About this file

This is an Inquiries and Answers document for DQ AAAA 2027-0081 IRA Tax Credit Compliance, a Colorado state procurement involving multiple state agencies including the Colorado Department of Human Services (CDHS), Department of Personnel & Administration (DPA), Department of Military and Veterans Affairs (DMVA), and Department of Natural Resources (DNR). The solicitation seeks consulting services for IRA tax credit compliance across 10 renewable energy and energy efficiency projects, including five solar installations, two battery storage systems, one ground source heat pump system, and multiple electric vehicle charging stations located at various sites throughout Colorado. The projects range from 18 kW to 3,306.2 kW in size and include installations at facilities in Denver, Pueblo, Lakewood, Colorado Springs, Centennial, Longmont, and Windsor. The document provides responses to 11 bidder inquiries addressing project costs, scope requirements, and payment terms.

Total project costs across all 10 initiatives are estimated at approximately $19.6 million, with material costs totaling approximately $5.6 million and labor costs (including engineering) totaling approximately $13.6 million. The pricing structure initially proposed contingent fees tied to actual tax credit receipt; however, Modification 1 of the solicitation clarified that contractors will be compensated for services rendered regardless of whether credits are ultimately received, and contractors may progress bill as work is completed. The solicitation explicitly addresses Circular 230 compliance restrictions prohibiting contingent fees on originally filed federal returns. The document provides detailed project-level breakdowns including construction start dates, months placed in service, AC output specifications for solar installations, and storage capacity details for battery systems. Notably, the State of Colorado, as a tax-exempt entity, is likely eligible for direct cash payments (elective pay) under IRA provisions, though the solicitation includes language covering credit transfer and sale scenarios for comprehensive coverage of potential scenarios.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPA Solicitation #:

DQ AAAA 2027*0081

IRA Tax Credit Compliance

INQUIRIES AND ANSWERS

Question 1: Can the Agency please provide the following for all 10 listed projects, total cost for each project (either current or anticipated estimate)?

Answer 1: See chart on last page of this document.

Question 2: Can the Agency please provide the following for all 10 listed projects, material cost for each project (either current or anticipated estimate)?

Answer 2: See Answer 1

Question 3: Can the Agency please provide the following for all 10 listed projects, labor cost for each project (either current or anticipated estimate)?

Answer 3: See Answer 1

Question 4: Is there any leeway with the pricing structure set forth in the documented quote (section 4D.iv)? We are not able to perform our work on a contingent basis so the fees would need to be locked regardless of whether a credit ends up being received by the State or not. In addition, we’d like to progress bill as our work is performed. Would this be a deal breaker?

Answer 4: No, language has been updated in modification 1 of DQ AAAA 2027-0081 to clarify payment.

Question 5: Are you able to provide the estimated capex/budget for each of the projects so we have a better idea of the potential credit amounts the state is expecting on these projects?

Answer 5: Please see the answers to Questions 1, 2, and 3 above.

Question 6: The quote mentions on page 7 of the document the State is seeking support for the transfer/sale of these credits. My understanding is that the State of CO is a tax-exempt entity eligible for direct cash payments (officially called elective pay) so I’m not sure this would apply but would like to confirm.

Answer 6: It is unlikely that the State would need this provision, however, this language has been included to ensure that all potential scenarios are covered.

Question 7: Company has an existing executed engagement letter from the 2023 IRA project, which included Company scope, terms and conditions, general business terms, etc. Can we leverage the 2023 executed contract as a starting point, or do you prefer a markup of the standard contract/terms and conditions?

Answer 7: No. Please submit a markup of the standard contract.

Question 8: Is the expectation of the State, that if the IRA credits are ultimately denied, that Company would not be paid for any Services? We ask because unfortunately, contingent fee/success-based fees are not permissible per Circular 230 for originally filed federal returns.

Answer 8: No, language has been updated in modification 1 of DQ AAAA 2027-0081 to clarify payment.

Question 9: We are requesting two numbers per project: material cost and labor cost. Estimates or current budget figures are fine, we do not need invoices at this stage:

Agency Project Location Material

Labor

CDHS Solar, 1,127.5 kW 3824 W. Princeton Cir, Denver

CDHS Solar, 3,306.2 kW 1600 W. 24th St, Pueblo

DPA Solar, 639.36 kW 1350 Lincoln St, Denver

DPA Solar, 71.5 kW 700 Kipling, Lakewood

DMVA Battery storage, 612 kWh 9510 Voyager Pkwy, Colorado Springs

DMVA Ground source heat pump, 480,000 Btu

1800 Patrick St, Bldg 1800, Colorado Springs

DMVA Solar, 50 kW 6848 S. Revere Pkwy, Centennial

DMVA Solar, 18 kW 4045 Weld County Rd 22, Longmont

DNR Solar, 364.8 kW 6060 Broadway, Denver

Multipl e

~26 EV chargers Multiple locations

● Material means equipment and hardware: panels, inverters, racking, batteries, heat pump and loop field, charging units, wiring, and electrical gear.

● Labor means installation and construction labor, including subcontractors.

● If design, engineering, permitting, or interconnection costs are tracked separately, a third number for those is helpful but not required. For the EV chargers, a combined total across all sites is fine.

Answer 9: See answer to question 1

Question 10: For solar project located at 3824 W. Princeton Circle, Denver, CO, 80236, we need to measure the solar output in AC. While there’s typically a 10-20% reduction for DC to AC, we just wanted to be certain.

Answer 10: 3824 W Princeton Circle: 1127.5 KW DC, 900 KW AC 1600 W 24th: 3306.2 KW DC, 2625 KW AC

Question 11: For the battery storage project located at 9510 Voyager Parkway Colorado Springs, CO 80920, can you please provide the size in kW (net output) versus kWh (storage capacity) to help verify if this project meets the 1MW exception?

Answer 11: Voyager Parkway: 120 kW / 612 kwH Great Western Dr: 60 kW / 120 kWh

Agency Project Type Address Size (kW, MW, btu) AC output

Construction Start Date

Month Placed in Service

Total Cost (estimate if we don't have)

Material Cost

Labor Cost(includes engineering)

CDHS Solar

3824 W. Princeton Circle, Denver, CO, 80236 1,127.5 KW DC 900 KW 5/1/2026 Oct-27 $5,837,926 $676,682 $5,161,244

CDHS Solar 1600 W. 24th St., Pueblo, CO, 81003 3,306.2 KW DC 2625 KW 10/21/2025 Oct-26 $8,101,877 $1,192,065 $6,909,812

DPA Solar 1350 Lincoln St, Denver, CO 80203 639.36 KW DC 6/1/2027 10/31/2027 $2,179,208 $1,525,445 $653,762

DPA Solar 700 Kipling, Lakewood 71.5 KW DC 6/15/2026 7/31/2026 $377,390 $264,173 $113,217

DMVA

Battery Storage

9510 Voyager Parkway Colorado Springs, CO 80920 120 kW / 612 kwh Nov-26 Nov-26 $725,000 $500,000 $225,000

DMVA

Battery Storage

31725 Great Western Dr. Windsor, CO 80550 60 kW / 120 kWh May-27 May-27 $230,000 $120,000 $110,000

DMVA

Ground Source Heat Pump

1800 Patrick St, Building 1800 Colorado Springs, CO 80914 480,000 btu 1/1/2025 Aug-26 $400,000 $250,000 $150,000

DMVA Solar 6848 S Revere Pkwy Centennial CO 80112 50 kw 11/1/2026 27-Mar $120,000 $75,000 $45,000

DMVA Solar

4045 Weld County Road 22 Longmont, CO 80504 18 kw 10/1/2026 27-Mar $75,000 $45,000 $30,000

DNR Solar 6060 Broadway, Denver, CO 80216 364.8 kWp DC 2/2/2026 Sep-26 $1,526,290 $915,774 $610,516

Book1.pdf