Industrial Overhead Fan Layout-B469.pdf

PDF 381 KB Posted

Attached to
Industrial Fan Delivery and Installation Federal contract opportunity
Solicitation number
FA8136-24-R-0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a combined synopsis/solicitation for a federal contract opportunity related to the delivery and installation of industrial overhead fans. The solicitation number is FA8136-24-R-0001 and it is being issued as a Request for Proposal (RFP) under FAR Part 12, Acquisition of Commercial Items.

The key details are:

  • The government is seeking 6 units of 16-foot ceiling fan kits and 4 units of 6-foot ceiling fan kits, along with a 5-year warranty, delivery, and installation services.
  • The work is to be performed at Building 469, Tinker Air Force Base in Oklahoma.
  • The contract will be awarded on a Lowest Price Technically Acceptable (LPTA) basis. Offerors must meet all technical requirements in the Performance Work Statement (PWS) to be considered.
  • Proposals are due by June 10, 2024. A site visit is mandatory on May 22, 2024.
  • The contract will be a Firm-Fixed-Price award. Expected delivery and installation is to be completed within 180 days of order.
  • The acquisition is open to small businesses first, with full and open competition if there is inadequate small business participation.

View the file

Other files for this federal contract opportunity

Other files attached to Industrial Fan Delivery and Installation, newest first.
File Type Posted
Combined Site Visits Sign In Sheets May 22 and 23.pdf PDF
Safety Requirements.pdf PDF
TAFB Facility Standard.pdf PDF
TAFB General Safety Requirements.pdf PDF
PWS_10May24.pdf PDF
TAFB Electrical Standards.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

72NDAIRBASEWING SC- TINKERAFBBLDG469– OVERHEAD FAN LAYOUT

46' 11"

117'

23' 1"

48' 6"

28' 2"

84'

28' 2"

28' 6"

51' 9"

28' 6"

67' 10"

49' 8"

30'

11'1" 031'11"

031'11"

031'11"

031'11"

41' 10"02

90' 1002"

- Panel HP is attached on south side of steel I-column

- Panel LF is attached on west side of steel I-column

N

Room #107, Fire Panel Location

File details come from the government source that posted it. Updated .