About this file

This is a Notice to Bidders and Special Provisions document from the Illinois Department of Transportation (IDOT) for Contract No. 74650, a federal-aid construction project involving superstructure replacement and bridge widening of two structures on Interstate 57 in Coles County. The project encompasses removal and replacement of existing bridge decks and superstructures on structures SN 015-0003 (southbound) and SN 015-0004 (northbound) over the Illinois Central Railroad and Township Road 86 at Jones Switch, southeast of Mattoon, with substructure widening to accommodate proposed improvements. The scope of work includes approach slab and shoulder removal, diamond grinding and surface testing, slipform parapet construction, concrete headwall installation for pipe drains, temporary lighting systems, real-time traffic control systems, and removal and disposal of regulated substances. The construction is sequenced across four stages: median crossover and pre-stage construction, pre-stage deck patching, stage 1 reconstruction of one bridge, and stage 2 reconstruction of the second bridge. Electronic bids must be submitted via the iCX (Integrated Contractors Exchange) system prior to 12:00 p.m. on September 18, 2026, with public opening immediately following. The completion date for roadway opening to traffic is October 31, 2028, with an allowance of 15 guaranteed working days for cleanup and punch list items. The contract requires coordination with an adjacent concurrent IDOT contract (74435) for combined traffic control operations.

Pricing will be determined on a unit price basis for various line items including traffic control standards, temporary lighting, real-time traffic control systems, bridge deck grinding, seeding, and numerous construction materials and services as detailed in the contract documents. Traffic control restrictions prohibit certain lane closures between November 15 and March 1, and December 1 and March 1. Utility coordination is required with Ameren Electric and Gas, multiple fiber optic providers, water services, and telecommunications companies, with estimated relocation dates specified for each utility. The contract is funded with federal-aid highway construction funds and will be awarded to the lowest responsive and responsible bidder meeting conformity with IDOT terms and conditions as established in the Standard Specifications for Road and Bridge Construction, the Manual on Uniform Traffic Control Devices, and all supplemental and special provisions. All bidders are required to make various certifications as part of the proposal, and false or fraudulent certifications constitute a breach of contract and may result in termination. Disadvantaged Business Enterprise (DBE) participation is required, with specific provisions for DBE subcontractor reporting and payment documentation throughout the project duration.

View the file

Other files

File Type Posted
IDOT 74650-132.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting September 18, 2026

Notice to Bidders, Specifications and Proposal

Contract No. 74650 COLES County Section (15-22VB)BR Route FAI 57 Project BR-7FG0(942) District 7 Construction Funds

Prepared by F

Checked by

(Printed by authority of the State of Illinois)

NOTICE TO BIDDERS

1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.

September 18, 2026 at which time the bids will be publicly opened from the iCX SecureVault.

2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the

Invitation for Bids as:

Contract No. 74650 COLES County Section (15-22VB)BR Project BR-7FG0(942) Route FAI 57 District 7 Construction Funds

Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004)

3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.

(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.

4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.

By Order of the Illinois Department of Transportation

Gia Biagi, Secretary

FAI ROUTE 57 (I-57)

PROJECT BR-7FG0(942)

SECTION (15-22VB)BR

COLES COUNTY

CONTRACT NO. 74650

INDEX

FOR

SUPPLEMENTAL SPECIFICATIONS

AND RECURRING SPECIAL PROVISIONS

Adopted January 1, 2026

This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.

ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)

SUPPLEMENTAL SPECIFICATIONS

Std. Spec. Sec. Page No.

109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires

1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment

SECTION (15-22VB)BR

RECURRING SPECIAL PROVISIONS

The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:

CHECK SHEET # PAGE NO.

1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)

3 X EEO

4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 Construction Layout Stakes

10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 X Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 X Station Numbers in Pavements or Overlays

SECTION (15-22VB)BR

i

TABLE OF CONTENTS

LOCATION OF PROJECT

DESCRIPTION OF PROJECT

TRAFFIC CONTROL PLAN

APPROACH SLAB REMOVAL

BORROW AREAS, USE AREAS, AND/OR WASTE AREAS

BRIDGE APPROACH SHOULDER REMOVAL

CLASS BS AGGREGATE OPTIMIZATION

COMPLETION DATE PLUS GUARANTEED WORKING DAYS

CONCRETE HEADWALL FOR PIPE DRAINS

COOPERATION BETWEEN CONTRACTORS

EMBANKMENT

HMA SURFACE REMOVAL (DECK)

HMA SURFACE REMOVAL, VARIABLE DEPTH

LINEAR DELINEATION PANELS

PIPE DRAINS, 12” (SPECIAL)

PLUG EXISTING DECK DRAINS

REAL-TIME TRAFFIC CONTROL SYSTEM

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES

REMOVE CONCRETE HEADWALLS FOR PIPE DRAINS

REMOVE INLET BOX

SEEDING, CLASS 2 (SPECIAL)

SUGGESTED SEQUENCE OF CONSTRUCTION

STATUS OF UTILITIES TO BE ADJUSTED

TEMPORARY LIGHTING SYSTEM

TEMPORARY RAISED PAVEMENT MARKER

TEMPORARY RUMBLE STRIPS (SPECIAL)

TEMPORARY TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL TANGENT)

TRAFFIC BARRIER TERMINALS

DIAMOND GRINDING AND SURFACE TESTING BRIDGE SECTIONS

SLIPFORM PARAPET

BRIDGE DECK CONSTRUCTION

BRIDGE DECK GROOVING (LONGITUDINAL)

HOT DIP GALVANIZING FOR STRUCTURAL STEEL

ERECTION OF BRIDGE GIRDERS OVER OR ADJACENT TO RAILROADS

BAR SPLICERS, HEADED REINFORCEMENT

SECTION (15-22VB)BR

ii

CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)

COMPENSABLE DELAY COSTS (BDE)

CONCRETE SEALER (BDE)

DECK SLAB REPAIR

DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)

EROSION CONTROL BLANKET (BDE)

FUEL COST ADJUSTMENT (BDE)

GUARDRAIL (BDE)

HOT-MIX ASPHALT (BDE)

HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)

LONGITUDINAL TINING (BDE)

PAVEMENT MARKING (BDE)

PERFORMANCE GRADED ASPHALT BINDER (BDE)

PREFORMED PLASTIC PAVEMENT MARKING (BDE)

RAILROAD PROTECTIVE LIABILITY INSURANCE (BDE)

RAISED REFLECTIVE PAVEMENT MARKERS (BDE)

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)

SEEDING (BDE)

SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)

SIGN PANELS AND APPURTENANCES (BDE)

SLOPE WALL (BDE)

SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)

SPEED DISPLAY TRAILER (BDE)

STEEL COST ADJUSTMENT (BDE)

SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)

SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)

SUBMISSION OF BIDDERS LIST INFORMATION (BDE)

SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)

SURVEYING SERVICES (BDE)

TEMPORARY CONCRETE BARRIER (BDE)

TEMPORARY RUMBLE STRIPS (BDE)

VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)

WEEKLY DBE TRUCKING REPORTS (BDE)

WORK ZONE TRAFFIC CONTROL DEVICES (BDE)

WORK ZONE WIDTH RESTRICTION (BDE)

PROJECT LABOR AGREEMENT

SECTION (15-22VB)BR

STATE OF ILLINOIS

SPECIAL PROVISIONS

The following Special Provisions supplement the “Standard Specifications for Road and Bridge Construction, Adopted January 1, 2022”, the latest edition of the “Manual on Uniform Traffic Control Devices for Streets and Highways”, and the “Manual of Test Procedures for Materials” in effect on the date of invitation for bids, and the “Supplemental Specifications and Recurring Special Provisions” indicated on the Check Sheet included herein, which apply to and govern the construction of FAI Route 57 (I-57), Project BR-7FG0(942), Section (15-22VB)BR, Coles County, Contract No. 74650, and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.

FAI Route 57 (I-57) Project BR-7FG0(942) Section (15-22VB)BR

Coles County Contract No. 74650

LOCATION OF PROJECT

The project is located on I-57 over the Illinois Central Railroad (ICRR) and CR550N/Fairway Lane (TR 86) at Jones Switch, southeast of Mattoon.

DESCRIPTION OF PROJECT

This project consists of the removal and replacement of the existing decks and superstructures on SNs 015-0003(SB) and 015-0004(NB). The substructures on both bridges will be widened to accommodate the proposed improvements.

TRAFFIC CONTROL PLAN

Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, these special provisions, and any other special details and highway standards contained herein and in the plans.

Special attention is called to Articles 107.09, 107.14, and 107.15 of the Standard Specifications for Road and Bridge Construction, the following highway standards and special details relating to traffic control, and these special provisions.

Highway Standards:

SECTION (15-22VB)BR

701001 701006 701101 701201 701316 701400 701401 701402 701406 701416 701901

The work shall be completed using crossovers to allow each bridge to be temporarily closed for construction.

Traffic control standards shall be applied as directed by the Engineer. Suggested applications for each standard or details are as follows:

Traffic Control and Protection, Standard 701001. Traffic Control and Protection, Standard 701001 shall be used for work on Fairway Lane that is more than 15’ from the edge of pavement.

Traffic Control and Protection, Standard 701006. Traffic Control and Protection, Standard 701006 shall be used for work on Fairway Lane that is 15’ to 24” from the edge of pavement.

Traffic Control and Protection, Standard 701101. Traffic Control and Protection, Standard 701101 shall be used for work that is 15’ to 24” from the edge of pavement such as grading and seeding.

Traffic Control and Protection, Standard 701201. Traffic Control and Protection, Standard 701201 shall be used for day-time lane closures on Fairway Lane, such as grading and seeding, and/or anytime that the Contractor’s operations encroach within 2’ of the edge of pavement.

Traffic Control and Protection, Standard 701316. Traffic Control and Protection, Standard 701316 shall be used for overnight lane closures on Fairway Lane, such as substructure work for the pier extensions, and/or anytime that the Contractor’s operations encroach within 2’ of the edge of pavement.

This work will be paid at the contract price, EACH, for TRAFFIC CONTROL AND PROTECTION, STANDARD 701316. The price, each, shall be interpreted to mean that the traffic control for the work along Fairway Lane will be measured separately for payment for each stage on I-57. This price shall include all work items, except the items specifically identified below for separate payment. No lane closures utilizing Traffic Control and Protection, Standard 701316 shall be allowed between December 1 and March 1 of any given year.

Traffic signals will be paid at the contract unit price per EACH for TEMPORARY BRIDGE TRAFFIC SIGNALS. The price, each, shall be interpreted to mean the entire traffic signal system for the work along Fairway Lane will be measured separately for payment for each stage of I-57.

Temporary rumble strips will be paid at the contract unit price per EACH for TEMPORARY

RUMBLE STRIPS (SPECIAL).

Traffic Control and Protection, Standard 701400. Traffic Control and Protection, Standard 701400 shall be used in conjunction with Standards 701401, 701402, 701406, and 701416.

Traffic Control and Protection, Standard 701401. Traffic Control and Protection, Standard 701401 shall be used for daytime and/or overnight single lane closures, such as the construction of the median cross-overs, and/or anytime that the Contractor’s operations encroach within 2’ of the edge of pavement.

SECTION (15-22VB)BR

Traffic Control and Protection, Standard 701402. Traffic Control and Protection, Standard 701402 shall be used for lane closures with temporary concrete barrier, such as the deck patching on SN 015-0003(SB). No lane closures utilizing Traffic Control and Protection, Standard 701402 shall be allowed between November 15 and March 01

This work will be paid at the contract unit price per EACH for TRAFFIC CONTROL AND PROTECTION, STANDARD 701402. The unit each shall be interpreted to mean that the traffic control for each side of the pre-stage work on SN 015-0003(SB) will be measured separately for payment.

Traffic Control and Protection, Standard 701406. Traffic Control and Protection, Standard 701406 shall be used for daytime only single lane closures, and/or anytime that the Contractor’s operations encroach within 2’ of the edge of pavement.

Traffic Control and Protection, Standard 701416. Traffic Control and Protection, Standard 701416 shall be used for the reconstruction of both bridges. Stage 1 traffic will be placed on 015-0003(SB) during the reconstruction of SN 015-0004. Stage 2 traffic will be placed on 015-0004(NB) during the reconstruction of SN 015-0003. No lane closures utilizing Traffic Control and Protection, Standard 701416 shall be allowed between November 15 and March 01.

This work will be paid at the contract price per EACH for TRAFFIC CONTROL AND PROTECTION, STANDARD 701416. The unit each shall be interpreted to mean that the traffic control for the work at each bridge will be measured separately for payment.

Temporary lighting shall be installed at each cross-over in accordance with the details in the plans and shall be paid for separately.

Temporary concrete barriers and their relocation will be paid for separately. Anchor pins, except for the six anchor pins for the barrier unit at each end of an installation, will be included in the cost for Pinning Temporary Concrete Barrier.

Modular glare screens shall be mounted on the top of the temporary concrete barrier. modular glare screens will be paid for separately.

Existing pavement markings in conflict with the proposed traffic control shall be covered by pavement marking black-out tape. pavement marking black-out tape will be paid for separately.

The reflective lenses on the raised reflective pavement markers in conflict with the proposed traffic control shall be removed. The reflective lenses for any raised reflective pavement markers outside the limits of the milling and resurfacing shall be stored and reinstalled at the completion of the work. This work will be paid for separately.

Temporary pavement markers will be paid for separately.

Bridge Width Restriction Signs. The Contractor shall furnish and install the following signs to advise motorists of the width restriction created by the stage construction bridge work. The signs shall be installed on posts or type 3 barricades, unless otherwise specified, as described below:

Pre-Stage I: 12’-6” SB, No Restriction NB Pre-Stage II: 12’-6” SB, No Restriction NB

SECTION (15-22VB)BR

Stage 1: 14’-0” SB, 14’-0” NB Stage 2: 17’-6” SB, 17’-6” NB

See the Width Restriction Signage Detail in the plans for the sign locations.

The Engineer shall approve the exact locations of all proposed signs and barricades prior to installation. Installation shall be in accordance with Standard 701901.

The signs shall be furnished by the Contractor and shall conform to the dimensions and text as shown on the drawing included herein. When the width displayed on the signs must change as determined by the Engineer for the second stage of construction, materials to modify the signs shall be furnished and installed by the Contractor. The Contractor shall be responsible for the maintenance of the barricades and signs during the life of the project. The Contractor shall ensure that continual visibility of these signs is maintained and not obstructed by vegetation or other obstacles.

The signs shall be promptly removed when the restriction is no longer in effect.

The cost of furnishing, installing, maintaining, and removing width restriction signs and barricades shall be included in the contract price for Traffic Control and Protection, Standard 701416.

SECTION (15-22VB)BR

APPROACH SLAB REMOVAL

Description. This work shall consist of the complete removal of the existing approach slab as shown in the plans. All pavement and appurtenances within the limits of the approach slab shall be removed. This includes, but not limited to, PCC pavement, HMA overlays, reinforcement, curbs, inlets, stabilized subbase, approach footing (sleeper slab), connector pavement, and expansion joint material adjacent to the approach slab.

The Contractor shall remove the existing approach slabs in a manner to not damage the adjacent structures that are to remain and in accordance with the applicable portions of Section 501.05 of the Standard Specifications. Approach slab removal shall be performed in accordance with Sections 440 and 442.05(a) of the Standard Specifications.

SECTION (15-22VB)BR

Method of Measurement. Approach slab removal will be measured for payment in place, and the area computed in square yards.

Basis of Payment. This work will be paid at the contract unit price per SQUARE YARD for

APPROACH SLAB REMOVAL.

BORROW AREAS, USE AREAS, AND/OR WASTE AREAS

In addition to the provisions contained in Article 107.22 of the Standard Specifications, the Contractor shall submit all required documents to the District electronically. All photos shall be in color.

BRIDGE APPROACH SHOULDER REMOVAL

Bridge approach shoulder pavement removal shall be in accordance with Section 440 of the Standard Specifications. This includes, but not limited to, PCC pavement, HMA overlays, reinforcement, curbs, inlets, and subbase. This work will be paid for at the contract unit price per SQUARE YARD for BRIDGE APPROACH SHOULDER REMOVAL.

CLASS BS AGGREGATE OPTIMIZATION

For superstructure construction, class BS concrete shall contain a blend of two, or more, coarse aggregate sizes blended in accordance with Article 1004.02(d). The blended aggregate will consist of CA-07 or CA-11 with CA-13, CA-14, or CA-16. The blended coarse aggregate gradation shall have a minimum of 45% passing the ½ inch sieve and a maximum of 60% passing the ½ inch sieve, or as directed by the Engineer.

The cost of compliance with this requirement shall be considered included in the cost of the concrete superstructures.

COMPLETION DATE PLUS GUARANTEED WORKING DAYS

The Contractor shall complete all contract items and safely open all roadways to traffic by October 31, 2028, except as specified herein. The Contractor will be allowed to complete all clean-up work and punch list items within 15 guaranteed working days after the completion date for opening the roadway to traffic. Under extenuating circumstances, the Engineer may direct that certain items of work, not affecting the safe opening of the roadway to traffic, may be completed within the guaranteed working days allowed for clean-up work and punch list items. Temporary lane closures for this work may be allowed at the discretion of the Engineer.

Article 108.09 of the Standard Specifications shall apply to both the completion date and the number of working days.

SECTION (15-22VB)BR

CONCRETE HEADWALL FOR PIPE DRAINS

This work shall be in accordance with Section 601 of the Standard Specifications and Standards 601001 and 601101. All areas disturbed by the construction of the pipe drains and headwalls shall be seeded with a class II seed mixture in accordance with Section 250.07 of the Standard Specifications. Fertilizer nutrients shall be applied in accordance Section 250.04 of the Standard Specifications. Mulch shall be method 2 in accordance with Section 251.03 of the Standard Specifications.

This work will be paid for at the contractor unit price per EACH for CONCRETE HEADWALL FOR PIPE DRAINS. The price shall include all labor, equipment, and materials including the precast concrete headwall, rodent shield, fertilizer, seeding, and mulch.

COOPERATION BETWEEN CONTRACTORS

There is a possibility that other contractor operations for the following contract may be ongoing within the proposed project limits at the same time as the work included in this contract is being performed:

Contract: 74435 Section: (15-22HB-4)BR (15-22)R

I-57/ILL-16

Bridge Replacement / Interchange Reconstruction Coles County

The Contractor for this section shall cooperate with any other contractors performing work within, or adjacent to, this project in accordance with Article 105.08 of the Standard Specifications. Any inconveniences or delays caused in complying with this requirement shall be considered included in the contract, and no additional compensation will be allowed.

In the event that traffic control and staging operations are in effect for both projects that would necessitate a combined traffic control setup between these two contracts, traffic control shall be extended to Station 708+50 along I-57 to accommodate the necessary traffic control operations.

The Contractors shall work together along with the Engineer(s) to combine the traffic control set-ups and maintain traffic flow between the two projects. Traffic control devices, signage, pavement markings, and taper rates shall conform to the applicable traffic control standards each project is utilizing.

Any additional traffic control devices, signage, pavement markings, and any other items required to extend traffic control to this location will not be paid for separately but shall be included in the cost of the traffic control standard being utilized.

SECTION (15-22VB)BR

EMBANKMENT

Embankments shall be constructed in accordance with Sections 202, 204, and 205 of the Standard Specifications and the following.

When embankments are to be constructed on hillsides or existing slopes steeper than 3H:1V, steps shall be keyed into the existing slope by stepping and benching as shown in the plans or as directed by the Engineer.

All materials for embankment construction shall be approved by the Engineer. In addition to the requirements of Section 204, soils exhibiting the following properties shall not be allowed:

Liquid limit (AASHTO T 89) greater than 60.

Soils exhibiting the following properties shall be restricted to the interior of the embankment:

Less than 35% passing the #200 sieve.

Liquid limit (AASHTO T 89) greater than 50 but less than 60.

Plasticity index (AASHTO T 90) less than 12.

These restricted soils shall be encapsulated by a minimum of 2 feet of unrestricted soil as directed by the Engineer. The thickness of encapsulation shall not include topsoil. The Engineer may restrict or prohibit the use of materials, other than those identified above, which exhibit potential for significant erosion or excessive change in volume.

Where lime modified soil is shown in the plans, materials placed in the top 2 feet of embankments shall have a clay content greater than or equal to 20% over the width of the improved subgrade.

Clay is defined according to AASHTO M 145. Clay content shall be determined according to

AASHTO T 88.

The moisture content of all embankment lifts, including embankment place adjacent to a structure, shall not exceed 110% of the optimum moisture determined according to AASHTO T 99 (Method C). If the Engineer determines the embankment lifts are unstable after achieving the required density, the Contractor shall reprocess and the compact the unstable material as directed by the Engineer. The Engineer may reduce the allowable moisture content to correct or prevent stability problems during embankment construction.

When the proposed embankment height is greater than 30 feet, any embankment lift shall provide a minimum IBV of 3.0 when tested in accordance with Illinois Testing Procedure 501 or 502. Any embankment fill not providing the minimum required IBV shall be removed and replaced, modified, or reprocessed to provide an IBV of 3.0. The volume of material covered by this requirement includes the entire cross-sectional area of the embankment greater than 30 feet in height and an additional 250 feet in each direction of the starting and ending station where the embankment is greater than 30 feet.

This work will be paid for at the contract unit prices per CUBIC YARD for EARTH EXCAVATION, BORROW EXCAVATION, and/or FURNISHED EXCAVATION.

SECTION (15-22VB)BR

RECOVERABLE DELINEATORS

This work shall consist of furnishing and installing recoverable delineators using either a drive-able and/or surface mount ground anchor system in accordance with the following:

1. Driveable Ground Anchor – for ground installation (shoulders)

a. Ground Anchor shall be a 2” x 12 ga. X 24” piece of perforated square tubing.

2. Surface Mount Ground Anchor – for installation on PCC or HMA surfaces

a. Shall use a surface mount base that can be installed using either an epoxy or bolt-down system.

The recoverable delineators shall be omni-directional and self-righting and being capable of withstanding multiple vehicle hits and return to vertical. They shall include a flexible square to round self-righting joint. All posts shall be white and a minimum of 28 inches tall as shown on Standard 701901. They shall permanently flattened and sealed at the top having a minimum width of 3” and be capable of displaying a 3” wide piece of reflective sheeting.

The delineator will be pinned to the ground anchor allowing the post to be replaced in less than a minute requiring no specialized tools.

Reflective sheeting on each highway delineator shall be 3” x 9” in dimension and match the adjacent pavement marking in color. Reflective sheeting shall comply with Article 1091.03 of the Standard Specifications.

The delineators shall be installed at proposed delineator locations in accordance with the plans.

All equipment necessary for the installation shall be per manufacturer’s recommendation.

This work will be paid for at the contract unit price per EACH for RECOVERABLE DELINEATORS.

HMA SURFACE REMOVAL (DECK)

This work shall be in accordance with Section 440 of the Standard Specifications and the following. The intent of this work is to completely remove the existing HMA surface course on SN 015-0003 (SB), in stages, as part of the pre-stage deck patching operations. The Contractor shall adjust the milling depth, or utilitze other means, to eliminate scabbing and to ensure that all the existing hot-mix asphalt is removed.

This work will be paid for at the contract unit price per SQUARE YARD for HOT-MIX ASPHALT

SURFACE REMOVAL (DECK).

SECTION (15-22VB)BR

HMA SURFACE REMOVAL, VARIABLE DEPTH

following. This milling is intended for cross-slope correction and minor profile corrections in advance of the proposed HMA resurfacing. The centerline depth shall be as shown in the Paving Details in the plans. The cross-slope shall be as shown on the typical cross-sections and cross-sections in the plans.

This work will be paid for at the contract unit price per SQUARE YARD for HOT-MIX ASPHALT

SURFACE REMOVAL, VARIABLE DEPTH.

LINEAR DELINEATION PANELS

Description. This work shall consist of placing linear delineation panels on temporary concrete barrier wall, and new or existing concrete parapet wall.

Materials. Each panel shall be no less than 34 inches in length and 6 inches in width. The panels shall be constructed of cube-corner retroreflective material in standard highway colors permanently bonded to an aluminum substrate. The lateral edges of each panel shall be hemmed.

The panel assembly shall have a repeating raised lateral ridge every 2.25 inches. Each ridge shall be 0.34 inches high with a 450 profile and a 0.28 inch radius top. Each panel shall be attached according to the manufacturer's specifications and/or recommendations.

Daytime color requirements shall be determined from measurement of the retroreflective sheeting applied to aluminum test panels. Daytime color shall be measured instrumentally using a spectrometer employing annular 45/0 (or equivalent 0/45) illuminating and viewing geometry.

Measurements shall be made in accordance with ASTM E1164 for ordinary colors or ASTM E2153 for fluorescent colors. Chromaticity coordinates shall be calculated for CIE Illuminant D65 and the CIE 1931 (2o) Standard Colormetric Observer in accordance with ASTM E308 for ordinary colors or ASTM E2153 for fluorescent colors.

Chromaticity Limits for White x y x y x y x y Limit Y (%)

Min Max White 0.303 0.287 0.368 0.353 0.340 0.380 0.274 0.316 40 -

Chromaticity Limits for Fluorescent Orange x y

Total Luminance Factor Y (%) Min

Fluor. 0.595 0.351 0.645 0.355 0.583 0.416 0.542 0.403 30 Orange

SECTION (15-22VB)BR

Chromaticity Limits for Fluorescent Yellow x Y x Y x y x y Total Luminance

Factor YT (%) Min Fluor.

Yellow

0.521 0.424 0.557 0.442 0.479 0.520 0.454 0.491 40

Temporary. Two panels shall be placed on each section of temporary concrete barrier wall 6 inches down from the top. The panels shall be alternating white and fluorescent orange, have a spacing of 28 inches apart, and be centered horizontally on each section of barrier wall. These panels shall be used in lieu of the type C crystal-colored reflectors shown on Standard 704001.

Permanent. Panels shall be placed on each new or existing concrete parapet wall 6 inches down from the top and shall remain in place after the project has been completed. The panels color shall match the adjacent edge line, be placed on the parapet wall spaced at 50 foot centers, and centered horizontally. The panels shall be used in lieu of the typical reflective markers shown on Standard 635011.

Basis of Payment. The linear delineation panels will not be paid for separately but shall be considered included in the cost of the contract.

PIPE DRAINS, 12” (SPECIAL)

This work shall be in accordance with Section 601 of the Standard Specifications, Standard 610001, Standard 542401, and the following. This work shall consist of removing and replacing the existing 12” pipe drains at the shoulder inlet locations shown in the plans. The existing pipe drain material is unlined corrugated HDPE pipe. The proposed pipe drain material shall comply with Section 601.02. Unlined corrugated HDPE pipe will not be allowed.

There is significant erosion of the roadway foreslope at the pipe drain locations to be replaced.

The Contractor shall furnish, and compact, suitable soil to backfill the eroded areas and the proposed pipe drains. The completed work shall be seeded and covered with erosion control blanket.

This work will be paid at the contract unit price per FOOT for PIPE DRAINS 12” (SPECIAL) which price shall include the removal and disposal of the existing pipe drains and the backfill of the pipe drains and the eroded areas. The proposed concrete thrust blocks, end sections, seeding, and erosion control blanket will be paid separately.

SECTION (15-22VB)BR

PLUG EXISTING DECK DRAINS

This work shall be in accordance with Section 604 of the Standard Specifications and the following. This work shall consist of filling the existing bridge scuppers on SN 015-0003 (SB) with concrete in advance of erecting the prestage I traffic control.

This work will be paid for at the contract unit price per EACH for PLUG EXISTING DECK DRAINS.

REAL-TIME TRAFFIC CONTROL SYSTEM

Description: This item shall consist of furnishing, installing, maintaining, relocating, and removing an automated real-time traffic control system (RTTCS) meeting the requirements noted herein and providing the maintenance of the system during the duration of the work.

The Contractor shall furnish said system for measuring and delivering condition-responsive alerts on the project. The RTTCS components shall be installed at the locations shown in the plans.

The RTTCS shall be installed and operational two weeks prior to any lane closures on the project and shall remain in place until directed by the Engineer to remove the system or a portion thereof.

The RTTCS shall consist of, at a minimum:

• A Real-Time Traffic Control Monitoring Sensor Unit. Each sensor shall be capable of communicating with other components of this system.

• A Real-Time Traffic Control Warning Sign. Each unit shall consist of:

• Warning signs with sign legend as shown in the plans.

• Each sign shall have amber wigwag LED flashing lights (two flashers per sign) attached, with a minimum lens size of 12 inches. The flash pattern and flash sequence shall comply with the MUTCD, Chapter 4L.

• Remote communication hardware and software and controllers capable of activating flashing beacons.

• One real-time traffic control central base unit equipped with appropriate hardware, software and dedicated network connection. To maintain accurate and reliable communication between all components of the system.

The exact locations of all devices shall be determined as part of an on-site communications analysis with the Contractor.

The RTTCS shall meet the following specifications:

• The RTTCS shall be a proven system that has been successfully deployed and operated in actual work zone and congestion areas.

• The RTTCS shall be capable of identifying stopped / slowed traffic conditions. The system shall self-test for communication or sensor failures.

• The RTTCS shall operate continuously (24 hours, 7 days a week) when in place and visible to the motoring public.

SECTION (15-22VB)BR

• The traffic sensors shall be of a type whose accuracy is not degraded by inclement weather or degraded visibility conditions including, but not limited to precipitation, fog, darkness, excessive dust and road debris.

• The RTTCS shall be capable of acquiring traffic data for a minimum of two lanes of traffic in the same direction.

• Traffic sensors shall sequentially activate the warning sign flashers as the queue extends and be capable of only activating specific warning sign flashers.

• The RTTCS shall be capable of activating a message board.

• The RTTCS shall utilize static signs with two wigwag flashing beacons that only activate when slowed or stop traffic is detected to convey real-time traffic condition information to motorists.

• The warning sign flashers shall activate whenever the average traffic speeds fall below 30 mph and turn off when the average speed returns to above 45 mph. These speed thresholds shall be capable of being changed based on actual field trials and the location of the traffic sensor.

• Warning signs expected to be in place for more than two weeks shall be post mounted.

• The RTTCS shall have a reliable communication system and provide warnings to the system manager and the Engineer when communication or device failures are detected.

• The RTTCS shall be capable of notifying the Resident Engineer and Communications Center when the flashing beacons are activated.

• The RTTCS and flashers shall have a reliable power source.

• The RTTCS shall allow authorized users remotely to manually override the system during apparent system failures.

• Critical system operator control functions shall be password protected.

• The RTTCS shall have reporting features to a secure website. The website shall, at a minimum, show the current speeds at each detector location and whether the warning flashers are activated. The website shall provide access to archival data for the duration of the project. This data shall be printable.

• The RTTCS shall provide data logging the system events and key detection data. The data is to include the dates and times that the system was activated, which signs were activated, duration of the activation, and average speeds at each detections device. The data shall be provided to the Engineer at the close of the project in Microsoft Excel ®, latest format.

• If during the duration of the project, it is found that the distances or locations in relation to each other and/or to the taper, detectors or warning signs need to be relocated due to a change in the traffic conditions or queuing patterns, a one-time adjustment is included in the cost of the Real-Time Traffic Control Monitoring Sensor Unit.

• The RTTCS components may be relocated as deemed necessary by the Engineer

• During winter shut-down all trailers shall be removed from the right of way and the signs shall be removed as directed by the Engineer. All removal, storage, and reinstallation shall be included in the cost of the Real-time Traffic Control Monitoring Sensor Units.

System Performance: After the RTTCS is in place and operational, knowledgeable Contractor personnel shall be available for one work week (until Friday at 8:00 PM) after the lane closures are in place to ensure that the system is functioning properly. The responsible individual shall be capable of responding within 15 minutes during the first week and shall have sufficient resources to correct any issues with the RTTCS at that time.

To ensure a prompt response to incidents involving the integrity of the RTTCS devices, the Contractor shall provide a telephone number where a responsible individual can be contacted on

SECTION (15-22VB)BR

a 24-hour-a-day basis. The Contractor shall dispatch sufficient resources within two hours of notification to make needed corrections of deficiencies. All deficiencies shall be corrected within 12 hours. If the Contractor fails to restore the RTTCS to full operation within the time limits specified above, the Engineer will impose a daily monetary traffic control deficiency deduction for each calendar day (or portion thereof) the deficiency exists, as described in Article 105.03 of the Standard Specifications.

Additional real-time traffic control sensor units installed as directed by the Engineer after the initial deployment of the system shall be in operation and accepted by the Engineer within 14 calendar days after the Contractor receives written notification of changes from the Engineer. If the Contractor fails to update the RTTCS to full operation within the time limits specified above, the Engineer will impose a daily monetary traffic control deficiency deduction for each calendar day (or portion thereof) the deficiency exists, as described in Article 105.03 of the Standard Specifications.

A traffic control deficiency deduction will be made for each individual component of the RTTCS that is not functioning correctly. Individual components of the RTTCS are traffic sensors, central base station unit, and warning signs with flashers.

Method of Measurement: This work will be measured for payment as follows.

Real-time traffic control warning sign will be measured on a calendar month basis per each unit, which each unit consists of one warning sign with two amber LED flashing lights attached and remote communication hardware and software and controllers capable of communicating with other components of this system.

Real-time traffic control monitoring sensor unit will be measured on a calendar month basis per each unit, which each unit includes, one traffic sensor, remote communication hardware and software, and controllers capable of communicating with other components of this system.

Real-time traffic control central base unit will be measured on a calendar month basis, which includes all hardware, software, website, and communications network necessary to run the real-time traffic control system.

Basis of Payment: This work will be paid for as follows.

Real-Time Traffic Control Warning Sign will be paid for at the contract unit price per CALENDAR MONTH OR fraction thereof for REAL-TIME TRAFFIC CONTROL WARNING SIGN.

Real-Time Traffic Monitoring Sensor Unit will be paid for at the contract unit price per CALENDAR MONTH or fraction thereof for REAL-TIME TRAFFIC CONTROL SENSOR UNIT.

Real-Time Traffic Control Central Base Unit will be paid for at the contract unit price per CALENDAR MONTH or fraction thereof for REAL-TIME TRAFFIC CONTROL CENTRAL BASE

UNIT.

SECTION (15-22VB)BR

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES

Description. This work shall consist of the removal and disposal of regulated substances according to Section 669 of the Standard Specifications as revised below.

Contract Specific Work Areas. For stationing, the lateral distance is measured from centerline, and the farthest distance is the offset distance or construction limit, whichever is less.

The following contract specific work areas shall be monitored by the environmental firm for soil contamination and workers protection.

Site 4704-2: ROW, approximate I-57 M.M. 186.6 to M.M. 187.5, unincorporated Lafayette Township, Coles County, Illinois

Soil Management

• Station 639+50 to 645+30, 22 feet RT to 32 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameters: iron and manganese.

• Station 647+93 to 648+75, 22 feet RT to 32 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 653+25 to 653+40, 22 feet RT to 32 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 653+95 to 656+18, 24 feet RT to 32 feet RT and 56 feet RT to 68 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameters: iron and manganese.

• Station 656+18 to 659+05, 0 feet RT to 75 feet RT (0 to 5 feet bgs) – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameters: iron and manganese.

• Station 656+95 to 659+23, 0 feet RT to 75 feet RT (5 to 9 feet bgs) – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(1). COC Sampling parameters: iron, lead, and manganese.

• Station 660+25 to 661+75, 24 feet RT to 32 feet RT and 56 feet RT to 68 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 662+75 to 664+25, 22 feet RT to 32 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 671+75 to 673+25, 22 feet RT to 32 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 674+75 to 676+23, 22 feet RT to 32 feet RT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

SECTION (15-22VB)BR

• Station 639+80 to 645+00, 22 feet LT to 32 feet LT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameters: iron and manganese.

• Station 647+90 to 651+75, 22 feet LT to 32 feet LT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 654+70 to 655+75, 24 feet LT to 32 feet LT and 56 feet LT to 68 feet LT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameters: iron and manganese.

• Station 657+55 to 658+93, 0 feet LT to 75 feet LT (0 to 5 feet bgs) – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 656+95 to 659+23, 0 feet LT to 75 feet LT (5 to 9 feet bgs) – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(1). COC Sampling parameters: iron, lead, manganese, and vanadium.

• Station 660+12 to 661+32, 24 feet LT to 32 feet LT and 56 feet LT to 68 feet LT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 664+25 to 665+75, 22 feet LT to 32 feet LT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 667+25 to 668+35, 22 feet LT to 32 feet LT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameter: manganese.

• Station 670+90 to 676+60, 22 feet LT to 32 feet LT – The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05 (a)(2). COC Sampling parameters: iron and manganese.

Groundwater Management

• Station 656+95 to 659+23, 0 feet LT to 75 feet LT – The Engineer has determined this groundwater meets the criteria of and shall be managed in accordance with Article 669.05(d). COC Sampling parameters: iron, lead, manganese, and vanadium.

• Station 656+95 to 659+23, 0 feet RT to 75 feet RT – The Engineer has determined this groundwater meets the criteria of and shall be managed in accordance with Article 669.05(d). COC Sampling parameter: iron, lead, manganese.

Work Zones. Three distinct OSHA HAZWOPER work zones (exclusion, decontamination, and support) shall apply to projects adjacent to or within sites with documented leaking underground storage tank (LUST) incidents or sites under management in accordance with the requirements of the Site Remediation Program (SRP); Resource Conservation and Recovery Act (RCRA);

Comprehensive Environmental Response, Compensation and Liability Act (CERCLA); or as deemed necessary. For this project, the work zones apply for the following ISGS PESA Sites:

None

Additional information on the contract specific work areas listed above collected during the regulated substances due-diligence process is available through the District’s Environmental Studies Unit (DESU).

SECTION (15-22VB)BR

REMOVE CONCRETE HEADWALLS FOR PIPE DRAINS

This work consists of removing and disposing of precast, or cast-in-place, concrete headwalls for pipe drains at the locations shown in the plans or as directed by the Engineer. After the headwalls are removed, the voids shall be filled with suitable excavated material and graded to match the existing slope. All areas disturbed by the headwall removal shall be seeded with a class II seed mixture in accordance with Section 250.07 of the Standard Specifications. Fertilizer nutrients shall be applied in accordance Section 250.04 of the Standard Specifications. Mulch shall be method 2 in accordance with Section 251.03 of the Standard Specifications.

This work will be paid for at the contractor unit price per EACH for REMOVE CONCRETE

HEADWALLS FOR PIPE DRAINS.

REMOVE INLET BOX

following. This work shall consist of removing the existing shoulder Inlets at the locations shown in the plans. The inlet removal is to be performed in conjunction with the shoulder inlet and 12” pipe drain replacements shown in the plans and Standard 601001.

This work will be paid at the contract unit price per EACH for REMOVE INLET BOX.

SEEDING, CLASS 2 (SPECIAL)

All areas disturbed during construction shall be seeded with class 2 seeding in accordance with Section 250 of the Standard Specifications. All disturbed areas shall be covered with mulch in accordance with Section 251 of the Standard Specifications. Mulch shall be in accordance with method 1.

This work will be paid for at the contract unit price per ACRE for SEEDING, CLASS 2 (SPECIAL), which price shall include furnishing and applying fertilizer nutrients at the rate of 90 lbs./acre for nitrogen, phosphorus, and potassium; agricultural ground limestone at the rate of 4 tons/acre; and mulch at the rate of 2 tons/acre.

SECTION (15-22VB)BR

SUGGESTED SEQUENCE OF CONSTRUCTION

1. Construct the median cross-overs. construct the pre-stage shoulder replacements along the southbound lanes. Plug the existing deck drains on SN 015-0003(SB).

2. Complete the pre-stage I deck patching and associated work items.

3. Complete the pre-stage II deck patching and associated work items.

4. Complete the stage 1 roadway and bridge construction items for SN 015-0003(NB).

5. Complete the stage 2 roadway and bridge construction items for SN 015-0004(SB).

See also the Traffic Control Plan special provision for the applicable traffic control standards for each of the above construction stages. See also the Maintenance of Traffic Sheets in the plans for each of the above construction stages.

STATUS OF UTILITIES TO BE ADJUSTED

Name/Address of Utility Company Type Location of conflict Est. Date of Relocation

Ameren Electric Att: Matt Purcell Email: MPurcell@ameren.com Phone: 217-274-8064(Cell) Electric Contact Info Only

Ameren Gas Att: Justin Stephens Email: jstephens3@ameren.com Phone: 217-565-2143(Cell) Gas

High Pressure Gas Main on north side of township road.

Not in conflict, but a Watch & Protect will be required.

Coordinate with Ameren Gas Contact. During Construction

Bluebird Networking Att: Jeremy Carr Email:…

This is the start of the file's text. The full file is on GovTribe.