFP PROCESS 4
1.1 RFP Availability 4
1.2 RFP Exhibits 4
1.3 RFP Attachments 4
1.4 RFP Definitions 4
1.5 RFP Components 5
2 PROJECT INFORMATION 5
2.1 Project Description 5
2.2 Project Scope of Work 5
2.3 Project Timeline 5
3 RFP PROCESS 6
3.1 RFP General Terms 6
3.2 RFP Pre-Proposal Meeting 7
3.3 RFP Modifications 7
3.4 RFP Questions 7
3.5 RFP Protests 7
4 PROPOSAL REQUIREMENTS 8
4.1 Proposal Content 8
4.2 Proposal Submission 8
4.3 Proposal Amendment or Withdrawal 8
4.4 Proposal Period of Irrevocability 8
4.5 Proposal Ownership 8
4.6 Proposal Disclosure 8
4.7 Proposal Opening 9
InterMountain ESD RFP #22-01 Page 3 of 29
5 PROPOSAL EVALUATION PROCESS 9
5.1 Proposal Evaluation Method 9
5.2 Proposal Evaluation Criteria 9
5.3 Proposal References 10
5.4 Protests of Contract Award 10
6 CONTRACT TERMS AND CONDITIONS 11
6.1 Prevailing Wages 11
6.2 Performance Bond 11
6.3 Insurances 11
6.4 State OCCB Registration Requirements 11
6.5 Mechanics Liens or Stop Notices 12
6.6 Contract Execution 12
Exhibit #1 Section 23 81 26.13 13-14
Exhibit #2 Equipment List 15-16
Attachment A Bid Form 17
Attachment B Statement of Assurances 18-19
Attachment C Proposer References 20
Attachment D Debarment and Suspension and Other 21-22
Responsibility Matters Primary Covered
Transactions
Attachment E Clean Air & Water Certificate 23-24
Attachment F Certification Regarding Lobbying 25-28
Disclosure of Lobbying Activities
InterMountain ESD RFP #22-01 Page 4 of 29
1 RFP PROCESS
1.1 RFP Availability
This RFP is available electronically through the OregonBuys (formerly Oregon Procurement
Information Network, ORPIN), website at https://oregonbuys.gov/bso/. Interested parties must be registered with OregonBuys eProcurement program to obtain and download documents. Registration is at no cost. Future notices regarding this solicitation, including solicitation addenda, will be posted to OregonBuys.
1.2 RFP Exhibits
EXHIBIT 1 Section 23 81 26.13 Small-Capacity Split-System Heater/Air Conditioners
EXHIBIT 2 Equipment List
1.3 RFP Attachments
ATTACHMENT A Bid Form
ATTACHMENT B Statement of Assurances
ATTACHMENT C Proposer References
ATTACHMENT D Debarment and Suspension and Other Responsibility Matters…
ATTACHMENT E Clean Air and Water Certificate
ATTACHMENT F Certification Regarding Lobbying Disclosure of Lobbying Activities
1.4 RFP Definitions
Intent to Award Written notice which is publicly displayed on OregonBuys prior to signing of a contract that shows the selection of a vendor for a contract.
Notice to Proceed A notification letter from the Owner addressed to a Contractor stating the date on which the Contractor can begin Project Work.
Project The total construction of which the Work performed under the Contract
Documents may be whole or a part and which may include construction by the Owner or by separate Contractors.
Proposal A competitive offer, which is binding on the offerer, in which price, delivery, and conformance to specification and the requirements of the
Request for Proposal, will be the predominant award criteria.
Proposer An individual, firm, or corporation, which submits a Proposal in response to a contracting agency's request.
Responsible Proposer A person who meets the standards described in ORS 279B.110.
Responsive Proposal A Proposal that substantially complies with the RFP and all prescribed procurement procedures and requirements.
RFP Request for Proposals https://oregonbuys.gov/bso/
InterMountain ESD RFP #22-01 Page 5 of 29
Specifications That portion of the Contract Documents consisting of the written requirements for materials, equipment systems, standards, and workmanship for the Work, and performance of related services.
1.5 RFP Components
This RFP process has several components, including but not limited to:
1) RFP Notice;
2) Question and Answer Period;
3) Receipt of RFP’s;
4) Proposal Evaluations;
5) Notice of Intent to Award;
6) Contract Negotiations;
7) Recommendation to the Board and Board Approval;
8) Notice to Proceed.
2 PROJECT INFORMATION
2.1 Project Description
The InterMountain ESD, 2001 SW Nye Ave., Pendleton, Oregon, is in the former Pendleton Community
Hospital, built in 1960. In 1989, the ESD bought and remodeled this building. For heating and cooling the facility, two large Carrier RTU units were installed. Nearly 25 years later, these units are being replaced with ductless “mini-splits” on the first floor of the building.
