This is a Notice to Highway Contractors issued by the Indiana Department of Transportation (INDOT) for multiple highway improvement projects across various districts in Indiana, with bids due on November 5, 2026 at 10:00 AM. The notice solicits sealed proposals from contractors holding valid Certificates of Qualification from INDOT for 27 distinct contract opportunities encompassing bike and pedestrian facilities, intersection improvements, small structure replacements, culvert work, HMA overlays, bridge construction and rehabilitation, pavement patching, tree removal, and traffic signal modernization. Project locations span multiple counties including Marion, Hamilton, LaPorte, Jasper, Washington, Porter, Harrison, Vigo, Decatur, Orange, Lake, Allen, Fountain, Bartholomew, Montgomery, Jay, Delaware, Jackson, Grant, Scott, and Ohio counties. Completion dates range from March 2027 through November 2028. The bidding process is conducted electronically through the Bid Express Online Bidding Exchange, with contractors required to register in advance by 9:00 AM on the bid opening date. Proposal bids will be downloaded and publicly released beginning at 11:30 AM on the INDOT webpage, with in-person attendance available upon 24-hour advance notice.

All bids must include executed bid bonds submitted through designated electronic surety platforms (Surety2000 or Tinubu Surety Solution), and most contracts require fully executed performance bonds submitted separately. Contractors submitting bids of $150,000 or more must include a written drug testing plan for employees in compliance with Indiana Code 4-13-18. Detailed construction contract documents are available at no cost through the INDOT Documents Download webpage. Disadvantaged Business Enterprise (DBE) goals are 0.00% for most contracts, with select projects in Allen County (pavement patching and bridge work) specifying MBE, WBE, and IVOSB goals ranging from 0% to 3.00%. The specific Interchange Modification project (Call 251, R-43950-A) is located on I-465 at Keystone Avenue in Marion County with a completion date of October 5, 2027 and qualifications requirements designated as E(D) and E(G). Contract administration inquiries and bidder registration requests should be directed to indotbidders@indot.in.gov, with the INDOT Contract Administration Division located at 100 North Senate Avenue, Indianapolis, Indiana 46204.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO HIGHWAY CONTRACTORS

November 5, 2026

Sealed proposals for certain highway improvements as described below will be received from contractors holding a valid Certificate of Qualification issued by the Indiana Department of Transportation (INDOT) until the above stated letting date and time.

ELECTRONIC BIDDING: All contracts within this notice are designated for electronic bidding via the Bid Express Online Bidding Exchange (Bid Express). Only electronic bids submitted via Bid Express will be accepted on contracts designated for electronic bidding.

LOCATION OF OPENING: All submitted proposal bids will be downloaded from Bid Express immediately after the above stated letting date & time.

Due to the time required to download and import them into the processing database, the reading and immediate public release of the proposal bids will begin at 11:30 AM on the INDOT webpage. With advanced notice, INDOT will accommodate anyone wishing to attend in-person the reading of the proposal bids.* To request in-person attendance of proposal bid readings please contact Contract Administration at indotbidders@indot.in.gov at least 24 hours prior to the letting. Proposal bids will be considered as provided for in the Rules governing INDOT bidding.

LETTING DOCUMENTS: Detailed Construction Contract letting documents will be available for downloading via the INDOT internet Documents Download webpage at no cost. Those document files are copyright free without restrictions on duplication or distribution. Required electronic bidding files will be available from the Bid Express website. It is the bidder's responsibility to check the Bid Express website for all amendment files prior to the deadline. An amendment file may not be communicated by the issuance of an INDOT revision notice.

BIDDER REGISTRATION: Contractors planning to submit electronic bids via Bid Express must register in advance by emailing their request to bid to:

INDOTbidders@indot.in.gov. Requests must indicate the contracts desired to bid with call number(s) and include the Contractor’s FEIN number. Only registered valid bidders may submit bids via Bid Express. Bidder registration requests must may be received no later than 9:00 AM (local time) on the bid opening date.

BID BONDS: An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid.

