Contract Summary
This is a Notice to Bidders and Specifications document for the Illinois Department of Transportation (IDOT) on behalf of Winnebago County Highway Department for HMA resurfacing and culvert replacement work along Old River Road (C.H. 64) in Rockton Township. The project, identified as Contract No. 85800, Section 23-00724-00-RS, Route FAU 9886, Project 6TSR-845, involves the removal and replacement of seven pipe and reinforced concrete box culverts, removal of existing concrete curb and gutter, adjustment of sanitary manhole frames with new Type 1 closed lids, excavation and grading of existing shoulders, HMA base course widening, Class D patching, placement of HMA binder and surface courses for pavement and shoulders, installation of longitudinal joint sealers and aggregate shoulder wedges, application of thermoplastic pavement markings, and installation of centerline and shoulder rumble strips. Electronic bids must be submitted through the iCX system (Integrated Contractors Exchange) prior to 12:00 p.m. on November 6, 2026, at which time bids will be publicly opened. The contract will be awarded to the lowest responsive and responsible bidder in accordance with IDOT standards and specifications.
The contract is funded through Construction Funds and is governed by the Standard Specifications for Road and Bridge Construction (Adopted January 1, 2022, Revised January 1, 2026), supplemental specifications, recurring special provisions, and local roads and streets recurring special provisions. Special provisions address traffic control and protection, including maintenance of one-way traffic during work hours and two-way traffic during non-working hours, with allowances for 48-hour road closures for individual culvert replacements. The contractor is responsible for all utility coordination, maintenance of roadways within construction limits, dust control, and restoration. Specific construction requirements include aggregate subgrade improvement, filter fabric installation, construction layout with laser level verification, rumble strip installation at eight-inch widths, and concrete structure extensions at designated locations. No specific pricing information, set-asides, or contract term duration is provided in this bidding document; award and contract execution details will be determined following the bid opening.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting November 6, 2026
Notice to Bidders, Specifications and Proposal
Contract No. 85800 WINNEBAGO County Section 23-00724-00-RS Route FAU 9886 (Old River Road) Project 6TSR-845 () District 2 Construction Funds
Prepared by F
Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
November 6, 2026 at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Contract No. 85800 WINNEBAGO County Section 23-00724-00-RS Project 6TSR-845 () Route FAU 9886 (Old River Road) District 2 Construction Funds
HMA resurfacing along Old River Rd. from Roscoe Rd. to IL 75. Additional work includes replacement of box and pipe culverts, drainage improvements, pavement markings and other required work.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
CONTRACT 85800
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 Additional State Requirements for Federal-Aid Construction Contracts 2 Subletting of Contracts (Federal-Aid Contracts)
3 EEO
4 Specific EEO Responsibilities Non Federal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays
LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS
Table of Contents
CHECK SHEET # PAGE NO.
LRS 1 Reserved LRS 2 Furnished Excavation LRS 3 Work Zone Traffic Control Surveillance LRS 4 Flaggers in Work Zones LRS 5 Contract Claims LRS 6 Bidding Requirements and Conditions for Contract Proposals LRS 7 Bidding Requirements and Conditions for Material Proposals LRS 8 Reserved LRS 9 Bituminous Surface Treatments LRS 10 Reserved LRS 11 Employment Practices LRS 12 Wages of Employees on Public Works LRS 13 Selection of Labor LRS 14 Paving Brick and Concrete Paver Pavements and Sidewalks LRS 15 Partial Payments LRS 16 Protests on Local Lettings LRS 17 Substance Abuse Prevention Program LRS 18 Multigrade Cold Mix Asphalt LRS 19 Reflective Crack Control Treatment
Old River Road Resurface Project
FAU 9886
Section # 23-00724-00-RS County: Winnebago
Project: 6TSR(845)
INDEX OF SPECIAL PROVISIONS
1) Location & Description of the project
2) Cooperation with Utilities
3) Maintenance of Roadways
4) Saw cuts
5) Trench Backfill
6) Filter Fabric
7) Aggregate Subgrade Improvement, 12’’
8) Excavating and Grading Existing Shoulder
9) Construction Layout
10) Centerline Rumble Strip & Shoulder Rumble Strip 8’’
11) Concrete Structure, Special
12) Sanitary Manholes to be Adjusted with New Ty 1 Frame, Closed Lid
13) Traffic Control and Protection, Special
14) Box Culvert Removal
15) Insurance (LR 107-4)
16) Construction and Maintenance Signs (LR 702)
17) Local Quality Assurance/Quality Management QC/QA (LR 1030-2) i
BDE SPECIAL PROVISIONS
The following special provisions indicated by an “X” are applicable to this contract. An * indicates a new or revised special provision for the letting.
File Name Pg. Special Provision Title Effective Revised 80099 Accessible Pedestrian Signals (APS) April 1, 2003 Jan. 1, 2022 _ 80274 14 Aggregate Subgrade Improvement April 1, 2012 April 1, 2022 80192 17 Automated Flagger Assistance Device Jan. 1, 2008 April 1, 2023 80173 Bituminous Materials Cost Adjustments Nov. 2, 2006 Aug. 1, 2017 80426 Bituminous Surface Treatment with Fog Seal Jan. 1, 2020 April 1, 2026 80475 Bridge Deck Concrete Overlays Jan. 1, 2026 80241 Bridge Demolition Debris July 1, 2009
5053I Building Removal Sept. 1, 1990 Aug. 1, 2022 5026I Building Removal with Asbestos Abatement Sept. 1, 1990 Aug. 1, 2022
80460 18 Cement, Finely Divided Minerals, Admixtures, Concrete, and Mortar Jan. 1, 2025 Jan. 1, 2026 80384 35 Compensable Delay Costs June 2, 2017 April 1, 2019 80198 Completion Date (via calendar days) April 1, 2008 80199 Completion Date (via calendar days) Plus Working Days April 1, 2008 80461 Concrete Barrier Jan. 1, 2025 80453 Concrete Sealer Nov. 1, 2023 80261 Construction Air Quality – Diesel Retrofit June 1, 2010 Jan. 1, 2025 80476 Deck Slab Repair Jan. 1, 2026
* 80029 39 Disadvantaged Business Enterprise Participation Sept. 1, 2000 July 2, 2026
* 80486 Engineer’s Field Office Nov. 1, 2026 80467 Erosion Control Blanket Aug. 1, 2025 80229 Fuel Cost Adjustment April 1, 2009 Aug. 1, 2017 80452 Full Lane Sealant Waterproofing System Nov. 1, 2023 80433 Green Preformed Thermoplastic Pavement Markings Jan. 1, 2021 Jan. 1, 2022 80471 43 Guardrail Nov. 1, 2025 80472 High Friction Surface Treatment Nov. 1, 2025 80456 44 Hot-Mix Asphalt Jan. 1, 2024 April 1, 2026 80446 48 Hot-Mix Asphalt – Longitudinal Joint Sealant Nov. 1, 2022 Aug. 1, 2023 80438 Illinois Works Apprenticeship Initiative – State Funded Contracts June 2, 2021 April 2, 2024 80483 Inlet Filters April 1, 2026 80477 Longitudinal Tining Jan. 1, 2026 July 1, 2026 80450 Mechanically Stabilized Earth Retaining Walls Aug. 1, 2023 Aug. 1, 2025 80478 Modified Longitudinal Construction Joint Jan. 1, 2026 80464 50 Pavement Marking April 1, 2025 Nov. 1, 2025 80468 51 Pavement Patching Aug. 1, 2025 80441 52 Performance Graded Asphalt Binder Jan 1, 2023 April 1, 2026 80459 Preformed Plastic Pavement Marking June 2, 2024 3426I Railroad Protective Liability Insurance Dec. 1, 1986 Jan. 1, 2022 80473 Raised Reflective Pavement Markers Nov. 1, 2025 80455 58 Removal and Disposal of Regulated Substances Jan. 1, 2024 April 1, 2026 80474 Residential Driveway Temporary Signal Nov. 1, 2025 80445 60 Seeding Nov. 1, 2022 July 1, 2026
* 80457 Short Term and Temporary Pavement Markings April 1, 2024 Nov. 1, 2026 80462 Sign Panels and Appurtenances Jan. 1, 2025 Jan. 1, 2026 80479 Sinusoidal Rumble Strips Jan. 1, 2026 80469 Slope Wall Aug. 1, 2025 80448 66 Source of Supply and Quality Requirements Jan. 2, 2023 Jan. 1, 2026 80340 Speed Display Trailer April 2, 2014 Jan. 1, 2022 80127 Steel Cost Adjustment April 2, 2004 Nov. 1, 2025 80480 Structural Repair of Concrete Jan. 1, 2026 80397 68 Subcontractor and DBE Payment Reporting April 2, 2018 80391 69 Subcontractor Mobilization Payments Nov. 2, 2017 April 1, 2019
File Name Pg. Special Provision Title Effective Revised 80463 70 Submission of Bidders List Information Jan. 2, 2025 Mar. 2, 2025 80482 71 Submission of Payroll Records – Federal Aid Contract April 1, 2026 80437 Submission of Payroll Records – State Contract April 1, 2021 April 1, 2026 80435 Surface Testing of Pavements – IRI Jan. 1, 2021 Jan. 1, 2023 80465 73 Surveying Services April 1, 2025 80481 Temporary Concrete Barrier Jan. 1, 2026 80466 Temporary Rumble Strips April 1, 2025 80484 Tolerance in Thickness for Continuously Reinforced PCC Pavement July 1, 2026 80470 Traffic Signal Backplate Aug. 1, 2025 20338 Training Special Provisions Oct. 15, 1975 Sept. 2, 2021 80429 Ultra-Thin Bonded Wearing Course April 1, 2020 Jan. 1, 2022
* 80439 74 Vehicle and Equipment Warning Lights Nov. 1, 2021 Nov. 1, 2026 80458 Waterproofing Membrane System Aug. 1, 2024 80302 75 Weekly DBE Trucking Reports June 2, 2012 Jan. 2, 2025 80454 Wood Sign Support Nov. 1, 2023 80427 76 Work Zone Traffic Control Devices Mar. 2, 2020 Jan. 1, 2026 80485 79 Work Zone Width Restriction July 1, 2026 80071 80 Working Days Jan. 1, 2002
Special Provisions
Page 1 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
Local Public Agency
Winnebago County Hwy Dept County
Winnebago Section Number
23-00724-00-RS
The following Special Provision supplement the "Standard Specifications for Road and Bridge Construction", adopted
January 1, 2022 , the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures of Materials" in effect on the date of invitation of bids, and the Supplemental Specification and Recurring Special Provisions indicated on the Check Sheet included here in which apply to and govern the construction of the above named section, and in case of conflict with any parts, or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
LOCATION & DESCRIPTION OF THE WORK
The proposed work is on Old River Road (C.H. 64) from north of Roscoe Road to IL-75 (Blackhawk Rd) in section SEC - 19, 24, 25, 30, 31, 36 and 35 of T46N-R1E in Rockton Township.
The proposed work includes the removal and replacement of seven (7) pipe/RC Box culverts, removal of existing concrete curb and gutter and the removal of reinforced concrete drainage structures, Concrete Gutter Ty A, Adjust Sanitary Manhole Frame & Grate, cutting butt joints, excavating and grading existing shoulder, HMA base course widening, Class D patching, the placement of HMA binder and surface for pavement and shoulder, longitudinal joint sealer, aggregate shoulder wedge, incidental HMA surfacing, rumble strips at the centerline and edge of pavement, Thermoplastic pavement markings, and other ancillary work.
See the plans, the summary of quantities, and the schedule of quantities for a complete description and location of the contract work.
COOPERATION WITH UTILITIES
It shall be the responsibility of the Contractor to cooperate and coordinate with the utilities in accordance with Articles 105.07 and 107.37. Call JULIE at 1-800-892-0123 before digging. The contractor shall make his own investigation to verify or determine the existence, nature and location of all the utilities and structures on the site that may interfere with the construction before starting his operations.
The Contractor shall take whatever precautions may be necessary to protect the property of the various public utilities which may be located underground or above ground or adjacent to the site of these improvements. If so required, the respective utility companies will make the needed adjustments to these facilities. These facilities shall be saved and care shall be exercised so as not to disrupt or destroy the services provided by these utilities. The Contractor will be required to repair or replace any utility property which has been damaged by the Contractor's activities. The procedures and specifications of any utility repairs will be in accordance with and to the satisfaction of the damaged utility.
MAINTENANCE OF ROADWAYS
The Contractor shall provide traffic control for the convenience and protection of workers and for vehicular and pedestrian traffic. Special attention is called to Articles 107.09 and to 107.14 of the Standard Specifications. The Contractor shall provide the proposed work schedule at the pre-construction meeting for approval by the Engineer.
On the date that work begins on this project, the Contractor shall assume responsibility for normal maintenance of all existing roadways within the limits of the improvement. This normal maintenance shall include all repair work such as patching, intermittent resurfacing, sign maintenance, and shoulder work deemed necessary by the Engineer, but shall not include snow removal operations. Traffic control and protection for maintenance of roadways will be provided by the Contractor as required by the Engineer.
All streets and driveway entrances shall be kept in a condition satisfactory to the Engineer to allow continuous access for all local residents and emergency vehicles. At all times and to the satisfaction of the
Page 2 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
Section Number
23-00724-00-RS
County
Winnebago Local Public Agency
Winnebago County Hwy Dept
Engineer, the Contractor shall provide access to residents and emergency vehicles within the work limits.
Dust control during construction shall be considered a part of maintenance and shall be done to the satisfaction of the Engineer.
When the roadway is not closed and/or Standard 701316 or 701321 are in effect, the mainline shall be kept open to one-way traffic at all times during working hours and two-way traffic during non-working hours.
SAW CUTS
This work shall be performed in accordance with the applicable portions of Section 442 of the Standard Specification and as detailed in the plans and as directed by the Engineer and as modified by this special provision. Saw cutting shall consist of sawing existing pavements, driveways, concrete curb and gutters, and as directed by the Engineer, to a full-depth so as when the existing pavement or curb is removed, a clean and neat vertical edge will result with no spalling of the surface intended to remain. Full depth saw cutting shall be performed to establish a straight and true edge at existing driveways where the proposed shoulder work is to cross asphalt or concrete driveways. This work shall not be measured and paid for separately and shall be considered incidental to EXCAVATING & GRADING EXISTING SHOULDER.
In addition to saw cuts at the driveways, the Contractor shall perform full-depth saw cuts at each trench edge for pipe culverts scheduled for replacement. Pavement cores within the project limits indicate that existing pavement thickness varies from 2.5" to 6" with 3" being the average of all cores taken. The Contractor shall be required to provide clean and neat vertical edges such that no spalling of the existing pavement structure will occur during the excavation of the trench. This work shall not be measured and paid for separately and shall be considered incidental to CLASS D PATCH of the type and thickness specified.
TRENCH BACKFILL
This work shall be performed in accordance with the applicable portions of Section 208 and as detailed on the plans and as directed by the Engineer and as modified by this special provision. The proposed typical section provides a 22' roadway. As such, Article 208.01 provides for an additional 2' beyond EOP resulting in a total trench backfill length of 26' long as measured perpendicular to the centerline of roadway; however, at locations where pipe culverts are to be replaced near intersections with channelization, the trench backfill length will be wider. See pipe culvert replacement detail plans for the appropriate trench backfill limits.
This work shall be paid for at the contract unit price per Cubic Yard of TRENCH BACKFILL.
FILTER FABRIC
This work shall be performed in accordance with the applicable portions of Section 282 of the Standard Specification and as detailed on the plans and as directed by the Engineer and as modified by this special provision. The Contractor shall use fabric meeting the material requirements of Article 1080.03 to encase the trench as detailed in the plans to a depth of one (1) foot above the top of the pipe. As noted above in TRENCH BACKFILL, the length of the fabric lining the trench shall be a minimum of 36', as measured perpendicular to the centerline of the roadway.
This work shall be measured and paid for at the contract unit price per Square Yard of FILTER FABRIC.
AGGREGATE SUBGRADE IMPROVEMENT, 12"
This work shall be in accordance with the applicable portions of Section 311 of the Standard Specifications except that the coarse aggregate material called for in Article 1004.04 shall be substituted with a Breaker Run Crushed Stone material. This material shall only be used as directed by the Engineer to remedy unsuitable soils encountered during the trench excavation for pipe culverts and to ensure that the underlying material is suitable for constructing the pipe culvert bedding.
Page 3 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
23-00724-00-RS
County
Winnebago Local Public Agency
Winnebago County Hwy Dept
The Breaker Run Crushed Stone material shall meet the following requirements: except for the bedding material provided in either Article 502.13 or Article 540.06 for box culverts or Article 542.04(c) for pipe culverts, the Breaker Run Rock layer shall be constructed of top size 6 inch, with 70% to 90% by weight, passing through the 4 inch sieve and 15% to 40% by weight, passing through the 2 inch sieve. The Breaker Run Rock shall be reasonably uniformly graded from coarse to fine, and shall be taken from a quarry ledge capable of producing Class "D” quality aggregate. The granular bedding layer for the Pipe Culvert is included in the unit price for Pipe Culverts.
The Breaker Run Crushed Stone shall be paid for at the contract unit price per Square Yard of
AGGREGATE SUBGRADE IMPROVEMENT, 12".
EXCAVATING AND GRADING EXISTING SHOULDER
This work shall be performed according to the applicable portions of Section 202 of the standard specification. The Contractor shall closely coordinate the excavation and grading operation with the placement of the hot-mix asphalt base course widening operation. Prior to the placement of the HMA base course widening, the Contractor shall excavate, grade and shape the existing shoulder to the depth, slope and width shown in the plans. At the end of each working day, the Contractor will be required to have placed the HMA base course widening at all locations where the excavating and grading has been completed and been approved for paving by the Engineer. Vertical drop offs at the existing pavement edge will not be allowed over night.
Prior to the excavation of the existing shoulder, a full-depth saw cut shall be made at the appropriate offset for each existing driveway having a "hard" surface (asphalt or concrete). This is to ensure that spalling of the existing driveway pavement to remain in place does not occur.
Special attention to Section 202 of the standard specification, that excavated material shall be deposited in windrow along the shoulder or along the ditch fore-slope, later to be used to tuck back to completed HMA/ AGG shoulder as detail shown in Typical sections or as directed by the Engineer.
For the mainline, the Contractor shall use a string line, or another method approved by the Engineer, to establish a reference line to cut and create a relatively straight edge. The Contractor will work to ensure that the overall proposed width is being achieved as detailed in the Typical Section(s). All existing signs and mailboxes that conflict with the proposed improvement will be removed and reinstalled per Article
107.20 and 107.25. All costs associated with removing and reinstalling signs and mailboxes will not be paid for separately but shall be considered as included in the contract price per UNIT for EXCAVATING
AND GRADING EXISTING SHOULDER.
Saw cuts will not be paid for separately but shall be included in the contract price per UNIT for all the work previously described as EXCAVATING AND GRADING EXISTING SHOULDER.
Hot-mix asphalt base course widening will be paid for at the contract unit price per Square Yard for HOT-
MIX ASPHALT BASE COURSE WIDENING, 5''.
Method of Measurement: EXCAVATING AND GRADING EXISTING SHOULDER will be measured for payment in Unit ( i.e. 1 Unit= 100 FEET)
Basis of Payment: This work shall be paid for at the contract price per UNIT for EXCAVATING AND
GRADING EXISTING SHOULDER.
Page 4 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
23-00724-00-RS
County
Winnebago
CONSTRUCTION LAYOUT
This Pay Item shall be performed in accordance with Check Sheet # 9 Special Provision for Construction Layout Stakes.
Prior to the beginning of the project, this item will be used to account for the work of preserving the location of existing pavement markings and the work to re-establish the locations required for the final pavement markings. This work shall include the preservation of existing pavement markings for all flush medians, corner islands, turn lanes, passing and no passing zones. The Contractor shall provide labor, equipment, and material to preserve all locations of pavement markings and upon the completion of the HMA overlay work, the Contractor shall layout the locations for the purpose of re-establishing the final pavement markings. In the event that the Contractor fails to preserve passing and no passing zones before HMA overlay operations begin and the pavement markings cannot re-established, the Contractor, at no additional cost to the contract, will be required to perform a sight distance study in accordance with Part 3 (Markings) of the MUTCD manual to re-establish the zones.
This item will also include the layout associated super elevation correction as detailed in the plans. The Contractor shall provide the required labor, equipment, and materials necessary to establish the lines and slopes as detailed in the plans.
This item will also include the layout associated with the pipe culvert replacements. The Contractor shall provide the required labor, equipment, and materials necessary to establish the lines and slopes as detailed in the plans for all pipe culvert replacement locations. The contractor will be required to use a laser level capable of shooting grade on a slope as entered by the end user. The laser level will be in operation at each culvert location and throughout the duration of the trench excavation and the placing of the pipe bedding material to ensure that proper depth, thicknesses, and slopes are achieved. The laser level will be required to be in operation during the placement of the bedding stone to ensure that the desired slopes detailed in the plans are being achieved by the Contractor.
This work shall also include all layout required for the construction of rumble strips both at the edge of pavement and at the centerline of pavement. If "drip lines" (paint marks for layout for lines) are necessary, the cost of establishing these lines will be included in the item for CONSTRUCTION LAYOUT.
Method of Measurement: CONSTRUCTION LAYOUT will be measured for payment in LUMP SUM, complete in place.
Basis of Payment: This work shall be paid for at the contract unit price per LUMP SUM for
CONSTRUCTION LAYOUT.
CENTER LINE - RUMBLE STRIP 8" and SHOULDER RUMBLE STRIP, 8'' This work shall be done in accordance with the applicable portions of Section 642, as detailed in IDOT standard 642006, as modified by this special provision, and as directed by the Engineer. All rumble strips shall be eight (8) inches wide and shall be constructed at the edge of shoulder and at the centerline of pavement. Prior to beginning the work, the Contractor shall consult with the Engineer to review the limits and to mark any locations to be omitted, such as at residential entrances or at tapers for turn lanes.
All work required to layout lines, including "drip lines," (paint marks for layout for lines) and locations for the CENTER LINE - RUMBLE STRIP - 8" or SHOULDER RUMBLE STRIPS, 8" shall be paid for and included in the contract unit price per Lump Sum for CONSTRUCTION LAYOUT.
Method of Measurement: CENTER LINE - RUMBLE STRIP - 8" and SHOULDER RUMBLE STRIP, 8'' will be measured for payment in FOOT.
Page 5 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
23-00724-00-RS
County
Winnebago
Basis of Payment: This work shall be paid for at the contract unit price per FOOT for CENTER LINE - RUMBLE STRIP - 8" and SHOULDER RUMBLE STRIP, 8''.
CONCRETE STRUCTURE, SPECIAL
This work consists of extending Concrete head walls for the box culvert in accordance with applicable portions of Section 503 of the Standard Specifications and at the location specified by the Engineer on WCHD SN 64-15 (NBIS 101-5110) at Old River Rd STA 26+45.
Concrete head wall width shall be eight (8) inches. Existing structure head wall and wing wall widths shall be field verified and Concrete head wall width shall be adjusted to match the existing structure's wall thickness.
Any field adjustments made to the Concrete head wall width will be considered incidental and will not be paid for separately, but shall be included in the contract unit price per Lump Sum for CONCRETE
STRUCTURE, SPECIAL.
Concrete head wall shall be poured as a sixteen (16) inch vertical extension of the structure's existing head wall and wing walls. Concrete head wall shall have two (2) No. 4 Epoxy Coated Bar as horizontal reinforcement. Twenty one (21) inch No. 6 Epoxy Coated vertical Tie Bars shall be placed every two (2) feet connecting the existing structure walls to the Concrete Curb extension by drill and grout 7'' deep hole.
Tie Bars shall be drilled to a depth of seven (7) inches into the existing structure walls. All reinforcement bars shall be tied together throughout the Concrete head wall extension.
The cost of furnishing and installing reinforcement bars will not be paid for separately, but shall be included in the contract unit price per Lump Sum for CONCRETE STRUCTURE, SPECIAL.
This work will be paid for at the contract unit price per Lump Sum for CONCRETE STRUCTURE, SPECIAL which price shall include all labor, equipment and material necessary to satisfactorily complete the work as described.
SANITARY MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME, CLOSED LID
Description: This work shall conform to Rockton Village Public Works requirements, details, and provisions, and Section 602 of the IDOT Standard Specifications for Road and Bridge Construction, current edition.
This work shall include all equipment, materials, labor, transportation, and workmanship to adjust sanitary manholes as shown on the plans.
This work shall consist of removing existing manhole frames and lids, removing all brick/precast adjusting rings, and all other materials, furnishing and installing new adjusting rings as required, and installing existing frames and lids and exterior manhole adjustment seals.
This work shall include all earth excavation, trench backfill and compaction, pavement removal and replacement as required, in accordance with all applicable IDOT provisions and specifications.
This work shall include adjusting manhole frames to finish grade. The frame and lid shall be set 1/4 inch min. to 3/8 inch max. below final grade in pavement and at final grade in turf areas. All proposed rim elevations shall be obtained from the roadway reconstruction plan and profile plan sheets or from the Resident Engineer.
This work shall include the removal of all existing adjustment (whether brick or concrete), and replacement with new adjusting rings. The combination of new adjusting rings shall be such that the minimum number of
Page 6 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
23-00724-00-RS
County
Winnebago Local Public Agency
Winnebago County Hwy Dept rings possible are used.
Allowable types of adjusting rings include precast concrete and expanded polypropylene (EPP). These can be used in conjunction with each other, except that a precast concrete ring shall not be placed over an EPP ring.
For precast concrete adjusting rings:
All adjusting ring joints, as well as the joint between the frame and adjustment ring, shall be sealed watertight by means of an all-weather rubber butyl sealant designed for the purpose of sealing concrete structures water-tight. The adjusting ring surface shall be dry and free of foreign material. The surface shall be dried and heated with a weed burner when outside temperatures are less than optimum for adhesion of the sealant to the concrete.
Frames in the roadway shall be pitched to match the slope of pavement. EPP taper rings are required when frames are pitched.
For expanded polypropylene (EPP) adjusting rings:
The use of EPP adjustment rings shall be according to Sections 602 and 1043 of the IDOT Standard Specifications, and Supplemental Specifications & Recurring Special Provisions, most recent edition. The EPP adjustment rings shall be installed according to the manufacturer’s instructions. If the top surface of the manhole is not level, even, or is irregular, a non-shrink grout shall be placed to create a level surface and the first EPP ring shall be bedded and leveled in the non-shrink grout. The joints between the manhole, all adjustment rings, and the frame shall be sealed with the manufacturer’s recommended/ specified adhesive. The top ring shall be a ‘finish ring’ when pitching the frame is not necessary.
Frames in the roadway shall be pitched to match the slope of pavement. The top ring shall be a tapered ‘adjustment’ ring when pitching the frame is required. Shimming is not an acceptable method of pitching when using EPP rings. The upper most ring shall have grooves on the lower surface and a flat upper surface.
External adjustment seals are required, regardless of the type of adjustment rings used. Heat shrinkable adjustment seals shall not be used with EPP rings.
The maximum height of adjustment shall be 12 inches. The distance between the top of the frame to the first manhole step shall be no more than 30 inches. A maximum of one (1) 2 inch adjusting ring will be allowed.
Materials:
1. Adjusting rings:
a. Precast concrete adjusting rings shall be standard reinforced concrete pipe pattern and shall conform to ASTM C478 and ASTM C139. There shall be no spalled edges or cracks. Precast concrete adjusting rings shall be size 4 inch height or greater.
b. Expanded polypropylene (EPP) rings shall be in accordance with Section 1043 of the IDOT Standard Specifications.
2. Adjusting ring sealant:
a. Precast concrete adjusting ring sealant shall be a flexible rubber butyl pre-formed sealant designed for the purpose of making concrete structure joints water-tight. Material shall conform to ASTM C990.
b. EPP ring sealant used for watertight installation of the EPP rings shall meet ASTM C 920, Type S, Grade NS, Class 25, uses NT, T, M, G, A, and O.
3. Manhole exterior adjustment seals (chimney seals) shall be of a rubber compound in accordance with ASTM C-923 and shall have two stainless steel compression bands also in accordance with ASTM C-923.
Page 7 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
23-00724-00-RS
County
Winnebago
Manhole adjustment insert riser rings are not approved for use.
Required Submittals:
1. Manhole adjustment ring material specifications.
2. Manhole adjustment ring sealant material specifications.
3. Manhole exterior adjustment seal (chimney seal) material specifications.
Basis of Payment: This work shall be paid for at the contract unit price per Each for SANITARY
MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME, CLOSED LID.
TRAFFIC CONTROL AND PROTECTION, SPECIAL
Traffic control shall be in accordance with the applicable sections of the Standard Specifications, the applicable guidelines contained in the National Manual on Uniform Traffic Control Devices for Streets and Highways, the Illinois Supplement to the National Manual on Uniform Traffic Control Devices, these special provisions, and any special details and Highway Standards contained herein and in the plans.
Special attention is called to Articles 107.09 and 107.14 of the Standard Specifications and the following Highway Standards relating to traffic control:
701001 701006 701011 701201 701301 701306 701311 701326 701901 720001 720006 720011
728001 729001 731001 BLR 21-9
Signs:
“BUMP” (W8-1(O)48) signs shall be installed as directed by the Engineer.
“UNEVEN LANES” W8-11(O)48 signs shall be installed at 1 mile intervals or as directed by the Engineer.
“LOW SHOULDER” W8-9(O)48 signs shall be installed at 1 mile intervals or as directed by the Engineer.
“NO PASSING ZONES NOT STRIPED NEXT ___ MILES” (G20-I 100(O)) signs shall be 60” x 36”.
When covering existing Department signs, no tape shall be used on the reflective portion of the sign.
Contact the District sign shop for covering techniques.
Flaggers shall comply with all requirements and signaling methods contained in the Department’s “Traffic Control Field Manual” current at the time of letting. The flagger equipment listed for flaggers employed by the Illinois Department of Transportation shall apply to all flaggers
In addition to the flaggers shown on applicable standards, on major sideroads, flaggers shall be required on all legs of the intersection. Major sideroads for this project shall be University Parkway and Ferry St.
Traffic Control for Road Closure: This work shall be done according to the Road Closure Standard and Section 701 of the Standard Specifications. The Contractor will be allowed to complete each culvert pipe replacement under closure; however, only one location will be allowed to be closed at any time. Each closure will be allowed 48 hours. Prior to opening the closure, the Contractor will be required to have removed and replaced the existing culvert, completed the trench backfill, and re-graded the roadside slope.
The Contractor shall have the option of constructing the Class D patch during the closure or to fill the trench with stone up to the top and complete all the Class D patches for the entire project as a single operation. If
Page 8 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
23-00724-00-RS
County
Winnebago Local Public Agency
Winnebago County Hwy Dept the Contractor chooses to construct the Class D patch not with the closure but as a single operation, no additional payment will be made for the additional stone or for the core out / re-grading required to prepare the trench for the Class D patch. If the Contractor chooses to perform the Class D patches collectively and not with each closure, the Contractor will be required to construct the patch under traffic and for the duration of the temporary aggregate, the Contractor shall erect and maintain signs to notify the public of the rough surface and shall be required to maintain the aggregate surface until the Class D patch is completed and no additional payment will be allowed. The Contractor will be allowed five (5) working days after the last pipe culvert replacement has been completed to complete all Class D patches. Failure to complete the Class D patches within the five (5) working days shall result in liquidated damages being accessed according to article 108.09. The Contractor is encouraged to construct all items associated with the closed location during the closure; however, the Contractor will be allowed to complete other ancillary work, such as seeding and restoration, placing rip-rap, placing delineators, etc. under traffic. If the Contractor chooses to work on ancillary items after the closure, the Contractor will be responsible to provide the required traffic control and no additional compensation will be allowed. Should the contractor fail to open up a closure within the 48 hours, liquidated damages will be accessed according to article 108.09.
Signing and devices required to close the road, according to the Traffic Control for Road Closure detail and contained herein, shall be the responsibility of the Contractor. A local detour will not be provided.
“ROAD CLOSED AHEAD” (W20-3(O)-48) with flasher and the appropriate arrow plate (W1-6(o)-36x18 or W1-7(o)-36x18) shall be required on all side roads within the limits of the mainline "ROAD CLOSED AHEAD" signs.
University Parkway and Ferry Street shall be considered Condition I Major sideroad closures for signing as shown on the District Standard Traffic Control for Road Closure Detail.
Signing and devices required to close the road, according to the Traffic Control for Road Closure detail and contained herein, shall be the responsibility of the Contractor. Detour signing required to detour traffic to alternate routes shall be the responsibility of the Contractor. The day the detour signing begins, the detour will be in effect when the Contractor has notified the Resident Engineer or personnel on the project. No detour shall be erected on Friday, Saturday or Sunday. The road shall not be closed until the detour signing is completely installed, verified, and ready to accept traffic.
This work will be paid for at the contract unit price per LUMP SUM for TRAFFIC CONTROL AND
PROTECTION, (SPECIAL).
Maintenance of Traffic:
When the roadway is not closed and/or Standard 701316 or 701321 are not in effect, the mainline shall be kept open to one-way traffic at all times during working hours and two-way traffic during non-working hours.
The Contractor shall notify the Winnebago County Highway Department, the corresponding Township Commissioner, city municipality, emergency response agencies (i.e.: fire, ambulance, police), school bus companies and the Department of Transportation (Bureau of Project Implementation) regarding any changes in traffic control.
The Contractor shall notify the Winnebago County Highway Department, corresponding Township Commissioner and/or city municipality for any sideroad closure or opening.
The Contractor shall submit a maintenance of local traffic plan to the Engineer at the preconstruction meeting telling how local access will be maintained at each access location. It will show which locations will be completely closed, and which locations will be constructed utilizing Traffic Control Standard 701206 and/
Page 9 of 9Printed 08/25/26 BLR 11310 (Rev. 10/04/17)
23-00724-00-RS
County
Winnebago Local Public Agency
Winnebago County Hwy Dept or barricades. This traffic plan will need to be approved by the Engineer before the roadway is closed to traffic.
The Contractor shall have all lanes open from 3 PM Friday until 5 AM Monday, unless prior approval is obtained from the Resident Engineer.
The township road shall be closed during construction using Traffic Control and Protection Standard
BLR-21.
BOX CULVERT REMOVAL
This work shall be done in accordance with Section 501 of the Standard Specifications. The work shall consist of removing and disposing of existing CAST-IN-PLACE box culverts with wing walls.
No. Station Description
1 Old River Rd STA. 84+28 WCHD SN # 64-18 - Remove 38 feet Exist. RC BOX Culvert 10' x 3.75' with all 4 Wing walls
The Removal and disposal of all 4 wing walls will not be measured separately for payment, but shall be included in the contract unit price per FOOT for BOX CULVERT REMOVAL.
This work shall be paid for at the contract unit price per FOOT for BOX CULVERT REMOVAL.
LR107-4
State of Illinois Department of Transportation
Bureau of Local Roads and Streets
SPECIAL PROVISION
FOR
INSURANCE
Effective: February 1, 2007 Revised: August 1, 2007
All references to Sections or Articles in this specification shall be construed to mean specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation.
The Contractor shall name the following entities as additional insured under the Contractor’s general liability insurance policy in accordance with Article 107.27:
The entities listed above and their officers, employees, and agents shall be indemnified and held harmless in accordance with Article 107.26.
Winnebago County
Village of Rockton
LR 702
State of Illinois Department of Transportation
Bureau of Local Roads and Streets
SPECIAL PROVISION
FOR
CONSTRUCTION AND MAINTENANCE SIGNS
Effective: January 1, 2004 Revised: June 1, 2007
All references to Sections or Articles in this specification shall be construed to mean a specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation.
701.14. Signs. Add the following paragraph to Article 701.14:
All warning signs shall have minimum dimensions of 1200 mm x 1200 mm (48" x 48") and have a black legend on a fluorescent orange reflectorized background, meeting, as a minimum, Type AP reflectivity requirements of Table 1091-2 in Article 1091.02.
LR1030 2
State of Illinois
DEPARTMENT OF TRANSPORTATION
Bureau of Local Roads & Streets
SPECIAL PROVISION
FOR
LOCAL QUALITY ASSURANCE/ QUALITY MANAGEMENT QC/QA
Effective: January 1, 2022
Replace the first five paragraphs of Article 1030.06 of the Standard Specifications with the following:
“ 1030.06 Quality Management Program. The Quality Management Program (QMP) will be Quality Control / Quality Assurance (QC/QA) according to the following.”
Delete Article 1030.06(d)(1) of the Standard Specifications.
Revise Article 1030.09(g)(3) of the Standard Specifications to read:
“ (3) If core testing is the density verification method, the Contractor shall provide personnel and equipment to collect density verification cores for the Engineer. Core locations will be determined by the Engineer following the document “Hot-Mix Asphalt QC/QA Procedure for Determining Random Density Locations” at density verification intervals defined in Article 1030.09(b). After the Engineer identifies a density verification location and prior to opening to traffic, the Contractor shall cut a 4 in. (100 mm) diameter core. With the approval of the Engineer, the cores may be cut at a later time.”
Revise Article 1030.09(h)(2) of the Standard Specifications to read:
“ (2) After final rolling and prior to paving subsequent lifts, the Engineer will identify the random density verification test locations. Cores or nuclear density gauge testing will be used for density verification. The method used for density verification will be as selected below.
Density Verification Method Cores
Nuclear Density Gauge (Correlated when paving 3,000 tons per mixture)
Density verification test locations will be determined according to the document “Hot- Mix Asphalt QC/QA Procedure for Determining Random Density Locations”. The density testing interval for paving wider than or equal to 3 ft (1 m) will be 0.5 miles (800
m) for lift thicknesses of 3 in. (75 mm) or less and 0.2 miles (320 m) for lift thicknesses greater than 3 in. (75 mm). The density testing interval for paving less than 3 ft (1 m) wide will be 1 mile (1,600 m). If a day’s paving will be less than the prescribed density testing interval, the length of the day’s paving will be the interval for that day. The density testing interval for mixtures used for patching will be 50 patches with a minimum of one test per mixture per project.
If core testing is the density verification method, the Engineer will witness the Contractor coring, and secure and take possession of all density samples at the
LR1030 2
density verification locations. The Engineer will test the cores collected by the Contractor for density according to Illinois Modified AASHTO T 166 or AASHTO T 275.
If nuclear density gauge testing is the density verification method, the Engineer will conduct nuclear density gauge tests. The Engineer will follow the density testing procedure detailed in the document “Illinois Modified ASTM D 2950, Standard Test Method for Density of Bituminous Concrete In-Place by Nuclear Method”.
A density verification test will be the result of a single core or the average of the nuclear density tests at one location. The results of each density test must be within acceptable limits. The Engineer will promptly notify the Contractor of observed deficiencies.”
Revise the seventh paragraph and all subsequent paragraphs in Section D. of the document “Hot-Mix Asphalt QC/QA Initial Daily Plant and Random Samples” to read:
“Mixtures shall be sampled from the truck at the plant by the Contractor following the same procedure used to collect QC mixture samples (Section A). This process will be witnessed by the Engineer who will take custody of the verification sample. Each sample bag with a verification mixture sample will be secured by the Engineer using a locking ID tag. Sample boxes containing the verification mixture sample will be sealed/taped by the Engineer using a security ID label.”
AGGREGATE SUBGRADE IMPROVEMENT (BDE)
Effective: April 1, 2012 Revised: April 1, 2022
Add the following Section to the Standard Specifications:
“SECTION 303. AGGREGATE SUBGRADE IMPROVEMENT
303.01 Description. This work shall consist of constructing an aggregate subgrade improvement (ASI).
303.02 Materials. Materials shall be according to the following.
Item Article/Section
(a) Coarse Aggregate ............................................................................................... 1004.07
(b) Reclaimed Asphalt Pavement (RAP) ................................................................... 1031.09
303.03 Equipment. The vibratory roller shall be according to Article 1101.01, or as approved by the Engineer. Vibratory machines, such as tampers, shall be used in areas where rollers do not fit.
303.04 Soil Preparation. The minimum immediate bearing value (IBV) of the soil below the improved subgrade shall be according to the Department’s “Subgrade Stability Manual” for the aggregate thickness specified.
303.05 Placing and Compacting. The maximum nominal lift thickness of aggregate gradations CA 2, CA 6, and CA 10 when compacted shall be 9 in. (225 mm). The maximum nominal lift thickness of aggregate gradations CS 1, CS 2, and RR 1 when compacted shall be 24 in. (600 mm).
The top surface of the aggregate subgrade improvement shall consist of a layer of capping aggregate gradations CA 6 or CA 10 that is 3 in. (75 mm) thick after compaction. Capping aggregate will not be required when aggregate subgrade improvement is used as a cubic yard pay item for undercut applications.
Each lift of aggregate shall be compacted to the satisfaction of the Engineer. If the moisture content of the material is such that compaction cannot be obtained, sufficient water shall be added so that satisfactory compaction can be obtained.
303.06 Finishing and Maintenance. The aggregate subgrade improvement shall be finished to the lines, grades, and cross sections shown on the plans, or as directed by the Engineer. The aggregate subgrade improvement shall be maintained in a smooth and compacted condition.
303.07 Method of Measurement. This work will be measured for payment according to Article 311.08.
303.08 Basis of Payment. This work will be paid for at the contract unit price per cubic yard
(cubic meter) or ton (metric ton) for AGGREGATE SUBGRADE IMPROVEMENT or at the contract unit price per square yard (square meter) for AGGREGATE SUBGRADE IMPROVEMENT, of the thickness specified.”
Add the following to Section 1004 of the Standard Specifications:
“ 1004.07 Coarse Aggregate for Aggregate Subgrade Improvement (ASI). The aggregate shall be according to Article 1004.01 and the following.
(a) Description. The coarse aggregate shall be crushed gravel, crushed stone, or crushed concrete. In applications where greater than 24 in.