In the spring of 2022, eight mini-splits units were installed in the business department of the IMESD.
The plan is to continue to install these mini-splits throughout the building and abandon both RTUs. An additional part of the RFP is to determine the availability and cost to provide power to these units. Also, two mixing units will need to be installed to replace the air circulation provided by the present RTUs. A decommissioning and demolition/removal plan for the existing RTUs will need to be developed and included within the RFP.
The eight mini-splits installed in the spring of 2022, were a combination of Rudd and Daikin units, varying in size from 7K to 18K. In an effort to stay consistent, all future mini-splits will also be Rudd or
Daikin units.
We anticipate the project to be partially funded by Federal Grants. Therefore, the successful proposers will follow both federal and state regulations.
2.2 Project Scope of Work
Work includes providing equipment specified in Exhibit 1 in the sizes and quantities based on Exhibit 2.
2.3 Project Timeline
September 13th, 2022 RFP Release for Advertisement
September 28th, 2022 Mandatory Pre-proposal Meeting and Site Tour, 10:00 AM
InterMountain ESD RFP #22-01 Page 6 of 29
October 25th, 2022 RFP Questions Due by 2:00 PM
October 27th, 2022 Proposals Due RFP’s due by 2:00 PM
October 31st, 2022 Proposals Scored
November 2nd, 2022 Notification of Apparent Successful Proposer
November 8th, 2022 Post-Selection Review and Protest Period Ends
November 10th, 2022 Respond to Post-Selection Review Comments
November 16th, 2022 IMESD Board of Directors approve Selected Proposer
November 18th, 2022 Notice to Proceed given to RFP Successful Proposer
December 30th, 2022 Substantial Completion of mini-split project (phase 2)
January 31st, 2023 Substantial Completion of mini-split project (phase 3)
3 RFP PROCESS
3.1 RFP General Terms
1. News releases relating to this RFP will not be made without prior approval by, and in coordination with, IMESD.
2. The IMESD is issuing this RFP for the purpose of obtaining Proposals for the provision of MEP equipment.
3. All representations made by a Proposer in response to this RFP, whether verbal or written, will be incorporated into any agreement between the IMESD and the successful Proposer.
4. Proposals must conform to the requirements of this RFP and be signed by a person who is authorized to make such commitments on behalf of the Proposer. Proposer’s signature on the Bid Form constitutes a certification that the Proposer has read and fully understands all Proposal terms. No consideration will be given to any claim resulting from proposing without comprehending all requirements of the Proposal
Documents.
5. Proposals lacking required signatures will be deemed “nonresponsive.” The IMESD may disqualify nonresponsive Proposers from further evaluation.
6. All costs a Proposer incurs in preparing and submitting its Proposal or in negotiating and signing an agreement shall be the sole responsibility of the Proposer. Any due diligence conducted by a Proposer is at the Proposer’s expense.
7. All Proposals become the property of the IMESD upon delivery to the IMESD. The IMESD reserves the right to share the RFP and any Proposals the IMESD receives with any third party of their choosing in order to secure expert opinion.
8. The IMESD reserves the right to reject any or all Proposals.
9. The IMESD reserves the right to postpone or cancel the RFP without liability to the IMESD any time prior to executing an agreement if the IMESD determines, in its sole discretion, it’s in the IMESD’s best interest to do so.
10. Successful Proposer may commence Work only after the IMESD delivers a Notice to Proceed.
11. Proposers shall meet the highest industry standards.
InterMountain ESD RFP #22-01 Page 7 of 29
3.2 Pre-Proposal Meeting
A mandatory pre-proposal Meeting will be held Wednesday, September 28th, 2022 @ 10:00AM
2001 SW Nye Ave., Pendleton, OR 97801
3.3 RFP Modifications
The IMESD reserves the right to make changes to the RFP. Changes will be made only by written addendum, which will be posted on OregonBuys. Statements made by the IMESD’s representatives are not binding unless issued by written addendum.
3.4 RFP Questions
Prospective Proposers may request additional information or suggest changes to the RFP by submitting a written request. The request shall specify the provision of the RFP in question and contain an explanation for the requested change. The IMESD will evaluate all requests submitted but will not be obligated to accept requested changes.
Questions and suggestions pertaining to this RFP shall be presented via email to the Single Point of
Contact listed on the Cover Page.
Questions and suggestions must be received by date and time stated on the Cover Page. No oral questions or post marks will be accepted.
Reponses to questions and suggestions will be compiled and collectively addressed in addendum format on OregonBuys.
3.5 RFP Protests
Prospective Proposers may protest the procurement process or the solicitation document by filing a written RFP Protest. To be considered, an RFP Protest must contain a detailed statement of the legal and factual grounds for the protest, a description of the resulting prejudice to the prospective Proposer, the relief sought by the Proposer, and the other matters required under OAR 137-049-0260.
