Interior_&_Exterior_Painting_-_Maintenance.pdf
PDF 1 MB Posted
- Attached to
- Interior & Exterior Painting - Maintenance
- Solicitation number
- 26/27-0012
- Issued by
- San Bernardino County, California
About this file
This specification document outlines interior and exterior painting maintenance services for the Fontana Unified School District (FUSD), a K-12 public school district serving approximately 32,000 students across 45 school sites in San Bernardino County, California. The District is soliciting sealed bids for painting maintenance services under Bid No. 26/27-0012 through the procurement portal at https://procurement.opengov.com/portal/fusd, with responses due no later than 2:00 pm on Monday, November 2, 2026. The resulting contract will have an initial term of four years with the option to renew for an additional one year, not to exceed five years total.
The District estimates the annual cost for painting maintenance services may reach up to $1,500,000, provided for informational purposes only and not constituting a guarantee or commitment to spend this amount. No specific information regarding set-asides, incumbent contractors, site visit requirements, bidders' conferences, or award dates is detailed in the available documentation. Interested vendors are encouraged to visit www.fusd.net for additional information about the District and its operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FUSD_Standardization_-_Paint_Highlighted.pdf | ||
| FUSD._M&O.Paint_Specifications.Jan_2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fontana Unified School District
9680 Citrus Avenue
Fontana, CA 92335
BID NO. 26/27-0012
FOR
INTERIOR & EXTERIOR PAINTING - MAINTENANCE
Bid No. 26/27-0012 Interior & Exterior Painting - Maintenance
TABLE OF CONTENTS
I. Project Information
II. Notice Inviting Bids - PW
III. Prequalification of Bidders
IV. Instructions To Bidders
V. General Conditions-Unit Price
VI. Supplementary Conditions
VII. Special Conditions
VIII. Scope Of Work
IX. Unit Price Line Item Descriptions
X. School Sites
XI. Federal Requirements/ Federal Labor Standards Provisions
XII. PW Vendor Questionnaire, References, & Forms
XIII. Bid Form Information
XIV. Unit Price Bid Form & Hypothetical Job Scenario
XV. Miscellaneous Information
Attachments:
A - FUSD. M&O.Paint_Specifications.Jan_2026
B - FUSD Standardization - Paint Highlighted
1. Project Information
This project is being let in accordance with the California Uniform Public Construction Cost Accounting Act
(“CUPCCAA”) set forth in Public Contract Code section 22000 et seq. Bidders shall comply with any requirements set forth in the CUPCCAA including all guidelines and requirements in the current CUPCCAA
Policies and Procedures Manual.
License Classification: Category A requires a valid and active C-33 Painting and Decorating Contractor’s
License. Category B requires the applicable contractor license classification authorizing D-51 Waterproofing and
Weatherproofing work. See the Notice Inviting Bids and Special Conditions for additional requirements.
Contract Term: One (1) year, with four (4) optional one-year renewals; maximum potential term of five (5) years.
Estimated Aggregate Contract Value: $1,500,000
Liquidated Damages: $1,000.00 per calendar day
Notice Inviting Bids Post Date: October 3, 2026
Job Walk or PreBid Conference (Mandatory): October 12, 2026, 11:00am
Agenda
Maintenance & Operations Building, located in the District’s FMOT Complex at 9851 Catawba
Avenue, Fontana, CA 92335
Prequalification Apply by Date/Time: October 14, 2026, 4:00pm
Request for Information / Q & A Deadline: October 20, 2026, 2:00pm
Prequalification Approve by Date/Time: October 26, 2026, 4:00pm
Addendum (if needed): October 26, 2026, 4:00pm
Bid Response Due: November 2, 2026, 2:00pm
Tentative Post-Bid Interviews: November 5, 2026
Intent To Award: November 11, 2026
Tentative Award of Contract: December 16, 2026
Please note, bids are to be submitted through the e-procurement portal at https://procurement.opengov.com/portal/fusd.
Bidder must also deliver bid bond/guarantee to be received no later than the bid due and addressed to:
Fontana Unified School District, Attn: Shamica R. Nance, Sr. Director of Purchasing, 9680 Citrus Avenue.
https://government-project.s3.amazonaws.com/306188/311e6863-0d75-4844-9f1a-f423f39973dd_FMOT_Complex_M&O.pdf https://procurement.opengov.com/portal/fusd
Building #30, Fontana, CA 92335.
Please have the Bidder Name, Project Title and Project Number listed clearly on the outside of the envelope.
*If applicable, the Substitution deadline is the same day as the Request for Information (RFI)/Question & Answer deadline.
2. Notice Inviting Bids - PW
NOTICE IS HEREBY GIVEN that the Fontana Unified School District (“District”), hereinafter referred to as the
District, will receive bids up to, but no later than 2:00 pm on Monday, November 2, 2026 through the
Procurement Portal at www.fusd.net/bids, proposals for the award of a contract for: Bid No. 26/27-0012 Interior
& Exterior Painting - Maintenance
All bids shall be made and presented only on the forms presented by the District. Bids shall be received through the e-procurement portal at www.fusd.net/bids. Please scan and upload a copy of your bid bond/cashier’s check, as well as mail or deliver the original to be received no later than the bid due and addressed to:
Fontana Unified School District, Attn: Shamica R. Nance, Sr. Director of Purchasing, 9680 Citrus Avenue, Building #30, Fontana, CA 92335. Please have BID BOND, the Bidder Company Name, Project Number and
Title listed clearly on the outside of the envelope. Any bids received after the time specified above or after any extensions due to material changes shall not be accepted.
Prequalification of Bidders. As a condition of submitting a bid for this Project, and in accordance with
California Public Contract Code section 20111.6, prospective bidders are required to be prequalified. Bids will not be accepted if prospective bidder has not been prequalified where prequalification is required. The District uses and will accept prequalification applications through PQ Bids only. The link can be accessed by going to the
Fontana Unified School District website at www.fusd.net/bids Bid Process, or you may enter the following link in your search engine: https://pqbids.com/fontana/. Prequalification documents must be submitted to PQBids by
October 14, 2026, at 4:00 p.m. October 26, 2026, at 4:00 p.m. is the last day to be approved through PQ
Bids. This prequalification is mandatory for all prospective bidders to be considered; bidders that do not meet these deadlines will be deemed as nonresponsive. Once the bidder is final approved through PQ Bids, they will be approved for one (1) year from the final approval date. It is and will be the bidders’ sole responsibility to stay updated and approved in the PQ Bids system. The District has no responsibility to contact contractors to apply, renew or update information in the PQ Bids system. Any questions or technical support inquiries in submitting the required documents may be directed to PQ BIDS at info@pqbids.com or by calling 888-218-4173. (NOTE: Use the questionnaire type: AB2031-Projects, Agency Name: Fontana Unified to prequalify on the PQ Bids website).
The approved list of prequalified contractors will be posted under Official Notices in OpenGov.
If this Project includes work that will be performed by mechanical, electrical or plumbing (“MEP”) subcontractors
(contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified. It is the responsibility of the bidder to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified before submitting a bid.
A Mandatory Pre-Bid Conference will be conducted on Monday, October 12, 2026, promptly at 11:00 A.M.
Contractors and/or their representatives are to meet at Maintenance & Operations Building, located in the
District’s FMOT Complex at 9851 Catawba Avenue, Fontana, CA 92335. Only those bidders who attend the entire job walk will be eligible to bid this project. Please RSVP to the event on OpenGov, https://procurement.opengov.com/portal/fusd, by clicking by clicking "Events RSVP" dropdown that is located next to "Draft Response". Click "Attending". The system will send a confirmation email upon submission. Late arrivals will not be permitted to participate.
https://www.fusd.net/bids https://www.fusd.net/bids https://www.fusd.net/ https://pqbids.com/fontana/
Request for Information (RFI)/ Question & Answer deadline is: 2:00 pm on Tuesday, October 20, 2026.
Requests for Information must be submitted through the e-procurement portal. No other questions or requests for information will be accepted after this date and time.
License Requirements: Bidders may bid on one or both categories:
Category A - Interior & Exterior Painting - Maintenance requires a valid C-33 Contractor’s License;
Category B - Waterproofing & Weatherproofing - Maintenance requires the applicable contractor license classification authorizing D-51 work. Each category will be evaluated and awarded separately to the lowest responsive and responsible Bidder. All required licenses shall be valid at the time of bidding and remain valid throughout performance of the applicable Work. Subcontractors shall be properly licensed and certified pursuant to California law for the trades necessary to perform the Work called for in the Contract Documents, and all required licenses and certifications shall remain valid through completion of the applicable Work.
CONTRACTOR should consult the General Conditions, Supplementary General Conditions, and General
Requirements regarding Milestones and Liquidated Damages.
Each bid must strictly conform with and be responsive to the contract documents as defined in the General
Conditions. The DISTRICT reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding.
Each bidder shall submit with its bid, on the form furnished with the contract documents, a list of the designated subcontractors on this project as required by the Subletting and Subcontracting Fair Practices Act, California
Public Contract Code Sections 4100 et. seq.
The District may request interviews from the top Contractors.
In accordance with California Public Contract Code Section 22300, the DISTRICT will permit the substitution of securities for any moneys withheld by the DISTRICT to ensure performance under the contract. At the request and expense of the CONTRACTOR, securities equivalent to the amount withheld shall be deposited with the
DISTRICT, or with a state or federally chartered bank as the escrow agent, who shall then pay such moneys to the
CONTRACTOR. Upon satisfactory completion of the contract, the securities shall be returned to the
CONTRACTOR.
