Instructions on Completing SBE-M-WBE Schedules1-2 Final with attachments.pdf

PDF 3 MB Posted

Attached to
PRE-QUALIFICATION FOR DOOR REPLACEMENT SERVICES
Solicitation number
RPQ 680 22-113/SS 7
Issued by
Palm Beach County, Florida

About this file

This document provides instructions for completing Subcontractor/Subconsultant Schedules 1 and 2 required by the Palm Beach County Office of Economic and Business Opportunity (OEBO) for the Poseidon Place - Demolition (RE-BID) project, solicitation number 2021-047109-R2. Schedule 1 must be completed by the prime contractor and submitted with the bid or proposal, listing the prime contractor's information and dollar amount or percentage of work, along with all subcontractors and subconsultants and their respective certifications as Small Business Enterprise (SBE), Women Business Enterprise (WBE), Minority Business Enterprise (MBE), or non-certified businesses. Schedule 2 is a binding letter of intent that must be properly executed by all subcontractors, subconsultants, and any tiered subcontractors, specifying in detail the scope of work, line items, descriptions, unit prices, quantities, and total prices or percentages. The sample submission demonstrates a prime contractor, Demolition Company, Inc., with 80 percent of work, utilizing two subcontractors: Rugs R Us with 5 percent ($5,000) for furnishing and installing flooring, and Painting R Us with 15 percent ($15,000) for painting and wallpaper services, for a total bid price of $100,000 with $15,000 in certified S/M/WBE participation.

Failure to submit properly executed Schedules 1 and 2 may render a submittal non-responsive to SBE requirements. Only firms certified by Palm Beach County at the time of solicitation opening or the due date are eligible to meet the established OEBO Affirmative Procurement Initiative (API). The S/M/WBE credit is awarded only for areas in which the certified business is actually certified. The prime contractor must certify the accuracy of information provided and sign and date all forms. Modification of the forms is not permitted and will result in rejection upon submittal. Both the sample Schedule 1 and Schedule 2 forms were executed on May 1, 2023, with signatures from authorized representatives of the prime contractor and subcontractors.

View the file

Other files

File Type Posted
22-113-SS.pdf PDF
22-113-SS_1_12-22-22.pdf PDF
22-113-SS_Amendment 2.pdf PDF
22-113-SS_3_07-02-25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS ON COMPLETING SUBCONTRACTOR/SUBCONSULTANT

SCHEDULES 1 - 2

Respondents are required to complete and properly execute the required OEBO schedules when responding to a solicitation and when submitting requests for payment after contract award.

Subcontractor/Subconsultant Schedules 1 and 2 are required to be submitted with the bid or proposals in order to be deemed responsive to the SBE requirements, when applicable. Failure to submit properly executed Schedules 1 and 2 may deem the submittal as non-responsive.

Important Points to Remember

A. Schedule 1 MUST be completed by the Prime Contractor and submitted with their bid or proposal.

1. All Prime Contractors, regardless of their certification status, must properly complete section “A” of this form. List the Company name, address, contact person and information along with the dollar amount or percentage of work to be completed by the prime.

2. Section “B” of this form must list all the Subcontractor(s)/Subconsultant(s) to be utilized on this project. Please check the appropriate box if the Subcontractor(s)/Subconsultant(s) is certified as an SBE, WBE, MBE or Non-SBE.

3. If the Subcontractor/Subconsultant is a certified business, please place the dollar amount or percentage of work in the appropriate race category. The race category indicated on the

Schedule 1 should match the Schedule 2.

4. Make sure to write the total bid price dollar amount and SBE-M/WBE participation dollar amount or percentage of work at the bottom of the form.

5. The Prime must print, sign and date the form.

B. Schedule 2 MUST be properly executed and submitted with the bid/proposal for all

Subcontractors/Subconsultants listed on Schedule 1.

1. Specify in detail: The line items, if available; a specific description of work, material associated with each line item or overall project; the total price or percentage of work for each line item; and a grand total dollar amount or percentage for all line items or overall project work.

2. If there is a portion of the description of work that will not be performed by a subcontractor, the subcontractor that will be performing that portion of work must be identified. The name along with the dollar amount or percentage of work must be written in the [red box] on the

Schedule 2 form. A separate, properly executed Schedule 2 must be submitted for all tiered

Subcontractors/Subconsultants.

3. The Subcontractor must print, sign and date the form.

4. SBE Prime Contractors must complete a properly executed Schedule 2 in order to be considered responsive to the OEBO API approved for the solicitation.

Please see the sample Schedules for more details.

OEBO SCHEDULE 1

SOLICITATION/PROJECT/BID NAME: Poseidon Place - Demolition (RE-BID) SOLICITATION/PROJECT/BID NO.: 2021-047109-R2

SOLICITATION OPENING/SUBMITTAL DATE: COUNTY DEPARTMENT: _

Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:

NAME OF PRIME RESPONDENT/BIDDER: ADDRESS: _

CONTACT PERSON: PHONE NO.: E-MAIL:

PRIME’S DOLLAR AMOUNT OR PERCENTAGE OF WORK: Non-SBE MBE WBE SBE

Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:

Subcontractor/Sub consultant Name DIRECTION: List Firm Name, Address, & Provide PBC Vendor ID#. (https://www.pbcgov.org/pbcvendors)

(Check all Applicable Categories)

MBE WBE SBE

Non-SBE Minority Women Small

Business Business Business

Black

DOLLAR AMOUNT OR PERCENTAGE OF WORK

Hispanic Women Caucasian Asian Other

1.

2.

3.

4.

5.

(Please use additional sheets if necessary)

Total Bid/Offer Price $ Total

Total Certified S/M/WBE Participation $

I hereby certify that the above information is accurate to the best of my knowledge: _

Name & Authorized Signature Title

Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.

2. Only those firms certified by Palm Beach County at the time of solicitation opening or due date are eligible to meet the established OEBO Affirmative Procurement Initiative (API). Please check the applicable box and list the dollar amount or percentage under the appropriate demographic category.

3. Modification of this form is not permitted and will be rejected upon submittal.

REVISED 06/30/2022

*SMWBE Primes must include their percentage or dollar amount in the Total Participation line under section B.

May 15, 2023 Facilities Development & Operations http://www.pbcgov.org/pbcvendors) http://www.pbcgov.org/pbcvendors)

OEBO LETTER OF INTENT – SCHEDULE 2

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. The Schedule 2 shall contain bolded language indicating that by signing the Schedule 2, both parties recognize this Schedule as a binding document. All Subcontractors/subconsultants, including any tiered Subcontractors/subconsultants, must properly execute this document. Each properly executed Schedule 2 must be submitted with the bid/proposal.

SOLICITATION/PROJECT NUMBER: 2021-047109-R2

SOLICITATION/PROJECT NAME: Poseidon Place - Demolition

Prime Contractor: Subcontractor:

(Check box(s) that apply)

SBE WBE MBE M/WBE XNon-S/M/WBE Date of Palm Beach County Certification (if applicable): _.

The undersigned affirms they are the following (select one from each column if applicable):

Column 1 Column 2 Column 3

Male Female African-American/Black Asian American Caucasian American Supplier

Hispanic American Native American

S/M/WBE PARTICIPATION – S/M/WBE Primes must document all work to be performed by their own work force on this form. Failure to submit a properly executed Schedule 2 for any S/M/WBE participation may result in that participation not being counted. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. S/M/WBE credit will only be given for the areas in which the S/M/WBE is certified. A detailed proposal may be attached to a properly executed Schedule 2.

Line

Item

Item Description Unit Price Quantity/

Units

Contingencies/

Allowances

Total Price/Percentage

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:

Print Name of Prime Print Name of Subcontractor/subconsultant

By: By:

Authorized Signature Authorized Signature

Print Name Print Name

Title Title

Date: Date: _

Revised 09/17/2019

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Price or Percentage:

Name of 2nd/3rd tier Subcontractor/subconsultant

OEBO LETTER OF INTENT – SCHEDULE 2

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. The Schedule 2 shall contain bolded language indicating that by signing the Schedule 2, both parties recognize this Schedule as a binding document. All Subcontractors/subconsultants, including any tiered Subcontractors/subconsultants, must properly execute this document. Each properly executed Schedule 2 must be submitted with the bid/proposal.

SOLICITATION/PROJECT NUMBER: 2021-047109-R2

SOLICITATION/PROJECT NAME: Poseidon Place - Demolition

Prime Contractor: Subcontractor:

(Check box(s) that apply)

SBE WBE MBE M/WBE Non-S/M/WBE Date of Palm Beach County Certification (if applicable): _.

The undersigned affirms they are the following (select one from each column if applicable):

Column 1 Column 2 Column 3

Male Female African-American/Black Asian American Caucasian American Supplier

Hispanic American Native American

S/M/WBE PARTICIPATION – S/M/WBE Primes must document all work to be performed by their own work force on this form. Failure to submit a properly executed Schedule 2 for any S/M/WBE participation may result in that participation not being counted. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. S/M/WBE credit will only be given for the areas in which the S/M/WBE is certified. A detailed proposal may be attached to a properly executed Schedule 2.

Line

Item

Item Description Unit Price Quantity/

Units

Contingencies/

Allowances

Total Price/Percentage

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:

Print Name of Prime Print Name of Subcontractor/subconsultant

By: By:

Authorized Signature Authorized Signature

Print Name Print Name

Title Title

Date: Date: _

Revised 09/17/2019

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Price or Percentage:

Name of 2nd/3rd tier Subcontractor/subconsultant

Rug Schedule 2.pdf
Blank Page
Wall Paper Painting.pdf
Blank Page
SOLICITATION OPENINGSUBMITTAL DATE:
COUNTY DEPARTMENT:
ADDRESS: 1234 Military Trail, WPB 33415
NAME OF PRIME RESPONDENTBIDDER: Demolition Company, Inc.
CONTACT PERSON: Mary Jane Smith
PHONE NO: 561-666-5555
EMAIL: smith@demo.company
PRIMES DOLLAR AMOUNT OR PERCENTAGE OF WORK: 80%
NonSBE:
MBE:
WBE:
undefined:
undefined_20:
undefined_10:
undefined_2:
undefined_13:
undefined_12:
undefined_11:
undefined_8:
undefined_7:
undefined_6:
undefined_3:
undefined_9:
undefined_4:
undefined_5:
undefined_39:
undefined_38:
undefined_37:
undefined_36:
undefined_35:
undefined_34:
undefined_29:
undefined_28:
undefined_27: 5%
undefined_26:
undefined_25:
undefined_24:
undefined_19:
undefined_18:
undefined_17:
undefined_16:
undefined_15: 15%
undefined_14:
Vendor ID httpswwwpbcgovorgpbcvendors: Painting R Us
2: Rugs R Us
3:
4:
5:
Total BidOffer Price: $100,000
Total Certified SMWBE Participation: $15,000
undefined_21:
undefined_22:
undefined_23:
undefined_32:
undefined_33:
undefined_44:
undefined_43:
undefined_42: $5,000
undefined_41:
undefined_40: $15,000
Total:
I hereby certify that the above information is accurate to the best of my knowledge: Signature and Printed Name
undefined_30:
undefined_31:
Title: President
Check Box2: Yes
Check Box3: Yes
Check Box5: Off
Check Box6: Off
Check Box28: Yes
Check boxs that apply: Demolition Company, Inc.
Subcontractor: Rugs R Us
undefined_45:
Line ItemRow1:
Item DescriptionRow1: Furnish and Install Flooring
Unit PriceRow1:
Quantity UnitsRow1:
Contingencies AllowancesRow1:
Total PricePercentageRow1: $5,000
Line ItemRow2:
Item DescriptionRow2:
Unit PriceRow2:
Quantity UnitsRow2:
Contingencies AllowancesRow2:
Total PricePercentageRow2:
Line ItemRow3:
Item DescriptionRow3:
Unit PriceRow3:
Quantity UnitsRow3:
Contingencies AllowancesRow3:
Total PricePercentageRow3:
Line ItemRow4:
Item DescriptionRow4:
Unit PriceRow4:
Quantity UnitsRow4:
Contingencies AllowancesRow4:
Total PricePercentageRow4:
Line ItemRow5:
Item DescriptionRow5:
Unit PriceRow5:
Quantity UnitsRow5:
Contingencies AllowancesRow5:
Total PricePercentageRow5:
Line ItemRow6:
Item DescriptionRow6:
Unit PriceRow6:
Quantity UnitsRow6:
Contingencies AllowancesRow6:
Total PricePercentageRow6:
project at the following total price or percentage: $5,000
Name of 2nd3rd tier Subcontractorsubconsultant:
Price or Percentage:
Print Name of Prime: Demolition Company, Inc.
Print Name of Subcontractorsubconsultant: Rugs R Us
Print Name: Jane Ann Smith
Print Name_2: Joseph James
Title_2: President
Title_3: President
Date: May 01, 2023
Date_2: May 01, 2023
Text12: Jane Ann Smith
Text13: Joseph James
Check Box14: Yes
Check Box15: Off
Check Box21: Yes
Check boxs that apply0: Demolition Company, Inc.
Subcontractor1: Painting R Us
undefined_452: 12.01.2022
Line ItemRow13:
Item DescriptionRow14: Painting
Unit PriceRow15:
Quantity UnitsRow16:
Contingencies AllowancesRow17:
Total PricePercentageRow18: $5,000
Line ItemRow29:
Item DescriptionRow210: Wall Paper
Unit PriceRow211:
Quantity UnitsRow212:
Contingencies AllowancesRow213:
Total PricePercentageRow214: $10,000
Line ItemRow315:
Item DescriptionRow316:
Unit PriceRow317:
Quantity UnitsRow318:
Contingencies AllowancesRow319:
Total PricePercentageRow320:
Line ItemRow421:
Item DescriptionRow422:
Unit PriceRow423:
Quantity UnitsRow424:
Contingencies AllowancesRow425:
Total PricePercentageRow426:
Line ItemRow527:
Item DescriptionRow528:
Unit PriceRow529:
Quantity UnitsRow530:
Contingencies AllowancesRow531:
Total PricePercentageRow532:
Line ItemRow633:
Item DescriptionRow634:
Unit PriceRow635:
Quantity UnitsRow636:
Contingencies AllowancesRow637:
Total PricePercentageRow638:
project at the following total price or percentage39: $15,000
Name of 2nd3rd tier Subcontractorsubconsultant40:
Price or Percentage41:
Print Name of Prime42: Demolition Company, Inc.
Print Name of Subcontractorsubconsultant43: Painting R Us
Print Name44: Jane Ann Smith
Print Name_245: Joanne Painter
Title_246: President
Title_347: President
Date48: May 01, 2023
Date_249: May 01, 2023
Text1250: Jane Ann Smith - Signature
Text1351: Joanne Painter - Signature
Check Box1552: Off
Check Box22: Yes
Check Box23: Yes
Check Box26: Yes

File details come from the government source that posted it. Updated .