An RFP Protest must be submitted in writing no later than the date and time shown on the Cover Page.
RFP Protests must be submitted as shown on the Cover Page.
The IMESD will evaluate all RFP Protests submitted. RFP Protests will be resolved in writing. The
IMESD will make any changes to the process or to the solicitation documents by written addendum via
OregonBuys.
An issue that could have been, but was not, raised pursuant to a request for clarification or RFP Protest is not a ground for a Protest of Award.
InterMountain ESD RFP #22-01 Page 8 of 29
4 PROPOSAL REQUIREMENTS
4.1 Proposal Content
1. Attachment A: Bid Form. Completed and signed.
2. Attachment B: Statement of Assurances. Completed, signed and notarized.
3. Attachment C: Proposer References Completed.
4. Attachment D: Debarment and Suspension and Other Responsibility Matters Completed
5. Attachment E: Clean Air and Water Certificate Completed
6. Attachment F: Certification Regarding Lobbying Disclosure Completed
4.2 Proposal Submission
Each submission in response to this RFP must be:
1) Submitted via email with a subject line:
a. “IMESD RFP #22-01 Ductless Mini-Splits Project”;
2) Delivered by the date and time stated on the Cover Page;
3) Delivered to the individual listed on the Cover Page;
4) The file format must be in PDF format and may not exceed 10 MB.
4.3 Proposal Amendment or Withdrawal
A Proposer may amend or withdraw its Proposal any time prior to the time and date established for submission of Proposals. Proposals may be withdrawn in writing on company letterhead signed by an authorized representative if received by IMESD before the Proposal closing. Proposals may also be withdrawn in person before the Proposal closing upon presentation of appropriate identification.
4.4 Proposal Period of Irrevocability
Proposals shall be offers that are irrevocable for a period of sixty (60) calendar days after the date
Proposals are due.
4.5 Proposal Ownership
All documents, reports, submittals, working papers or other material submitted to the IMESD from
Proposers shall become the sole and exclusive property of the IMESD, the public domain (expect for materials deemed to be excluded as trade secrets), and not the property of the Proposers. Proposers shall not copyright, or cause to be copyrighted, any portion of any said documents submitted to the IMESD as a result of this solicitation.
4.6 Proposal Disclosure
Any information provided to the IMESD pursuant to this RFP is subject to public disclosure pursuant to
Oregon Revised Statute (ORS) 192.410 to 192.505.
InterMountain ESD RFP #22-01 Page 9 of 29
The general requirement for public disclosure is subject to several exemptions. Each page containing information deemed by the Proposers as necessary to remain exempt from public disclosure after
Proposals have been evaluated (e.g., pages containing trade secret, economic development information, etc.) and should be plainly marked. Marked pages should be placed in a group separate from the remainder of the Proposal.
The fact that a Proposer marks and segregates certain information as exempt from disclosure does not mean that the information is necessarily exempt. The IMESD will make an independent determination regarding exemptions applicable to information that has been properly marked and segregated.
Information that has not been properly marked and segregated may be disclosed in response to a public records request. When exempt information is mixed with nonexempt information, the non-exempt information must be disclosed. The IMESD will redact pages that include both exempt and nonexempt information to allow disclosure of the nonexempt information.
Unless expressly provided otherwise in this RFP or in a separate communication, the IMESD does not agree to withhold from public disclosure any information submitted in confidence by a Proposer unless the information is otherwise exempt under Oregon law. The IMESD considers Proposals submitted in response to this RFP to be submitted in confidence only until the IMESD’s evaluation is complete and the IMESD has acted on the Notice of Intent to Award.
4.7 Proposal Opening
A public Proposal opening will not be held.
5 PROPOSAL EVALUATION PROCESS
5.1 Proposal Evaluation Method
The IMESD may employ methods of Vendor selection that include, but are not limited to:
A) Discussions leading to best and final offers, in which the contracting agency may not disclose private discussions leading to best and final offers;
B) Discussions leading to best and final offers, in which the contracting agency may not disclose information derived from proposals submitted by competing proposers;
C) Serial negotiations, beginning with the highest ranked proposer;
D) Competitive simultaneous negotiations;
E) A combination of methods as authorized or prescribed by rules adopted under ORS 279A.065
(Model rules generally).
5.2 Proposal Evaluation Criteria
Proposals will be evaluated based on the following criteria:
1. Cost;
2. References and Past Projects;
3. Proposal;
InterMountain ESD RFP #22-01 Page 10 of 29
4. Serviceability.
5.3 Proposal References
The IMESD reserves the right to investigate references, including customers other than those listed in a
Proposers submission. This inquiry may include without limitation, investigation of past performance of any Proposer with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, completion or delivery of a project on schedule, and its lawful payment of employees and Subcontractors.