Each bidder’s bid must be accompanied by one of the following forms of bidder’s security: (1) cash; (2) a cashier’s check made payable to the DISTRICT; (3) a certified check made payable to the DISTRICT; or (4) a bidder’s bond executed by a California admitted surety as defined in Code of Civil Procedure Section 995.120, made payable to the DISTRICT in the form set forth in the contract documents. Such bidder’s security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed contract, if the same is awarded to such bidder, and will provide the required Performance and
Payment Bonds and insurance certificates. In the event of failure to enter into said contract or provide the necessary documents, said security will be forfeited.
Bidders are advised that this contract is a public work for purposes of the California Labor Code, which requires payment of prevailing wages. Wage rates can be obtained from the Director of the Department of Industrial
Relations at https://www.dir.ca.gov/oprl/dprewagedetermination.htm. All contractors bidding on a public works project must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5c.
The DISTRICT has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which this work is to be performed for each craft, classification or type of worker needed to execute the contract. These per diem rates, including holiday and overtime work, as well as employer payments for health and welfare, pension, https://www.dir.ca.gov/oprl/dprewagedetermination.htm vacation, and similar purposes are available from the Director of the Department of Industrial Relations. Pursuant to California Labor Code Sections 1720 et seq., it shall be mandatory upon the CONTRACTOR to whom the contract is awarded, and upon any subcontractor under such CONTRACTOR, to pay not less than the said specified rates to all workers employed by them in the execution of the contract.
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of
Industrial Relations. No bid will be accepted, nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the bidder and its subcontractors, of any tier, shall maintain active registration with the
Department of Industrial Relations for the duration of the project.
This project is subject to labor compliance monitoring and enforcement of prevailing wage requirements by the
Department of Industrial Relations. The successful bidder and any listed subcontractor(s) shall be required to furnish electronic certified payroll records directly to the Labor Commissioner, Division of Labor Standards
Enforcement.
No bidder may withdraw any bid for a period of ninety (90) calendar days after the date set for the opening of bids.
Separate payment and performance bonds, each in an amount equal to 100% of the total contract amount, are required, and shall be provided to the DISTRICT prior to execution of the contract and shall be in the form set forth in the contract documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure Section 995.120.
Any request for substitutions pursuant to Public Contracts Code Section 3400 must be made on the form set forth in the contract documents and included with the bid.
It is each bidder’s sole responsibility to ensure its bid is timely delivered and received at the location designated as specified above. Any bid received at the designated location after the scheduled closing time for receipt of bids shall be returned to the bidder unopened.
Fontana Unified School District Board of Education Publication Dates: October 3, 2026 and October 10, 2026
3. Prequalification of Bidders
As stated in the Notice a condition of submitting a bid for this Project, and in accordance with California Public
Contract Code section 20111.6, prospective bidders are required to be prequalified. Bids will not be accepted if prospective bidder has not been prequalified where prequalification is required. The District uses and will accept prequalification applications through PQ Bids only. The link can be accessed by going to the Fontana Unified
School District website at www.fusd.net and visiting the Purchasing Department’s webpage. The link to PQ Bids will be under the electronic prequalification tool field and you will be directed to the PQ Bids prequalification page, or you may enter the following link in your search engine: https://pqbids.com/fontana/.
Prequalification documents must be submitted to PQ Bids by October 14, 2026, at 4:00 p.m. October 26, 2026, at 4:00 p.m.is the last day to be approved through PQ Bids. This prequalification is mandatory for all prospective bidders to be considered; bidders that do not meet these deadlines will be deemed as nonresponsive.
Once the bidder is final approved through PQ Bids, they will be approved for one (1) year from the final approval date. It is and will be the bidders’ sole responsibility to stay updated and approved in the PQ Bids system. The
District has no responsibility to contact contractors to apply, renew or update information in the PQ Bids system.
https://www.fusd.net/ https://pqbids.com/fontana/
Any questions or technical support inquiries in submitting the required documents may be directed to PQ BIDS at info@pqbids.com or by calling 888-218-4173. (NOTE: Use the questionnaire type: AB2031-Projects, Agency
Name: Fontana Unified to prequalify on the PQ Bids website). The approved list of prequalified contractors will be posted under Official Notices in the Procurement Portal at https://procurement.opengov.com/portal/fusd.
If this Project includes work that will be performed by mechanical, electrical or plumbing (“MEP”) subcontractors (contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified. It is the responsibility of the bidder to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified before submitting a bid.
4. Instructions To Bidders
4.1. Preparation of Bid Form
All interested Vendors are invited to submit a Bid in accordance with the terms and conditions stated in the Bid documents. Bids must be electronically submitted up to but not later than the date and time indicated in the Notice
Inviting Bids. A copy of the Bid documents can be downloaded by accessing the District’s web site at https://procurement.opengov.com/portal/fusd. Vendors are required to register for an account via the District’s e-Procurement Portal hosted by OpenGov.
The District reserves the right to reject any bid if all of the above information is not furnished. It is each bidder’s sole responsibility to ensure its bid is timely submitted and received by the District. Any bid received after the scheduled closing time for receipt of bids shall not be accepted.
4.2. Signature
The bid form, all bonds, all designations of Subcontractors, the Contractor’s Certificate, the Agreement, and all
Guarantees must be signed in permanent ink in the name of the bidder and must bear the signature in longhand of the person or persons duly authorized to sign the bid. Typed font signature will not be accepted.
If bidder is a corporation, the legal name of the corporation shall first be set forth, together with two signatures: one from the President and one from the Secretary or Assistant Secretary. Alternatively, the signature of other authorized officers or agents may be affixed, if a certified copy of the resolution of the corporate board of directors authorizing them to do so is provided to the District. Such documents shall include the title of such signatories below the signature and shall bear the corporate seal.
If bidder is a partnership, the true name of the firm shall first be set forth, together with the names of all persons comprising the partnership or co-partnership. The bid must be signed by all partners comprising the partnership unless proof in the form of a certified copy of a statement of partnership acknowledging the signer to be a general partner is presented to the District, in which case the general partner may sign.
Bids submitted as joint ventures must so state and be signed by each joint venture.
Bids submitted by individuals must be signed by the bidder unless an up-to-date power- of-attorney is on file in the
District office, in which case, said person may sign for the individual.
The above rules also apply in the case of the use of a fictitious firm name. In addition, however, where a fictitious name is used, it must be indicated in the signature.
4.3. Modifications
Changes in or additions to the bid form, recapitulations of the work bid upon, alternative proposals, or any other modification of the bid form which is not specifically called for in the Contract Documents may result in the
District’s rejection of the bid as not being responsive to the Notice Inviting Bids. No oral or telephonic modification of any bid submitted will be considered.
4.4. Erasures, Inconsistent or Illegible Bids
The bid submitted must not contain any erasures, interlineations, or other corrections unless each such correction creates no inconsistency and is suitably authenticated by affixing in the margin immediately opposite the correction the signature or signatures of the person or persons signing the bid. In the event of inconsistency between words and figures in the bid price, words shall control figures. In the event that the District determines that any bid is unintelligible, inconsistent, or ambiguous, the District may reject such bid as being non-responsive.
4.5. Examination of Site and Contract Documents
Each bidder shall visit the site of the proposed work and become fully acquainted with the conditions relating to the construction and labor so that the facilities, difficulties, and restrictions attending the execution of the work under the Contract are fully understood. Bidders shall thoroughly examine and be familiar with the drawings and specifications and all others documents and requirements that are attached to and/or contained in the Project Manual or other documents issued to bidders. The failure or omission of any bidder to receive or examine any Contract
Documents, form, instrument, addendum, or other document or to visit the site and become acquainted with conditions there existing shall not relieve any bidder from obligations with respect to the bid or to the Contract. The submission of a bid shall be taken as prima facie evidence of compliance with this Section. Bidders shall not, at any time after submission of the bid, dispute, complain, or assert that there were any misunderstandings with regard to the nature or amount of work to be done.
4.6. Withdrawal of Bids
Any Bid may be withdrawn by the Vendor by selecting the “Unsubmit Proposal” button at any time prior to the scheduled closing time for receipt of bids. Proposers are advised that the District reserves the right to amend the
Bid documents at any time. If a Vendor discovers any ambiguity or error such as a conflict, discrepancy, omission, or other errors in the Bid documents, proposer shall immediately notify the District via the OpenGov
Question/Answer tab.
No bidder may withdraw any bid for a period of ninety (90) calendar days after the date set for the opening of bids.
4.7. Agreements, Insurance and Bonds
The Agreement Form which the successful bidder, as Contractor, will be required to execute, and the forms and amounts of surety bonds and insurance endorsements which Contractor will be required to be furnished at the time of execution of the Agreement, are included in the bid documents and should be carefully examined by the bidder.
The number of executed copies of the Agreement, the Performance Bond, and the Payment Bond required is two
(2). Payment and Performance bonds must be executed by an admitted surety insurer as defined in Code of Civil
Procedure 995.120.
4.8. Interpretation of Plans and Documents/Pre-Bid Clarification
If any prospective bidder is in doubt as to the true meaning of any part of the Contract Documents, or finds discrepancies in, or omissions, a request for an interpretation or correction thereof may be submitted to the District, through the Procurement Portal. The bidder submitting the request shall be responsible for its prompt delivery. Any interpretation or correction of the Contract Documents will only be made by Addendum duly issued. Addendum will be made available through the e-procurement portal. No person is authorized to make any oral interpretation of any provision in the Contract Documents, nor shall any oral interpretation be binding on the District. If discrepancies on plans, specifications or elsewhere in the Contract Documents are not covered by addenda, bidder shall include in their bid methods of construction and materials for the higher quality and complete assembly.
Each request shall contain Specifications and/or Drawing number, if applicable, and any other pertinent information. Pre-bid clarification request shall be filed by the RFI deadline. Requests received after the deadline shall not be considered or responded to. A response to timely pre-bid clarifications requests which materially affects the bidders price will be made by Addendum issued by the District not less than seventy-two (72) hours prior to bid opening through the Procurement Portal.
SUBMITTAL OF A BID WITHOUT A REQUEST FOR CLARIFICATIONS SHALL BE
INCONTROVERTIBLE EVIDENCE THAT THE BIDDER HAS DETERMINED THAT THE BID
DOCUMENTS ARE ACCEPTABLE AND SUFFICIENT FOR BIDDING AND COMPLETING THE WORK;
THAT BIDDER IS CAPABLE OF READING, FOLLOWING AND COMPLETING THE WORK IN
ACCORDANCE WITH THE BID DOCUMENTS; AND THAT BIDDER AGREES THAT THE WORK CAN
AND WILL BE COMPLETED ACCORDING TO THE DISTRICT’S TIMELINES.
4.9. Bidders Interested in More Than One Bid
No person, firm, or corporation shall be allowed to make, or file, or be interested in more than one prime bid for the same work unless alternate bids are specifically called for. A person, firm, or corporation that has submitted a proposal to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a proposal or quoting prices to other bidders or making a prime proposal.
4.10. Unidentified Conditions Allowance
A 10% Unidentified Conditions Allowance is to be added to the cost of the Project. Each bidder is to add this percentage to their base bid amount. This allowance will be used for any unforeseen necessary changes that are approved, in writing, by the District. Any portion of the allowance that is not used to be deducted from the
Project/bid amount via deductive change order. Contractor shall submit the Allowance Authorization Form included herein to obtain written approval by the District.
This allowance requirement does not apply to Unit Price bids, and no allowance is to be included in the Unit Price schedule.
4.11. Award of Contract
The District reserves the right to reject any or all bids, or to waive any irregularities or informalities in any bids or in the bidding. The award of the contract, if made by the District, will be by action of the governing board and to the lowest responsible and responsive bidder, based on the sum of the Base Bid plus the Ten Percent (10%)
Unidentified Conditions Allowance, therefor from among those bidders responsive to the call for bids. In the event an award is made to bidder, and such bidder fails or refuses to execute the Contract and provide the required documents within five (5) calendar days after award of the Contract to bidder, the District may award the Contract to the next lowest responsible and responsive bidder or release all bidders. Each bid must conform and be responsive to the Contract Documents as defined in the General Conditions.
For Unit Price Contract bids, multiple-award bids, or solicitations containing separate Award Categories, refer to the Special Conditions for the applicable Basis of Award and Award of Contract provisions.
4.12. Bid Protest Procedure
Any bid protest by any bidder regarding any other bid must be submitted in writing to: Sr. Director of Purchasing, Shamica R. Nance at shamica.nance@fusd.net, not more than five (5) calendar days after receipt of written notice of the District’s intent to award to another bidder and must meet the following requirements:
a. The protest must contain a complete statement of any and all basis for the protest.
b. The protest must refer to the specific portions of all documents that form the basis for the protest.
mailto:shamica.nance@fusd.net
c. The protest must include the name, address, email and telephone number of the person representing the protesting party.
The procedure and time limits set forth in this section are mandatory and are each bidder's sole and exclusively remedy in the event of bid protest. Failure to comply with these procedures shall constitute a waiver of any right to further pursue the bid protest, including filing a Government Code claim, any administrative remedies or legal proceedings.
4.13. Alternates
If alternate bids are called for, the Contract may be awarded at the election of the Governing Board to the lowest responsible and responsive bidder using the method and procedures outlined in the Notice Inviting Bids and as specified in the section entitled Alternate/Deductive Bid Alternates.
a. Subcontractor Listing for Alternates. If alternate bids are called for and the bidder intends to use different or additional Subcontractors, a separate list of Subcontractors must be submitted for each such alternate.
4.14. Evidence of Responsibility
Upon the request of the District, a bidder whose bid is under consideration for the award of the Contract shall submit promptly to the District satisfactory evidence showing the bidder’s financial resources, surety and insurance claims experience, construction experience, completion ability, workload, organization available for the performance of the Contract, and other factors pertinent to a Project of the scope and complexity involved.
4.15. Listing Subcontractors
Each bidder shall submit with his bid, on the form furnished with the Contract Documents, a list of the names, license numbers, scopes of work, locations of the places of business, contact information, and Department of
Industrial Relations (“DIR”) registration numbers of each Subcontractor who will perform work or labor or render service to the bidder in or about the project, or a Subcontractor who under subcontract to the bidder, specially fabricates and installs a portion of the work, in an amount in excess of one-half of 1 percent of the bidder’s total bid as required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code section 4100, et seq.)
Pursuant to Labor Code section 1725.5, all Subcontractors (of any tier) performing work on this Project must be properly registered with DIR.
4.16. Workers’ Compensation
In accordance with the provisions of Labor Code section 3700, the successful bidder as the Contractor shall secure payment of compensation to all employees. The Contractor shall sign and file with the District the following certificate prior to performing the work under this contract: “I am aware of the provisions of Section 3700 of the
Labor Code, which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” The form of such certificate is included as a part of the Bid Documents.
4.17. Contractor’s License
To perform the work required by this notice, the Contractor must possess the Contractor’s License as specified in the Notice Inviting Bids, and the Contractor must maintain the license throughout the duration of the contract. If, at the time of bid, bidder is not licensed to perform the Project in accordance with Division 3, Chapter 9, of the
Business and Professions Code for the State of California and the Notice to Contractors calling for bids, such bid will not be considered and the Contractor will forfeit its bid security to the District.
4.18. Anti-Discrimination
It is the policy of the District that in connection with all work performed under contracts, there be no discrimination against any prospective or active employee engaged in the work because of race, color, ancestry, national origin, religious creed, sex, age, or marital status. The Contractor agrees to comply with applicable federal and California laws, including, but not limited to, the California Fair Employment and Housing Act, beginning with Government
Code section 12900 and Labor Code section 1735. In addition, the Contractor agrees to require like compliance by any Subcontractors employed on the work by such Contractor.
4.19. Preference for Materials and Substitutions
a. One Product Specified. Unless the Plans and Specifications state that no Substitution is permitted, whenever the Contract Documents indicate any specific article, device, equipment, product, material, fixture, patented process, form, method, construction, or any specific name, make, trade name, or catalog number, with or without the words, “or equal,” such specification shall be read as if the language “or equal” is incorporated.
b. Request for Substitution. Bidder may, unless otherwise stated, offer any material, process, article, etc., which is materially equal or better in every respect to that so indicated or specified
(“Specified Item”) and will completely accomplish the purpose of the Contract Document. If bidder desires to offer a Substitution for a Specified Item, such bidder must make a request in writing on the District’s Substitution Request Form (“Request Form”) located within the
Question and Answer section of the e-procurement portal. The completed Request Form must be submitted through the e-procurement portal at least seven (7) business days prior to the bid opening date. The Request Form must be accompanied by evidence as to whether the proposed substitution:
i. Is equal in quality, service, and ability to the Specified Item as demonstrated by a side by side comparison of key characteristics and performance criteria (CSI comparison chart);
ii. Will entail no changes in detail, construction and scheduling of related work;
iii. Will be acceptable in consideration of the required design and artistic effect;
iv. Will provide no cost disadvantage to the District;
v. Will require no excessive or more expensive maintenance, including adequacy and availability of replacement parts; and
vi. Will require no change in the Contract Time.
Any bidder requesting a substitution shall provide any and all Drawings, Specifications, samples, performance data, calculations, and other information as may be required to assist the Architect and the District in determining whether the proposed substitution is acceptable. The burden of establishing these facts shall be upon the bidder.
After the District’s timely receipt of such evidence by bidder, the District will make its final decision as to whether the bidder’s request for substitution for any Specified Items will be granted. The District shall have sole discretion in deciding as to whether a proposed request for substitution is equal to or better than a Specified Item. Any request for substitution which is granted by the District shall be issued via an addendum issued to all bidders. The District may condition its approval of any substitution upon delivery to the District of an extended warranty or other assurances of adequate performance of the substitution. Any and all risks of delay due to DSA, or any other governmental agency having jurisdiction shall be on the bidder.
4.20. Disqualification of Bidders and Proposals
More than one proposal for the same work from any individual, firm, partnership, corporation, or association under the same or different names will not be accepted; and reasonable grounds for believing that any bidder is interested in more than one proposal for the work will be cause for rejecting all proposals in which such bidder is interested and the bidder will forfeit their bid security to the District.
4.21. Unbalanced or Altered Bids
Proposals in which the prices are obviously unbalanced, and those which are incomplete or show any alteration of form or contain any additions or conditional or alternate bids that are not called for or otherwise permitted, may be rejected. A proposal on which the signature of the bidder has been omitted may be rejected. If, in the District’s sole discretion, it determines any pricing, costs or other information submitted by a bidder may result in an unbalanced bid, the District may deem such bid non-responsive. A bid may be determined by the District to be unbalanced if the bid is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the District even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advanced payment.
4.22. Employment of Apprentices
The Contractor and all Subcontractors shall comply with the provisions of California Labor Code including, but not limited to sections 1777.5, 1777.6, and 1777.7 concerning the employment of apprentices. The Contractor and all
Subcontractors shall comply with the requirements of said sections, including applicable portions of all subsequent amendments in the employment of apprentices; however, the Contractor shall have full responsibility for compliance with said Labor Code sections, for all apprenticeable occupations, regardless of any other contractual or employment relationships alleged to exist.
4.23. Non-Collusion Declaration
Public Contract Code section 7106 requires bidders to submit declaration of non-collusion with their bids. This form is included in the vendor questionnaire and must be signed and dated by the bidder under penalty of perjury.
4.24. Wage Rates, Travel and Subsistence
a. The Contractor and all Subcontractors shall comply with the requirements set forth in Division 2, Part 7, Chapter 1 of the Labor Code. Pursuant to Labor Code section 1770 et seq., the District has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which this work is to be performed for each craft, classification or type of worker needed to execute the contract. Copies are available from the District to any interested party on request and are also available from the Director of the Department of Industrial Relations. The Contractor shall obtain copies of the above-referenced prevailing wage sheets and post a copy of such wage rates at appropriate, conspicuous, weatherproof points at the Site.
b. Any worker employed to perform work on the Project and such work is not covered by any classification listed in the published general prevailing wage rate determinations or per diem wages determined by the Director of the Department of Industrial Relations, shall be paid not less than the minimum rate of wages specified therein for the classification which most nearly corresponds to the employment of such person in such classification.
c. Holiday and overtime work, when permitted by law, shall be paid for at the rate set forth in the prevailing wage rate determinations issued by the Director of the Department of Industrial
Relations or at least one and one-half (1½) times the specified basic rate of per diem wages, plus employer payments, unless otherwise specified in the Contract Documents or authorized by law.
d. These per diem rates, including holiday and overtime work, and employer payments for health and welfare, pension, vacation, and similar purposes, are on file at the administrative office of the
District, located as noted above and are also available from the Director of the Department of
Industrial Relations. It is the Contractor’s responsibility to ensure the appropriate prevailing rates of per diem wages are paid for each classification. It shall be mandatory upon the Contractor to whom the Contract is awarded, and upon any Subcontractor under such Contractor, to pay not less than the said specified rates to all workers employed by them in the execution of the
Contract.
4.25. DIR Registration of Contractor and Subcontractors
Contractor or all Subcontractors shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in the Labor Code, unless currently registered and qualified to perform public work pursuant to
Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract
Code, provided the Contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
This Project is a public works project as defined in Labor Code section 1720. Each Contractor bidding on this
Project and all Subcontractors (of any tier) performing any portion of the Work must comply with the Labor Code sections 1725.5 and 1771.1 and must be properly and currently registered with DIR and qualified to perform public works pursuant to Labor Code section 1725.5 throughout the duration of the Project. For more information and up to date requirements, Contractors are recommended to periodically review the DIR’s website at www.dir.ca.gov.
Contractor shall be solely responsible for ensuring compliance with Labor Code section 1725.5 as well as any requirements implemented by DIR applicable to its services or its Subcontractors throughout the term of the
Agreement and in no event shall Contractor be granted increased payment from the District or any time extensions to complete the Project as a result of Contractor’s efforts to maintain compliance with the Labor Code or any requirements implemented by DIR. Failure to comply with these requirements shall be deemed a material breach of this Agreement and grounds for termination for cause. The Contractor and all Subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by the
District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. The District reserves the right to withhold contract payments if the District is notified, or determines as the result of its own investigation, that Contractor is in violation of any of the requirements set forth in Labor Code section 1720 et seq. at no penalty or cost to the District. Monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE).
4.26. No Telephone or Facsimile Availability
No telephone or facsimile machine will be available to bidders on the District premises at any time.
4.27. Obtaining Bidding Documents
Bidding Documents, may be obtained from:
https://www.dir.ca.gov/
The e-procurement portal at https://procurement.opengov.com/portal/fusd.
Bidders shall utilize a complete set of Bidding Documents in preparing a bid. The failure or omission of bidder to receive any bid document, form, instrument, Addendum, or other document shall not relieve bidder from any obligations with respect to the bid and/or Contract.
4.28. Addenda
Clarification or any other notice of a change in the Bidding Documents will be issued only by the District and only in the form of Addendum, through the e-procurement portal. Any other purported Addenda are void and unenforceable.
Bidder is responsible for ascertaining the disposition of all Addenda issued regardless of District notification and to acknowledge all Addenda through the e-procurement portal prior to the bid opening. Addenda is available for inspection through the e-procurement portal. Oral statements or any instructions in any form, other than Addendum as described above, shall be void and unenforceable. Addenda issued by the District must be acknowledged by the bidder. Failure to acknowledge may result in bid being deemed non-responsive.
4.29. CUPCCAA
This Project is being let in accordance with the California Uniform Public Construction Cost Accounting
(“CUPCCAA”) set forth in Public Contract Code section 22000 et seq. Bidders shall comply with any requirements set forth in the CUPCCAA including all guidelines and requirements in the current California Uniform Public
Construction Cost Accounting Commission Cost Accounting Policies and Procedures Manual. If applicable, only
Contractors included on the District’s Qualified List shall submit bids for the Project as set forth in the CUPCCAA.
4.30. Debarment
Bidder may also be subject to debarment, in addition to seeking remedies for False Claims under Government Code section 12650 et seq. and Penal Code section 72, the District may debar a Contractor if the Board, or the Board may designate a hearing officer who, in his or her discretion, finds the Contractor has done any of the following:
a. Intentionally or with reckless disregard, violated any term of a contract with the District
b. Committed an act or omission which reflects on the Contractor’s quality, fitness or capacity to perform work for the District;
c. Committed an act or offense which indicates a lack of business integrity or business honesty; or,
d. Made or submitted a false claim against the District or any other public entity (See Government
Code section 12650, et seq., and Penal Code section 72.)
4.31. Mandated Reporter Training Requirement
California Mandated Reporter Requirement – Contractors and Vendors https://mandatedreportertraining.com/california/
Any contractor, subcontractor, consultant, or vendor (“Contractor”) providing services on a school campus or at any District facility where pupils may be present shall comply with all applicable California mandated reporter laws.
Pursuant to California Penal Code § 11165.7 and Education Code § 44691, certain individuals working on school grounds, including employees of outside contractors who may have direct contact with students, may be designated as mandated reporters of child abuse and neglect.
Accordingly, Contractor shall ensure the following:
https://mandatedreportertraining.com/california/
A. Mandated Reporter Training Required - Contractor certifies that all Contractor employees, agents, or subcontractors who will perform work on District property during times when students are present have completed California-required mandated reporter training consistent with state law.
B. Training Prior to Campus Access - Such training must be completed prior to the employee commencing work on any school site or District facility.
C. Proof of Compliance - Contractor shall provide, upon request, documentation verifying completion of mandated reporter training for covered employees.
D. Duty to Report - Contractor employees identified as mandated reporters must immediately report suspected child abuse or neglect in accordance with Penal Code §§ 11164–11174.3 (Child Abuse and
Neglect Reporting Act).
E. Failure to Comply - Failure to comply with these requirements shall constitute a material breach of contract and may result in removal of personnel from District property and/or termination of the agreement.
5. General Conditions-Unit Price
5.1. ARTICLE 1 DEFINITIONS
NOTE: The following shall not be construed as a comprehensive list of all definitions in the Contract Documents and there may be other definitions set forth in the Contract Documents. Additionally, any references to any DSA forms, documents or requirements shall be construed to incorporate any updates, supplements, or additions. The
Contractor shall be required to meet the latest DSA requirements applicable to the Project. These General
Conditions are intended to supplement, complement and work in conjunction with the Division 1 documents/specifications. Work required by one set of documents and not by the others shall be done as if required by all. In the event there is a discrepancy, conflict, or ambiguity between the various documents, it is intended that the more stringent, higher quality, and greater quantity of work shall apply. The Contractor shall carefully review all Contract Documents carefully and if there are any discrepancies, conflict or ambiguities in the documents, the
Contractor shall notify the Construction Manager in writing. Failure to provide written notice shall be deemed consent by the Contractor that all of the requirements in the documents are clear, there are no discrepancies, conflicts or ambiguities, and that the Contractor understands the requirements for the Project.
1. Action of the Governing Board is a vote of a majority of the District’s governing board.
2. Approval means written authorization through action of the governing board unless specific delegation of approval authority is delegated to a District representative.
3. As shown, as indicated, as detailed refers to drawings accompanying this specification.
4. Claim. A “Claim” shall have the same meaning as in Public Contract Code sections 9204 and 20104, including the requirements of Section 9204 (c)(1) to submit a Claim to the District by registered or certified mail. In addition, a Claim shall include any disagreement involving any withholding the
District makes or has provided notice to the Contractor that it intends to make from any payment that would otherwise be due to the Contractor. Notwithstanding the above, before any “Dispute” rises to the level of a Claim, the Contractor must have complied with the applicable provisions of Article 43, including the requirement to assemble documentation supporting the Contractor’s position. Supporting documentation (see Article 44) must be submitted with a Claim.
5. Dispute. A “Dispute” is a disagreement over a discrete and separate issue involving the terms or conditions of the Project or Contract where the Contractor’s opinion or interpretation of the Project, Contract, payment, Change Order or Request for Proposal differs from that of the District or Architect.
A Dispute includes any disagreement that would be considered a claim under Public Contract Code sections 9204 and 20104, but has not yet risen to the level of a Claim. A Dispute only rises to the level of a Claim once the Contractor assembles back-up documentation and presents it to the District for evaluation. See Article 44.
6. Complete/ Completion/ Final Completion means that all Work in the Contract Documents is finished, the requirements of the Contract Documents have been met, the Project has been closed out, and all
Work has ceased on the Project. This may also be referred to as Final Completion. In most cases, the recording of a Notice of Completion shall represent Completion of the Project. Beneficial Occupancy does not mean the Work is Complete.
7. Contract, Contract Documents includes all documents noted in Article 7 of the Agreement Form and all modifications, addenda, and amendments thereto.
8. Contractor, District and Architect are those mentioned as such in the Agreement. They are treated throughout the contract as if they are of singular number and neuter gender.
9. Locality in which the work is performed means the county in which the public work is done.
10. Project is the planned undertaking as provided for in the Contract Documents by District and
Contractor.
11. Provide shall include “provide complete in place”, that is, “furnish & install”.
12. Safety Orders are those issued by the Division of Industrial Safety an OSHA Safety and Health
Standards for construction.
13. Standards, Rules and Regulations that are recognized printed standards applicable to the Project shall be considered as one and a…