Independent_Cost_Estimate_ICE_Form.pdf

PDF 58 KB Posted

Attached to
Legal Service
Solicitation number
2026-11
Issued by
Summit County, Akron City, Ohio

About this file

This is an Independent Cost Estimate (ICE) Form, a template document used to document the estimated costs for goods or services. The form is designed to support procurement decisions and establish pricing benchmarks for contracting purposes related to METRO RTA's legal services solicitation in Ohio. The form accommodates multiple estimation methodologies, including published price lists, engineering or technical estimates, and independent third-party estimates. It provides sections for both standard items with per-unit and delivered costs, as well as non-standard services, repairs, or specialized items that require detailed labor, material, and overhead calculations.

The form includes structured cost breakdown categories for services, repairs, and non-standard items, with fields for material costs, other direct costs, labor rates and hours by classification, allocated overhead, selling, general and administrative (SG&A) expenses, and profit margins. The template allows for multiple line items (up to six rows for standard products and six rows for service items) to accommodate comprehensive cost analysis. The document requires the preparer's signature and identification of the estimation method used, with provisions for attaching detailed spreadsheets to support complex cost calculations. This form functions as a standardized tool to ensure consistent cost documentation and justification across procurement activities.

View the file

Other files

File Type Posted
Legal_Service.pdf PDF
doc03527020260729094002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEPENDENT COST ESTIMATE

Requisition Number: Date of Estimate:

Contract Type:

���� Material

���� Construction

���� Services

���� Other (Specify)

Description of Goods/Services:

Method of Obtaining the Estimate:

I have obtained the following estimate from:

���� Published Price List/Past pricing (Date)

���� Engineering or technical estimate

���� Independent Third Party estimate

���� Other (Specify)

Cost Estimate Details:

Through the method stated above it has been determined that the total cost of the goods/services is expected to be $ Details are shown below.

COST OF STANDARD ITEMS

PRODUCT

COST ($/EA)

DELIVERED

COST ($/EA)

NO FREIGHT NOTES / DATA SOURCE

A

COST OF SERVICES, REPAIRS, OR NON-STANDARD ITEMS

ITEM/TASK:

MATERIAL

OTHER

DIRECT

COSTS

LABOR

(RATE,HOURS)

LABOR

CLASS

ALLOCATED

OVERHEAD SG&A PROFIT TOTAL

B

Signature of Preparer The preceding cost estimate was obtained or prepared by:

(For complex items or tasks, attach detailed spreadsheet(s) explaining rationale.)

Requisition Number:
Date of Estimate:
Other (Specify):
Description of Goods/Services:
Published Price List/Past pricing (Date:
Other (Specify:
PRODUCT_Row_1:
COST ($/EA) DELIVERED_Row_1:
COST ($/EA) NO FREIGHT_Row_1:
NOTES / DATA SOURCE_Row_1:
PRODUCT_Row_2:
COST ($/EA) DELIVERED_Row_2:
COST ($/EA) NO FREIGHT_Row_2:
NOTES / DATA SOURCE_Row_2:
PRODUCT_Row_3:
COST ($/EA) DELIVERED_Row_3:
COST ($/EA) NO FREIGHT_Row_3:
NOTES / DATA SOURCE_Row_3:
PRODUCT_Row_4:
COST ($/EA) DELIVERED_Row_4:
COST ($/EA) NO FREIGHT_Row_4:
NOTES / DATA SOURCE_Row_4:
PRODUCT_Row_5:
COST ($/EA) DELIVERED_Row_5:
COST ($/EA) NO FREIGHT_Row_5:
NOTES / DATA SOURCE_Row_5:
PRODUCT_Row_6:
COST ($/EA) DELIVERED_Row_6:
COST ($/EA) NO FREIGHT_Row_6:
NOTES / DATA SOURCE_Row_6:
MATERIAL_Row_1:
OTHER DIRECT COSTS_Row_1:
LABOR (RATE,HOURS)_Row_1:
LABOR CLASS_Row_1:
ALLOCATED OVERHEAD_Row_1:
SG&A_Row_1:
PROFIT_Row_1:
TOTAL_Row_1:
MATERIAL_Row_2:
OTHER DIRECT COSTS_Row_2:
LABOR (RATE,HOURS)_Row_2:
LABOR CLASS_Row_2:
ALLOCATED OVERHEAD_Row_2:
SG&A_Row_2:
PROFIT_Row_2:
TOTAL_Row_2:
MATERIAL_Row_3:
OTHER DIRECT COSTS_Row_3:
LABOR (RATE,HOURS)_Row_3:
LABOR CLASS_Row_3:
ALLOCATED OVERHEAD_Row_3:
SG&A_Row_3:
PROFIT_Row_3:
TOTAL_Row_3:
MATERIAL_Row_4:
OTHER DIRECT COSTS_Row_4:
LABOR (RATE,HOURS)_Row_4:
LABOR CLASS_Row_4:
ALLOCATED OVERHEAD_Row_4:
SG&A_Row_4:
PROFIT_Row_4:
TOTAL_Row_4:
MATERIAL_Row_5:
OTHER DIRECT COSTS_Row_5:
LABOR (RATE,HOURS)_Row_5:
LABOR CLASS_Row_5:
ALLOCATED OVERHEAD_Row_5:
SG&A_Row_5:
PROFIT_Row_5:
TOTAL_Row_5:
MATERIAL_Row_6:
OTHER DIRECT COSTS_Row_6:
LABOR (RATE,HOURS)_Row_6:
LABOR CLASS_Row_6:
ALLOCATED OVERHEAD_Row_6:
SG&A_Row_6:
PROFIT_Row_6:
TOTAL_Row_6:
The preceding cost estimate was obtained or prepared by:
PrintButton1:
NumericField1:
:

File details come from the government source that posted it. Updated .