Industry_Day_Notice_1.pdf
PDF 406 KB Posted
- Attached to
- DK-AO Heart Butte Safety of Dam Modification
- Solicitation number
- DOIRFBO240024
About this file
This document is an Industry Day Notice for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota. The primary objective of the Industry Day is for the Bureau of Reclamation to share project details with interested parties and gather feedback to shorten the project duration, reduce costs, and minimize risks. The scope includes installation and operation of dewatering and unwatering systems, cofferdam design and construction, injection grouting, concrete repair, jet grouting, and other construction activities. The North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction, and the anticipated project magnitude is over $10 million. The Industry Day will be held over two days, October 22-23, 2024, and will include a site visit and one-on-one breakout sessions with contractors. Contractors must RSVP by October 11, 2024 to participate. Reclamation will post questions and answers from the event on SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Heart_Butte_Modification_Draft_Construction_Plans_(June_2024)_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Heart Butte Dam Modification Industry Day Notice
Solicitation Notice DOIRFB0240024
In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the United States Bureau of Reclamation (Reclamation), Missouri Basin Regional Office, is hosting an Industry Day Event for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota.
This Industry Day Notice is only for informational and market research purposes only. It is NOT a Request for Proposal (RFP) nor an Invitation for Bid (IFB) and does NOT bind the U.S.
Government in any way. Interested parties will NOT be reimbursed for any costs associated with this notice.
PURPOSE
The primary objective of the Industry Day is for Reclamation to share important HBSDM project details with interested parties and to improve the mutual understanding of government requirements and industry capabilities. Reclamation is also seeking feedback from industry regarding the project schedule and technical aspects of the work in an effort to shorten the project duration, reduce overall costs, and reduce the potential risks to contractors and the government. The Industry Day will include a site visit and allow attendees to engage directly with Reclamation contracting officials and project leads as part of a collaborative planning process.
The scope of the HBSDM project includes, but is not limited to, the following:
Installation and operation of dewatering and unwatering systems.
Cofferdam design, construction, and removal.
Injection grouting of voids in foundation materials from within the outlet works conduit.
Sawcutting, hydro-demolition, temporary shoring, reinforcement repair, and reconstruction of a portion of the existing concrete outlet works conduit.
Jet grouting from within the outlet works conduit and from the exterior of the outlet works conduit.
Excavation of a portion of the existing dam embankment.
Construction of a new sand filter trench.
Construction of a new sand filter, gravel drain, and berm.
Installation of HDPE toe-drain pipes, observation wells, and cleanouts.
Furnishing and installing pre-fabricated earth retaining walls.
Chemical grouting of outlet works conduit joints.
NAICS and Magnitude The North American Industry Classification System (NAICS) for the project is 237990, Other Heavy and Civil Engineering Construction. In accordance with FAR 36.204, the anticipated magnitude of this project is over $10,000,000.
Industry Day Schedule – Please note the time zone change between sites Day 1 – October 22, 2024 9:00 a.m. – 2:00 p.m. MDT
Location: Lake Tschida Welcome Center, 5675 North Dakota Highway 49, Elgin, ND
Heart Butte Site (MDT) Item
9:00-9:15 Welcome and Introduction
9:15-10:15 Project Overview
10:15-10:30 Break
10:30 – 11:30 Contracting & Execution
11:30-12:00 Lunch (on own, services not available nearby)
12:00-2:00 Site Visit
Day 2 – October 23, 2024 Location: Dakotas Area Office, Room 308, 304 East Broadway Ave., Bismarck, ND
Reclamation will host one-on-one breakout sessions with contractors by request.
Breakout sessions will be a minimum of 1-hour. Duration and timing of the breakout sessions may vary depending on the number of vendors who request participation in a breakout session. Please contact Amy Darlinton and Mitchell Frost at the emails listed below to register for participation in the breakout sessions not later than October 11, 2024 at 1700MD. The schedule for breakout sessions will be share with respondents at least 1-week prior to the Industry Day event.
Reclamation will allow a verbal question and answer session during each breakout sessions.
Vendors may also submit written questions following the breakout sessions by 5:00 p.m. MT on November 15, 2024. Reclamation will make one attempt to adequately address each written question and thereafter post all questions and answers on SAM.gov.
Please see the attachments for more information relating to the current draft design analysis by the Bureau of Reclamation. Attachment #2 must be requested separately from the Contracting Officer due to it's size. Additional information will be posted as an addendum to this notice when updated information and/or documents become available.
Please RSVP with Amy Darlinton at adarlinton@usbr.gov and Mitchell Frost at mfrost@usbr.gov no later than October 11, 2024 at 1700MD to register for this Industry Day event.
Attachments:
(1) Heart Butte Modification Draft Construction Plans (June 2024)
(2) Heart Butte Dam Geologic Investigation Report (2021)
File details come from the government source that posted it. Updated .