1) Completed previous contracts of a similar nature with a satisfactory record of performance. For purposes of this subparagraph, a satisfactory record of performance means that to the extent that the costs associated with and time available to perform a previous contract remained within the
Proposer’s control, the Proposer stayed within the time and budget allotted for the procurement and otherwise performed the contract in a satisfactory manner. The IMESD shall document the
Proposer’s record of performance if the IMESD finds under this subparagraph that the Proposer is not responsible.
2) The Proposer must have a satisfactory record of integrity. The IMESD in evaluating the
Proposer’s record of integrity may consider, among other things, whether the Proposer has previous criminal convictions for offenses related to obtaining or attempting to obtain a contract or subcontract or in connection with the Proposer’s performance of a contract or subcontract.
The IMESD shall document the Proposer’s record of integrity if the IMESD finds under this subparagraph that the Proposer is not responsible.
5.4 Protests of Contract Award
An affected Proposer may only protest if the Proposer is responsible and submitted a responsive
Proposal.
Proposers wishing to protest their Proposal rejection as non-responsive and/or the Intent to Award, may do so providing:
1) Proposer is adversely affected because Proposer would be eligible to be awarded the Contract if the protest were successful: and
2) The reason for the protest is:
a) The IMESD demonstrated bias toward a Proposal or Proposer;
b) The IMESD abused its direction in rejecting the protester’s Proposal as nonresponsive;
c) The evaluation of the Proposals is otherwise in violation of any provisions of ORS 279A or
ORS 279B of 279C.; and/or
d) All higher ranked Proposals are nonresponsive.
An affected Proposer may only protest if the Proposer is responsible and submitted a responsive
All Contract Award Protests must be in writing and received via email no later than 2:00 PM Pacific
Time within seven days after the posted Notice of Intent to Award to the individual listed on Cover
Page.
InterMountain ESD RFP #22-01 Page 11 of 29
Contract Award Protests must specify the grounds for the protest including the specific citation of law, rule, regulation, or procedure upon which the protest is based.
Contract Award Protests not filed within the time specified above, or which fail to cite the specific law, rule, regulation, or procedure upon which the protest is based shall be dismissed. An issue that could have been raised by request for clarification or protest of specifications is not grounds for Contract
Award Protests.
6 CONTRACT TERMS AND CONDITIONS
The Contract term will be through completion and final acceptance of the mini-split projects and expiration of the warranty period. Any agreement resulting from this RFP shall be based on the RFP documents.
6.1 Prevailing Wages
Public Improvement contracts with costs in excess of $50,000 are subject to BOLI prevailing wage.
6.2 Performance Bond
A performance bond and a payment bond, each in the amount of 100 percent (100%) of the total proposed price with a corporate surety approved by the Agency, shall be required for the faithful performance of the contract.
6.3 Insurances
In addition, the successful proposer will provide the Agency with a Certificate of Insurance with the following coverage:
A. If Contractor has one or more workers, as defined by ORS 656.027, Contractor shall provide workers compensation insurance in compliance with ORS 656.017, which requires subject employers to provide
Oregon workers compensation coverage for all their subject workers.
B. Professional liability insurance with a combined single limit, or the equivalent, of not less than
$1,000,000.00 for each claim, incident or occurrence. This is to cover damages caused by error, omission or negligent acts related to any professional services to be provided under this Contract.
C. General liability insurance with combined single limits, or the equivalent, of not less than
$2,000,000.00, for each occurrence for bodily injury and property damage. The policy shall include contractual liability coverage for the indemnity provided under this Contract. It shall provide that the District and their officers, employees, and agents are additional insureds but only with respect to the Contractor's services to be provided under this Contract.
D. Automobile liability insurance with a combined single limit, or the equivalent, of not less than
$2,000,000.00 for each accident for bodily injury and property damage, including coverage for owned, hired or non-owned vehicles, as applicable.
6.4 State OCCB Registration Requirements
N/A
InterMountain ESD RFP #22-01 Page 12 of 29
6.5 Mechanics Liens or Stop Notices
The resultant Contract shall at all times indemnify and hold the IMESD harmless from all claims, losses, demands, damages, cost, expenses or liability costs for labor or materials in connection with construction, repair, alteration or installation of structures, improvements, equipment or facilities, and from the cost of defending against such claims, including attorney’s fees and costs.
6.6 Contract Execution
After receipt and acceptance of the properly executed agreement, the IMESD will issue a Notice to
Proceed. No Work shall be performed until the Notice to Proceed is issued.
End of RFP – Attachments follow
InterMountain ESD RFP #22-01 Page 13 of 29
EXHIBIT #1
SECTION 23 81 26.13
SMALL-CAPACITY SPLIT-SYSTEM HEATER/AIR CONDITIONERS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Indoor air handling (fan and coil) units for ductless systems.
1.2 SUBMITTALS
A. Product Data: Provide rated capacities, weights, accessories, electrical nameplate data, and wiring diagrams.
B. Shop Drawings: Indicate assembly, required clearances, and location and size of field connections.
C. Warranty: Submit manufacturer’s warranty and ensure forms have been filled out in
Owner's name and registered with manufacturer.
1.3 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience.
1.4 WARRANTY
A. Warranty period for entire system shall be one (1) year from date of substantial completion including both parts and labor.
B. Warranty period for compressors shall be manufacturer's standard but not less than five
(5) years from date of equipment startup.
C. Warranty period for control boards (if applicable), shall be manufacturer's standard but not less than three (3) years from date of equipment startup.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis of Design:
1. Split-System Heating and Cooling Units (Mini-Splits) - Rudd and Daikin units
2. Mixing Units - TBD
2.2 SYSTEM DESIGN
A. Split-System Heating and Cooling Units: Self-contained, packaged, matched factory engineered and assembled, pre-wired indoor and outdoor units; UL listed.
InterMountain ESD RFP #22-01 Page 14 of 29
1. Heating and Cooling: Air-source electric heat pump located in outdoor unit with evaporator.
2. Provide refrigerant lines internal to units and between indoor and outdoor units, factory cleaned, dried, pressurized and sealed, with insulated suction line.
B. Mixing Units
1. Units will be installed to replace the existing RTU units that will provide air circulation to all of the rooms currently heated and cooled by these units. The mixing units will supply a minimal level of heated and cooled air to rooms to decrease the likelihood of a cold or hot draft coming from the ducts.
2.3 INDOOR AIR HANDLING UNITS FOR DUCTLESS SYSTEMS
A. Indoor Units: Self-contained, packaged, factory assembled, pre-wired unit consisting of cabinet, supply fan, evaporator coil, and controls; wired for single power connection with control transformer.
1. Location: Wall Units.
2. Fan: Line-flow fan direct driven by a single motor.
3. Filter return air with washable, antioxidant pre-filter and a pleated anti-allergy enzyme filter.
B. Evaporator Coils: Copper tube aluminum fin assembly, galvanized or polymer drain pan sloped in all directions to drain, drain connection, refrigerant piping connections, restricted distributor or thermostatic expansion valve.
1. Construction and Ratings: In accordance with AHRI 210/240 and UL 207.
2. Manufacturer: System manufacturer.
2.4 OPERATING CONTROLS
1. Mini-Splits - Battery powered remote control devices mounted on wall bracket.
2. Mixer Units – TBD
END OF SECTION
InterMountain ESD RFP #22-01 Page 15 of 29
EXHIBIT #2
Equipment List
Phase 2
Room # Dimensions Square
Footage Size of Unit Needed (TBD)
100/106 49' 6" x 26' 3" 1,300
400 19’ 6” x 11’ 6” 224
402 19’ 6” x 11’ 6” 224
404 19’ 6” x 11’ 6” 224
406 19’ 6” x 21’ 6” 420
500 15' 6" x 11' 172
501 11' x 6' 6" 72
502 11' 6" x 20' 6" 236
504 15' x 22' 3" 334
507A 16' x 11' 176
507B 8' x 8' 64
507C 16' 6" x 16' 264
507D 16' 6" x 16' 6" 272
507E 14' 6" x 11' 6" 167
507F 19' x 15' 285
510 20' x 15" 300
512 15' 9" x 6' 6" 102
600 10’ x 10’ 6” 105
601A 14' x 14' 196
601B 16' 6" x 14' 6" 239
Phase 3
Room # Dimensions Square
Footage Size of Unit Needed (TBD)
103 15' 6" x 34' 527
105A 15' 6" x 20' 310
105B 15' 6" x 8' 124
107 10' 6" x 15' 6" 163
109 15' 6" x 8' 6" 132
110 16' x 21' 6" 344
110A 6' 6" x 8' 6" 55
110B 16' x 11' 6" 184
110C 8' 6" x 8' 6" 72
110D (Reception) 16' x 10' 6" 168
InterMountain ESD RFP #22-01 Page 16 of 29
Lobby 19’ x 25’ 475
112 15' 6" x 11' 6" 178
Room # Dimensions Square
Footage Size of Unit Needed (TBD)
113 15' 6" x 11' 170
114 21' 6" x 19' 6" 419
115 15' 6" x 9' 140
120* 21' 6" x 11' 6" 247*
201 16' 6" x 21' 6" 355
204 16' 6" x 11' 6" 190
205 13' x 11' 6" 150
206/208 16' 6" x 23'6" 388
209 16' 6" x 11' 6" 190
210 16' 6" x 11' 6" 190
211 16' 6" x 21' 347
212 11' x 14' 6" 160
300 16' 6" x 6' 6" 107
301 15' 6" x 30' 465
302 13' x 13' 169
303 17' 6" x 11' 6" 201
305 17' 6" x 11' 6" 201
306 17' 6" x 11' 6" 201
307 17' 6" x 11' 6" 201
308 17' 6" x 11' 6" 201
309 17' 6" x 11' 6" 201
310 17' 6" x 11' 6" 201
312 17' 6" x 11' 6" 201
Phase 2 - Mixing Unit (TBD)
Brand/Model Specs
Phase 3 - Mixing Unit (TBD)
Brand/Model Specs
InterMountain ESD RFP #22-01 Page 17 of 29
ATTACHMENT “A” - BID FORM
RFP #22-01: Mini-Split Ductless Heating and Cooling Units
Submitted by: _______________________________________ (company)
A. Indicate time required to deliver submittals after contracts have been signed with up to four (4)
HVAC Subcontractors: _____________________ weeks.
B. Indicate time required from receipt of approved submittals to delivery of equipment to four (4)
Project sites: _____________________ weeks.
C. Provide product-specific catalog data to allow proposal evaluation. Proposer may provide links to specific products and/or email PDFs of catalog data as attachments to Proposal.
D. Provide product support data, including name of service organization with product-specific expertise that is closest to project location.
E. State how Proposer’s products differ from basis-of-design product. Proposer may attach one additional page per equipment type to Proposal.
F. Include a list of all exceptions taken to the Specifications. Identify the Specification reference.
Describe what requirements cannot provided by the Proposer and any items that are included that
Proposer believes results in the system meeting the intent of the Specifications. Proposer may attach one additional page per equipment type to Proposal.
G. Include any additional data that may be of value in the evaluation process. Proposer may attach one additional page per equipment type to Proposal.
InterMountain ESD RFP #22-01 Page 18 of 29
H. Proposers wishing to be considered for this project should provide price escalation for equipment that may have to be purchased in 2023, and any special considerations. Proposer may attach additional page to Proposal.
ATTACHMENT “B”
STATEMENT OF ASSURANCES
1) The undersigned attests that they have the authority and/or responsibility to represent the organization submitting this Proposal in all phases of the RFP process and in this Statement of
Assurances.
2) Proposing company understands that this RFP is considered an integral part of the RFP process and RFP terms shall be binding on the Proposing company. Failure of the successful company to accept these obligations may result in cancellation of an award.
3) Proposing company accepts all terms and conditions contained in this RFP. The RFP and
Proposal response, and any modifications to them, will be part of the Contract Documents.
4) The undersigned understands that any false or substantially incorrect statement in the RFP or
Statement of Assurances may disqualify this Proposer from further consideration or any further contract.
5) Proposing company understands that in responding to the RFP, it agrees to comply with all applicable federal, state, and local laws, regulations and requirements related to the RFP and performance of any resulting contract, including but not limited to those referenced in this RFP.
6) The undersigned acknowledges receipt of and agrees to be bound by addenda numbered ____ through ____ inclusive, and any additional addenda issued until the Notice to Proceed has been issued.
7) Non-Collusion. The undersigned certifies that: a) This Proposal has been arrived at independently and is being submitted without collusion with any other vendor of materials, supplies, equipment or services to limit independent bidding or competition, and b) The contents of this Proposal have not been communicated by the undersigned or its employees or agents to any person not an employee or agent of the undersigned or its surety on any bond furnished with the bid, and will not be communicated to such person prior to the official opening of the
8) By signing this Statement, Proposing company hereby certifies that it has not discriminated against minority, women or emerging small business enterprises in obtaining any required
Subcontracts.
InterMountain ESD RFP #22-01 Page 19 of 29
9) By signing this Statement, Proposing company hereby certifies that to the best of undersigned’s knowledge, Proposing company is in compliance with all Oregon tax laws described in ORS
305.380(4).
I, the undersigned, have read and understand the requirements, special provisions, bid instructions and all other conditions issued by Central Point School District for
RFP #22-01: Mini-Split Ductless Heating and Cooling Units
I have read and understand the provisions included in the RFP and agree to abide by and fulfill the requirements thereof if selected as a result of this RFP. Company Name:
___________________________________________________________ Company Address:
_________________________________________________________ Company Phone:
___________________________________________________________ Authorized
Representative’s Signature__________________________________________ Printed Name and Title: _____________________________________________________ Date:
________________________ Federal Business ID No.: ________________________
NOTARY: Subscribed and sworn before me this _____ day of ____________, 20____.
_____________________ Notary Public for the State of _________________________. My
Commission expires _________________________________.
InterMountain ESD RFP #22-01 Page 20 of 29
ATTACHMENT “C”
PROPOSER REFERENCES
List three (3) projects, commenced or completed within five (5) years of the date of this Proposal, for which the Proposer supplied similar equipment. Proposer may supply the required information in a different format if all required information is provided.
Project #1 Name, Address, Contact Name, Phone of
Owner Contract Value
(initial contract price)
Month/Year
Commenced
Month/Year
Completed
Additional Owner Contact info (if applicable) Description of Project Project Location
Project #2 Name, Address, Contact Name, Phone of
Contract Value
(initial contract price) Month/Year
Commenced
Project #3 Name, Address, Contact Name, Phone of
Contract Value
(initial contract price) Month/Year
Commenced
InterMountain ESD RFP #22-01 Page 21 of 29
Attachment D
Debarment and Suspension and Other Responsibility Matters Primary Covered Transactions
2 CFR 200.213- Non-federal entities are subject to the non-procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, 2 CFR part 180. These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs or activities.
(Before completing certification, read instructions on next page.)
(1) The prospective primary participant certifies to the best of its knowledge and belief that it and its principals:
(a) Are not presently debarred, suspended, proposed for disbarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
(b) Have not within a three-year period preceding this application been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity
(Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and
(d) Have not within a three-year period preceding this application had one or more public transactions
(Federal, State, or local) terminated for cause or default.
(2) Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective primary participant shall attach an explanation to this proposal.
InterMountain ESD RFP #22-01 Page 22 of 29
Business Name:
Date: By:
Name and Title of Authorized Representative
Signature of Authorized Representative
InterMountain ESD RFP #22-01 Page 23 of 29
Instructions for Certification
1. By signing and submitting this form, the prospective lower tier participant is providing the certification set out on the reverse side in accordance with these instructions.
2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.
3. The prospective lower tier participant shall provide immediate written notice to the person to whom this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
4. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and
"voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and
Coverage sections of rules implementing Executive Order 12549. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations.
5. The prospective lower tier participant agrees by submitting this form that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated.
6. The prospective lower tier participant further agrees by submitting this form that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion
- Lower Tier Covered Transactions," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the Nonprocurement List.
8. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant are not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.
InterMountain ESD RFP #22-01 Page 24 of 29
Attachment E
Clean Air and Water Certificate
NOTE: This certificate must be completed for all new and renewal contract years when the contract exceeds $100,000.
Applicable if the contract exceeds $100,000 or the Contracting Officer has determined that the orders under an indefinite quantity contract in any one year will exceed $100,000 or a facility to be used has been the subject of a conviction under the Clean Air Act (41 U.S.C. 1857c-8(c)(1) or the Federal Water
Pollution Control Act 33 1319(d) and is listed by EPA or the contract is not otherwise exempt. Both the
Local Educational Agency and Contractor (offeror) shall execute this Certificate.
_______________________________________ InterMountain ESD
NAME OF CONTRACTOR NAME OF LOCAL EDUCATIONAL AGENCY
THE CONTRACTOR AGREES AS FOLLOWS:
A. To comply with all the requirements of Section 114 of the Clean Air Act, as amended (41 U.S.C.
1857, et seq., as amended by Public Law 91-604) and Section 308 of the Federal Water Pollution
Control Act (33 U.S.C. 1251, et seq., as amended by Public Law 92-500), respectively, relating to inspection, monitoring, entry, reports and information as well as other requirements specified in
Section 114 and Section 308 of the Air Act and the Water Act, respectively, and all regulations and guidelines issued thereunder before the award of this contract.
B. That no portion of the work required by this prime contract will be performed in a facility listed on the Environmental Protection Agency List of Violating Facilities on the date when this contract was awarded unless and until the EPA eliminates the name of such facility or facilities from such listing.
C. To use his/her best efforts to comply with Clean air standards and Clean water standards at the facilities in which the contract is being performed.
D. To insert the substance of the provisions of this clause in any nonexempt subcontract, including this paragraph.
THE TERMS IN THIS CLAUSE HAVE THE FOLLOWING MEANINGS:
A. The term "Air Act" means the Clean Air Act, as amended (41 U.S.C. 1957 et seq., as amended by
Public Law 91-604).
B. The term "Water Act" means Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 et seq., as amended by Public Law 92-500).
C. The term "Clean Air Standards" means any enforceable rules, regulations, guidelines, standards, limitations, orders, controls, prohibitions, or other requirements which are contained in, issued under, or otherwise adopted pursuant to the Air Act or Executive Order 11738, an applicable implementation plan as described in section 110(d) of the Clean Air Act (42 U.S.C. 1957c-5(d)), an approved implementation procedure or plan under Section 111(c) or Section 111(d), respectively, of the Air Act (42 U.S.C. 1857c-6(c) or (d)), or approved implementation procedure under Section
112(d) of the Air Act (42 U.S.C. 1857c-7(d)).
