Mill, Patch and Resurface FAP 693 (ILL 9, US150) Locust Street From East of Main Street
Solicitation number
70F18
Issued by
Mclean County, Illinois

About this file

This is a Notice to Bidders and Special Provisions document issued by the Illinois Department of Transportation (IDOT) for Contract No. 70F18, a federal-aid construction project in McLean County. The project involves milling, patching, and resurfacing approximately 1.37 miles of FAP 693 (Illinois Route 9/US Route 150), specifically Locust Street from east of Main Street to Towanda Avenue and Towanda Avenue from Locust Street to Empire Street in Bloomington, Illinois. The work scope includes pavement patching, milling to variable depths, hot-mix asphalt paving with longitudinal joint sealant, ADA improvements, curb and gutter removal and replacement, drainage and utility structure adjustments, pavement marking and signing, raised reflective pavement marker installation, traffic signal installation, and removal and disposal of regulated substances at identified contamination sites. Electronic bids must be submitted to the iCX system no later than 12:00 p.m. on September 18, 2026. Construction is scheduled to begin no earlier than June 1, 2027. The project is funded through the National Highway Performance Program (NHPP) under project number NHPP-20DB(729).

The contract will be awarded to the lowest responsive and responsible bidder. The contractor must maintain one-lane, one-way traffic throughout construction with alternate side road closures as necessary, with work hours limited to 7:00 a.m. to 6:00 p.m., Monday through Friday, and no work permitted on weekends. Prior to construction, the contractor must schedule and conduct a public information meeting, advertise a minimum of 10 days in advance, and provide door-hanger or mail notification to properties within 500 feet of the project area. The contractor must notify specified federal, state, and local agencies and organizations at least two weeks prior to project start and lane closures. Extensive coordination is required with utility providers including Ameren IL, City of Bloomington Water, Comcast, Frontier, Nicor, and communications infrastructure providers regarding utility relocations and adjustments. The contractor must furnish GPS survey equipment to IDOT for exclusive use during construction and provide training to six Department staff members. All costs associated with traffic control compliance, utility coordination, environmental remediation, public information activities, and construction layout are included in the bid prices with no additional compensation allowed. The project is subject to federal-aid construction contract requirements, Equal Employment Opportunity provisions, prevailing wage standards, and weekly Disadvantaged Business Enterprise trucking reporting requirements.

View the file

Other files

File Type Posted
ildot 70F18-075.pdf PDF
ildot 70F18-045.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting September 18, 2026

Notice to Bidders, Specifications and Proposal

Contract No. 70F18 MCLEAN County Section (1,FR)RS-2 Route FAP 693, MUN 8345 Project NHPP-20DB(729) District 5 Construction Funds

Prepared by F

Checked by

(Printed by authority of the State of Illinois)

NOTICE TO BIDDERS

1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.

September 18, 2026 at which time the bids will be publicly opened from the iCX SecureVault.

2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the

Invitation for Bids as:

Contract No. 70F18 MCLEAN County Section (1,FR)RS-2 Project NHPP-20DB(729) Route FAP 693, MUN 8345 District 5 Construction Funds

Mill, patch and resurface FAP 693 (ILL 9, US150) Locust Street from east of Main Street to Towanda Avenue and Towanda Avenue from Locust Street to Empire Street in Bloomington, IL. Approximately

1.37 miles gross length.

3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.

(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.

4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.

By Order of the Illinois Department of Transportation

Gia Biagi, Secretary

FAP Route 639 & MUN Route 8345 (IL 9/US 150 & Towanda Ave.)

Section (1,FR)RS-2 McLean County

INDEX

FOR

SUPPLEMENTAL SPECIFICATIONS

AND RECURRING SPECIAL PROVISIONS

Adopted January 1, 2026

This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.

ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)

SUPPLEMENTAL SPECIFICATIONS

Std. Spec. Sec. Page No.

109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires

1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment

Section (1,FR)RS-2

RECURRING SPECIAL PROVISIONS

The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:

CHECK SHEET # PAGE NO.

1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)

3 X EEO

4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes

10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 X Station Numbers in Pavements or Overlays

Section (1,FR)RS-2 i

TABLE OF CONTENTS

INTENT OF PROJECT

PUBLIC MEETING

DESCRIPTION OF WORK

TRAFFIC CONTROL PLAN

CONTRACTOR ACCESS

COORDINATION BETWEEN CONTRACTS

COOPERATION BETWEEN CONTRACTORS

NOTIFICATION PRIOR TO LANE CLOSURES

PUBLIC INFORMATION PLAN

PUBLIC NOTIFICATION

SEQUENCE OF OPERATIONS

TEMPORARY INFORMATION SIGNING

TRAFFIC CONTROL & PROTECTION DEVICES (ROAD & SIDEROAD/STREET CLOSURES)

TRAFFIC CONTROL AND PROTECTION (SPECIAL)

TMP MONITORING

WIDTH RESTRICTIONS

STATUS OF UTILITIES

AGGREGATE SURFACE COURSE FOR TEMPORARY ACCESS

CLASS SI CONCRETE (MISCELLANEOUS)

CLASS SI CONCRETE (OUTLETS):

COMBINATION CONCRETE CURB AND GUTTER (ABUTTING EXISTING PAVEMENT)

CONCRETE CURB, TYPE B (SPECIAL):

CONCRETE RETAINING WALL REMOVAL

CONCRETE STEP REMOVAL

CONSTRUCTION LAYOUT EQUIPMENT

DELAYED START DATE

DOMESTIC WATER SERVICE BOXES TO BE ADJUSTED

EXISTING STATE-OWNED UTILITIES

FENCE REMOVAL

FURNISH TREES AND/OR SHRUBS

GROOVING FOR RECESSED PAVEMENT MARKINGS

Section (1,FR)RS-2 ii

HAND GRADING

HOT-MIX ASPHALT SURFACE REMOVAL

INLETS TYPE A, WITH SPECIAL FRAME AND GRATE

MAINTENANCE OF ROADWAY DRAINAGE

MANHOLES TO BE ADJUSTED WITH FRAME AND GRATE (SPECIAL)

MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME, CLOSED LID (SPECIAL)

PAVEMENT PATCHING

PAVEMENT PATCHING – CLASS D AND PARTIAL DEPTH

PIPE HANDRAIL (SPECIAL)

PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT

PROPOSED STORM SEWER CONNECTION TO EXISTING STORM SEWER

RAISED REFLECTIVE PAVEMENT MARKER REMOVAL

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES

STORM SEWER WATERMAIN AND STORM SEWER, RUBBER GASKET, CLASS A

STRINGLINE

SURFACE TRANSITIONS AT ADA PEDESTRIAN RAMPS DURING CONSTRUCTION

TEMPORARY DRAINAGE INTO PROPOSED DRAINAGE STRUCTURES

TEMPORARY FENCE (SPECIAL)

TREE REMOVAL

ACCESSIBLE PEDESTRIAN SIGNALS

CONCRETE FOUNDATION, TYPE C

DAMAGE TO EQUIPMENT

ELECTRIC CABLE

ELECTRIC CABLE IN CONDUIT, GROUND, NO. 6 1/C

EMERGENCY VEHICLE PRIORITY SYSTEM

ETHERNET SWITCH

FIBER OPTIC CABLE IN CONDUIT, 12 FIBER, SINGLE MODE

FULL-ACTUATED CONTROLLER AND CABINET, SPECIAL

HANDHOLE

LUMINAIRE, LED, ROADWAY, OUTPUT DESIGNATION G

LUMINAIRE SAFETY CABLE ASSEMBLY

MAINTENANCE OF EXISTING TRAFFIC SIGNAL INSTALLATION

MAST ARM DAMPENING DEVICE

MAST ARM MOUNTED STREET NAME SIGNS

Section (1,FR)RS-2 iii

MAST ARM MOUNTED TRAFFIC SIGNAL HEAD PLACEMENT

MODIFY EXISTING CONTROLLER CABINET

PAINT TRAFFIC SIGNAL EQUIPMENT

POLYCARBONATE SIGNAL HEADS

REMOVE EXISTING HANDHOLE

REMOVE EXISTING TRAFFIC SIGNAL EQUIPMENT

SERVICE INSTALLATION, TYPE A (MODIFIED)

TRAFFIC SIGNAL BACKPLATE

TRAFFIC SIGNAL POST

UNDERGROUND CONDUIT

UNINTERRUPTABLE POWER SUPPLY, STANDARD

VIDEO VEHICLE DETECTION SYSTEM

SOIL BORING LOGS

ACCESSIBLE PEDESTRIAN SIGNALS (APS) (BDE)

AGGREGATE SUBGRADE IMPROVEMENT (BDE)

BITUMINOUS MATERIALS COST ADJUSTMENTS (BDE)

CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)

COMPENSABLE DELAY COSTS (BDE)

DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)

FUEL COST ADJUSTMENT (BDE)

HOT-MIX ASPHALT (BDE)

HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)

INLET FILTERS

PAVEMENT MARKING (BDE)

PAVEMENT PATCHING (BDE)

PERFORMANCE GRADED ASPHALT BINDER (BDE)

RAISED REFLECTIVE PAVEMENT MARKERS (BDE)

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)

SEEDING (BDE)

SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)

SIGN PANELS AND APPURTENANCES (BDE)

SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)

STEEL COST ADJUSTMENT (BDE)

Section (1,FR)RS-2 iv

SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)

SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)

SUBMISSION OF BIDDERS LIST INFORMATION (BDE)

SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)

SURFACE TESTING OF PAVEMENTS – IRI (BDE)

SURVEYING SERVICES (BDE)

TRAFFIC SIGNAL BACKPLATE (BDE)

TRAINING SPECIAL PROVISIONS (BDE)

IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION . 121

VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)

WEEKLY DBE TRUCKING REPORTS (BDE)

WORK ZONE TRAFFIC CONTROL DEVICES (BDE)

WORK ZONE WIDTH RESTRICTION (BDE)

WORKING DAYS (BDE)

PROJECT LABOR AGREEMENT

SWPPP

Section (1,FR)RS-2

STATE OF ILLINOIS

SPECIAL PROVISIONS

The following Special Provisions supplement the “Standard Specifications for Road and Bridge Construction, Adopted April 1, 2022”, the latest edition of the “Manual on Uniform Traffic Control Devices for Streets and Highways”, and the “Manual of Test Procedures for Materials” in effect on the date of invitation for bids, and the “Supplemental Specifications and Recurring Special Provisions” indicated on the Check Sheet included herein, which apply to and govern the construction of FAP Route 639 & MUN Route 8345 (IL 9/US 150 & Towanda Ave.), Project NHPP- 20DB(729), Section (1,FR)RS-2, McLean County, Contract No. 70F18 and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.

INTENT OF PROJECT

The intent of this project is to mill, patch and resurface FAP 639 (ILL 9, US150) Locust Street from east of Main Street to Towanda Avenue and Towanda Avenue from Locust Street to Empire Street in Bloomington, IL.

This work shall be completed utilizing lane closures in accordance with the applicable Highway Standards. The Contractor shall note that all intersecting roadways within the project limits shall necessitate lane closures during this project. The Contractor will utilize methods necessary to protect and preserve the surrounding environment and properties during construction of this project.

PUBLIC MEETING

The Contractor shall schedule and conduct a Public Information Meeting for this project before the start of construction. The Contractor shall secure a suitable accessible facility for the meeting subject to the approval of the Department. The Contractor shall advertise the meeting a minimum of 10 calendar days in advance in at least one local paper, radio, television, social media, or websites to generate as much public participation as possible. The Contractor shall pay for all required insurance and fees associated with the meeting. The Contractor shall have representatives at the meeting to answer questions concerning scheduling, the nature of the work performed, and any other issues that may arise.

The Contractor shall provide notification of the public meeting to the properties within 500 feet of the project area, via door hangers or U.S. Mail a minimum of 10 days before the public meeting.

This work will not be paid for separately but considered included in the cost of the various traffic control items included herein.

Section (1,FR)RS-2

DESCRIPTION OF WORK

The work included in this section consists primarily of:

1 Pavement Patching 2 Pavement milling of various depths to the existing concrete pavement 3 HMA Paving 4 Longitudinal Joint Sealant 5 ADA Improvements 6 Curb and Gutter removal and replacement 7 Drainage/Utility Structure Adjustments/Replacements 8 Pavement Marking, Signing, and Raised Reflective Pavement Markers 9 Traffic Signal Installation 10 All other items necessary to complete construction on FAP 693

TRAFFIC CONTROL PLAN

Eff. 09-11-1990 Rev. 01-01-2024

Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, these Special Provisions and any special details and highway standards contained herein and in the plans.

Special attention is called to Articles 107.09 and 107.14 of the Standard Specifications, the following Highway Standards relating to Traffic Control, and the listed Supplemental Specifications and Recurring Special Provisions.

Highway Standards: 701427 701601 701701 701801 701901

Special Provisions: Contractor Access Cooperation Between Contractors Notification Prior to Lane Closures

Public Information Plan Public Notification

Sequence of Operations Temporary Information Signing

TMP Monitoring Traffic Control and Protection Devices (Road & Sideroad / Street Closures) Traffic Control and Protection (Special) Width Restrictions

Plan Details: District 5 CADD Detail No. 70200000 District 5 CADD Detail No. X72000201

Limits of Construction: The Contractor shall coordinate the items of work in order to keep hazards and traffic inconveniences to a minimum, as specified below:

Section (1,FR)RS-2

1. The contractor shall provide, erect and maintain all the necessary signs, barricades, cones, drums, flags and lights for the warning and protection of traffic, as required by Sections 107 and 701 through 703 of the Standard Specifications.

2. In addition to the flaggers required by the various standards, additional flaggers shall be provided, if required by the Engineer, and they will be paid in accordance with Article 109.04 of the Standard Specifications.

3. The Contractor shall have responsibility for all Traffic Control Devices throughout the entire project. Any additional work or material shall be considered included in the contract unit price for TRAFFIC CONTROL AND PROTECTION, (SPECIAL).

4. At any particular location, the Contractor shall work on only one side of the pavement for a length of two blocks at a time and shall keep all equipment, materials and vehicles off the pavement, the shoulder, and right-of-way on the side of the pavement open to traffic.

5. To provide a pedestrian access route throughout the project limits as shown on

Highway Standard 701801 for sidewalk, corner and crosswalk closure, the Contractor shall only work within the two-block closure on the same side of the pavement. Any variations required to this requirement will be determined by the Engineer.

6. The Contractor shall provide and maintain access to commercial and private properties abutting the roadway being improved in accordance with Article 107.09 of the Standard Specifications. Access to commercial property shall at no time be shut off completely and at no time shall a private entrance be closed for an extended period of time as determined by the Engineer. To minimize business impacts, construction operations across each entrance shall be completed in half widths unless the entrance is a single lane width not wide enough to stage and the Contractor has permission from the property owner to close the entrance entirely during construction operations at that particular location.

7. The Contractor shall also provide business access signs as shown in the plan details at entrances that are under construction. These signs will only be required during construction operations occurring at a particular business and can be relocated as work proceeds throughout the project limits. The business access signs required for this project will not be paid for separately, but shall be included in the price of the various traffic control items.

8. Any inconveniences or delays caused to the Contractor in complying with this Special

Provision will be considered as included in the contract unit price for TRAFFIC CONTROL AND PROTECTION, (SPECIAL) and no additional compensation will be allowed.

Section (1,FR)RS-2

Traffic: It is the intention of the Department that FAP 693 be kept open to traffic at all times during the construction of this section. At all times, one- lane, one-way traffic shall be maintained throughout the project. Alternate side road closures will be required, as necessary, to complete paving operations. Timing and schedule of side road closures to be determined by the Engineer.

During periods when material or equipment is being hauled to or from the project site all haul trucks shall have at least one (1) flashing amber light or one (1) set of dual emergency flashers, operating when within the lane closure. In addition “WORK TRUCK DO NOT FOLLOW” shall be displayed on the rear of all haul trucks. Displays shall be 36 inch x 18 inch (0.91 m x 0.46 m) made of Fluorescent Orange reflective material as specified in Article 1106.01. This work shall be considered as included in the contract unit prices for the construction items involved and no additional compensation will be allowed.

Parking of personal vehicles within the right-of-way will be strictly prohibited. Off-site parking and transportation arrangements shall be the responsibility of the Contractor.

Work Hours: It is the intention of the Department that FAP Route 693 / (ILL 9 / US 150) be constructed between the hours of 7:00 AM to 6:00 PM on Monday through Friday. No work will be allowed outside of those hours, and no work will be allowed on Saturdays or Sundays.

The following traffic control standards shall be utilized during, but not limited to, the listed construction operations:

TRAFFIC CONTROL AND PROTECTION, STANDARD 701427

Traffic Control and Protection, Standard 701427 shall be used on FAP 693 for intermittent or moving operations requiring lane closures on the multilane section of Locust Street. These operations may include but not necessarily be limited to pavement marking operations.

This work will not be measured for payment separately in accordance with Article 701.19 (a) of the Standard Specifications.

TRAFFIC CONTROL AND PROTECTION, STANDARD 701601

Traffic Control and Protection, Standard 701601 shall be used on FAP 693 for operations requiring a lane closure. This work may include but not necessarily be limited to pavement removal, pavement and base construction, HMA Surface Removal, Pavement Patching, HMA Resurfacing, curb & gutter removal and installation, and storm sewer removal and installation.

Special attention is called to Section 701 where reference is made to the protection of unattended obstacles or excavations in the work area.

Traffic Control and Protection, Standard 701601 including additional Highway Construction Speed Zone Signs will not be measured for payment separately in accordance with the following special provision: TRAFFIC CONTROL AND PROTECTION, (SPECIAL).

Section (1,FR)RS-2

TRAFFIC CONTROL AND PROTECTION, STANDARD 701701

Traffic Control and Protection, Standard 701701 shall be used at intersections with FAP 693 for operations requiring a lane closure or operations adjacent to a lane of traffic at intersections. This work may include but not necessarily be limited to ADA sidewalk improvements, pavement removal, pavement and base construction, HMA surface removal, pavement patching, HMA resurfacing, curb & gutter removal and installation, storm sewer removal and installation, pavement markings and raised reflective pavement marker installation. Special attention is called to Section 701 where reference is made to the protection of unattended obstacles or excavations in the work area.

Traffic Control and Protection, Standard 701701 including additional Highway Construction Speed Zone Signs will not be measured for payment separately in accordance with the following special provision: TRAFFIC CONTROL AND PROTECTION, (SPECIAL).

TRAFFIC CONTROL AND PROTECTION, STANDARD 701801

Traffic Control and Protection, Standard 701801 shall be used at all sidewalks where the work will necessitate closure of the sidewalk, corner, or crosswalk for a period.

If the Contractor can’t provide pedestrian accommodations per Traffic Control and Protection, Standard 701801 at sidewalk closures that have existing sidewalk on only one side of the roadway, the Contractor shall provide the Engineer two weeks notification to allow time for a public press release of impacted sidewalk closure areas.

Traffic Control and Protection, Standard 701801 will not be measured for payment in accordance with the following special provision: TRAFFIC CONTROL AND PROTECTION, (SPECIAL).

CONTRACTOR ACCESS

Eff. 09-11-1990 Rev. 01-01-2014

At road closure locations, where Type III barricades are installed in a manner that will not allow contractor access to the project without relocation of one or more of the barricades, the arrangement of the barricades at the beginning of each work day may be relocated, when approved by the Engineer, in the manner shown on Highway Standard 701901 for Road Closed to Through Traffic. ' Road Closed ' signs (Rll-2), supplemented by ' Except Authorized Vehicles ' signs (R3-Il0l), shall be mounted on both the near-right and the far-left barricade(s). At the end of each work day the barricades shall be returned to their in-line positions. This work will be considered to be included in the cost of the various traffic control items and no extra compensation will be allowed.

Section (1,FR)RS-2

COORDINATION BETWEEN CONTRACTS

Any construction activities adjacent to the Bloomington High School/Junior High School complex between East of Colton to the Locust St/Towanda Avenue intersection will only be allowed during summer break (approximately June 1 to August 15). The Contractor and Engineer will need to coordinate with the School District at the time of construction to confirm the dates for summer break. The Contractor shall coordinate with Contractors on any adjacent contracts such that simultaneous work on Empire Street and Locust Street adjacent to the School Complex will not be permitted. Access from either Empire Street or Locust Street will be maintained at all times even during summer break. Any costs incurred as a result of this provision shall be considered included in the cost of the construction items involved and no additional compensation will be allowed.

COOPERATION BETWEEN CONTRACTORS

Eff. 01-01-2024

There is a possibility that other Contractor’s operations may be ongoing within the proposed project limit at the same time as the work included in this contract is being performed. The Contractor for this section shall cooperate with any other Contractors performing work adjacent to this project in accordance with Article 105.08 of the Standard Specifications. Any inconveniences or delays caused the Contractor in complying with this requirement shall be considered incidental to the contract and no additional compensation will be allowed.

Section (1,FR)RS-2

NOTIFICATION PRIOR TO LANE CLOSURES

The Contractor shall notify the Department’s Bureau of Operations and the individuals and organizations listed below at least two (2) weeks prior to the start of the project and two (2) weeks prior to any lane closures.

Name Organization Phone Number Robert Hodgson IDOT Traffic Operations Engineer 217-712-9018 Dan DeWitt IDOT Maintenance Field Engineer 217-843-0344 Bike Blono Bikeblono@gmail.com Rhonda Flegel McLean County 911 Director 309-663-9911 Steve Petrilli Town of Normal Police Chief 309-454-9650 Ryan Otto Town of Normal Engineer 309-454-9574 Matt Lane McLean County Sheriff 309-888-5034 Jerry Stokes McLean County Engineer 309-663-9445 Eric West City of Bloomington Fire Department 309-434-2626 Public Affairs Officer City of Bloomington Police Department 309-434-2355 Jim Karch City of Bloomington – City Engineer 309-434-2220 Phil Allyn City of Bloomington – Traffic Engineer 309-434-2427 Dr. David Mouser Bloomington S.D. 87 – Superintendent 309-827-6031 Michael Cornale Bloomington S.D. 87 – Chief Fin. Off. 309-827-6031 Kris Newcomb McLean County EMS 309-827-4348 Cathy Beck McLean County EMA 309-888-5020 Charlie Moore McLean County Chamber of Commerce 309-829-1190 Raymond Lai McLean County Reg. Plan. Comm. 309-828-4331 Chris Koos Town of Normal – Mayor 309-454-9777 Regan Deering IL State Rep. – 88th District 217-876-1968 Sharon Chung IL State Rep. – 91st District 309-808-2351 Dennis Tipsword IL State Rep. – 105th District 815-844-8344 Sally J. Turner IL State Sen. – 44th District 217-651-8291 David Kohler IL State Sen. – 46th District 309-677-0120 Chris Balkema IL State Sen. – 53rd District 815-844-9179 Aza Dzurovcik Bloomington Center for Performing Arts 309-846-2859 Bloomington City Hall 309-434-2509 Downtown Bloomington Association 309-434-2295 Connect Transit 309-828-9833 IL State Police (Troop 5) 815-844-1500 Normal Public Schools District 5 309-557-4000 Illinois State University 309-438-2181 Illinois Wesleyan University 309-556-1000 OSF St. Joseph Medical Center 309-662-3311 Carle BroMenn Medical Center 309-454-1400 Carl Olson Bloomington-Normal Airport Authority 309-663-7384 Duane Lindeman Bloomington-Normal Water Reclamation 309-827-4396

These agencies, organizations, and individuals shall also be notified when the project is complete.

Section (1,FR)RS-2

PUBLIC INFORMATION PLAN

Changeable Message Signs will be required for seven (7) days each prior to the beginning of construction operations to inform the traveling public of the upcoming delays that may be caused by the project. The signs will be located as follows or as directed by the Engineer:

Route Direction Location ILL Rte. 9 EB West of Main Street Clinton St (US 150) NB Just south of Locust St.

Main St. NB Just south Locust St.

PUBLIC NOTIFICATION

Prior to the start of construction operations, a press release will be used to inform the media, area businesses, the general public, and public officials about the upcoming project. Information on current road construction projects will also be available on the IDOT website.

Three (3) Temporary Information Signs shall be required seven (7) days prior to starting construction operations to inform the public of the date the proposed improvements will begin and to provide advanced warning of potential backups. Once construction begins the signs shall be revised to read “ROAD WORK AHEAD EXPECT DELAYS”. The signs shall remain in place for the duration of the project. The Temporary Information Signs shall be placed on Locust St west of the project, Clinton Street south of the project, and Main St south of Locust.

All Temporary Information Signs shall be placed in advance of the project limits at locations to be determined by the Engineer.

SEQUENCE OF OPERATIONS

The following sequence of construction and requirements for construction along FAP 693 shall be followed unless the Contractor submits an alternate plan in detail and receives written approval from the Engineer before work starts.

1. Install storm sewers and patch the road where applicable.

2. Remove and replace existing curb/curb and gutter along FAP 693 as shown in the plans.

3. Construct entrances and sidewalks as shown in the plans.

4. Construct traffic signals.

5. Mill existing hot-mix asphalt pavement sections and follow immediately with paving of the hot-mix asphalt binder course. Milling and paving operation sequencing to be determined by the Engineer.

6. Pave SMA hot-mix asphalt along entire length of FAP 693.

Section (1,FR)RS-2

TEMPORARY INFORMATION SIGNING

Description. This work shall consist of the furnishing, installation, maintenance, and removal of temporary information signs.

Materials. Materials shall be according to the applicable portions of Section 701 of the Standard Specifications and as shown on the plans.

Construction Requirements. The temporary information signs shall be in place at least one week prior to the beginning of construction activities that impact traffic flow and shall remain in place until the completion of the project. If all lanes are open for an extended period of time during the project, such as a winter shutdown, the Contractor shall cover the signs until lane closures resume.

Signs shall be installed according to the requirements of Section 701.

Method of Measurement: This work will be measured for payment in square feet in place. The auxiliary sign panel will not be measured for payment.

Basis of Payment. This work will be paid for at the contract unit price per square foot for

TEMPORARY INFORMATION SIGNING.

TRAFFIC CONTROL & PROTECTION DEVICES (ROAD & SIDEROAD/STREET CLOSURES)

Eff. 09-11-1990 Rev. 01-01-2014

It is the intent of the Department that all sideroads be closed to traffic during the construction of the reconstruction section. During the period of road closure, the Contractor shall provide traffic control devices in accordance with the CADD detail for TRAFFIC CONTROL AND PROTECTION

DEVICES (ROAD & SIDEROAD/STREET CLOSURES).

The work and material specified in TRAFFIC CONTROL & PROTECTION DEVICES (ROAD & SIDEROAD/STREET CLOSURES) shall not be paid for separately but shall be included in the price of the various traffic control items.

TRAFFIC CONTROL AND PROTECTION (SPECIAL)

This item of work shall include furnishing, installing, maintaining, replacing, relocating and removing all traffic control devices used to regulate, warn, or direct traffic during the construction or maintenance of improvements on FAP 693 and side streets.

TRAFFIC CONTROL AND PROTECTION, (SPECIAL) shall be provided as called for in the plans, these special provisions, applicable Highway Standards, applicable sections of the Standard Specifications, or as directed by the Engineer.

All traffic control devices used on this project shall conform to the plans, Special Provisions, Traffic Control Standards, “Illinois Supplement to the National Manual on Uniform Traffic Control Devices”, and “Manual on Uniform Traffic Control Devices.” No modification of these requirements will be allowed without prior written approval of the Engineer.

Section (1,FR)RS-2

Traffic Control Devices include signs and their supports, signals, barricades with sandbags, channelizing devices, warning lights, arrow boards, flaggers, or any other device used for the purpose of regulating, detouring, warning or guiding traffic through or around the construction zone.

Special attention shall be given to advance warning signals during construction operations in order to keep lane assignment consistent with barricade placement at all times. The Contractor shall immediately remove, cover or turn from the view of the motorists all traffic control devices which are inconsistent with detour or lane assignment patterns and conflicting conditions during the transition from one construction stage to another. When the Contractor elects to cover conflicting or inappropriate signing, materials used shall cover the entire sign. The method used for covering the signing shall meet the approval of the Engineer.

The Contractor shall coordinate all traffic control work on this project with adjoining or overlapping projects, including barricade placement necessary to provide a uniform traffic detour pattern.

When directed by the Engineer, the Contractor shall remove all traffic control devices which were furnished, installed and maintained under this contract, and such devices shall remain the property of the Contractor. All traffic control devices shall remain in place until specific authorization for relocation or removal is received from the Engineer.

Temporary Pavement Markings (not included in the standards, details, or specifications) and Changeable Message Signs (not included in the standards, details, or specifications) will be measured for payment and paid for separately as outlined in the Standard Specifications for Road and Bridge Construction or in these Special Provisions.

Anticipated Highway standards which will be used include but is not limited to 701427, 701601, 701701, 701801, 701901.

All traffic control and protection items not paid for separately shall be considered as included in the cost of TRAFFIC CONTROL AND PROTECTION, (SPECIAL). This work will be measured for payment on a lump sum basis and paid for at the contract lump sum price for TRAFFIC CONTROL AND PROTECTION, (SPECIAL) with no additional compensation allowed.

TMP MONITORING

The management strategies within the TMP shall be continuously monitored throughout the project to determine if they meet safety and mobility goals. If the safety and mobility conditions are unfavorable, adjustments shall be implemented. Details of the successes and failures of the TMP as well as implemented changes will be included in the Work Zone TMP Summary reports to be submitted by the Resident Engineer/Technician at the conclusion of the project.

If the Contractor fails to carry out the TMP Strategies as shown in the plans and contract documents, Traffic Control Deficiency Deductions will be administered according to Article 105.03(b) of the Standard Specifications for Road and Bridge Construction.

Section (1,FR)RS-2

WIDTH RESTRICTIONS

Eff. 12-07-1999 Rev. 4-27-2021

The work within this contract will cause a width restriction requiring notification a minimum of 21 days prior to the actual width restriction and/or event requiring “Maximum Width” signing. All “Maximum Width” signing shall be furnished, erected, maintained and removed by the Contractor for placement at the locations shown within the contract plans.

Width restrictions shall be interpreted as any change in the existing horizontal clearance caused by the placement of physical barrier(s) that extend above the pavement surface. Width restrictions less than 17’-6” (Barrier to Barrier) shall be reported and signed on all roadways. Width restrictions of 17’-6” to 30’-0” on Interstate or multilane roadways shall be reported. Construction activities which close a lane with operating equipment, or with drums, barricades, or cones, will be considered as width restrictions.

Notification of width restriction requires a minimum of 21 days before the actual restriction is placed to ensure specific routed over-width permitted loads are not sent through the restriction site. The Contractor shall notify the Resident Engineer a minimum of 21 days prior to the width restriction. In the notification, the Contractor shall include the location, scheduled restriction start date, road restriction width(s)/closure, proposed posted width (i.e. Barrier to Barrier width minus 18 inches).

The Contractor is advised he will not be allowed to install the width restriction without the 21 day notice and failure to provide proper notice will delay the installation of the width restriction.

The notice of width restriction is considered a part of the Contractor’s approved work schedule and is the Contractor’s responsibility to provide proper notice. Delays caused by failure to provide notice shall not be considered justification for work day additions or completion date extensions.

All work associated with the furnishing, erecting, maintaining, and removal of Width Restriction Signing will be paid for at the contract Lump Sum Price for WIDTH RESTRICTION SIGNING.

Section (1,FR)RS-2

STATUS OF UTILITIES

The following utilities are involved in this project. The utility companies have provided the estimated dates.

Name & Address of Utility:

*Ameren IL (electric) Douglas Palmer DPalmer3@ameren.com 501 E. Lafayette St.

Bloomington, IL 61701

(309) 823-9227

(447) 287-8274

Multiple power poles and light poles in conflict with ADA curb ramp, sidewalk, and entrance widening in the project area. Below are the stations for the poles with conflict to sidewalk:

1. S Sta 44+60

2. S Sta 45+50

3. N Sta 46+05

4. NE Cor E Locust St & East St Sta 46+90

5. N Sta 48+60

6. S Sta 49+08

7. N Sta 54+90

8. N Sta 57+90

9. S Sta 59+20

10. N Sta 60+10

11. NE Cor of E Locust St & Evans St Sta 61+50

12. N Sta 63+05

13. NW Cor of E Locust ST & N Clinton St Sta 67+85

14. S Sta 71+90

15. S Sta 79+80

16. S Sta 81+85

17. S Sta 83+25

Estimated Date Relocation Completed

Before construction

Utility

*Campus Communications Group Ron Battle RBattle@CCGFiber.com Pavlov Media601 N Co Fair Dr Champaign IL, 61821

(217) 402-2737

Type & Location:

Communications fiber line and vaults within the project limits

(Various locations for fiber lines may need to be adjusted as needed during construction)

Section (1,FR)RS-2

Relocation

Not required

Utility

*City of Bloomington Brett Lueschen blueschen@cityblm.org City of Bloomington Water 603 West Division Street Bloomington, IL 61701

(309) 434-2400

(309) 728-2353

Type &

Water hydrants in conflict:

N Sta 48+60- Rover review NE Cor E Locust & Colton Ave Sta 87+90

Relocation

Utility

*CIRBN

Dennis Legget dennisl@cirbn.org 200 W Front St, Suite 500A Bloomington, IL 61701

(309) 820-7321

- S Sta 76+60 --Marker and Vault in conflict with proposed sidewalk

- S Sta 88+40- Vault

- S Sta 46+75- Marker

(Other locations for fiber lines may be adjusted may be needed during construction)

Relocation

Utility

*Comcast Martha Gieras martha_gieras@comcast.com 688 Industrial Drive Elmhurst, Illinois 60126 Phone: (224) 229-5862 Fax: (630) 359-5482

Section (1,FR)RS-2

Location:

Overhead fiber optic and cable lines within the project limits, some lines will be moved concurrent with Ameren pole adjustments.

(Various locations may need to be adjusted as needed during construction)

Estimated Date Relocation

Utility

*Frontier Adam Gangloff adam.r.gangloff@ftr.com 109 East Market Street 2nd Floor North Bloomington, IL 61701

(309) 557-1378

Communications fiber and cable within the project limits.

(Various locations for fiber lines may be adjusted as needed during construction)

Estimated Date Relocation

Utility

*Metronet Jeff Taylor jeff.taylor@metronet.com 2014 Cabin town Rd Bloomington IL 61701 (309)-838-0788

(309) -386-1259

Communications fiber and cable within the project limits

(Various locations for fiber lines may be adjusted as needed during construction)

Estimated Date Relocation

Utility

*Nicor

Karey Johnson karejohn@southernco.com DOT Liaison Engineering - Planning & Liaison C: 224-471-9356 O: 630-388-2923

Section (1,FR)RS-2

Gas main within the project limits- TBD upon completion of review of gas main

Estimated Date Relocation

Utility

*Stratus Network Tyler Evans Andrew Franczek tevans@stratusnet.com afranczek@stratusnet.com 4700 N. Prospect Road (309)-696-6349 Peoria Heights, IL 61616

(309) 678-9977

Fiber optic handhole markers and handholes within the project limits:

(Various locations may need to be adjusted as needed during construction)

Estimated Date Relocation

The above represents the best information of the Department and is only included for the convenience of the bidder. The applicable provisions of Sections 102, 103, and Articles 105.07, 107.20, 107.37-.40, and 108.02 of the Standard Specifications for Road and Bridge Construction shall apply.

The estimated utility relocation dates should be part of the progress schedule submitted by the contractor. If any utility adjustments or relocations have not been completed by the above dates specified and when required by the contractor’s operations after these dates, the contractor should notify the Engineer in writing. A request for an extension of time will be considered to the extent the Contractor’s critical path schedule is affected.

Toll Free J.U.L.I.E. Telephone Number (800) 892-0123 or 811

* = J.U.L.I.E. Member

AGGREGATE SURFACE COURSE FOR TEMPORARY ACCESS

Revise Article 402.10 of the Standard Specifications to read:

“402.10 For Temporary Access. The contractor shall construct and maintain aggregate surface course for temporary access to private entrances, commercial entrances and roads according to Article 402.07 and as indicated by the Engineer.

Section (1,FR)RS-2

The aggregate surface course shall be constructed to the dimensions and grades specified below, except as modified by the plans or as indicated by the Engineer.

a) Private Entrance. The minimum width shall be 12 ft (3.6 m). The minimum compacted thickness shall be 6 in. (150 mm). The maximum grade shall be eight percent, except as required to match the existing grade.

b) Commercial Entrance. The minimum width shall be 24 ft (7.2 m). The minimum compacted thickness shall be 9 in. (230 mm). The maximum grade shall be six percent, except as required to match the existing grade.

c) Alley will be considered as commercial entrance for the purpose of payment for temporary access.

Maintaining the temporary access shall include relocating and/or regrading the aggregate surface coarse for any operation that may disturb or remove the temporary access. The same type and gradation of material used to construct the temporary access shall be used to maintain it.

When use of the temporary access is discontinued, the aggregate shall be removed and utilized in the permanent construction or disposed of according to Article 202.03.”

Add the following to Article 402.12 of the Standard Specifications:

“Aggregate surface course for temporary access will be measured for payment as each for every private entrance or commercial entrance. If a residential drive or commercial entrance is to be constructed under multiple stages, the aggregate needed to construct the second or subsequent stages will not be measured for payment but shall be included in the cost per each of the type specified.”

Revise the second paragraph of Article 402.13 of the Standard Specifications to read:

“Aggregate surface course for temporary access will be paid for at the contract unit price per each for TEMPORARY ACCESS (PRIVATE ENTRANCE) or TEMPORARY ACCESS (COMMERCIAL

ENTRANCE).

Partial payment of the each amount bid for temporary access, of the type specified, will be paid according to the following schedule:

a) Upon construction of the temporary access, sixty percent of the contract unit price per each, of the type constructed, will be paid.

b) Subject to the approval of the Engineer for the adequate maintenance and removal of the temporary access, the remaining forty percent of the pay item will be paid upon the permanent removal of the temporary access.”

Section (1,FR)RS-2

CLASS SI CONCRETE (MISCELLANEOUS)

Description. This work shall conform to Sections 351, 503, and 508 of the IDOT Standard Specifications for Road and Bridge Construction. The concrete steps shall be constructed to the grades indicated in the plans and, when necessary, adjusted in the field per the Engineer’s direction.

Method of Measurement. This work will be measured for payment as CUBIC YARD.

Basis of Payment. This work will be paid for at the contract unit price per CUBIC YARD for Class SI CONCRETE (MISCELLANEOUS) which price shall include all necessary labor, equipment, and materials necessary for the construction of the concrete steps including any aggregate and reinforcement bars.

CLASS SI CONCRETE (OUTLETS):

This work shall consist of constructing the concrete outlets at the location shown on the plans.

This work shall be performed in accordance with the applicable portions of Section 606 of the Standard Specifications and with the detail shown in the plans.

Method of Measurement: The volume of concrete used will be measured and computed in cubic yards

Basis of Payment: Class SI Concrete (Outlets) will be paid for at the contract unit price per cubic yard, measured as specified, for CLASS SI CONCRETE (OUTLETS) which price shall be payment in full for all labor, equipment and materials, including concrete, reinforcement bars, backfill, etc. required to complete this item as specified and as directed by the Engineer.

COMBINATION CONCRETE CURB AND GUTTER (ABUTTING EXISTING PAVEMENT)

This work shall consist of constructing combination concrete curb and gutter with a uniform gutter width abutting existing pavement that is to remain as shown in the plans and in accordance with Section 606 of the Standard Specifications. The curb and gutter flag shall be constructed to the heights shown in the plans.

Add to the end of the first paragraph of article 606.15 the following: “All cost associated with constructing the combination concrete curb and gutter abutting the existing pavement shall be included in the contract unit price bid for COMBINATION CONCRETE CURB AND GUTTER, of the type specified (ABUTTING EXISTING PAVEMENT) and no additional cost will be allowed.”

Delete the last paragraph of article 606.15 and insert the following: “The excavation necessary for construction of the combination curb and gutter that abuts the existing pavement shall be included in contract unit price bid for COMBINATION CONCRETE CURB AND GUTTER, of the type specified (ABUTTING EXISTING PAVEMENT) in accordance with Section 202 of the Standard Specifications.”

Section (1,FR)RS-2

CONCRETE CURB, TYPE B (SPECIAL):

Description: This work shall consist of the construction of Concrete Curb, Type B (Special) as detailed in the plans at locations shown in the plans. This work shall be completed in accordance with the detail in the plans, the applicable portions of Section 606 of the Standard Specifications and as directed by the Engineer.

Method of Measurement. This work will be measured for payment as FOOT.

Basis of Payment. This work will be paid for at the contract unit price per FOOT for CONCRETE CURB, TYPE B (SPECIAL) which price shall include all labor and equipment necessary, including reinforcement bars, expansion joints, weep holes, etc. to complete the work specified herein.

CONCRETE RETAINING WALL REMOVAL

Description. This work shall consist of the removal of existing retaining walls at the locations specified in the plans. Disposal shall be according to the requirements of Article 202.03 and Section 501 of the Standard Specifications.

General. The existing retaining wall shall be removed to a depth of 1 foot below the proposed sidewalk. Removal of the retaining wall shall be in accordance with applicable sections of Article

501.04 and 501.05.

Method of Measurement. The removal of concrete retaining walls shall be measured in place along the length of the wall.

Basis of Payment. This work will be measured for payment in place and paid for at the contract unit price per FOOT for CONCRETE RETAINING WALL REMOVAL, which shall include removal and disposal of the material.

CONCRETE STEP REMOVAL

Description. This work consists of the removal of the existing concrete steps as shown in the plans. Removal shall include saw cutting and all existing material removal, including any attached handrail and buried portions of the structure that may be present. Disposal shall be according to the requirements of Article 202.03 and Section 501 of the Standard Specifications.

Method of Measurement. The removal of concrete steps with all associated work and disposal shall be measured for payment and computed as each concrete step removed.

Basis of Payment. This work will be measured for payment in place and paid for at the contract unit price per EACH for CONCRETE STEP REMOVAL, which price shall include removal including any attached handrail, disposal of the materials, and all required excavation and backfilling.

Section (1,FR)RS-2

CONSTRUCTION LAYOUT EQUIPMENT

Effective: June 1, 2025

General The Contractor shall furnish articles of survey equipment to be used by the Department for independent monitoring and verification of construction layout stakes, reference points, and any other horizontal and vertical control set by the Contractor. All equipment will be for the exclusive use of the Department throughout the duration of the contract and will be returned to the Contractor at the end of the contract.

Equipment The equipment shall be furnished no later than fourteen days prior to construction activities begins. The equipment to be furnished by the Contractor shall consist of the following, or equivalent:

Product Number Name Qty 5199-00 Yel Tripod, Antenna, GPS, Adjustable 1 8154-00 Org Bag, Tripod, 5119 GPS Antenna 1 51870-50-70 Utility Gain antenna 3 74450-14 TDL 450H Field Battery/Charger Kit includes: 1 56657-00 Battery in pouch 1 51862-00 9’ SAE to SAE cable 1 52083 Univ. power adapter kit 1 C01790 Charger 1 R10-102-60-01 Trimble R10-2, Model 60, single receiver Case, Row 3 R10-CFG-002-41 Trimble R10-2 Config. Lvl – R10 Base & Rover Mode 3 101071-00-01 Trimble Acc – Power Supply and Power Cord for Dual Battery

Charger (North America)

43169-20 Rod – 2.5m Carbon Fiber Telescopic Range Pole w/ Bipod 2 TSC7-1-1111-00 Trimble TSC7 controller – QWERTY keypad, USB/Serial boot, Worldwide region, Standalone Includes:

Power supply with cable 2 Screen protector 2 Hand strap 2 1 set of two batteries 2 Stylus with tether 2 Quick start guide 2 TA-FENSURV-P Trimble Access – General Survey; Perpetual License (software) 2 SA-ROADS-P Trimble Access – Roads; Perpetual License (software) 2 121349-01-1 Trimble TSC7 Accessory – Pole Mount 2 121358-01-1 Trimble TSC7 Accessory – Ext. Battery Charger w/ Int. Cord, Battery 2-pack

121354-01-1 Trimble TSC7 Accessory – Carry Case Shoulder Bag 2

The Department will have control over data loaded onto the units and may use data not available to the Contractor.

Section (1,FR)RS-2

Any software updates will be applied to the equipment by the Contractor. Another unit shall be furnished to the Department when updates or fixes require the unit to be unusable for more than eight consecutive hours.

Training The Contractor shall provide training for six members of the Department’s staff on use of the equipment and software. Training shall occur at least seven days before construction activity begins.