PERFORMANCE BONDS: A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Bid Express does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids.

CONTRACTOR EMPLOYEE DRUG TESTING PLAN: Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor’s employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids.

October 07, 2026Published:

Letting Date & Time:

INDIANA DEPARTMENT OF TRANSPORTATION

10:00 AMat

INDIANA DEPARTMENT OF TRANSPORTATION

Contract Administration Division 100 North Senate Avenue, N758-Cont Indianapolis, IN 46204 For more information call (317)232-5300.

INTERNET WEBPAGE ADDRESSES:

Documents Download webpage - http://erms.indot.in.gov/ViewDocs/ Rules for Bidding webpage - http://www.in.gov/dot/div/contracts/letting/general/105iac11.pdf Letting Information Index webpage - http://www.in.gov/dot/div/contracts/letting/index.html Bid Express website - https://www.bidx.com/

TITLE VI ASSURANCES: In accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Sub Title A, Office of the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation, the Indiana Department of Transportation assures minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, age, national origin, religion, sexual orientation, gender identity, disability/handicap or income status in consideration for an award.

atNovember 5, 2026 10:00 AMLetting Date & Time:

R -39073-A BIKE AND PEDESTRIAN FACILITIES

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

1592448 BIKE AND PEDESTRIAN FACILITIES1592448

HANCOCK COUNTY - ALONG CR 200W FROM 600 FT S OF WEST

900N TO N FORTVILLE PIKE

June 02, 2028 0.00

C(B) E(A) E(E)

Completion Date DBE Goal:

Qualifications:

R -42227-A INTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE

AND PED FACILITY

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

1901880 INTERSECTION IMPROVEMENT, ROUNDABOUT1901880

HAMILTON COUNTY - ON SR 38 AT LOGAN STREET

2500934 BIKE AND PEDESTRIAN FACILITIES2500934

HAMILTON COUNTY - ON SR 38 AT LOGAN STREET

May 19, 2028 0.00

B(A) C(B) E(F)

Completion Date DBE Goal:

Qualifications:

R -42446-A SMALL STRUCTURE REPLACEMENT

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

1900028 SMALL STRUCTURE REPLACEMENT CV 421-046-227.00 CULVERT1900028

LAPORTE COUNTY - ON US 421 OVER E ARM LITTLE CALUMET

RIVER, 3.22 MI S OF I-94

1900029 SMALL STRUCTURE REPLACEMENT CV 421-046-229.10 CULVERT1900029

LAPORTE COUNTY - ON US 421 OVER WEST BRANCH TRAIL

CREEK, 1.2 MILES S OF I-94

June 30, 2028 0.00

C(B) E(E)

Completion Date DBE Goal:

Qualifications:

R -43210-A SMALL STRUCTURES AND DRAINS CONSTRUCTION

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2001612 SMALL STRUCTURES AND DRAINS CONSTRUCTION2001612

JASPER COUNTY - ON SR 10 AT VARIOUS LOCATIONS

2001615 SMALL STRUCTURES AND DRAINS CONSTRUCTION2001615

JASPER COUNTY - ON SR 110 AT VARIOUS LOCATIONS

September 24, 2027 0.00

C(B) E(E)

Completion Date DBE Goal:

Qualifications:

R -43746-A HMA OVERLAY, PREVENTIVE MAINTENANCE

Seymour DistrictCall

Contract

Project Control No. LocationFederal/State No.

2100170 HMA OVERLAY, PREVENTIVE MAINTENANCE2100170

WASHINGTON COUNTY - ON SR 60 FROM 2.86 MILES W OF SR 335

TO 100 FEET W OF SR 335

July 30, 2027 0.00

B(A) E(R)

Completion Date DBE Goal:

Qualifications:

R -43809-A SMALL STRUCTURE REPLACEMENT

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

1701334 SMALL STRUCTURE REPLACEMENT CV 030-064-18.75 CULVERT1701334

PORTER COUNTY - ON US 30 OVER UNT, 4.73 MILES EAST OF SR

1701335 SMALL STRUCTURE REPLACEMENT CV 030-064-19.10 CULVERT1701335

PORTER COUNTY - ON US 30 OVER UNT TO LAKE LOUISE, 5.26

MILES WEST OF SR 2

June 02, 2028 0.00

B(A) C(B) 0112E(E)

Completion Date DBE Goal:

R -43915-A SMALL STRUCTURE PIPE LINING

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2100762 SMALL STRUCTURE PIPE LINING CV 049-064-37.65 CULVERT2100762

PORTER COUNTY - ALONG SR 49 OVER UNT TO DAMON RUN, 0.7

MILE SOUTH OF I-90

August 01, 2027 0.00

E(E) 0290

Completion Date DBE Goal:

Qualifications:

R -43950-A INTERCHANGE MODIFICATION

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

2000159 INTERCHANGE MODIFICATION2000159

MARION COUNTY - ON I-465 AT KEYSTONE AVENUE

October 05, 2027 0.00

E(D) E(G)

Completion Date DBE Goal:

Qualifications:

R -44008-A BIKE AND PEDESTRIAN FACILITIES

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2101141 BIKE AND PEDESTRIAN FACILITIES2101141

PORTER COUNTY - ALONG THE TOD PARKING LOT TO NAPOLEON

ST AND INDIANA STREET

November 15, 2028 0.00

A(B) C(B) 0120

Completion Date DBE Goal:

R -44293-A BIKE AND PEDESTRIAN FACILITIES

Seymour DistrictCall

Contract

Project Control No. LocationFederal/State No.

2101688 BIKE AND PEDESTRIAN FACILITIES2101688

HARRISON COUNTY - ON MULBERRY ST FROM E POPLAR ST TO

COLLEGE AVE

May 07, 2028 0.00

A(B) C(B) E(F)E(A)

Completion Date DBE Goal:

Qualifications:

R -44392-A SMALL STRUCTURES AND DRAINS CONSTRUCTION

Crawfordsville DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200503 SMALL STRUCTURES AND DRAINS CONSTRUCTION CV 040-084-

15.65 CULVERT

2200503

VIGO COUNTY - ON US 40, 7.40 MILES EAST OF I-70

June 30, 2028 0.00

C(B) E(E)

Completion Date DBE Goal:

R -44432-A SMALL STRUCTURE REPLACEMENT AND PIPE LINING

Seymour DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200495 SMALL STRUCTURES AND DRAINS CONSTRUCTION2200495

DECATUR COUNTY - ON SR 46 OVER UNT TO COBBS FORK, 5.3

MILES EAST OF US 421

2200601 SMALL STRUCTURE PIPE LINING CV 003-016-73.10 CULVERT2200601

DECATUR COUNTY - ON SR 3 OVER UNNAMED DITCH, 1.43 MILES

NORTH OF US 421

2200603 SMALL STRUCTURE PIPE LINING CV 003-016-67.41 CULVERT2200603

DECATUR COUNTY - ON SR 3 OVER UNT TO FALL FORK, 0.69 MILE

EAST OF SR 46

2200605 SMALL STRUCTURE REPLACEMENT CV 003-016-61.68 CULVERT2200605

DECATUR COUNTY - ON SR 3 OVER UNT TO WYALOOSING CREEK,

5.04 MILES S OF SR 46

July 19, 2027 0.00

C(B) E(E) 02900112

Completion Date DBE Goal:

Qualifications:

R -44492-A SMALL STRUCTURE REPLACEMENT AND PIPE LINING

Vincennes DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200571 SMALL STRUCTURE REPLACEMENT CV 056-059-62.26 CULVERT2200571

ORANGE COUNTY - ON SR 56 OVER UNT TO DAVIS CREEK, 4.66

MILES WEST OF SR 145

2500553 SMALL STRUCTURE PIPE LINING CV 145-059-35.26 CULVERT2500553

ORANGE COUNTY - ON SR 145 OVER UNT TO PATOKA LAKE, 3.60

MILES N OF SR 164

August 01, 2027 0.00

C(B) E(E) 0290

Completion Date DBE Goal:

R -44635-A HMA OVERLAY, MINOR STRUCTURAL AND BRIDGE

THIN DECK OVERLAY

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200750 BRIDGE THIN DECK OVERLAY (I94)I80-16-04296 COMPOSITE

CONTINUOUS STEEL BEAM

2200750

LAKE COUNTY - ON I-94W OVER I-90, 0.46 MILE EAST OF I-80

2200751 BRIDGE THIN DECK OVERLAY (I94)I80-16-04296 COMPOSITE

CONTINUOUS STEEL BEAM

2200751

LAKE COUNTY - ON I-94E OVER I-90, 0.46 MILE EAST OF I-80

2200821 HMA OVERLAY, MINOR STRUCTURAL2200821

PORTER COUNTY - ON I-94 FROM I-80/90 TO 0.52 MILE EAST OF SR

June 01, 2028 0.00

B(A) D(B) E(C)

Completion Date DBE Goal:

Qualifications:

R -45582-A PAVEMENT PATCHING

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

2400568 PAVEMENT PATCHING2400568

ALLEN COUNTY - ON I-469 FROM 0.54 MI EAST OF I-69 TO 0.57 MI

WEST OF SR 1

October 30, 2027 0.00

A(A) E(Q)

Completion Date

Qualifications:

WBE Goal: 0.00 IVOSB Goal: 0.00MBE Goal:

R -45664-A SMALL STRUCTURE REPLACEMENT

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2300980 SMALL STRUCTURE REPLACEMENT CV 016-037-20.50 CULVERT2300980

JASPER COUNTY - ON SR 16 OVER SPURGEON DITCH, 5.74 MILES

EAST OF US 231

October 15, 2027 0.00

C(B) E(E)

Completion Date DBE Goal:

R -45794-A PAVEMENT PATCHING

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

2400726 PAVEMENT PATCHING2400726

MARION COUNTY - ON I-65 FROM 5.77 MILES S OF I-465S TO 0.18

MILE N OF I-465S

November 02, 2027 0.00

A(A) B(A) E(Q)

Completion Date

Qualifications:

WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:

R -45886-A PAVEMENT MARKINGS AND SIGN MODERNIZATION

Crawfordsville DistrictCall

Contract

Project Control No. LocationFederal/State No.

2401657 PAVEMENT MARKINGS2401657

FOUNTAIN COUNTY - ON VARIOUS ROADS THROUGHOUT THE

COUNTY

2401658 SIGN MODERNIZATION2401658

FOUNTAIN COUNTY - ALONG VARIOUS ROADS THROUGHOUT THE

COUNTY

September 01, 2027 0.00

E(D) E(G)

Completion Date DBE Goal:

Qualifications:

R -46136-A INTERSECTION IMPROVEMENT WITH ADDED TURN

LANES

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2000022 INTERSECTION IMPROVEMENT WITH ADDED TURN LANES2000022

LAKE COUNTY - ON US 20 AT SR 152

June 05, 2028 0.00

B(A) C(B)

Completion Date DBE Goal:

R -46147-A HMA OVERLAY, PREVENTIVE MAINTENANCE

Seymour DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200834 HMA OVERLAY, PREVENTIVE MAINTENANCE2200834

BARTHOLOMEW COUNTY - ON I-65 FROM 0.44 MILE N OF US 31 TO

0.54 MILE N OF SR 252

October 30, 2027 0.00

B(A)

Completion Date DBE Goal:

Qualifications:

R -46447-A SIDEWALK CONSTRUCTION AND DRAINAGE

IMPROVEMENTS

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2501048 SIDEWALK CONSTRUCTION AND DRAINAGE IMPROVEMENTS2501048

LAKE COUNTY - ALONG CATHERINE ST, 71ST AVE AND 70TH AVE IN

MERRILLVILLE

July 16, 2027 0.00

C(B) E(E) E(F)

Completion Date DBE Goal:

Qualifications:

R -46935-A TREE REMOVAL AND TRIMMING

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

2600938 TREE REMOVAL AND TRIMMING2600938

HAMILTON COUNTY - ALONG SR 32 FROM 520 FT E OF EAST ST TO

625 FT W OF RIVER AV

January 01, 2028 0.00

C(B) 0380

Completion Date

Qualifications:

WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:

B -43912-A BRIDGE THIN DECK OVERLAY

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2400455 BRIDGE THIN DECK OVERLAY 002-45-09632 CONTINUOUS

REINFORCED CONCRETE SLAB

2400455

LAKE COUNTY - ON SR 2 OVER MJ BROWN DITCH, 2.70 MILES

EAST OF I-65

April 30, 2027 0.00

C(B) E(C) 0272

Completion Date DBE Goal:

Qualifications:

B -44260-A BRIDGE DECK OVERLAY AND REHABILITATION OR

REPAIR

Crawfordsville DistrictCall

Contract

Project Control No. LocationFederal/State No.

2101713 BRIDGE DECK OVERLAY 54-00175 CONTINUOUS REINFORCED

CONCRETE SLAB

2101713

MONTGOMERY COUNTY - ON CR 550E OVER BIG RACCOON

CREEK, 0.40 MILE S OF SR 234

2101715 BRIDGE REHABILITATION OR REPAIR 54-00066 CONTINUOUS

REINFORCED CONCRETE SLAB

2101715

MONTGOMERY COUNTY - ON CR 300S OVER WALNUT FORK

SUGAR CRK, 0.10 MI OF US 136

2101723 BRIDGE DECK OVERLAY 54-00063 CONTINUOUS REINFORCED

CONCRETE SLAB

2101723

MONTGOMERY COUNTY - ON CR 625E OVER SUGAR CREEK, 0.10

MILE NORTH OF SR 32

August 15, 2027 0.00

C(B) D(A) E(C)

Completion Date DBE Goal:

B -44266-A BRIDGE REPLACEMENT

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

2101729 BRIDGE REPLACEMENT 38-00093 CONTINUOUS REINFORCED

CONCRETE SLAB

2101729

JAY COUNTY - ON CR 350W OVER SIPE DITCH, 0.90 MILE NORTH

OF SR 26

September 17, 2027 0.00

C(B) D(A) 0250

Completion Date DBE Goal:

Qualifications:

B -44268-A BRIDGE REHABILITATION OR REPAIR

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

2101735 BRIDGE REHABILITATION OR REPAIR 18-00030 CONTINUOUS

REINFORCED CONCRETE SLAB

2101735

DELAWARE COUNTY - ON EATON-ALBANY PIKE OVER REES DITCH,

0.55 MILE E OF FW AVE

September 17, 2027 0.00

C(B) D(A)

Completion Date DBE Goal:

Qualifications:

B -44466-A BRIDGE DECK OVERLAY AND COPING REPLACEMENT

Seymour DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200670 BRIDGE DECK OVERLAY AND COPING REPLACEMENT 050-36-06788

CONTINUOUS REINFORCED CONCRETE SLAB

2200670

JACKSON COUNTY - ON US 50 OVER VON FANGE DITCH, 0.82 MILE

WEST OF SR 11

October 01, 2027 0.00

D(A) E(C)

Completion Date DBE Goal:

B -44533-A REPLACE SUPERSTRUCTURE

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200710 REPLACE SUPERSTRUCTURE I469-18-07027 CONTINUOUS

COMPOSITE PLATE GIRDER

2200710

ALLEN COUNTY - ON MINNICH ROAD NB OVER I-469, 1.73 MILES

WEST OF US 30

2200711 REPLACE SUPERSTRUCTURE I469-18-07027 CONTINUOUS

COMPOSITE PLATE GIRDER

2200711

ALLEN COUNTY - ON MINNICH ROAD SB OVER I-469, 1.73 MILES

WEST OF US 30

October 30, 2027 0.00

D(B)

Completion Date DBE Goal:

Qualifications:

B -44534-A BRIDGE DECK OVERLAY

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200786 BRIDGE DECK OVERLAY I69-311-07303 BSBL CONTINUOUS

PRESTRESSED CONCRETE I-BEAM

2200786

ALLEN COUNTY - ON I-69S OVER WASHINGTON CENTER ROAD,

0.62 MI N OF SR 3

2200787 BRIDGE DECK OVERLAY I69-311-07303 BNBL CONTINUOUS

PRESTRESSED CONCRETE I-BEAM

2200787

ALLEN COUNTY - ON I-69N OVER WASHINGTON CENTER ROAD,

0.62 MI N OF SR 3

2200788 BRIDGE DECK OVERLAY I69-310-04550 DSBL CONTINUOUS

PRESTRESSED CONCRETE I-BEAM

2200788

ALLEN COUNTY - ON I-69S OVER SPY RUN CREEK, 0.42 MI S OF SR

2200789 BRIDGE DECK OVERLAY I69-310-04550 DNBL CONTINUOUS

PRESTRESSED CONCRETE I-BEAM

2200789

ALLEN COUNTY - ON I-69N OVER SPY RUN CREEK, 0.42 MI S OF SR

October 30, 2027 0.00

D(B) E(C)

Completion Date DBE Goal:

B -44535-A BRIDGE THIN DECK OVERLAY AND NEW SIGNAL

INSTALLATION

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200984 BRIDGE THIN DECK OVERLAY I469-00-07031 COMPOSITE

CONTINUOUS STEEL BEAM

2200984

ALLEN COUNTY - ON I-469E OVER I-69, 5.51 MILES SOUTH OF US

2200985 BRIDGE THIN DECK OVERLAY I469-00-07031 COMPOSITE

CONTINUOUS STEEL BEAM

2200985

ALLEN COUNTY - ON I-469W OVER I-69, 5.51 MILES SOUTH OF US

2400753 NEW SIGNAL INSTALLATION2400753

ALLEN COUNTY - ON SR 1 AND I-469 RAMPS

August 21, 2027 0.00

D(B) E(A) 0272

Completion Date DBE Goal:

Qualifications:

B -44536-A BRIDGE DECK OVERLAY

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200548 BRIDGE DECK OVERLAY 003-44-07156 REINFORCED CONCRETE

SLAB

2200548

LAGRANGE COUNTY - ON SR 3 OVER MILL RACE, 2.98 MILES

NORTH OF US 20

November 01, 2027 0.00

C(B) D(A) 0250

Completion Date DBE Goal:

B -44548-A BRIDGE REPLACEMENT AND REHABILITATION

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200564 BRIDGE REPLACEMENT CV 016-035-101.75 CULVERT2200564

HUNTINGTON COUNTY - ON SR 16 OVER SILVER CREEK BRANCH,

1.47 MILES E OF SR 105

2200955 BRIDGE DECK OVERLAY 105-35-06867 CONTINUOUS REINFORCED

CONCRETE SLAB

2200955

HUNTINGTON COUNTY - ON SR 105 OVER SILVER CREEK, 1.57

MILES SOUTH OF SR 16

October 31, 2027 0.00

D(A) E(E)

Completion Date DBE Goal:

Qualifications:

B -44588-A SMALL STRUCTURES AND DRAINS CONSTRUCTION

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200497 SMALL STRUCTURES AND DRAINS CONSTRUCTION 48288

CULVERT

2200497

DELAWARE COUNTY - ON SR 32 OVER UNT TO TRUITT DITCH, 0.95

MILE EAST OF US 35

June 25, 2027 0.00

E(E) E(K)

Completion Date DBE Goal:

Qualifications:

B -44653-A BRIDGE COATING

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200537 BRIDGE COATING I80-03-07553 CONTINUOUS COMPOSITE PLATE

GIRDER

2200537

LAKE COUNTY - ON I-80 OVER KENNEDY AVENUE, 0.97 MILE EAST

OF US 41

June 30, 2027 0.00

D(B) E(M)

Completion Date DBE Goal:

B -45063-A BRIDGE REPLACEMENT

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

1900048 BRIDGE REPLACEMENT 035-27-10469 PRESTRESSED CONCRETE

BULB-T BEAM

1900048

GRANT COUNTY - ON US 35 OVER DEER CREEK, 0.25 MILE WEST

OF SR 9

October 31, 2027 0.00

D(A)

Completion Date DBE Goal:

Qualifications:

B -45410-A BRIDGE THIN DECK OVERLAY

Seymour DistrictCall

Contract

Project Control No. LocationFederal/State No.

2300825 BRIDGE THIN DECK OVERLAY 203-72-03078 PRESTRESSED

CONCRETE I-BEAM

2300825

SCOTT COUNTY - ON SR 203 OVER WOODS FORK CREEK, 1.52

MILES SOUTH OF SR 3

July 30, 2027 0.00

D(A) 0272

Completion Date DBE Goal:

Qualifications:

B -45648-A BRIDGE THIN DECK OVERLAY

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2300840 BRIDGE THIN DECK OVERLAY 912-45-06599 COMPOSITE

CONTINUOUS STEEL BEAM

2300840

LAKE COUNTY - ON SR 912 OVER GUTHRIE STREET, 0.32 MILE

WEST OF US 12

June 11, 2027 0.00

D(B) 0272

Completion Date DBE Goal:

B -46218-A SMALL STRUCTURE REPLACEMENT

Seymour DistrictCall

Contract

Project Control No. LocationFederal/State No.

2200547 SMALL STRUCTURE REPLACEMENT CV 262-058-8.80 CULVERT2200547

OHIO COUNTY - ON SR 262 OVER UNNAMED DITCH, 8.80 MILES S

OF US 50

August 13, 2027 0.00

C(B) 0103

Completion Date DBE Goal:

Qualifications:

B -46893-A TREE REMOVAL AND TRIMMING

Greenfield DistrictCall

Contract

Project Control No. LocationFederal/State No.

2600795 TREE REMOVAL AND TRIMMING2600795

VARIOUS COUNTIES - ALONG VARIOUS ROADS THROUGHOUT THE

GREENFIELD DISTRICT

March 12, 2027 0.00

Completion Date

Qualifications:

WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:

M -46855-A TREE REMOVAL AND TRIMMING

LaPorte DistrictCall

Contract

Project Control No. LocationFederal/State No.

2500498 TREE REMOVAL AND TRIMMING2500498

VARIOUS COUNTIES - ALONG VARIOUS ROADS THROUGHOUT THE

LAPORTE DISTRICT

March 31, 2027 0.00

Completion Date

Qualifications:

WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:

T -44553-A RAISED PAVEMENT MARKINGS, REFURBISHED

Fort Wayne DistrictCall

Contract

Project Control No. LocationFederal/State No.

2201087 RAISED PAVEMENT MARKINGS, REFURBISHED2201087

VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE

FORT WAYNE DISTRICT

November 15, 2027 0.00

Completion Date DBE Goal:

Qualifications:

T -46088-A RAISED PAVEMENT MARKINGS, REFURBISHED

Crawfordsville DistrictCall

Contract

Project Control No. LocationFederal/State No.

2500040 RAISED PAVEMENT MARKINGS, REFURBISHED2500040

VARIOUS COUNTIES - ALONG VARIOUS ROADS THROUGHOUT THE

CRAWFORDSVILLE DISTRICT

July 31, 2027 0.00

Completion Date DBE Goal:

Qualifications:

T -46195-A TRAFFIC SIGNALS MODERNIZATION

Crawfordsville DistrictCall

Contract

Project Control No. LocationFederal/State No.

1800215 TRAFFIC SIGNALS MODERNIZATION1800215

TIPPECANOE COUNTY - ON SR 26 AT CR 900E, 4.71 MILES EAST OF

I-65

June 30, 2028 0.00

B(A) E(A)

Completion Date DBE Goal:

File details come from the government source that posted it. Updated .