ildot 66N24.064.pdf
PDF 7 MB Posted
- Attached to
- Removal and Replacement of SN 050-0059
- Solicitation number
- 66N24
- Issued by
- Lasalle County, Lee Center CDP, Illinois
About this file
Summary
This is a Notice to Bidders and Special Provisions document issued by the Illinois Department of Transportation (IDOT) for a construction contract located in LaSalle County, Illinois. The project involves the removal and replacement of bridge SN 050-0059 carrying US Route 52 over Mission Creek, approximately 0.4 miles west of IL 71, along with associated roadwork on US Route 52 from IL 23 to IL 71 spanning 8.66 gross miles (8.47 net miles). Work includes milling and resurfacing of US Route 52, construction of 4-foot paved shoulders and 2-foot aggregate shoulders, tree removal, cleaning of existing paved ditches, and replacement of multiple culverts. The existing single-span reinforced concrete slab bridge will be replaced with a 12-foot by 12-foot double barrel reinforced concrete box culvert with an upstream drop box. Electronic bids must be submitted to the iCX system (Integrated Contractors Exchange) prior to 12:00 p.m. on November 6, 2026, at which time bids will be publicly opened. Contract No. 66N24 will be awarded to the lowest responsive and responsible bidder in accordance with IDOT rules and Department standards.
The project is funded with Federal-aid funds under Project STP-HSIP-BR-CHU8(388) through the Department's District 3 Construction Funds. The contract includes numerous special provisions addressing traffic control, utility relocations (Ameren Illinois, AT&T, Frontier Communications, and Nicor Gas), wetland protection, railroad coordination with Illinois Railway LLC, temporary bridge traffic signals with microwave detection, and environmental compliance including removal and disposal of regulated substances at five identified sites and compliance with a Section 404 permit and Nationwide Permit #3 for in-stream maintenance work. Utility relocations are anticipated to be complete by approximately April 1, 2027, and the contractor must procure a Railroad Protective Liability Insurance policy and right-of-entry permit from Illinois Railway (as of January 29, 2026, costing $4,000 for 30 days or $20,000 for six months). The contract requires compliance with federal and state prevailing wage, EEO, and DBE participation requirements, and the contractor must submit detailed design for the temporary support system and coordinate operations with adjacent Design Build project for Fox River Road (SN 050-0058).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting November 6, 2026
Notice to Bidders, Specifications and Proposal
Contract No. 66N24 LASALLE County Section (124,125)RS-3 &(125 BR-1)BR Route FAP 607 Project STP-HSIP-BR-CHU8(388) District 3 Construction Funds
Prepared by F
Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
November 6, 2026 at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Contract No. 66N24 LASALLE County Section (124,125)RS-3 &(125 BR-1)BR Project STP-HSIP-BR-CHU8(388) Route FAP 607 District 3 Construction Funds
Removal and replacement of SN 050-0059 carrying US 52 over Mission Creek located approximately
0.4 miles west of IL 71. Additional work includes milling/resurfacing at roadway approaches, additional shoulders, upgraded guardrails, and improvements to entrances and a sideroad.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
FAP Route 607 (US 52)
Section (124,125)RS-3 & (125 BR-1)BR LaSalle County
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
Section (124,125)RS-3 & (125 BR-1)BR
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)
3 X EEO
4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 X Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 X Station Numbers in Pavements or Overlays
Section (124,125)RS-3 & (125 BR-1)BR i