InterMountain ESD RFP #22-01 Page 25 of 29
D. The term "Clean Air Standards" means any enforceable limitation, control, condition, prohibition, standard, or other requirement which is promulgated pursuant to the Water Act or contained in a permit issued to a discharger by the Environmental Protection Agency or by a State under an approved program, as authorized by Section 402 of the Water Act (33 U.S.C. 1342) or by local government to ensure compliance with pretreatment regulations as required by Section 307 of the
Water Act (33 U.S.C. 1317).
E. The term "Compliance" means compliance with Clean air or water standards. Compliance shall also mean compliance with a schedule or plan ordered or approved by a court of competent jurisdiction, the Environmental Protection Agency or an Air or Water Pollution Control Agency in accordance with the requirements of the Air Act or Water Act and regulations issued pursuant thereto.
F. The term "facility" means any building, plant, installation, structure, mine, vessel, or other floating craft, location or sites of operations, owned or supervised by the Contractor.
SIGNATURE/TITLE OF AUTHORIZED REPRESENTATIVE DATE
SIGNATURE/TITLE OF AGENCY REPRESENTATIVE DATE
InterMountain ESD RFP #22-01 Page 26 of 29
Attachment F
Certification Regarding Lobbying Disclosure of Lobbying Activities
(Complete the form that is applicable.)
NOTE: This certificate must be completed for all new and renewal contract years when the contract exceeds $100,000.
Applicable to Grants, Subgrants, Cooperative Agreements, and Contracts Exceeding $100,000 in Federal Funds.
Submission of this certification is a prerequisite for making or entering into this transaction and is imposed by section 1352, Title 31, U.S. Code. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The undersigned certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a
Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of a Federal contract, the making of a Federal grant, the making of a Federal loan, the entering into a cooperative agreement, and the extension, continuation, renewal, amendment, or modification of a Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal grant or cooperative agreement, the undersigned shall complete and submit Standard
Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.
(3) The undersigned shall require that the language of this certification be included in the award documents for all covered subawards exceeding $100,000 in Federal funds at all appropriate tiers and that all subrecipients shall certify and disclose accordingly.
Name/Address of Organization
Name/Title of Submitting Official
Signature Date
InterMountain ESD RFP #22-01 Page 27 of 29
DISCLOSURE OF LOBBYING ACTIVITIES
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352
1. Type of Federal Action: _____
a. contract
b. grant
c. cooperative agreement
d. loan
e. loan guarantee
f. loan insurance
2. Status of Federal Action: _____
a. bid/offer/application
b. initial award
c. post-award
3. Report Type: _____
a. initial filing
b. material change
For Material Change Only:
Year _____ Quarter _____
Date of Last Report _________
4. Name and Address of Reporting Entity:
_____Prime _____Subawardee Tier ____, if known:
Congressional District, if known:
5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of
Prime:
Congressional District, if known:
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable: ________________
8. Federal Action Number, if known: 9. Award Amount, if known:
10a. Name and Address of Lobbying Entity:
(if individual, last name, first name, middle)
10b. Individuals Performing Services (include address if different from 10a.)
(last name, first name, middle)
11. Amount of Payment (check all that apply):
___ Actual ___ Planned
12. Type of payment (check all that apply):
___ a. retainer
___ b. one-time fee
___ c. commission ___ d. contingent fee
___ e. deferred
___ f. other; specify: ____________________________________
13. Form of Payment (check all that apply):
___ a. cash
___ b. in-kind; specify:
Nature __________________________
Actual __________________________
14. Continuation Sheet(s) SF-LLL-A Attached:
Yes_____ (Number ________)
No _____
15. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or member(s) contracted for
Payment indicated in Item 11:
Attach Continuation Sheet(s) SF-LLL-A (if necessary)
16. Information requested through this form is authorized by Title 31
U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into.
This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature: _____________________________________________________
Print Name: ___________________________________________________
Title: _________________________________________________________
Telephone: ____________________________________________________
Date: _________________________________________________________
Federal Use Only: Authorized for Local Reproduction
Standard Form -- LLL
InterMountain ESD RFP #22-01 Page 28 of 29
DISCLOSURE OF LOBBYING ACTIVITIES
CONTINUATION SHEET SF-LLL-A
Reporting
Entity:______________________________________________Page_________of__________
InterMountain ESD RFP #22-01 Page 29 of 29
This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. If the space on the form is inadequate, use of SF-LLL-A Continuation Sheet for additional information. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of
Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered
Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action.
4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in item 4 checks "Subawardee", then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal
Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal
(RFP) Number, Invitation for Bid (IFB) Number; grant announcement number; the contract, grant or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .