This Invitation for Bid (IFB-5183-26/LTT) is issued by Seminole County Utilities Department, located in Sanford, Florida, for comprehensive inspection, cleaning, evaluation, and repair services of water storage tanks and contact chambers at multiple plant sites. The scope of work includes on-site visual inspections using manual and robotic methods for both interior and exterior surfaces of concrete and steel tanks, with an estimated one to nine inspections per year anticipated over the contract term. The asset inventory comprises 21 tanks across nine locations: Markham (3 GST concrete tanks, 1 ozone contact chamber), Southeast Regional (2 GST concrete tanks, 2 contact chambers), Country Club (2 GST concrete tanks, 2 contact chambers, 1 steel hydro tank), Lynwood (2 GST concrete tanks), Indian Hills (2 GST concrete tanks), Yankee Lake Surface Water Plant (2 GST concrete tanks), Markham Re-Pump (1 GST concrete tank), and Greenwood Reclaim (2 GST concrete tanks). A non-mandatory pre-proposal conference is scheduled for June 5, 2026, at 9:00 a.m. at Markham WTP with optional site tours. The deadline for questions is June 12, 2026, at 5:00 p.m., and electronic bid submission closes June 24, 2026, at 2:00 p.m. via Seminole County's e-Procurement Portal. The bid opening will be conducted via Microsoft Teams on the submission deadline date. The contract will be awarded to the lowest responsible bidder meeting all requirements, with bids remaining firm for 120 days post-opening and the successful contractor maintaining prices firm for one year after contract execution.
The pricing structure is detailed in Bid Price Sheet IFB 5183 - REV 6.16, with contractors submitting line-item pricing for inspection, cleaning, and repair services. The County provides tank drainage, manhole cover removal and replacement, utilities (potable water and electricity within 100 feet), tank refilling, disinfection, and bacteriological testing at no expense to the contractor. All materials and equipment must be new and of good quality, with contractors bearing responsibility for permits, licenses, fees, compliance with OSHA, AWWA, ACI standards, and Florida Administrative Code 62-555.350. Contractors must provide comprehensive written reports (two copies) and electronic copies on CD with labeled photos, plus a fully narrated color DVD of interior inspections, prepared by a Certified Inspector and sealed by a Registered Professional Engineer. Insurance requirements are specified in the Insurance_Requirements.pdf attachment. The contract includes price redetermination provisions based on Employment Cost Index or Producer Price Index for wages, fuel, and materials, with petitions allowed during renewal periods or within 30 days of the contract anniversary date. No set-asides, incumbent information, or specific contract value is identified in the solicitation materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Inspection,_Cleaning,_and_Repair_of_Water_Tanks_(Addendum_#2_Revision).pdf | ||
| Drawings.pdf | ||
| Draft_Agreement.pdf | ||
| Bid_Price_Sheet_IFB_5183_-_REV_6.16.xlsx | XLSX spreadsheet | |
| Insurance_Requirements.pdf | ||
| Sample_Purchase_Order.pdf | ||
| FEMA_Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
IFB-5183-26 /LTT
INSPECTION, CLEANING, AND REPAIR OF
WATER TANKS
1301 East Second St.
Sanford, FL 32771
RELEASE DATE: May 20, 2026
DEADLINE FOR QUESTIONS: June 12, 2026
RESPONSE DEADLINE: June 24, 2026, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/seminolefl https://secure.procurenow.com/portal/%7bproject.government.code%7d
Seminole County
IFB #IFB-5183-26 /LTT
Inspection, Cleaning, and Repair of Water Tanks
TABLE OF CONTENTS
I. Introduction II. Scope of Services
III. Instructions to Bidders IV. Maintenance Services Additional Terms & Conditions V. Instructions for the Preparation of Bids VI. Bid Form
Attachments:
A - Bid Price Sheet IFB 5183 - REV 6.16
B - Sample Purchase Order
C - Insurance Requirements
E - Drawings
F - Draft Agreement
Title: Inspection, Cleaning, and Repair of Water Tanks
1. Introduction
The Bidder is expected to completely analyze the information contained in this Invitation for Bid
(IFB) as guidance for the preparation of their submittal. The Bidder’s bid should be specific, detailed, and complete to demonstrate the Bidder’s understanding of the requested work clearly and fully and/or delivery requirements.
Public Records: Article 1, Section 24, Florida Constitution, guarantees every person access to all public records, and Section 119.011, Florida Statutes, provides a broad definition of “public records.” As such, all responses to this competitive solicitation are public records. Any Bidder or Respondent claiming any portion of its response to the solicitation contains information that is exempt from the public records law shall review and strictly follow the procedures set forth herein.
1.1. Summary
Seminole County Utilities Department is seeking bids from qualified contractors to provide comprehensive inspection, cleaning, evaluation, and repair services for its water storage tanks and contact chambers. The selected vendor will be responsible for performing on-site visual inspections, both manual and robotic, of the interior and exterior of various concrete and steel tanks located across multiple plant sites.
1.2. Contact Information
Liduvina Torres Senior Procurement Analyst 1301 E. Second St Sanford, FL 32771 Email: ltorres@seminolecountyfl.gov Phone: (407) 665-7117
Department:
Utilities - Utilities Operations
1.3. Timeline
Release Project Date May 20, 2026 mailto:ltorres@seminolecountyfl.gov tel:(407)665-7117
Pre-Proposal Meeting (Non-
Mandatory)
June 5, 2026, 9:00am
Agenda
Markham WTP – 5651 Lake Gussie Circle, Sanford, FL 32771 Front of Ground Storage Tank #2 Total Project Sites: 5 Site Access: We will begin at Markham.
Following the briefing, an optional tour of the remaining sites will be provided for any bidders wishing to inspect the other locations.
Question Submission Deadline June 12, 2026, 5:00pm
Proposal Submission Deadline June 24, 2026, 2:00pm
Attend bid opening via Microsoft Teams https://teams.microsoft.com/meet/2375787075
45?p=S3tsxHJlPhNVKw6uG0
Meeting ID: 237 578 707 545 Passcode: By9VR7oV https://government-project.s3.amazonaws.com/258141/c0330801-128f-4e15-b11a-efa3d52e6f82_Pre-bid_Agenda.pdf https://teams.microsoft.com/meet/237578707545?p=S3tsxHJlPhNVKw6uG0 https://teams.microsoft.com/meet/237578707545?p=S3tsxHJlPhNVKw6uG0
2. Scope of Services
2.1. General Requirements and Standards
The Contractor shall provide all labor, materials, and equipment necessary to perform on-site visual inspections (manual or robotic), evaluation, cleaning, and repair of the interior and exterior of water storage tanks.
A. Regulatory Compliance: All services must be performed in accordance with applicable standards and codes, including OSHA, AWWA, and ACI.
B. State Regulations: Services shall meet the requirements of Florida Administrative Code
(FAC) 62-555.350, including all necessary reports, documentation, and certifications.
C. Service Frequency: An estimated one (1) to nine (9) inspections per year are anticipated over the term of the agreement.
D. Gasket Replacement: The Contractor shall provide the County with a new gasket for the wall manhole covers as part of the inspections at no additional charge
2.2. Asset Inventory (Tanks to be Inspected)
The following tanks require inspection and cleaning during the contract period:
• Markham o GST: 3 concrete tanks, 1.5 MG each, 115′×19.25′ Domed
• Markham Ozone Chamber o Contact Chamber: 1 concrete tank, 53,000 Gallons, 29′×19′×31.75′
• Southeast Regional o GST: 2 concrete tanks, 2.5 MG each, 20′×144′ Domed o Contact Chamber: 2 concrete tanks, 30,000 Gallons each, 44′×34.5′×16′
• Country Club o GST: 2 concrete tanks, 1.2 MG each, 25.3′×90′ Domed o Contact Chamber: 2 concrete tanks, 16,000 Gallons each, 33.6′×22.3′×13′ o Hydro Tank: 1 steel tank, 10,000 Gallons, 8′×26′ Rounded Ends
• Lynwood o GST: 1 concrete tank, 0.35 MG, 55′×20′ Domed o GST: 1 concrete tank, 0.75 MG, 80′×20′ Domed
• Indian Hills o GST: 2 concrete tanks, 0.25 MG each, 50′×17′ Domed
• Yankee Lake Surface Water Plant o GST: 2 concrete tanks, 2 MG each, 110′×27.4′ Domed
• Markham Re-Pump o GST: 1 concrete tank, 3 MG, 125′×34′ Domed
• Greenwood Reclaim o GST: 2 concrete tanks, 1.75 MG each, 107′×26′ Domed
2.3. Inspection and Cleaning Specifications
A. Exterior Inspection Points
1. Wall Foundation & Footing: Check for dips, damp spots, bearing/joint filler pads, and gaps between wall and sub-grade/footing.
2. Wall Exterior: Check for cracks, hollows, and condition of architectural finish coating
(paint).
3. Access Components: Inspect manhole covers, frames, bolts, gaskets, and pipe sleeves/seals.
4. Ancillary Equipment: Evaluate ladders (risers, rungs, brackets, welds), safety rails, and liquid level indicators.
5. Dome Exterior: Check for cracks, hollows, spalling, and paint condition.
6. Roof Components: Inspect hatches, ventilators, aerators, overflows, and handrails.
B. Interior Inspection and Cleaning
1. Wall Interior: Check for shrinkage cracks, hollows, and spalling.
2. Floor Interior: Clean and check for cracks (note size/length), and inspect pipe encasements/supports.
3. Water Stop: Check for irregularities, holes, and gaps between wall and water stop.
4. Dome Interior: Check underside for exposed reinforcing steel, welded wire fabric, and hydrogen sulfide attack.
5. Special Procedures:
▪ Measure sediment depth for in-service inspections.
▪ Conduct dye leak pinpointing in concrete tanks where cracks suggest leakage.
▪ Measure steel wall thickness using ultrasonic for atmospheric tanks.
A. Pressure Tank Specifics
1. Confined Space Entry: Required for interior cleaning and inspection.
2. Technical Surveys: Perform ultrasonic thickness surveys of the tank, shell, and heads.
3. Condition Assessment: Measure pit depths on interior walls after cleaning and assess interior/exterior coatings.
2.4. Repair Services
The Contractor may be requested to perform repairs based on the findings of the inspections.
These services shall include, but are not limited to:
A. Structural Repairs: Addressing cracks, hollows, and spalling identified during interior or exterior evaluations.
B. Component Replacement: Repairing or replacing ladders, safety rails, hatches, ventilators, or aerator structures.
C. Sealant and Coating: Repairing water stops, pipe seals, or architectural coatings.
D. Steel Tank Remediation: Addressing pit depths or thinning wall thickness identified during ultrasonic surveys.
E. Painting: Sandblast and paint interior and exterior piping and metal components as needed.
2.5. Deliverables and Reporting
A. Certification: Reports must be prepared by a Certified Inspector and stamped/sealed by a Registered Professional Engineer per FAC 62-555.350.
B. Content: Reports must include a photographic record of interior and exterior surfaces and detailed recommendations for safety concerns, upgrades, or maintenance with estimated costs.
C. Format: The Contractor shall provide:
1. Two (2) comprehensive written copies.
2. Two (2) electronic copies on CD (including labeled photos).
3. One (1) fully narrated color DVD of the internal inspection.
2.6. County Support and Responsibilities
The following shall be provided by the County at no expense to the Contractor:
A. Access: Adequate access and open storage space near the tanks.
B. Utilities: Continuous supply of pressurized potable water and electricity (100-AMP, 110/220-volt) within 100 feet of sites.
C. Preparation: Complete drainage of tanks, disposal of contents/sediment, and removal/replacement of manhole covers.
D. Post-Inspection: Refilling, disinfection, bacteriological sampling, and testing.
E. Administrative: Payment of permit or governmental fees required for the work.
3. Instructions to Bidders
3.1. Contact
All prospective Bidders are hereby instructed not to contact any member of the Seminole
County Board of County Commissioners, the County Manager or Deputy Manager, or any
Seminole County Staff members other than the noted Purchasing & Contracts Division (herein referred to as ‘PCD’) Contact Person, Liduvina Torres, regarding this IFB or their written bid at any time prior to the posting on the COUNTY’S Website of the recommendation and intent to award by County staff for this project. Any such contact shall be cause for rejection of your bid.
Interpretation of this clause will be solely at the discretion of the COUNTY.
3.2. Pre-Proposal Conference
Seminole County Purchasing and Contracts Division will conduct a Non-Mandatory Pre-
Proposal Conference on Friday, June 5, 2026 at 9:00 am. The meeting will take place at
Markham WTP – 5651 Lake Gussie Circle, Sanford, FL 32771 Front of Ground Storage Tank #2
Total Project Sites: 5 Site Access: We will begin at Markham. Following the briefing, an optional tour of the remaining sites will be provided for any bidders wishing to inspect the other locations..
3.3. Public Opening
Electronic bids shall be received by PCD online in accordance with the instructions in this solicitation documents, unless otherwise revised via posted Addenda. Persons with disabilities needing assistance to participate in the Public Opening should call the noted PCD Contact
Person at least forty-eight (48) hours in advance of the Public Opening at (407) 665-7117.
Attend bid opening via Microsoft Teams at https://teams.microsoft.com/meet/237578707545?p=S3tsxHJlPhNVKw6uG0.
Microsoft Teams Need help?
Join the meeting now
Meeting ID: 237 578 707 545
Passcode: By9VR7oV
3.4. Delays
The COUNTY, at its sole discretion, may delay the scheduled due date and time for submission, if it is to the advantage of the COUNTY to do so. The COUNTY will post all changes in the scheduled due date and time for submission by written addendum posted to the COUNTY’s
Website: (https://secure.procurenow.com/portal/seminolefl)
3.5. Bid Submission and Withdrawal
The COUNTY will accept bids electronically via the COUNTY’s e-Procurement Portal until 2:00 pm on Wednesday, June 24, 2026. Bids received after the scheduled due date and time for submission shall not be considered. Bids submitted in any other format other than via the
COUNTY’S e-Procurement Portal, including but not limited to, hard copy (mailed or hand https://teams.microsoft.com/meet/237578707545?p=S3tsxHJlPhNVKw6uG0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Faka.ms%2FJoinTeamsMeeting%3Fomkt%3Den-US&data=05%7C02%7Cltorres%40seminolecountyfl.gov%7C631e7ee202ac46256e5608dda8547486%7C9d380a55ed1044b9813bb83cfe0e80d4%7C1%7C0%7C638851802863957101%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=V5vNikox%2BrhxGJ6C4PPD69gzbL0kShvF%2BJ%2FJzaVHIRQ%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/ap/t-59584e83/?url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_ZWM3MTEwMDQtMDcwYi00MzYxLTk0NGYtMWY0OTk5MGI1N2Qy%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25229d380a55-ed10-44b9-813b-b83cfe0e80d4%2522%252c%2522Oid%2522%253a%2522462f8932-cfb6-408b-89d3-e432396ca876%2522%257d&data=05%7C02%7Cltorres%40seminolecountyfl.gov%7C631e7ee202ac46256e5608dda8547486%7C9d380a55ed1044b9813bb83cfe0e80d4%7C1%7C0%7C638851802863980745%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=hlj%2FeswEYt0%2B6dgzTjNiTmwKIvQ4inmdJOGA5WVgLT4%3D&reserved=0 delivered), facsimile, or emailed submittals, will not be accepted, nor considered. The scheduled due date and time for submission will be scrupulously observed. Companies shall register on the COUNTY’S e-Procurement Portal. Once registered, Companies may view and click "Follow" to be a prospective Bidder for this solicitation and will appear on the Follower’s list. Bidders that fail to Follow this project will not receive automatic addenda notifications, nor will they be able to draft a response in the COUNTY’S e-Procurement Portal, and therefore will be unable to participate or be considered for this IFB. If a Bidder encounters technical difficulties using the
COUNTY’S e-Procurement Portal, or needs assistance using the Portal, Bidders may access the Help Center for vendor training guides provided by OpenGov-Procurement, the Software
Administrator. Proposers may also contact the Software Administrator using the real-time chat function on the COUNTY’S e-Procurement Portal (located in lower right-hand corner of the screen), or via email at support@procurenow.com for support.
The COUNTY will not be responsible for untimely submissions due to personal or company internet or hardware limitations, settings or restrictions, internet speed, power outage, network connection, or use of a malfunctioning electronic device, or the like, neither the COUNTY, nor the Software Administrator, will be held responsible. Bidders shall be solely responsible for ensuring the capability of their computer system while responding to this solicitation, and for the stability of their internet service. Uploading large documents may take significant time depending on the size of the file(s) and the Internet connection speed that the Bidder is using to submit a response. Failure of the Bidder to successfully submit an electronic proposal before the deadline indicated herein shall be at the Bidder's sole risk, and no relief will be given for late and/or improperly submitted bids. Once file(s) have been uploaded and the Submission Status shows as “Submitted” the submission is complete. At that point, the Bidder will also receive an email confirmation from the COUNTY’s e-Procurement Portal. Telephone confirmation of timely receipt of any submittal should be made by calling (407) 665-7117, before the 2:00 pm deadline.
The Bidder is required to submit ONE (1) ELECTRONIC FORMATTED file of their complete written bid.
Bidders may withdraw their bid electronically via the COUNTY’S e-Procurement Portal at any time prior to the scheduled due date and time for submission.
3.6. Inquiries
All Bidders should carefully examine the IFB documents. Any ambiguities or inconsistencies shall be brought to the attention of PCD Contact Person in writing via the Q&A tab in the
COUNTY’S e-Procurement Portal prior to the scheduled due date and time for submission.
Failure to do so, on the part of the Bidder, shall constitute an acceptance by the Bidder of any subsequent decision made by the COUNTY. Any questions concerning the intent, meaning and interpretations of the IFB documents including the attached Draft Agreement, shall be requested in writing, and received no later than 5:00 pm on Friday, June 12, 2026. Written requests shall be submitted via the COUNTY’S e-Procurement Portal The COUNTY will not be responsible for oral instructions made by employees of the COUNTY or its authorized representatives in regard to this IFB. If the Q&A deadline has passed, a Bidder may contact the
COUNTY directly if necessary at ltorres@seminolecountyfl.gov. The COUNTY reserves the right to reject any questions sent after the Q&A deadline.
http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training
3.7. Draft Legal Agreement
The COUNTY’s standard written legal agreement (hereinafter “Draft Agreement”), attached hereto, contains the terms and conditions that will become an integral part of the Contract. Any proposed revisions to the Draft Agreement will only be considered by the COUNTY if requested by Bidder/Proposer, and received in writing by COUNTY, prior to the scheduled due date and time identified herein as the Submission Deadline.
Any proposed revisions received by the COUNTY after the due date and time identified herein as the Submission Deadline will not be considered.
Bidders/Proposers who do not request any revisions agree to be legally bound by the terms and conditions of the Draft Agreement.
3.8. Addenda
Should revisions to the IFB documents become necessary, the COUNTY will post Addenda information on the COUNTY's e-Procurement Portal. The COUNTY’s e-Procurement Portal will issue an automated email notification to all “Followers” on the IFB’s Followers list. All Bidders should check the COUNTY's Website or notify Liduvina Torres to verify information regarding
Addenda. Failure to do so may result in rejection of the Bidder’s submitted bid and a determination as “Non-Responsive”. By execution of the Formal Notice for this IFB, the Bidder acknowledges receipt of all Addenda issued under this solicitation. Addenda information will be posted on the COUNTY’s Website (https://secure.procurenow.com/portal/seminolefl). It is the sole responsibility of the Bidder to ensure that they obtain information related to any Addenda.
3.9. Selection Process and Award
The award will be made in the best interest of the COUNTY, as determined by the COUNTY, based upon the low total price and/or line-item by line-item, to the Lowest Responsible Bidder(s) that meet the requirements listed in this solicitation. The COUNTY will determine the method that will more benefit the organization. The Bidder(s) understands that this Bid does not constitute an agreement or a contract with the Bidder. The COUNTY reserves the right to reject all bids/proposals, make multiple awards (award to more than one vendor), make a partial award, to waive formalities, to re-solicit and advertise for new bids/proposals, or to cancel the project in its entirety. In evaluating Bids, the COUNTY shall consider the information provided by the Apparent Low Bidder as described in these "INSTRUCTIONS TO BIDDERS." Any of the following causes may be considered as sufficient grounds for disqualification of a Bidder or the rejection of a Bid:
(a) Submission of more than one (1) Bid for the same Work by any entity under the same or different names.
(b) Evidence of collusion among Bidders.
(c) Submission of an unbalanced Bid in which prices quoted for some items are out of proportion to the prices quoted for other or similar items in the same Bid.
(d) Lack of responsibility as shown by past Work from the standpoint of life safety including, but not limited to, strict adherence to all maintenance of traffic requirements of COUNTY, workmanship, progress and financial irresponsibility.
(e) Uncompleted Work for which the Apparent Low Bidder is committed by contract which might hinder or prevent the prompt completion of Work under this Bid if an Agreement would have been awarded to the Apparent Low Bidder.
(f) Falsification of any entry made on the Bid Documents shall be deemed a material irregularity and will be grounds, at the COUNTY's option, for disqualification of the Apparent Low Bidder or rejection of the Bid.
(g) This section shall be construed liberally to benefit the public and not the Apparent Low
Bidder; however, any other evidence which may hinder or otherwise delay completion of the
Project may be grounds for disqualification.
(h) Non-compliance with the submittal requirements of these Instructions to Bidders.
AWARD CRITERIA: The recommendation of award will be based on, but not limited to the following criteria:
(a) The ability, capacity, and skill of the Apparent Low Bidder to perform the Work.
(b) Whether the Apparent Low Bidder can perform the Work promptly, or within the time specified, without delay or interference.
(c) The character, integrity, reputation, judgment, and efficiency of the Apparent Low Bidder.
(d) The quality of performance of previous contracts or services to Seminole County or any other agency or client.
(e) The previous and existing compliance by the Apparent Low Bidder with Chapter 220, Seminole County Purchasing Code & Procedures, the life safety requirements of COUNTY, and other laws and ordinances, regulations.
(f) The sufficiency of the financial resources and ability of the Apparent Low Bidder to perform the Work.
(g) The quantity, availability, and adaptability of the Apparent Low Bidder to perform the
Agreement or service to the particular needs of the COUNTY.
(h) The ability of the Apparent Low Bidder to retain employees for the purpose of this Work.
(i) The experience of the Apparent Low Bidder performing in a similar manner as required by this Agreement. Minimum of three (3) satisfactory years shall be required.
(j) The type, structure, and experience of the local or branch management proposed.
(k) Quality Control Program.
(l) Claims and Litigation filed against the Apparent Low Bidder or filed by the Apparent Low
Bidder for equitable adjustment, contract claim or litigation in the past five (5) years.
(m) Reprimand of any nature or suspension by the Department of professional Regulation or any other regulatory agency or professional association within the last five (5) years.
3.10. Bid Preparation Costs
Neither the COUNTY nor its representatives shall be liable for any expenses incurred in connection with preparation of a response to this IFB. Proposers should prepare their proposals simply and economically, providing a straightforward and concise description of the Proposer's ability to meet the requirements of this IFB
3.11. Accuracy of Bid Information
By submission of a bid, Bidder acknowledges that they have carefully examined the IFB documents and agrees to furnish the services/products specified in the solicitation at the prices, rates or discounts as proposed. Bidders agree that their bid will remain firm for a period of up to one hundred twenty (120) days to allow the County adequate time to evaluate the submittals.
By submission of a bid, Bidder agrees to abide by all conditions of this bid and understands that a background investigation may be conducted by the Seminole County Sheriff’s Department prior to award. Bidder certifies that all information contained in their bid is truthful to the best of their knowledge and belief. Bidder further certifies that they are duly authorized to submit this bid on behalf of the vendor/Bidder as its act and deed and that the vendor/Bidder is ready, willing, and able to perform if selected.
3.12. Insurance
A misstatement or omission of a material fact, whether intentional or not, regarding the
Proposer's insurance coverage, policies or capabilities may be grounds for rejection of the
Bidder’s submitted proposal and rescission of any ensuing Award Agreement.
The COUNTY recommends that all Bidders review the insurance requirements listed within the Draft Term Contract with their insurance carriers. A copy of the insurance certificate shall be furnished to the COUNTY prior to the final execution of the COUNTY’s
Award Term Contract. The COUNTY reserves the right to reject the award to any Bidder that fails to provide the insurance as required within the COUNTY’s Term Contract.
3.13. Licenses
Bidders, both corporate and individual, must be fully licensed and certified for the type of work to be performed in the State of Florida at the time of submittal of Bid. Should the Bidder not be fully licensed and certified, its bid shall be rejected. Any permits, licenses, or fees required shall be the responsibility of the Bidder. No separate or additional payment will be made for these costs.
Adherence to all applicable code regulations, Federal, State, County, City, etc., are the responsibility of the Bidder.
The following licensing requirements shall apply when the applicable Florida Statute mandates specific licensing for Contractors engaged in the type of work covered by this solicitation. (a)
State of Florida, Department of Professional Regulation, Construction Industries Licensing
Board and licensed by other federal, state, regional, county or municipal agencies having jurisdiction over the specified construction work; (b) Said licenses shall be in the Bidder's name as it appears on the Official Bid Form. Bidder shall supply appropriate license numbers, with expiration dates, as part of their bid. Failure to hold and provide proof of proper licensing, certification and registration may be grounds for rejection of the bid; (c) Bidder shall provide copies of all applicable licenses with their Bid Proposal; and (d) Subcontractors contracted by the Prime Contractor shall be licensed in their respective fields to obtain construction permits from the County.
3.14. Occupational Safety and Health Act (O.S.H.A.)
In instances where such is applicable due to the nature of the bid matter with which this bid package is concerned, all material, equipment, etc., as proposed and offered by Bidders must meet and conform to all O.S.H.A. requirements; the Bidder's signature upon the bid proposal form being by this reference considered a certification of such fact.
3.15. Posting of the IFB's Recommendation and Intent to Award
The recommendation and intent to award for this IFB will be posted on the COUNTY’s Website
(https://procurement.opengov.com/portal/seminolefl) prior to submission for final approval of award. Failure to file a protest with the COUNTY’s Purchasing & Contracts Manager within the time prescribed in the COUNTY's Purchasing Code, Policies and Procedures shall constitute a waiver of proceedings.
3.16. Public Records
Upon recommendation and intent to award this IFB as posted to the COUNTY’s website or thirty
(30) calendar days after closing, bids are considered “public records" and shall be subject to the public disclosure regulations consistent with Chapter 119, Florida Statutes. Bidders must invoke the exemptions to disclosure provided by law in their response to the solicitation and must identify the data or other materials to be protected by separate envelope, and must state the reasons why such exclusion from public disclosure is necessary pursuant to the COUNTY’s, “Compliance With Public Records Law” Form, which is required as part of the IFB documents.
Ownership of all data, material, and documentation originated and prepared for the County pursuant to the IFB shall belong exclusively to the County and be subject to public inspection in accordance with the Public Records Law. Trade secrets or proprietary information submitted by a Bidder shall not be subject to public disclosure under the Public Records Law; however, the
Bidder must invoke the protection of this section prior to or upon submission of the data or other materials, and must identify the data or other materials to be protected and state the reasons why protection is necessary.
3.17. Prohibition Against Contingent Fees
It shall be unethical for any person to be retained, or to retain any company or person, other than a bona fide employee working solely for the Bidder to solicit or secure the Term Contract for this IFB, and that it has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for the Bidder, any fee, commission, percentage, gift, or other consideration contingent upon or resulting from award or making of this Term Contract. For the breach or violation of this provision, the COUNTY shall have the right to terminate the Term Contract at its sole discretion, without liability and to deduct from the Term Contract price, or otherwise recover, the full amount of such fee, commission, percentage, gift, or consideration.
3.18. Acceptance/Rejection/Disqualification
The COUNTY reserves the right to accept and make award to those Bidders, who in the opinion of the COUNTY, will be in the best interest of and/or the most advantageous to the COUNTY.
The COUNTY reserves the right to reject all bids/proposals, make multiple awards (award to more than one vendor), make a partial award, to re-solicit and advertise for new bids/proposals, or to cancel the project in its entirety. The COUNTY reserves the right to reject the bid of any
Bidder who has previously failed in the proper performance of an award or to deliver on time agreements of a similar nature or who, in the COUNTY's opinion, is not in a position to perform properly under this award. The COUNTY reserves the right to inspect all facilities of Bidders to make a determination as to the available resources to perform properly under this award. The
COUNTY reserves the right to waive any irregularities, informalities, and technicalities and may, at its discretion, issue a re-procurement.
More than one (1) bid from an individual, firm, partnership, corporation, or association under the same or different names will not be considered. Reasonable grounds for believing that a Bidder is involved in more than one proposal submittal will be cause for rejection of all bids in which such Bidders are believed to be involved. Any or all bids will be rejected if there is reason to believe that collusion exists between Bidders. Bids in which the prices obviously are unbalanced will be subject to rejection.
3.19. Additional Terms and Conditions
Unless expressly accepted by the County, only the terms and conditions in this document shall apply: No additional terms and conditions included with the bid response shall be considered.
Any and all such additional terms and conditions shall have no force and effect, and are inapplicable to this bid if submitted either purposely through intent or design, or inadvertently appearing separately in transmittal letters, specifications, literature, price lists or warranties. It is understood and agreed that the general and/or any special conditions in these Bid Documents and any addenda issued under this solicitation are the only conditions applicable to this bid and the Bidder's authorized signature on the Bid Response Form attests to this. Exceptions to the terms and conditions will not be accepted.
3.20. Responsibility
The County reserves the right, before award, to require a Bidder to submit such evidence of his qualifications as it may deem necessary, and may consider any evidence available such as financial, technical, and other qualifications and abilities of the Bidder, including past performance and experience with the County. This information may be used to determine the
Bidder’s responsibility.
3.21. Bids to Remain Firm
All Bids shall remain firm for a minimum of one hundred twenty (120) days after the day of the
Bid opening to allow for the evaluation and selection process and proper execution of the
Agreement. Extensions of time when Bids shall remain opened beyond the one hundred twenty-day period may be made only by mutual agreement between Seminole County and the Selected
Bidder. The successful Contractor must maintain the bid prices firm for a minimum of one (1) year after the contract is executed. No cost increase will be authorized during the first year of the agreement.
3.22. Purchasing Code
Seminole County Code Chapter 220 (Purchasing Code), Administrative Code Section 3.55
(Purchasing Policy), and County Manager Policies apply to this IFB in their entirety.
3.23. Affirmation
By submission of a bid, the Bidder affirms that their bid is made without prior understanding, agreement or connection with any corporation, firm, or person submitting a bid for the same materials, supplies, equipment or services, and is in all respects fair and without collusion or fraud. The Bidder agrees to abide by all conditions of this IFB and the resulting Term
Contract as prepared by Seminole County.
3.24. Mistakes in the Bid
Bidders are expected to examine the terms and conditions, specifications, delivery schedule, bid prices, extensions and all instructions pertaining to supplies and services. Failure to do so will be at Bidder's risk. In the event of extension error(s), the unit price will prevail, and the Bidder's total offer will be corrected accordingly. Written amounts shall take precedence over numerical amounts. In the event of addition errors(s), the unit price, and extension thereof, will prevail and the Bidder's total offer will be corrected accordingly. Bids having erasures or corrections must be initialed in ink by the Bidder.
3.25. Governmental Restrictions
In the event that any governmental restrictions are imposed which would necessitate alteration of the material quality, workmanship or performance of the items offered on this bid prior to their delivery, it shall be the responsibility of the Bidder to notify the Purchasing and Contracts
Division at once, indicating in his/her letter the specific regulation which required an alteration, including any price adjustments occasioned thereby. The County reserves the right to accept such alteration or to cancel the contract or purchase order at no further expense to the County.
3.26. Drug-Free WorkPlace Compliance
Bidder shall comply with Section 287.087, Florida Statutes, and failure to comply shall result in rejection/disqualification of the bid and all agreements as a result of this solicitation.
3.27. Public Entity Crime
Any Person or affiliate, as defined in Section 287.133, Florida Statutes, shall not be allowed to contract with the COUNTY, nor be allowed to enter into a subcontract for Work on this Project, if such a person or affiliate has been convicted of a public entity crime within three (3) years from the date this Project was advertised for Proposal, or if such person or affiliate was listed on the
State's convicted vendor list, within three (3) years of the date this Project was advertised, whichever time period is greater. A public entity crime means a violation of any state or federal law with respect to and directly related to the transaction of business with any public entity or agency (federal, state or local), including but not limited to, any contract for the construction or repair of a public building or public work involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, forgery, falsification of records, receiving stolen property or material misrepresentation. Any Agreement with the COUNTY obtained in violation of this Section shall be subject to termination for cause. A sub-contractor who obtains a subcontract in violation of this Section shall be removed from the Project and promptly replaced by a sub-contractor acceptable to the COUNTY.
3.28. Uniform Commercial Code
The Uniform Commercial Code (Florida Statutes, Chapter 672) shall prevail as the basis for contractual obligations between the Bidder and the County for any terms and conditions not specifically stated in this solicitation.
3.29. Proprietary/Restrictive Specifications
Bidder, who feels the specifications contained herein are proprietary or restrictive in nature, thus potentially resulting in reduced competition, must notify the Purchasing and Contracts Division of their rejection upon receipt of this IFB and prior to the due date.
3.30. Payment Terms/Discounts
The County’s payment terms are in accordance with Section 218, Part VII, Florida Statutes, Florida Prompt Payment Act. Cash discounts for prompt payment shall not be considered in determining the lowest net cost for evaluation purposes.
3.31. Price Redeterminations
1. During the Renewal Term: Petitions for price redeterminations must be made at the time of
County’s notification to the Contractor of the renewal period. Any such petition must be made pursuant to the provisions of this Section and only for those price redetermination categories specified herein. Unless otherwise expressly set forth in this document, no other price redeterminations will be allowed. All price redeterminations will be approved by a duly executed amendment to the Contract to reflect the new prices for the renewal term.
2. Outside the Renewal Term: Petitions for price redeterminations must be made within thirty
(30) days of the anniversary date of the Contract. Any such petition must be made pursuant to the provisions of this Section and only for those price redetermination categories specified herein. Unless otherwise expressly set forth in this document, no other price redeterminations will be allowed. All price redeterminations will be approved by a duly executed amendment to the Contract.
BASIS FOR PRICE REDETERMINATIONS. The Contractor may petition the Purchasing and
Contracts Division for price redetermination based on the increased costs of wages, fuel, or materials. Price redeterminations will be based solely upon changes in pricing or costs documented by either the Employment Cost Index (ECI) or Producer Price Index (PPI), whichever is applicable, as published by the Bureau of Labor Statistics. The base index number for the ECI will be for the quarter in which the solicitation opens. The base index number for the
PPI will be for the month the solicitation opens. Any subsequent price redeterminations will use the last price redetermination approved for that price redetermination category as the "base index number." The County shall have the right to audit the Contractor's records, including, but not limited to, payroll, materials, and fuel cost records, to verify or otherwise investigate the validity of any price redetermination request.
WAGE PRICE REDETERMINATION. When requesting a price redetermination based upon an increase in wage costs, the Contractor shall refer to and utilize the Pay & Benefits, Employment
Cost Index, Private Industry, Compensation as prepared by the Bureau of Labor Statistics in the
U.S. Department of Labor available at www.bls.gov.
MINIMUM WAGE PRICE REDETERMINATION. If the minimum wage increases during the term of the Contract, including any renewal or extension period thereunder, the Contractor may petition the Purchasing and Contracts Division for price redetermination for those job categories where the pay to the Contractor's employee(s) is the current minimum wage. Upon verification of the information provided, the County will grant an increase of exactly the amount of the minimum wage increase (not the percentage increase). The Contractor must increase the pay to the employee(s) by the amount the Contractor has requested, which shall not exceed the amount of the minimum wage increase. The amount paid to the Contractor will be the increase plus any written and documented increase in FICA, Medicare, and Workers' Compensation insurance. The Contractor must supply written documentation of any other increase that is beyond the scope and control of the Contractor. All written documentation must satisfy the reasonable expectations of the Purchasing and Contracts Division.
• Example: Minimum wage increases from $7.31 to $7.56 per hour. The Contractor may petition for an increase of $0.25 per hour to be paid to the affected employee(s) and shall provide written and documented cost increases for FICA, Medicare and Workers' Compensation. The resulting increase in costs shall be incorporated into fees/rates billed to the County.
If the Contractor bills the County at a higher price according to any price redetermination granted by the County, and the Contractor fails to increase the hourly rate paid to the employee for the same period, the Contractor will be considered in Contract default and the Contract will be immediately terminated.
FUEL PRICE REDETERMINATION. If and when the price of fuel increases by a minimum of ten (10%) percent, the Contractor may petition the Purchasing and Contracts Division for a fuel price redetermination. As a condition of petitioning for a fuel price increase, the Contractor shall be required to petition for a fuel price redetermination decrease if and when the price of fuel decreases by a minimum often (10%) percent. Failure to make such petition may be grounds for
Contract termination and shall entitle the County to a refund of the cumulative increase in pay to the Contractor due to any prior fuel price redetermination increase(s). Fuel price redetermination must be based solely upon changes as documented by the Producer Price Index (PPI) for the commodity "Gasoline - WPU057".
MATERIALS PRICE REDETERMINATION. At the anniversary date of the Agreement, the
Contractor may petition the Purchasing and Contracts Division for a materials price redetermination. As a condition of petitioning for a materials price increase, the Contractor shall be required to petition for a materials price redetermination decrease if/when the price of materials used by the Contractor in connection with the Contract decreases. Failure to make such petition may be grounds for Contract termination and shall entitle the County to a refund of the cumulative increase in pay to the Contractor due to any prior materials price redetermination increase(s). Materials price redetermination must be based solely upon changes as documented by the Producer Price Index (PPI) under Inflation & Prices, Industry Data, Construction Machinery Mfg. PCU 333120333120, as published by the Bureau of Labor
Statistics.
PRICE REDETERMINATION CALCULATION. All Price Redeterminations shall be calculated as follows:
Example: Contractor indicated on the Submittal Form that fourteen percent (14%) of the cost to provide the product/service is directly attributed to the redetermination category (wages, fuel, or materials).
PPI in the month the solicitation closed was 158.73
Current PPI is 264.52 -158.73
105.79
105.79 divided by 158.73 = .666%
The unit cost of the service is $100.00
14% of $100.00 = $14.00
$14.00 x .666 = $9.32
The New Unit Price for the service is $109.32 ($100.00 + $9.32)
EXPIRATION UPON FAILURE TO AGREE TO PRICE REDETERMINATION. If the County and the Contractor cannot agree to a price redetermination pursuant to the terms and conditions of this Section, then the Contract will automatically expire without penalty or further expense to either party after a period of six (6) months following the Contractor's initial request for such price redetermination.
Requests for price redeterminations not made in accordance with the provisions of this Section shall be deemed null and void and shall not be a valid reason or pretext for expiration or termination of the Contract. If the contract expires pursuant to the terms and conditions of this
Section, the County reserves the right, at no expense, penalty, or consequence to the County, to award any remaining tasks thereunder to the next available most responsive and responsible
Contractor.
3.32. Purchasing Agreements With Other Governmental Agencies
All Applicants submitting a response to this solicitation agree that such response also constitutes a submittal to all governmental agencies within the State of Florida, under the same conditions, for the same contract price, and for the same effective period as this proposal, should the Applicant feels it is in their best interest to do so. Each governmental agency desiring to accept these submittals, and make an award thereof, shall do so independently of any other governmental agency. Each agency shall be responsible for its own purchases and each shall be liable only for materials and/or services ordered and received by it, and no agency assumes any liability by virtue of this solicitation. This agreement in no way restricts or interferes with the right of any governmental agency to re-solicit any or all items.
3.33. Quantities
Seminole County will not be held to any maximum or minimum purchase quantities as a result of this solicitation and/or resulting contract. Seminole County reserves the right to purchase any;
all, or none, of its requirements from vendors awarded a contract as a result of this solicitation.
All quantities as shown are approximate and no guarantee is made. Except as this contract may otherwise provide, if the County’s requirements do not result in orders in the quantities described as “estimated” in the contract’s price schedule, that fact shall not constitute the basis for an equitable adjustment.
3.34. Price/Delivery
Price(s) quoted must be the price(s) for new merchandise unless otherwise specified. Any bids containing escalator clauses will not be considered unless specifically requested in the bid specifications.
Delivery shall be during the normal working hours of the user department, Monday through
Friday, unless otherwise specified and incorporated into contract or purchase order document.
F.O.B. POINT: The F.O.B. point shall be destination. The prices bid shall include all costs of loading, transporting, delivery and to designated point(s) within Seminole County.
Deliveries resulting from this bid are to be made during the normal working hours of the County.
Time is of the essence and the Contractor’s delivery date must be specified and adhered to.
Should the Contractor, to whom the order or contract is awarded, fail to deliver on or before the stated date, the County reserves the right to cancel the order or contract and make the purchase elsewhere and the Contractor will be required to compensate the County for the difference in price paid for the alternate product. The Contractor shall be responsible for making all claims against carriers for missing or damage items. Partial shipments will be acceptable unless otherwise stated.
3.35. Bid Forms
All bids must be submitted on the County’s standard Bid Response Form. Bids on Bidder’s quotation forms shall not be accepted.
3.36. Method of Ordering
The County shall issue Purchase Orders against the contract on an as needed basis for the supplies or services listed on the Bid Proposal Form.
The County reserves the right to reject all bids/proposals, make multiple awards (award to more than one vendor), make a partial award, to re-solicit and advertise for new bids/proposals, or to cancel the project in its entirety.
4. Maintenance Services Additional Terms & Conditions
4.1. DEFINITIONS/INTERPRETATIONS
Definitions.
Whenever used in the Contract Documents, the following terms shall have the meanings indicated, which shall be applicable to both the singular and plural thereof.
Addenda - Written or graphic instruments issued prior to the date for opening Bids which modify or interpret the Bidding Documents by additions, deletions, corrections or clarifications.
Acceptance; Final Acceptance - The formal action by COUNTY accepting the Work as being complete after certification by County’s Representative of Final Completion.
Agreement - The written Agreement between COUNTY and CONTRACTOR covering the Work to be performed; other Contract Documents are incorporated in or referenced in the Agreement and made a part thereof as provided therein.
Building Elements - An architectural, structural, electrical, mechanical or plumbing component of a building, facility, space, or site.
Change Order - A written instrument issued on or after the Effective Date of the Agreement, of which when duly executed by COUNTY and CONTRACTOR amends the Contract Documents to provide for changes in the Work or in the provisions of the Contract Documents, or changes in Contract Price or Contract Time, or any combination thereof.
Contract Claim - Any dispute arising out of or related to the Contract Documents between the
COUNTY and CONTRACTOR including, but not limited to, any demand or assertion by one of the parties seeking any equitable adjustment of the Contract Price, Contract Time or other relief with respect to the Contract Documents.
Contract Documents - The Agreement and those documents referenced in the Agreement.
Contract Price - The total compensation, subject to authorized adjustments, payable by
COUNTY to CONTRACTOR for satisfactory completion of all Work under the Contract
Documents as stated in the Agreement.
Contract Time - The period of time allotted in the Contract Documents, subject to authorized adjustments, for Substantial Completion and Final Completion of the Work, or other interim completion dates identified in the Contract Documents.
CONTRACTOR - The individual, partnership, corporation, joint venture, or other legal entity or combination thereof, who is currently and actively licensed by the State of Florida and who has entered into the Agreement with COUNTY for the performance of the Work. The term
"CONTRACTOR" means CONTRACTOR or its authorized representative.
COUNTY - Seminole County, a political subdivision of the State of Florida; the Owner.
Date of Commencement of the Contract Time - The Begin Date given by the Purchase Order when the Contract Time commences to run.
Day - A calendar day of 24 hours lasting from midnight one day to midnight the next day.
Defect or Defective - A reference to Work that is unsatisfactory, faulty or deficient, or does not conform to the contract plans or specifications or does not meet the requirements of any inspection, code, reference standard, test or approval referred to in the Contract Documents or has been damaged prior to Final Acceptance (unless responsibility for the protection thereof has been assumed by COUNTY).
Effective Date of the Agreement - The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed by the last of the two parties to sign.
Equipment - The Machinery and Equipment, together with the necessary supplies for upkeep and maintenance thereof; also, the tools and all other apparatus necessary, for the construction and acceptable completion of the Work.
Holidays - Days designated by Seminole County as legal holidays. These days are:
New Year's Day - January 1st
Martin Luther King's Birthday - Third Monday in January
Memorial Day - Last Monday in May
Independence Day - July 4th
Labor Day - First Monday in September
Veteran's Day - As Designated
Thanksgiving Day - Fourth Thursday in November
Da…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .