Bridge Painting at Various Structures in Vermilion County
Solicitation number
70H78
Issued by
Vermilion County, Illinois

About this file

This is a Notice to Bidders and Specifications document issued by the Illinois Department of Transportation (IDOT) for Contract No. 70H78, involving bridge painting at eight structures in Vermilion County. The project encompasses cleaning and painting structural steel at bridges located on Interstate 74 (I-74) and Illinois Route 1/US Route 150 (FAP 332), with specific locations identified by structure numbers 092-0010 through 092-0039. The work requires cleaning all structural steel to SSPC SP10 (near white blast) standard, applying prime and paint coats, and containing and disposing of lead waste residue from all eight structures. Electronic bids must be submitted to the iCX-Integrated Contractors Exchange system prior to 12:00 p.m. on November 6, 2026, at which time bids will be publicly opened. The contract will be awarded to the lowest responsive and responsible bidder. Traffic control plans include 21-day road closures at three locations (G Street, Fairfield Avenue, and 14th Street) to facilitate full blast cleaning and painting operations, while other locations require lane closures on I-74 or maintaining open traffic conditions as specified. The project involves coordination with CSX Transportation regarding work near railroad property, including required track protection, flagging services, and compliance with CSX Construction Submission Criteria.

The contract includes multiple special provisions addressing traffic control standards, public notifications through changeable message signs, and notifications to local agencies and officials at least two weeks prior to any lane closures. Work must comply with environmental regulations regarding lead paint residue disposal and include measures for erosion control and water management. CSX Transportation requires advance notice of at least ten business days (or thirty days if flagging service is needed) prior to commencing work, and the contractor must obtain written authorization before beginning operations on CSX property. Contractor insurance requirements must be approved by CSX prior to work initiation. The project is funded with construction funds from the State of Illinois and is subject to state and federal requirements for Federal-Aid Construction Contracts, including EEO compliance provisions and disadvantaged business enterprise participation requirements. No in-stream work is permitted on this project as a 404 Permit was not obtained. Additional compensation will not be allowed for traffic control items, width restriction reporting, or delays caused by railroad traffic or other contractors' operations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 6, 2026 Letting

Notice to Bidders, Specifications and Proposal

Contract No. 70H78 VERMILION County Section D5 BRIDGE PAINTING 2027-1 Routes FAI 74 & FAP 332 District 5 Construction Funds

Prepared by S

Checked by (Printed by authority of the State of Illinois)

NOTICE TO BIDDERS

1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.

November 6, 2026 prevailing time at which time the bids will be publicly opened from the iCX SecureVault.

2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the

Invitation for Bids as:

VERMILION County Section D5 BRIDGE PAINTING 2027-1 Routes FAI 74 & FAP 332 District 5 Construction Funds

Bridge painting at various structures in Vermilion County.

3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.

(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.

4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to readvertise the proposed improvement, and to waive technicalities.

By Order of the Illinois Department of Transportation

Gia Biagi, Secretary

FAI Route 74 (I-74) and FAP Route 332 (IL 1 / US 150) Section D5 Bridge Painting 2027-1

Vermilion County

INDEX

FOR

SUPPLEMENTAL SPECIFICATIONS

AND RECURRING SPECIAL PROVISIONS

Adopted January 1, 2026

This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.

ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)

SUPPLEMENTAL SPECIFICATIONS

Std. Spec. Sec. Page No.

109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires

1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment

RECURRING SPECIAL PROVISIONS

The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:

CHECK SHEET # PAGE NO.

1 Additional State Requirements for Federal-Aid Construction Contracts 2 Subletting of Contracts (Federal-Aid Contracts)

3 X EEO

4 X Specific EEO Responsibilities Nonfederal-Aid Contracts 5 X Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 Construction Layout Stakes

10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays i

TABLE OF CONTENTS

INTENT OF PROJECT

DESCRIPTION OF WORK

TRAFFIC CONTROL PLAN

TRAFFIC CONTROL AND PROTECTION, STANDARD 701402 AND 701423

COOPERATION BETWEEN CONTRACTORS

CONTRACTOR ACCESS

WIDTH RESTRICTION – REPORTING ONLY

PUBLIC NOTIFICATION

NOTIFICATION PRIOR TO LANE CLOSURES

NOTIFICATION PRIOR TO ROAD CLOSURE

TMP MONITORING

NO IN-STREAM WORK

CSX TRANSPORTATION SPECIAL PROVISIONS

CSX TRANSPORTATION, INC. GENERAL NOTES

CSX TRANSPORTATION, CONSTRUCTION SUBMISSION CRITERIA

CSX TRANSPORTATION, SOIL AND WATER MANAGEMENT POLICY

CSX INSURANCE REQUIREMENTS FOR PUBLIC PROJECTS

RAILROAD PROTECTIVE LIABILITY INSURANCE (BDE)

EXISTING STATE-OWNED UTILITIES

STATUS OF UTILITIES

CLEANING AND PAINTING EXISTING STEEL STRUCTURES

CONTAINMENT AND DISPOSAL OF LEAD PAINT CLEANING RESIDUES

WARRANTY FOR CLEANING AND PAINTING STEEL STRUCTURES

AUTOMATED FLAGGER ASSISTANCE DEVICES (BDE)

CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)

COMPENSABLE DELAY COSTS (BDE)

CONCRETE BARRIER (BDE)

DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)

ILLINOIS WORKS APPRENTICESHIP INITIATIVE – STATE FUNDED CONTRACTS (BDE) 114

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)

SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)

SIGN PANELS AND APPURTENANCES (BDE)

ii

SPEED DISPLAY TRAILER (BDE)

SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)

SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)

SUBMISSION OF BIDDERS LIST INFORMATION (BDE)

SUBMISSION OF PAYROLL RECORDS – STATE CONTRACT (BDE)

SURVEYING SERVICES (BDE)

TEMPORARY CONCRETE BARRIER (BDE)

TEMPORARY RUMBLE STRIPS (BDE)

VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)

WEEKLY DBE TRUCKING REPORTS (BDE)

WORK ZONE TRAFFIC CONTROL DEVICES (BDE)

WORK ZONE WIDTH RESTRICTION (BDE)

WORKING DAYS (BDE)

STATE OF ILLINOIS

SPECIAL PROVISIONS

The following Special Provisions supplement the “Standard Specifications for Road and Bridge Construction, Adopted January 1, 2022”, the latest edition of the “Manual on Uniform Traffic Control Devices for Streets and Highways”, and the “Manual of Test Procedures for Materials” in effect on the date of invitation for bids, and the “Supplemental Specifications and Recurring Special Provisions” indicated on the Check Sheet included herein, which apply to and govern the construction of FAI Route 74 (I-74) and FAP Route 332 (IL 1 / US 150), Section D5 Bridge Painting 2027-1, Vermilion County, Contract No. 70H78, and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.

INTENT OF PROJECT

The intent of this project is to clean and paint all of the structural steel of eight (8) existing bridges for improved maintenance with a minimum disruption to the motoring public and adjacent environment.

Location 1: S.N. 092-0010, I-74 (EB) over “G” Street (FAU 7026) in Tilton, @ mile post 213.63 in Vermilion County. Painting entire structure.

Location 2: S.N. 092-0011, I-74 (WB) over “G” Street (FAU 7026) in Tilton, @ mile post 213.63 in Vermilion County. Painting entire structure.

Location 3: S.N. 092-0012, I-74 (WB) over CSXRR, “F” Street and Fairfield Ave in Tilton, @ mile post 213.81 in Vermilion County. Painting entire structure.

Location 4: S.N. 092-0013, I-74 (EB) over CSXRR, “F” Street and Fairfield Ave in Tilton, @ mile post 213.81 in Vermilion County. Painting entire structure.

Location 5: S.N. 092-0018, I-74 (EB) over Stoney Creek, South of Danville, mile post 216.40 in Vermilion County. Painting entire structure.

Location 6: S.N. 092-0019, I-74 (WB) over Stoney Creek, South of Danville, mile post 216.40 in Vermilion County. Painting entire structure.

Location 7: S.N. 092-0038, IL 1 / US 150 (FAP 332) over I-74 & Auxiliary Lanes, South of Danville, mile post 214.35 in Vermilion County. Painting entire structure.

Location 8: S.N. 092-0039, IL 1 / US 150 (FAP 332) over 14th St, South of Danville, in Vermilion County. Painting entire structure.

DESCRIPTION OF WORK

Locations 1-8: Clean all structural steel to SSPC SP10 (near white blast), prime, and paint per individual location. Contain and dispose of all lead waste residue from structures 092-0010, 092- 0011, 092-0012, 092-0013, 092-0018, 092-0019, 092-0038 and 092-0039 located in Vermilion County.

TRAFFIC CONTROL PLAN

Eff. 09-11-1990 Rev. 01-01-2014

Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, these Special Provisions and any special details and highway standards contained herein and in the plans.

Special attention is called to Articles 107.09 and 107.14 of the Standard Specifications, the following Highway Standards relating to Traffic Control, and the listed Supplemental Specifications and Recurring Special Provisions.

Highway Standards: 701001 701006 701101 701106

701201 701400 701402 701411 701423 701428 701601 701801 701901 704001

Special Provisions:

Cooperation Between Contractors Contractor Access Public Notification Notification Prior to Lane Closures Notification Prior to Road Closure Width Restriction – reporting only, no signage required

Plan Details:

Traffic Control Summary Chart Detail for Temporary Rumble Strips Traffic Control & Protection Devices (Road & Sideroad / Street Closures)

Traffic:

A 21-day road closure of “G” Street will be allowed at locations #1 and #2, structures 092-0010 & 0011 carrying I-74 over “G” Street. The contractor has 21 consecutive calendar days to complete the full blast cleaning and painting of both structures.

A 21-day road closure of Fairfield Ave will be allowed at locations #3 and #4, structures 092-0012 & 0013 carrying I-74 over CSX RR, “F” Street and Fairfield Ave. The contractor has 21 consecutive calendar days to complete the full blast cleaning and painting over Fairfield Ave in Spans 3 & 4 of both structures. Span 2 over CSX RR is to be cleaned and painted with Fairfield Ave open to traffic. I-74 lane closures, barrier wall and associated pay items are provided if working from the top is necessary. There may be room to stage equipment in Span 3 between Fairfield Ave and Pier 2, but that is mostly railroad ROW and would need to be coordinated as such. When cleaning and painting Span 1, access to the Ameren substation and property owner north of Span 1 must be maintained by splitting “F” Street using Traffic Control and Protection Standard 701601.

At locations #5 and #6, structures 092-0018 & 0019 carrying I-74 over Stoney Creek, I-74 lane closures, barrier wall and associated pay items are provided if working from the top is necessary, however, the Contractor may be able to stage equipment and work activities from below. Access from below may be possible from property owners along Griffin St and / or the access road through the City of Danville gates on Vine Street. The sign at the gates on Vine Street list a City of Danville phone number of (217) 213-1483.

A 21-day road closure of 14th Street will be allowed at location #8, structure 092-0039 carrying IL 1 / US 150 over 14th Street. The contractor has 21 consecutive calendar days to complete the full blast cleaning and painting of the entire structure.

At location #7, structure 092-0038 carrying IL 1 / US 150 over I-74, it is the intention of the Department that all routes be kept open to traffic at all times during the blast cleaning and painting operations. At any particular location when a lane is closed to traffic, the Contractor shall keep all equipment, materials, and vehicles out of the adjacent lanes and either behind barrier wall or off right-of-way.

The following traffic control standards shall be utilized during, but not limited to, the listed construction operations:

TRAFFIC CONTROL AND PROTECTION, STANDARD 701001:

This standard shall be utilized when any vehicle, equipment, workers, or their activities are more than 15 feet from the edge of pavement on two lane roadways. Traffic Control and Protection, Standard 701001 will not be measured for payment.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701006:

This standard shall be utilized when any vehicle, equipment, workers, or their activities are present in the area from 2 feet to 15 feet from the edge of pavement on two lane roadways. Traffic Control and Protection, Standard 701006 will not be measured for payment.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701101

Traffic Control and Protection, Standard 701101 shall be utilized when any vehicle, equipment, workers, or their activities are present in the area from 2 feet to 15 feet from the edge of pavement on multilane roadways, during working hours. Traffic Control and Protection, Standard 701101 will not be measured for payment.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701106

Traffic Control and Protection, Standard 701106 shall be used where equipment can be placed 15 ft. or greater off roadway on multilane roadways with speed limits greater than or equal to 45 mph. Traffic Control and Protection, Standard 701106, will not be measured for payment.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701201

Traffic Control and Protection, Standard 701201 shall be used where at any time, any vehicles, equipment, workers, or their activities will encroach into or within 2 feet of a lane on a two-lane / two-way roadway. When utilizing Traffic Control and Protection, Standard 701201, two certified flaggers will be required at all times. Traffic Control and Protection, Standard 701201 will be measured for payment on a lump sum basis for TRAFFIC CONTROL AND PROTECTION, STANDARD 701201.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701400

Traffic Control and Protection, Standard 701400 shall be used anytime a lane is closed on I-74.

Traffic Control and Protection, Standard 701400 will not be measured for payment.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701402

Traffic Control and Protection, Standard 701402 shall be used anytime a lane is closed on I-74.

Traffic Control and Protection, Standard 701402 will be measured as one each per lane / stage utilized.

Temporary Concrete Barrier and Impact Attenuators Test Level 3 shall be paid for according to Sections 704 and 706, and in conjunction with the “Traffic Control Summary” plan sheet schedule provided in the plans or as directed by the Engineer.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701411

Traffic Control and Protection, Standard 701411 shall be used where, at any time, any vehicles, equipment, workers, or their activities require a lane closure in close proximity of an exit or entrance ramp and supplements other traffic control standards for lane closures. Traffic Control and Protection, Standard 701411 is to be used at 092-0038 where the IL 1 / US 150 ramps merge into the I-74 auxiliary lanes. Traffic control and protection required under Standard 701411 will be measured for payment on an each basis for TRAFFIC CONTROL AND PROTECTION, STANDARD 701411.

In addition to the signs shown on Highway Standard 701411, one (1) set of dual display “BE PREPARED TO STOP” signs shall be placed between the Road Construction Ahead and Yield Ahead signs. The cost of furnishing, installing, maintaining, relocating, and removing these signs will be included in the cost of Traffic Control and Protection Standard 701411 with no additional compensation allowed.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701423 (SPECIAL)

Traffic Control and Protection, Standard 701423 (Special) shall be used in the I-74 EB and I-74 WB auxiliary lanes. Highway Standard 701423 will be used to shift traffic left or right for staged cleaning and painting of these spans. “Lane Shift Ahead” signs shall be used in lieu of Right and Left Lane Closed Ahead. The advisory speed limit shall be changed to “30” in lieu of 45. Traffic Control and Protection, Standard 701423 (Special) will be measured as one each per lane / stage utilized.

Temporary Concrete Barrier and Impact Attenuators Test Level 2 shall be paid for according to Sections 704 and 706, and in conjunction with the “Traffic Control Summary” plan sheet schedule provided in the plans or as directed by the Engineer.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701428

Traffic Control and Protection, Standard 701428 shall be used in conjunction with 701400 and 701402 for setup and removal of lane closures on freeway/expressway having ADT greater than 25,000. Traffic Control and Protection, Standard 701428 will not be measured for payment.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701601

Traffic Control and Protection, Standard 701601 shall be used at locations #3 and #4 when painting Span 1 over “F” Street. Access to the Ameren substation and the property owner north of Span 1 must be maintained at all times. Traffic Control and Protection, Standard 701601 will be measured for payment on a lump sum basis for TRAFFIC CONTROL AND PROTECTION, STANDARD 701601.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701801

Traffic Control and Protection, Standard 701801 shall be used at Location #8 when painting the span over the sidewalk along 14th Street. The Contractor shall stage painting operations to limit duration of the sidewalk closure. When the sidewalk is closed, the Contractor must allow safe pedestrian passage under the structure by providing clearance under the containment or pedestrian access through an adjacent span. Traffic Control and Protection, Standard 701801 will be measured as one each per structure location.

ADDITIONAL TRAFFIC CONTROL SIGNS

On the approach roadways for each overhead bridge, “Road Construction Ahead” and “Worker” signs shall be added in accordance with 701006 and 701106 anytime work activities are conducted on top of the structure. In addition to the signs shown on Highway Standard 701411, one (1) set of dual display “BE PREPARED TO STOP” signs shall be placed between the Road Construction Ahead and Yield Ahead signs. The cost of furnishing, installing, maintaining, relocating, and removing these signs will be included in the cost of Traffic Control and Protection Standard 701402 and 701411 with no additional compensation allowed.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701402 AND 701423

Eff. 08-20-2004 Rev. 04-01-2009

HIGHWAY STANDARD 701402 & 701423: The following sequence shall be followed for installation, relocation, and removal of the traffic control devices and the concrete barrier.

For installation, relocation, removal of barriers and work zone speed limit sign assemblies, ‘Flagger Ahead’ signs and a flagger shall be used as shown on Highway Standard 701401 until the barrier wall is set or relocated with each end properly secured to the pavement and protected with a completely installed impact attenuator and all workers and equipment are located behind the barrier wall. For removal operations, the flagger shall be used until all barriers; traffic control devices, workers and equipment are off the pavement.

INITIAL INSTALLATION OF CONCRETE BARRIER:

Step 1. All warning signs shall be erected beginning with the farthest sign from the work area.

Arrow boards shall be placed and actuated prior to placement of plastic drums forming the taper.

Step 2. The initial lane closure shall be implemented by installing a taper of drums beginning at the edge of pavement and progressing toward centerline until the entire lane is closed.

Step 3. The concrete barrier shall be erected (see Highway Standard 704001) beginning with the last concrete barrier to be placed and proceed toward centerline at a ratio of 12:1 until the lane is closed. The tangent portion shall be placed to provide a minimum work area and a maximum travel lane width. All vertical panels shall be in place before the end of the workday.

RELOCATION OF CONCRETE BARRIER:

Step 1. The tangent portion of the barrier shall be relocated beginning at the end farthest from the taper. Each section of concrete barrier shall be repositioned by relocating it onto the new surface. All operations shall be conducted within the area protected by the lane closure.

Reflective drums at 20’ (6 m') centers shall be used to temporarily protect any openings in between the new and old bridge decks until traffic is relocated.

Step 2. This step should not begin until it appears that this Step and Step 3 can be completed without interruption. The tapered portion of the barrier shall be relocated in two stages. The first stage will line up the taper, as a straight-line extension of the tangent wall and the second stage will form the taper as described in Step 3. The arrow boards should be relocated as required but not actuated until the changeover is completed.

Step 3. Relocate all drums to the center line, alerting all workers to the possibility of motorists using both lanes. Flagger(s) shall direct motorists to the newly surfaced lane and the arrow boards shall be actuated. Install drums forming the new lane closure taper. Revise sign messages for the appropriate lane. Install the concrete wall taper by working behind the drums forming the lane closure, beginning at the previous lead end of the tangent wall and working toward the shoulder.

REMOVAL OF CONCRETE BARRIER:

Step 1. The tangent portion shall be removed beginning at the end farthest from the taper.

Step 2. This step should not begin until it appears that all the concrete barrier can be removed without interruption from the work site. The barriers shall be removed beginning at the downstream end of the tangent portion and continuing upstream to the taper. The taper portion shall be removed last, beginning at the end farthest from the shoulder. Removal of all other traffic control devices should be removed in the normal sequence.

BASIS OF PAYMENT: This work shall be considered as included in the pay item for TRAFFIC

CONTROL & PROTECTION STANDARD 701402, TRAFFIC CONTROL & PROTECTION

STANDARD 701423, for TEMPORARY CONCRETE BARRIER, and for other pay items as described in the Standard Specifications and these Special Provisions. Four (4) vertical panels shall be attached to the barrier wall taper at 25-foot centers, and shall not be paid for separately, but shall be included in the cost of TRAFFIC CONTROL & PROTECTION STANDARD 701402, TRAFFIC CONTROL & PROTECTION STANDARD 701423, and for TEMPORARY CONCRETE

BARRIERS.

Reflectorized temporary marking tape shall be placed throughout the taper and alongside both sides of the work area, or as directed by the engineer. Existing markings that conflict with the staged temporary traffic markings shall be covered with blackout tape. The cost to cover existing markings with blackout tape and the placement and removal of temporary markings shall be included with TRAFFIC CONTROL AND PROTECTION, STANDARD 701402 & 701423.

Barrier Wall Reflectors, Type C shall also be placed on the Temporary Concrete Barrier as shown on TRAFFIC CONTROL AND PROTECTION, STANDARD 701402 and at any other barriers that may require delineation. The Barrier Wall Reflectors, Type C will not be paid for separately, but shall be included in the cost of TRAFFIC CONTROL AND PROTECTION, STANDARD 701402 & 701423.

COOPERATION BETWEEN CONTRACTORS

Eff. 01-01-2024

There is a possibility that other Contractor’s operations may be ongoing within the proposed project limit at the same time as the work included in this contract is being performed. The Contractor for this section shall cooperate with any other Contractors performing work adjacent to this project in accordance with Article 105.08 of the Standard Specifications. Any inconveniences or delays caused the Contractor in complying with this requirement shall be considered incidental to the contract and no additional compensation will be allowed.

CONTRACTOR ACCESS

Eff. 09-11-1990 Rev. 01-01-2014

At road closure locations, where Type III barricades are installed in a manner that will not allow contractor access to the project without relocation of one or more of the barricades, the arrangement of the barricades at the beginning of each workday may be relocated, when approved by the Engineer, in the manner shown on Highway Standard 701901 for Road Closed to Through Traffic. ' Road Closed ' signs (Rll-2), supplemented by ' Except Authorized Vehicles ' signs (R3-Il0l), shall be mounted on both the near-right and the far-left barricade(s). At the end of each workday the barricades shall be returned to their in-line positions. This work will be considered to be included in the cost of the various traffic control items, and no extra compensation will be allowed.

WIDTH RESTRICTION – REPORTING ONLY

The work within this contract will cause a width restriction requiring notification a minimum of 21 days prior to the actual width restriction. The width restriction on this contract is such that no signing will be required.

Width restrictions shall be interpreted as any change in the existing horizontal clearance caused by the placement of physical barrier(s) that extend above the pavement surface. Width restrictions less than 17’-6” (Barrier to Barrier) shall be reported and signed on all roadways. Width restrictions of 17’-6” to 30’-0” on Interstate or multilane roadways shall be reported. Construction activities which close a lane with operating equipment, or with drums, barricades, or cones, will be considered as width restrictions.

Notification of width restriction requires a minimum of 21 days before the actual restriction is placed to ensure specific routed over-width permitted loads are not sent through the restriction site. The Contractor shall notify the Resident Engineer a minimum of 21 days prior to the width restriction. In the notification, the Contractor shall include the location, scheduled restriction start date, road restriction width(s)/closure, proposed posted width (i.e. Barrier to Barrier width minus 18 inches).

The Contractor is advised he will not be allowed to install the width restriction without the 21 day notice and failure to provide proper notice will delay the installation of the width restriction.

The notice of width restriction is considered a part of the Contractor’s approved work schedule and is the Contractor’s responsibility to provide proper notice. Delays caused by failure to provide notice shall not be considered justification for workday additions or completion date extensions.

On this contract, Section D5 Bridge Painting 2027-1, in Vermilion County, Contract No. 70H78, there will not be any Barrier-to-Barrier width minus 18 inches less than 17’-6”, therefore no width restriction signage will be necessary. The actual width restriction to be reported will be agreed upon by the Contractor and the Engineer. The Contractor shall notify the Resident Engineer a minimum of 21 days prior to the width restriction for reporting purposes.

The 21-day notification and reporting procedures will not be measured for payment.

PUBLIC NOTIFICATION

Changeable Message Signs shall be placed seven (7) to ten (10) days prior to the beginning of construction to inform the public of upcoming work. Changeable Message Signs shall be placed in advance of the project site at locations to be determined by the Engineer. Changeable Message Signs providing advanced notice shall be utilized at locations within this contract in conjunction with the “Traffic Control Summary” plan sheet schedule provided in the plans or as directed by the Engineer. Ten (10) days advance notice shall be given at the road closure locations: Location #1 & #2 (G-Street), Location #3 & #4 (Fairfield Ave), and Location #8 (14th Street).

Changeable Message Signs used for advanced public notification shall be paid for at the contract unit price per CALENDAR DAY for CHANGEABLE MESSAGE SIGN. Any portion of one calendar day during which the sign is operated as directed by the Engineer shall be paid as one full calendar day.

When portable changeable message signs are shown on Traffic Control and Protection Standards, this work will not be paid for separately, but shall be considered as included in the cost of the Standard.

NOTIFICATION PRIOR TO LANE CLOSURES

Eff. 01-01-2024

The Contractor shall notify the Department’s Bureau of Operations and the individuals and organizations listed below at least two weeks prior to any lane closures for each of the locations shown in the plans.

Robert Hodgson IDOT Traffic Operations Engineer (217)-712-9018 Gary Sims IDOT Operations Engineer (217)-251-4859 Adrian L. Greenwell Vermilion County Engineer Joel Bird Vermilion County EMA Vermilion County 911

(217)-703-7870 (217)-443-6011 (217)-444-0165

David Ruwe Danville – Director of Public Works (217)-431-2288

William Wear Tilton – Mayor (217)-477-0800 Tom Overmyer Tilton – Village Engineer (217)-477-0800 T.J. George Tilton – Director of Public Works P. Bernardi Tilton – Police Chief Chris McMahon Tilton – Fire Chief Butch Fields Tilton – EMS Coordinator

(217)-477-0800 (217)-477-0800 (217)-477-0800 (217)-477-0800

These agencies, organizations, and individuals shall also be notified when construction operations are completed at each location shown in the plans.

NOTIFICATION PRIOR TO ROAD CLOSURE

The Contractor shall notify in writing the District 5 Bureau of Operations and the following individuals and organizations at least two (2) weeks prior to each road closure location: Location #1 & #2 (G-Street); Location #3 & #4 (Fairfield Ave); and Location #8 (14th Street). These agencies shall also be notified by the Contractor when each location is fully open to all traffic.

Robert Hodgson Traffic Operations Engineer 217-712-9018 Illinois Department of Transportation 13473 IL HWY 133, P.O. Box 610 Paris, IL 61944

Gary Sims Operations Engineer 217-251-4859

Acting Maintenance Field Engineer Illinois Department of Transportation

13473 IL HWY 133, P.O. BOX 610

Paris, IL 61944

Adrian Greenwell Vermilion Co. Engineer 217-703-7870 2732 Batestown Road Oakwood, IL 61858

Joel Bird Vermilion Co. Emergency Management Agency 217-443-6011 201 N. Vermilion St.

Lower Level Danville, IL 61832

Vermilion County 911 217-444-0165 2 E. South St.

Danville, IL 61832

David Ruwe Danville Director of Public Works 217-431-2288 Public Works Building 1155 East Voorhees Street Danville, IL 61832

William Wear Mayor of Tilton 217-477-0800 1001 Tilton Road Tilton, IL 61833

Tom Overmyer Tilton Village Engineer 217-477-0800

T.J. George Tilton Director of Public Works 217-477-0800

Tilton, IL 61833

P. Bernardi Tilton Police Chief 217-477-0800 1001 Tilton Road Tilton, IL 61833

Chris McMahon Tilton Fire Chief 217-477-0800 121 W. 5th St.

Tilton, IL 61833

Butch Fields Tilton EMS Coordinator 217-4770800 121 W. 5th St.

TMP MONITORING

The management strategies within the TMP shall be continuously monitored throughout the project to determine if they meet safety and mobility goals. If the safety and mobility conditions are unfavorable, adjustments shall be implemented. Details of the successes and failures of the TMP as well as implemented changes will be included in the Work Zone TMP Summary reports to be submitted by the Resident Engineer/Technician at the conclusion of the project.

If the Contractor fails to carry out the TMP Strategies as shown in the plans and contract documents, Traffic Control Deficiency Deductions will be administered according to Article 105.03(b) of the Standard Specifications for Road and Bridge Construction.

NO IN-STREAM WORK

No in-stream work will be allowed on this project. A 404 Permit was not obtained for this project, prohibiting any type in-stream work. Construction of haul roads, work pads, wing dams, rip rap placement, bank excavation or other such activities will not be needed or allowed for this project.

CSX TRANSPORTATION SPECIAL PROVISIONS

DEFINITIONS:

As used in these Special Provisions, all capitalized terms shall have the meanings ascribed to them by the Agreement, and the following terms shall have the meanings ascribed to them below:

“CSX” shall mean CSX Transportation, Inc., its successors and assigns.

“CSX Representative” shall mean the authorized representative of CSX Transportation, Inc.

“Agreement” shall mean the Agreement between CSX and Agency dated as of , 20 amended from time to time.

“Agency” shall mean the , “Agency Representative” shall mean the authorized representative of , “Contractor” shall have the meaning ascribed to such term by the Agreement.

“Work” shall mean the Project as described in the Agreement.

I. AUTHORITY OF CSX ENGINEER

The CSX Representative shall have final authority in all matters affecting the safe maintenance of CSX operations and CSX property, and his or her approval shall be obtained by the Agency or its Contractor for methods of construction to avoid interference with CSX operations and CSX property and all other matters contemplated by the Agreement and these Special Provisions.

II. INTERFERENCE WITH CSX OPERATIONS

A. Agency or its Contractor shall arrange and conduct its work so that there will be no interference with CSX operations, including, but not limited to: train, signal, telephone and telegraphic services, or damage to CSX’s property, or to poles, wires, and other facilities of tenants on CSX’s Property or right-of-way.

Agency or its Contractor shall store materials so as to prevent trespassers from causing damage to trains, or CSX Property. Whenever Work is likely to affect the operations or safety of trains, the method of doing such Work shall first be submitted to the CSX Representative for approval, but such approval shall not relieve Agency or its Contractor from liability in connection with such Work.

B. If conditions arising from or in connection with the Project require that immediate and unusual provisions be made to protect train operation or CSX’s property, Agency or its Contractor shall make such provision. If the CSX Representative determines that such provision is insufficient, CSX may, at the expense of Agency or its Contractor, require or provide such provision as may be deemed necessary, or cause the Work to cease immediately.

C. Should work activities be required within CSX property or right-of-way, the Contractor shall request CSX to locate any buried utilities or facilities (air lines, wells, etc.). A written request shall be delivered to the CSX Representative at least five (5) days in advance. The traditional “One Call” utility locate services are not responsible for locating any CSX undergrade utilities or facilities.

III. INSURANCE

The Contractor shall not be permitted to work on, or have potential to foul, CSX property or right-of-way until CSX has acknowledged written acceptance of the insurance coverages for the proposed project. See PAGE 16

- INSURANCE REQUIREMENTS

IV. NOTICE OF STARTING WORK

Agency or its Contractor shall not commence any work on CSX Property or rights-of-way until it has complied with the following conditions:

A. Notify CSX in writing of the date that it intends to commence Work on the Project. Such notice must be received by CSX at least ten (10) business days in advance of the date Agency or its Contractor proposes to begin Work on CSX property. The notice must refer to this Agreement by date. If flagging service is required, such notice shall be submitted at least thirty (30) business days in advance of the date scheduled to commence the Work.

B. Obtain authorization, through the Notice to Proceed, from the CSX Representative to begin Work on CSX property. Once authorization is given, Agency or Contractor shall provide a detailed schedule to include means and methods for review, comment and/or approval prior to commencement of work. CSX will in turn provide direction regarding specific conditions with which it must comply.

C. Obtain from CSX the names, addresses and telephone numbers of CSX’s personnel who must receive notice under provisions in the Agreement. Where more than one individual is designated, the area of responsibility of each shall be specified.

V. WORK FOR THE BENEFIT OF THE CONTRACTOR

A. No temporary or permanent changes to wire lines or other facilities (other than third party fiber optic cable transmission systems) on CSX property that are considered necessary to the Work are anticipated or shown on the Plans. If any such changes are, or become, necessary in the opinion of CSX or Agency, such changes will be covered by appropriate revisions to the Plans and by preparation of a force account estimate. Such force account estimate may be initiated by either CSX or Agency, but must be approved by both CSX and Agency. Agency or Contractor shall be responsible for arranging for the relocation of the third party fiber optic cable transmission systems, at no cost or expense to CSX.

B. Should Agency or Contractor desire any changes in addition to the above, then it shall make separate arrangements with CSX for such changes to be accomplished at the Agency or Contractor’s expense.

VI. HAUL ACROSS RAILROAD

A. If Agency or Contractor desires access across CSX property or tracks at other than an existing and open public road crossing in or incident to construction of the Project, the Agency or Contractor must first obtain the permission of CSX and shall execute a license agreement or right of entry satisfactory to CSX, wherein Agency or Contractor agrees to bear all costs and liabilities related to such access.

1. Temporary construction haul roads across CSX tracks will require a separate application and payment to CSX Property Services. Agreement extensions require additional payment. Actual cost is variable and project specific. Additional information can be found at this URL: https://www.csx.com/index.cfm/customers/value-added-services/ property-real-estate/permitting-utility-installations-and-rights-of-entry/.\\

B. Agency and Contractor shall not cross CSX’s property and tracks with vehicles or equipment of any kind or character, except at such crossing or crossings as may be permitted pursuant to this section.

VII. COOPERATION AND DELAYS

A. Agency or Contractor shall arrange a schedule with CSX for accomplishing stage construction involving work by CSX. In arranging its schedule, Agency or Contractor shall ascertain, from CSX, the lead time required for assembling crews and materials and shall make due allowance therefor.

B. Agency or Contractor may not charge any costs or submit any claims against CSX for hindrance or delay caused by railroad traffic; work done by CSX or other delay incident to or necessary for safe maintenance of railroad traffic; or for any delays due to compliance with these Special Provisions.

C. Agency and Contractor shall cooperate with others participating in the construction of the Project to the end that all work may be carried on to the best advantage.

D. Agency and Contractor understand and agree that CSX does not assume any responsibility for work performed by others in connection with the Project. Agency and Contractor further understand and agree that they shall have no claim whatsoever against CSX for any inconvenience, delay or additional cost incurred by Agency or Contractor on account of operations by others.

VIII. STORAGE OF MATERIALS AND EQUIPMENT

Agency and Contractor shall not store their materials or equipment on CSX’s property or where they may potentially interfere with CSX’s operations, unless Agency or Contractor has received CSX Representative’s prior written permission. Agency and Contractor understand and agree that CSX will not be liable for any damage to such materials and equipment from any cause and that CSX may move, or require Agency or Contractor to move, such material and equipment at Agency’s or Contractor’s sole expense. To minimize the possibility of damage to the railroad tracks resulting from the unauthorized use of equipment, all grading or other construction equipment that is left parked near the tracks unattended by watchmen shall be immobilized to the extent feasible so that it cannot be moved by unauthorized persons.

IX. CONSTRUCTION PROCEDURES

A. General

1. Construction work on CSX property shall be subject to CSX’s inspection and approval.

2. Construction work on CSX property shall be in accord with CSX’s Construction Submission Criteria, latest edition and CSX’s written outline of specific conditions and with these Special Provisions.

3. Contractor shall observe the terms and rules of the CSX Safe Way manual, which Agency and Contractor shall be required to obtain from CSX, and in accord with any other instructions furnished by CSX or CSX’s Representative. Failure to comply with the terms of the agreement and CSX rules can result in mandatory railroad worker protective training for the Agency, Contractor and its subcontractors.

B. Blasting

1. Agency or Contractor shall obtain CSX Representative’s and Agency Representative’s prior written approval for use of explosives on or adjacent to CSX property. If permission for use of explosives is granted, Agency or Contractor must comply with the following:

a. Blasting shall be done with light charges under the direct supervision of a responsible officer or employee of Agency or Contractor.

b. Electric detonating fuses shall not be used because of the possibility of premature explosions resulting from operation of two-way train radios.

c. No blasting shall be done without the presence of an authorized representative of CSX. At least thirty (30) days’ advance notice to CSX Representative is required to arrange for the presence of an authorized CSX representative and any flagging that CSX may require.

d. Agency or Contractor must have at the Project site adequate equipment, labor and materials, and allow sufficient time, to (i) clean up (at Agency’s expense) debris resulting from the blasting without any delay to trains; and (ii) correct (at Agency’s expense) any track misalignment or other damage to CSX’s property resulting from the blasting, as directed by CSX Representative, without delay to trains. If Agency’s or Contractor’s actions result in delay of any trains, including Amtrak passenger trains, Agency shall bear the entire cost thereof.

e. Agency and Contractor shall not store explosives on CSX property.

2. CSX Representative will:

a. Determine the approximate location of trains and advise Agency or Contractor of the approximate amount of time available for the blasting operation and clean-up.

b. Have the authority to order discontinuance of blasting if, in his or her opinion, blasting is too hazardous or is not in accord with these Special Provisions.

X. ENVIRONMENTAL

A. Should soil excavation within CSX property be anticipated and said soils cannot remain on CSX property during and after construction, then CSX Environmental must be contacted at least thirty (30) days in advance of the work in order to schedule sampling, classification and disposition of material. Excavated material is prohibited from being removed from CSX property, or rights-of-way, without expressed written direction from CSX. Should final disposition require disposal of excavated material, CSX shall have sole discretion of means and location of said disposal. The project sponsor or Agency will bear all costs associated with sampling, staging and subsequent disposal if deemed necessary. Contractor will be required to obtain all disposal tickets / documentation and provide the information to the CSX Representative. CSX will not bear any costs associated with this work.

B. Any waste materials generated by the Project, including but not limited to washing with cleaning solvents, blasting, scraping, brushing and painting operations, shall be the responsibility of the Agency or its Contractor and shall be contained, collected and properly disposed of by the Agency or its Contractor. Agency and its Contractor agree to fully comply with all federal, state, and local environmental laws, regulations, statutes and ordinances at all times.

XI. MAINTENANCE OF DITCHES ADJACENT TO CSX TRACKS

Agency or Contractor shall maintain all ditches and drainage structures free of silt or other obstructions that may result from their operations. In addition, Agency or Contractor shall maintain all CSX property or right-of-way impacted by project operations including but not limited to; access or haul roads, staging areas, parking lots in a manner that provides CSX free and clear access to facilities, materials while providing acceptable driving surfaces free of drainage impacts or reduced CSX capacity. Agency or Contractor shall provide erosion control measures during construction and use methods that accord with applicable state standard specifications for road and bridge construction, including either (1) silt fence; (2) hay or straw barrier; (3) berm or temporary ditches; (4) sediment basin; (5) aggregate checks; and (6) channel lining. All such maintenance and repair of damages due to Agency’s or Contractor’s operations shall be performed at Agency’s expense.

XII. TRACK PROTECTION / INSPECTION SERVICE

A. CSX has sole authority to determine the need for track protection required to protect its operations and property. In general, track protection will be required whenever Agency or Contractor or their equipment are, or are likely to be, working within fifty (50) feet of live track or other track clearances specified by CSX, or over tracks.

B. Agency shall reimburse CSX directly for all costs of track protection that is required on account of construction within CSX property shown in the Plans, or that is covered by an approved plan revision, supplemental agreement or change order.

C. Agency or Contractor shall give a minimum of thirty (30) days’ advance notice to CSX Representative for anticipated need for track protection. No work shall be undertaken until the flag person(s) is/are at the job site. If it is necessary for CSX to advertise a flagging job for bid, it may take up to ninety (90) days to obtain this service and CSX shall not be liable for the cost of delays attributable to obtaining such service.

D. CSX shall have the right to assign an individual to the site of the Project to perform inspection service whenever, in the opinion of CSX Representative, such inspection may be necessary.

Agency shall reimburse CSX for the costs incurred by CSX for such inspection service.

Inspection service shall not relieve Agency or Contractor from liability.

E. CSX shall render invoices for, and Agency shall pay for, the actual pay rate of the flagpersons and inspectors used, plus standard additives, whether that amount is above or below the rate provided in the Estimate. If the rate of pay that is to be used for inspector or flagging service is changed before the work is started or during the progress of the work, whether by law or agreement between CSX and its employees, or if the tax rates on labor are changed, bills will be rendered by CSX and paid by Agency using the new rates. Agency and Contractor shall perform their operations that require track protection or inspection service in such a manner and sequence that the cost of such will be as economical as possible.

XIII. UTILITY FACILITIES ON CSX PROPERTY

Agency shall arrange, upon approval from CSX, to have any utility facilities on or over CSX Property changed as may be necessary to provide clearances for the proposed trackage.

XIV. CLEAN-UP

Agency or Contractor, upon completion of the Project, shall remove and dispose from CSX’s Property any temporary construction work, any temporary erosion control measures used to control drainage, all machinery, equipment, surplus materials, falsework, rubbish, or temporary buildings belonging to Agency or Contractor.

Agency or Contractor, upon completion of the Project, shall leave CSX Property in neat condition, satisfactory to the CSX Representative.

XV. FAILURE TO COMPLY

If Agency or Contractor violate or fail to comply with any of the requirements of these Special Provisions, (a) CSX may require Agency and/or Contractor to vacate CSX Property; and (b) CSX may withhold monies due Agency and/or Contractor; (c) CSX may require Agency to withhold monies due Contractor; and (d) CSX may cure such failure and the Agency shall reimburse CSX for the cost of curing such failure

CSX TRANSPORTATION, INC. GENERAL NOTES

1. Refer to the CSX Transportation Public Project Information Manual for additional requirements needed for working on/above/adjacent to CSXT. Specific sections that pertain to this project are: Special Provisions for Construction near CSXT Property, Overhead Bridge Criteria, Construction Submission Criteria, Soil and Water Management Policy, and Insurance Requirements for Public Projects.

2. CSXT has sole authority to determine the need for track protection required to protect its operations and property.