Independent_Cost_Estimate_ICE_Form.pdf
PDF 58 KB Posted
- Solicitation number
- 2026-12
- Issued by
- Summit County, Akron City, Ohio
About this file
This is an Independent Cost Estimate (ICE) Form, a standard template used by governmental entities to document and justify cost estimates for procurement activities. The form is designed to capture comprehensive cost data for goods, services, repairs, or non-standard items being considered for acquisition. The document provides fields for requisition numbers, estimate dates, contract types, and descriptions of the goods or services, but the specific form provided contains no completed data entries.
The ICE form structure accommodates multiple estimation methodologies, including published price lists, past pricing data, engineering or technical estimates, and independent third-party estimates. Cost calculation sections are organized into two primary categories: standard items with unit costs and freight considerations, and services or non-standard items with detailed breakdowns including material costs, labor rates and hours, labor classifications, allocated overhead, selling, general and administrative (SG&A) expenses, and profit margins. The template includes rows for up to six line items in each category, allowing for complex procurement packages to be systematically documented. The form requires certification by the preparer and permits attachment of detailed spreadsheets for complex items or tasks to support the rationale behind cost estimates. As a blank template, this particular document serves as the framework for the Bus Video Surveillance System Replacement and Implementation project being solicited by METRO Regional Transit Authority in Ohio, which will require comprehensive cost estimation across the approximately 270 full systems and integrated back-office management components specified in that procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bus_Video_Surveillance_System_Replacement_and_Implementation_(Addendum_#2_Revision).pdf | ||
| Bus_Video_Surveillance_System_Replacement_and_Implementation.pdf | ||
| docx.svg | SVG file | |
| pdf.svg | SVG file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENT COST ESTIMATE
Requisition Number: Date of Estimate:
Contract Type:
���� Material
���� Construction
���� Services
���� Other (Specify)
Description of Goods/Services:
Method of Obtaining the Estimate:
I have obtained the following estimate from:
���� Published Price List/Past pricing (Date)
���� Engineering or technical estimate
���� Independent Third Party estimate
���� Other (Specify)
Cost Estimate Details:
Through the method stated above it has been determined that the total cost of the goods/services is expected to be $ Details are shown below.
COST OF STANDARD ITEMS
PRODUCT
COST ($/EA)
DELIVERED
COST ($/EA)
NO FREIGHT NOTES / DATA SOURCE
A
COST OF SERVICES, REPAIRS, OR NON-STANDARD ITEMS
ITEM/TASK:
MATERIAL
OTHER
DIRECT
COSTS
LABOR
(RATE,HOURS)
LABOR
CLASS
ALLOCATED
OVERHEAD SG&A PROFIT TOTAL
B
Signature of Preparer The preceding cost estimate was obtained or prepared by:
(For complex items or tasks, attach detailed spreadsheet(s) explaining rationale.)
| Requisition Number: |
| Date of Estimate: |
| Other (Specify): |
| Description of Goods/Services: |
| Published Price List/Past pricing (Date: |
| Other (Specify: |
| PRODUCT_Row_1: |
| COST ($/EA) DELIVERED_Row_1: |
| COST ($/EA) NO FREIGHT_Row_1: |
| NOTES / DATA SOURCE_Row_1: |
| PRODUCT_Row_2: |
| COST ($/EA) DELIVERED_Row_2: |
| COST ($/EA) NO FREIGHT_Row_2: |
| NOTES / DATA SOURCE_Row_2: |
| PRODUCT_Row_3: |
| COST ($/EA) DELIVERED_Row_3: |
| COST ($/EA) NO FREIGHT_Row_3: |
| NOTES / DATA SOURCE_Row_3: |
| PRODUCT_Row_4: |
| COST ($/EA) DELIVERED_Row_4: |
| COST ($/EA) NO FREIGHT_Row_4: |
| NOTES / DATA SOURCE_Row_4: |
| PRODUCT_Row_5: |
| COST ($/EA) DELIVERED_Row_5: |
| COST ($/EA) NO FREIGHT_Row_5: |
| NOTES / DATA SOURCE_Row_5: |
| PRODUCT_Row_6: |
| COST ($/EA) DELIVERED_Row_6: |
| COST ($/EA) NO FREIGHT_Row_6: |
| NOTES / DATA SOURCE_Row_6: |
| MATERIAL_Row_1: |
| OTHER DIRECT COSTS_Row_1: |
| LABOR (RATE,HOURS)_Row_1: |
| LABOR CLASS_Row_1: |
| ALLOCATED OVERHEAD_Row_1: |
| SG&A_Row_1: |
| PROFIT_Row_1: |
| TOTAL_Row_1: |
| MATERIAL_Row_2: |
| OTHER DIRECT COSTS_Row_2: |
| LABOR (RATE,HOURS)_Row_2: |
| LABOR CLASS_Row_2: |
| ALLOCATED OVERHEAD_Row_2: |
| SG&A_Row_2: |
| PROFIT_Row_2: |
| TOTAL_Row_2: |
| MATERIAL_Row_3: |
| OTHER DIRECT COSTS_Row_3: |
| LABOR (RATE,HOURS)_Row_3: |
| LABOR CLASS_Row_3: |
| ALLOCATED OVERHEAD_Row_3: |
| SG&A_Row_3: |
| PROFIT_Row_3: |
| TOTAL_Row_3: |
| MATERIAL_Row_4: |
| OTHER DIRECT COSTS_Row_4: |
| LABOR (RATE,HOURS)_Row_4: |
| LABOR CLASS_Row_4: |
| ALLOCATED OVERHEAD_Row_4: |
| SG&A_Row_4: |
| PROFIT_Row_4: |
| TOTAL_Row_4: |
| MATERIAL_Row_5: |
| OTHER DIRECT COSTS_Row_5: |
| LABOR (RATE,HOURS)_Row_5: |
| LABOR CLASS_Row_5: |
| ALLOCATED OVERHEAD_Row_5: |
| SG&A_Row_5: |
| PROFIT_Row_5: |
| TOTAL_Row_5: |
| MATERIAL_Row_6: |
| OTHER DIRECT COSTS_Row_6: |
| LABOR (RATE,HOURS)_Row_6: |
| LABOR CLASS_Row_6: |
| ALLOCATED OVERHEAD_Row_6: |
| SG&A_Row_6: |
| PROFIT_Row_6: |
| TOTAL_Row_6: |
| The preceding cost estimate was obtained or prepared by: |
| PrintButton1: |
| NumericField1: |
| : |
File details come from the government source that posted it. Updated .