TABLE OF CONTENTS
LOCATION OF PROJECT
DESCRIPTION OF PROJECT
STATUS OF UTILITIES TO BE ADJUSTED
WETLAND AREAS
FURNISHED EXCAVATION (SPECIAL)
EXPLORATION TRENCH, SPECIAL
ROCK FILL
AGGREGATE SURFACE COURSE, TYPE B
SURFACE COURSE PAVING SEQUENCE
CROSSING STRUCTURES WITH MATERIAL TRANSFER DEVICE
AGGREGATE SHOULDERS TYPE B
TACK COAT
STORM SEWER OR CULVERT TO BE FILLED
FILLING EXISTING STORM SEWERS OR CULVERTS
SHOULDER STABILIZATION AT GUARDRAIL
FURNISH PERMANENT SURVEY MARKERS
WIDTH RESTRICTION SIGN
TEMPORARY BRIDGE TRAFFIC SIGNALS (STANDARD 701316 OR 701321)
TRAFFIC CONTROL IN THE VICINTY OF A RAILROAD GRADE CROSSING
TEMPORARY ACCESS (FIELD ENTRANCE)
TEMPORARY INFORMATION SIGNING
TRAFFIC CONTROL AND PROTECTION STANDARD 701321 (SPECIAL)
LINEAR DELINEATOR PANELS, 6 INCH
PAINT PAVEMENT MARKING – TWO APPLICATIONS
LINEAR DELINEATOR PANELS, 4 INCH
MODIFIED URETHANE PAVEMENT MARKING – TWO APPLICATIONS
LINEAR DELINEATION PANELS (TEMPORARY BARRIER WALL)
TEMPORARY RUMBLE STRIPS (SPECIAL)
CURB REMOVAL AND REPLACEMENT
SHOULDER REMOVAL (SPECIAL)
RAILROAD PROTECTIVE LIABILITY INSURANCE (BDE)
Section (124,125)RS-3 & (125 BR-1)BR ii
RAILROAD PROTECTIVE LIABILITY/RIGHT OF ENTRY TO ILLINOIS RAILWAY PROPERTY
DOT/AAR NO. 065 075 E
TEMPORARY PAVEMENT
COORDINATION WITH ADJACENT CONTRACTS
TEMPORARY SUPPORT SYSTEM
SHOULDER STABILIZATION AT GUARDRAIL
HOT MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH
ISLAND PAVEMENT REMOVAL
CLEANING DRAINAGE SYSTEM
CLEANING PAVED DITCH
MAINTENANCE (CORPS OF ENGINEERS NWP # 3)
404 PERMIT
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES
MEMBRANE WATERPROOFING SYSTEM FOR BURIED STRUCTURES
BAR SPLICERS, HEADED REINFORCEMENT
AUTOMATED FLAGGER ASSISTANCE DEVICES (BDE)
BITUMINOUS MATERIALS COST ADJUSTMENTS (BDE)
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)
COMPENSABLE DELAY COSTS (BDE)
CONCRETE BARRIER (BDE)
CONSTRUCTION AIR QUALITY – DIESEL RETROFIT (BDE)
DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)
ENGINEER’S FIELD OFFICE (BDE)
EROSION CONTROL BLANKET (BDE)
FUEL COST ADJUSTMENT (BDE)
GUARDRAIL (BDE)
HOT-MIX ASPHALT (BDE)
HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)
PAVEMENT MARKING (BDE)
PAVEMENT PATCHING (BDE)
PERFORMANCE GRADED ASPHALT BINDER (BDE)
PREFORMED PLASTIC PAVEMENT MARKING (BDE)
RAISED REFLECTIVE PAVEMENT MARKERS (BDE)
Section (124,125)RS-3 & (125 BR-1)BR iii
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)
SEEDING (BDE)
SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)
SIGN PANELS AND APPURTENANCES (BDE)
SINUSOIDAL RUMBLE STRIPS (BDE)
SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)
STEEL COST ADJUSTMENT (BDE)
SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)
SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)
SUBMISSION OF BIDDERS LIST INFORMATION (BDE)
SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)
SURFACE TESTING OF PAVEMENTS – IRI (BDE)
SURVEYING SERVICES (BDE)
TEMPORARY CONCRETE BARRIER (BDE)
TRAINING SPECIAL PROVISIONS (BDE)
IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION 106
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
WEEKLY DBE TRUCKING REPORTS (BDE)
WOOD SIGN SUPPORT (BDE)
WORK ZONE TRAFFIC CONTROL DEVICES (BDE)
WORK ZONE WIDTH RESTRICTION (BDE)
WORKING DAYS (BDE)
PROJECT LABOR AGREEMENT
SWPPP
Section (124,125)RS-3 & (125 BR-1)BR
STATE OF ILLINOIS
SPECIAL PROVISIONS
The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of FAP Route 607 (US 52), Project STP-HSIP-BR-CHU8(388), Section (124,125)RS- 3 & (125 BR-1)BR, LaSalle County, Contract No. 66N24 and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
LOCATION OF PROJECT
This project is located on US Route 52 from IL 23 to IL 71 including a bridge replacement at Mission Creek, 0.4 mile west of IL 71 in LaSalle County, Illinois. The gross length of the project is 8.66 miles, and net length of the project is 8.47 miles.
DESCRIPTION OF PROJECT
The project includes milling and resurfacing US Route 52, construction of 4’ paved shoulder, 2’ aggregate shoulder, tree removal, cleaning of existing paved ditches and replacing culverts at multiple locations. Additional work includes removing the existing one span reinforced concrete slab bridge (Ex SN 050-0059) under US Route 52 and replacing it with a 12’x12’ double barrel reinforced concrete box culvert (PR SN 050-2061) with a drop box at 2’-2.5’ drop at the upstream end, and ancillary work necessary to complete the project as shown on the plans and as described herein.
Section (124,125)RS-3 & (125 BR-1)BR
STATUS OF UTILITIES TO BE ADJUSTED
(Effective January 1, 2007; Revised January 24, 2011)
Name & Address of Utility
Type
Location
Estimated Date Relocation Complete
Ameren Illinois 340 Raccuglia Dr.
P.O. Box 1428 LaSalle, IL 61301
Electric Ameren has a sub transmission electric power line which runs along the north side of US 52.
At station 443+55 they have a pole which conflicts with a proposed field entrance. They also have a pole located at 440+54 and 39.52’ RT that is close to the proposed NW corner of the new wingwall. They plan to relocate these two power poles to avoid the wingwall and entrance.
Conflicts with entrance and new wing walls.
Ameren Permit No.
AT&T (Distribution) 1000 Commerce Drive Oak Brook, IL 60523
AT&T #HG2109R
Communications AT&T has aerial cable attached to the power poles along the north right of way. They also have buried fiber optic cable along north ROW.
They may be in conflict near the proposed bridge at 440+80.
Relocation is very likely from station 440+00 to 442+00.
Commercial Broadband Solutions 228 Waterfall Road Elkhart, IN 46516
(Acquired by Surf)
Communications No response.
No conflicts are anticipated.
Enbridge 222 Indianapolis Blvd, Ste 100 Schererville, IN 46375
Pipeline The two Enbridge pipelines are located
2.8 miles west of this project.
Section (124,125)RS-3 & (125 BR-1)BR
Frontier Communications 112 W. Elm St.
Sycamore, IL 60178
Cable Frontier has buried cable from the NW corner of IL 71 and US 52 which extends along the north ROW of US 52 for approximately 1.16 mile to CR 3.
The cable goes aerial over the box culvert located near station 440+80 (they have two poles here).
At CR 3 their facilities go north and south. It then extends along the south ROW heading west. Their drawing ends so we do not know how far it extends in that direction.
It appears that the small pole near the box culvert on the north side of US 52 will be in conflict.
LaSalle Co. Hwy. Dept.
1400 N 27th Road Ottawa IL 61350
Public Works LaSalle County is clear of this project.
No conflicts.
Mediacom 4507 49th Ave.
Moline, IL 61265
Fiber cable Mediacom has underground fiber which crosses US 52 on the west side of the railroad tracks in Serena. They appear to be on the RR
ROW.
Metro comm 8 S. Washington St
P.O. BOX 555
Sullivan, IL 61951
Communications Metro Communications never responded.
No conflicts are anticipated.
Nicor 1844 Ferry Road Naperville, IL 60563
Gas Preliminary red line shows 4” running on the northside of US 52 and a 2” line crossing at Sta 438+40 and runs on the West side of Pleasant Ln
Section (124,125)RS-3 & (125 BR-1)BR
ONEOK
(DT Midstream) 22096 West Highway 73 Clinton, OK 73601
10” Gas Their pipeline (PL
105) crosses IL 23 six hundred and seventy feet south of US 52.
It is not within the project limits.
GPS: 41.483429, -
88815186
NW 30-35N-4E
Stratus 416 N Main St, Suite 601 Peoria, IL 61612
Fiber No response. No conflicts
The above represents the best information of the Department and is only included for the convenience of the bidder. The applicable provisions of Section 102 and Articles 105.07, 107.20, 107.37, 107.38, 107.39, 107.40, and 108.02 of the Standard Specifications for Road and Bridge Construction shall apply.
The estimated utility relocation dates should be part of the progress schedule submitted by the Contractor.
** Above utility relocation information reflected as of June 19, 2026. Utility relocations are anticipated to be complete by approximately April 1, 2027?. Per SB 699 (90 day utility relocation law), once the proposed right of way is clear to award the project, a notice will be sent to the utility companies instructing them to have their facilities relocated within 90 days.
WETLAND AREAS
(Effective April 3, 1997; Revised April 22, 2010)
Description: According to Federal Executive Order 11990, dated May 24, 1977, and Articles
107.01 and 107.23 of the Standard Specifications, the Contractor shall protect the wetland areas on or adjacent to this project.
This work shall consist of constructing, maintaining, removing, and disposing of a temporary fence, perimeter erosion barrier, and signs as shown on the plans and as described herein.
Materials: Temporary fence shall be a minimum of 4 ft. (1.2 m) in height and shall be a high visibility orange snow fence. Fence stakes shall meet the requirements of Article 1081.15(b) of the Standard Specifications.
Perimeter erosion barrier shall meet the requirements of Section 280 of the Standard Specifications.
Signs shall meet the requirements of Article 720.02 of the Standard Specifications and shall be 9” x 12” (225 mm x 300 mm) and shall read “Federally Protected Wetlands: KEEP OUT.” Sign supports shall meet the requirements of Section 1093 of the Standard Specifications.
Section (124,125)RS-3 & (125 BR-1)BR
Construction Requirements: The Contractor shall install fence at all wetland areas as shown on the plans. The Contractor shall also install a minimum of two signs at each wetland location. Signs shall not be spaced greater than 300’ (100 m) apart.
The Contractor shall remove the temporary fence at the completion of the project.
Method of Measurement: The temporary fence will be measured for payment in place in feet (meters) along the top of the fence. The signs, sign supports, and fence stakes will not be measured for payment.
Perimeter erosion barrier will be measured for payment according to Article 280.07 of the Standard Specifications.
Basis of Payment: The temporary fence will be paid for at the contract unit price per foot (meter) for TEMPORARY FENCE, which price shall include the cost of the snow fence, fence stakes, signs, and sign supports.
Perimeter erosion barrier will be paid for according to Article 280.08 of the Standard Specifications.
FURNISHED EXCAVATION (SPECIAL)
(Effective July 1, 1990; Revised October 11, 2024)
This work shall consist of excavating, hauling, and placing suitable materials obtained from locations approved by the Engineer from outside the limits of the right of way.
The final surface of all embankment areas shall be seeded. The top 4 in. of the seeded areas shall be vegetation sustaining soil subject to the approval of the Engineer. The cost of shaping the slopes and providing vegetation sustaining soil will not be paid for separately but shall be included in the cost of FURNISHED EXCAVATION (SPECIAL).
Method of Measurement. Furnished excavation will be measured per cubic yard and shall be measured by truck volume methods at the point of unloading. The Engineer and the Contractor shall agree upon the volume of each truck before hauling begins.
Basis of Payment. This work will be paid for at the contract unit price per cubic yard for
FURNISHED EXCAVATION (SPECIAL).
EXPLORATION TRENCH, SPECIAL
(Revised January 1, 2007)
This work shall consist of constructing a trench for the purpose of verifying clearances and locations of existing utilities and storm sewers. The exploration trench shall be constructed at the locations directed by the Engineer.
The depth of the trench shall be variable. The width of the trench shall be sufficient to allow proper investigation of the entire trench.
After the trench has been inspected by the Engineer. The excavated material shall be used to backfill the trench in a manner satisfactory to the Engineer. Any excess materials shall be disposed of according to Article 202.03 of the Standard Specifications.
Section (124,125)RS-3 & (125 BR-1)BR
This work will be paid for at the contract unit price per foot (meter) for EXPLORATION TRENCH, SPECIAL.
ROCK FILL
(Effective January 1, 2010; Revised April 1, 2014)
Description. This work shall consist of the furnishing and placement of rock fill where unstable and/or unsuitable materials have been removed below the plan bedding grade of proposed cast-in-place and/or precast concrete box culverts. This work shall be done as shown on the plans and as directed by the Engineer.
Materials. Materials shall meet the following requirements of the Standard Specifications:
Item Article/Section
(a) Coarse Aggregate………………………………………...1004
(b) Rock fill…………………………………………….……
(c) Geotextile Fabric………………………………………….1080.02
The gradation of rock fill shall be selected based on the following table:
Total Rock Fill Layer Thickness Rock Fill Gradation Less than
3 feet (0.9 meter) CS 01 or CS 02 (Note 1)
3 feet (0.9 meter) or Greater
Primary Crusher Run or Shot Rock (Note 2)
Note 1. CS 01 and CS 02 shall be crushed stone, crushed slag, crushed gravel, or crushed concrete and shall consist of sound durable particles reasonably free of deleterious materials.
Note 2. Primary Crusher Run and Shot Rock shall not exceed 18 inches (450mm).
COARSE AGGREGATE SUBGRADE GRADATIONS
Grad No. Sieve Size and Percent Passing 8” 6” 4” 2” #4
CS 01 100 97 ± 3 90 ± 10 45 ± 25 20 ± 20
CS 02 100 80 ± 10 25 ± 15
COARSE AGGREGATE SUBGRADE GRADATIONS
Grad No. Sieve Size and Percent Passing 200 mm 150 mm 100 mm 50 mm 4.75 mm
CS 01 100 97 ± 3 90 ± 10 45 ± 25 20 ± 20
CS 02 100 80 ± 10 25 ± 15
If gradation CS 02 is used, geotextile fabric shall be used as a separation layer between the soil and the aggregate.
Section (124,125)RS-3 & (125 BR-1)BR
Construction Requirements. Rock fill shall be placed following the excavation of unstable and/or unsuitable material. The rock fill shall be seated to the satisfaction of the Engineer. The top surface of the rock fill shall consist of 3 inches (75 mm) of aggregate gradations CA 07 or CA 11.
Geotextile fabric, if required, shall be installed according to the applicable portions of Section 210 of the Standard Specifications.
Method of Measurement. Rock fill will be measured for payment in cubic yards (cubic meters).
Geotextile fabric used with gradation CS 01 will be measured for payment according to Article
210.05 of the Standard Specifications. Geotextile fabric used with gradation CS 02 will not be measured for payment.
Basis of Payment. Rock fill will be paid for at the contract unit price per cubic yard (cubic meter) for ROCK FILL.
Geotextile fabric will be paid for according to Article 210.06 of the Standard Specifications.
Box culverts, removal and disposal of unstable and unsuitable materials, porous granular bedding material, and the excavation required for bedding will be paid for according to Section 540 of the Standard Specifications.
AGGREGATE SURFACE COURSE, TYPE B
(Effective January 1, 2007)
Add the following to Article 402.07 of the Standard Specifications:
The top layer shall be given a final rolling with a roller meeting the requirements of Article 1101.01.
SURFACE COURSE PAVING SEQUENCE
(Effective July 1, 1990; Revised January 1, 2007)
The HMA surface course shall be placed in a sequence that will minimize the time the centerline edge is exposed to traffic. When at the end of a day's operations the exposed centerline edge is greater than 1000 ft. (300 m), the contractor will be required to pave in the adjacent lane on the following work day.
CROSSING STRUCTURES WITH MATERIAL TRANSFER DEVICE
(Effective May 23, 2001; Revised January 1, 2025)
The Bureau of Bridges and Structures has analyzed the existing structures within the specified construction zone. Based on this analysis, an emptied Material Transfer Device with the identified maximum gross weight restrictions shown for each structure, will be allowed to cross the following structures:
050-0058
If the same Material Transfer Device is used throughout the entire project, it shall be limited to an empty gross weight based on the smallest weight identified in the list above.
Section (124,125)RS-3 & (125 BR-1)BR
AGGREGATE SHOULDERS TYPE B
(Effective July 1, 1990; Revised July 31, 2020)
The aggregate shoulder shall be constructed according to Section 481 of the Standard Specifications. The shoulder shall be constructed in two lifts. The first lift shall be placed and compacted flush with the top of the adjacent HMA shoulder or binder. Placement of the HMA surface course will not be allowed until the first lift of aggregate shoulder is constructed.
TACK COAT
(Effective December 10, 2025)
Replace the application rate table in Article 406.05 (c)(1) of the Standard Specifications with the following:
Type of Surface to be Tacked Residual Asphalt Rate lb/sq ft Concrete, Existing HMA, and Milled HMA .05 New HMA and Brick .05
STORM SEWER OR CULVERT TO BE FILLED
(Effective June 13, 1997; Revised January 1, 2007)
Description: This work shall consist of cleaning and then filling storm sewer or culvert pipes to be abandoned.
Materials. The material to fill the pipes shall be Controlled Low Strength Material (CLSM) meeting the requirements of Section 1019 of the Standard Specifications.
Construction Requirements: The inside of the pipe shall be cleaned of all unsuitable material and debris before placing the CLSM. The pipe shall be completely filled. The method used for filling the pipe and containing the CLSM at the pipe ends shall be at the Contractor’s option.
The weather and temperature placement requirements of Section 593 of the Standard Specifications shall apply.
Method of Measurement. The volume for payment of CLSM shall be the measured volume in cubic yards (cubic meters) of the culvert to be filled. Cleaning the culvert will not be measured for payment.
Basis of Payment. This work will be paid for at the contract unit price per cubic yard (cubic meter) for CONTROLLED LOW-STRENGTH MATERIAL.
FILLING EXISTING STORM SEWERS OR CULVERTS
(Effective June 13, 1997; Revised July 9, 2025)
Description. This work shall consist of cleaning and filling storm sewer or culvert pipes to be abandoned.
Section (124,125)RS-3 & (125 BR-1)BR
Materials. The material to fill the pipes shall be according to the following.
Item Article / Section
(a) Controlled Low Strength Material (CLSM) (Note 1) …………….1019
(b) Grout …………………………………………………………………1024.01
(c) Cellular Concrete ……………………………………………………1029
Note 1. CLSM shall not be used for filling pipes with a length exceeding 20 ft.
Construction Requirements. The inside of the pipe shall be completely cleaned prior to filling the pipe. The Contractor shall determine the method of containing material used to fill the pipe at the open ends of the pipe.
When pipes with a length exceeding 40 ft are to be filled, access holes shall be provided every 40 ft to verify the pipe is being filled completely.
When CLSM is used, the requirements of the first paragraph of Article 593.03 shall apply.
Method of Measurement. This work will be measured for payment in cubic yards in place based on the volume of the pipe to be filled.
Basis of Payment. This work will be paid for at the contract unit price per cubic yard for FILLING
EXISTING STORM SEWERS OR FILLING EXISTING CULVERTS.
SHOULDER STABILIZATION AT GUARDRAIL
(Effective February 7, 2013)
Replace the last sentence of the second, third and fourth paragraphs of Article 630.06 with the following:
The void around each post shall be backfilled with earth or aggregate and capped with 3 inches (75 mm) of grout.
FURNISH PERMANENT SURVEY MARKERS
(Effective May 28, 2025)
Description. Survey markers shall be in general accordance with Highway Standard 667101;
except they shall be bronze instead of aluminum and shall have a diameter of 3.5 inches. They shall be stamped “SECTION CORNER” as a circular row of text inside the words “ILLINOIS DEPARTMENT OF TRANSPORTATION” and shall have a “+” stamped in the center instead of a dimpled triangle.
The Engineer will supply a Professional Land Surveyor and equipment for installation of the survey markers. The Contractor shall supply traffic control for installation of the survey markers by the Engineer.
Basis of Payment. This work will be paid for at the contract unit price per each for FURNISH
PERMANENT SURVEY MARKERS.
Section (124,125)RS-3 & (125 BR-1)BR
WIDTH RESTRICTION SIGN
(Effective April 24, 2017)
Width restriction signs, as shown in Standard 701901 – Traffic Control Devices, shall be used on this project. They shall be placed as follows:
MAX WIDTH MILES AHEAD SIGN LOCATION
11’-6” 1/4 Mile Ahead US Rt 52- East of work area facing WB direction 11’-6” 1/4 Mile Ahead US Rt 52- West of work area facing EB direction 11’-6” 1/2 Mile Ahead US Rt 52- East of work area facing WB direction 11’-6” 1 Mile Ahead US Rt 52- East of work area facing WB direction 11’-6” 4 Mile Ahead US Rt 52- West of work area facing EB direction 11’-6” 8 Mile Ahead US Rt 52- West of work area facing EB direction 11’-6” 9 Mile Ahead US Rt 52- West of work area facing EB direction 11’-6” + M5-1L-21x15 1/2 Mile Ahead IL 71- South of US Rt 52 facing NB direction 11’-6” + M5-1L-21x15 1 Mile Ahead IL 71- South of US Rt 52 facing NB direction 11’-6” + M5-1R-21x15 1/2 Mile Ahead IL 71- North of US Rt 52 facing SB direction 11’-6” + M5-1R-21x15 1 Mile Ahead IL 71- North of US Rt 52 facing SB direction 11’-6” + M5-1R-21x15 8 1/2 Mile Ahead IL 23- North of US Rt 52 facing SB direction 11’-6” + M5-1L-21x15 8 1/2 Mile Ahead IL 23- South of US Rt 52 facing NB direction
The cost of supplying, installing, maintaining, and removing width restriction signs shall be included in the cost of the traffic control and protection pay items.
TEMPORARY BRIDGE TRAFFIC SIGNALS (STANDARD 701316 OR 701321)
(Effective July 1, 1999; Revised January 1, 2022)
Description. This work shall be done according to Sections 701 and 862 of the Standard Specifications, Standard 701316 or 701321, and modified as described herein.
Microwave detectors shall be installed instead of the induction loop detectors shown on Standard 701316 or Standard 701321.
Materials. The controller shall provide actuated operation for the number of phases required with full menu driven format for ease of data entry. The controller shall show all the timers operating simultaneously.
A standard uninterruptable power supply (UPS) shall be required for the traffic signal cabinet with controller.
All signal heads shall be LED’s.
The microwave detector shall be a motion and presence sensor that provides vehicle detection that is not affected by temperature, humidity, color, or background variations and shall meet the approval of the Engineer. It shall be capable of tracking multiple moving and stationary vehicles.
It shall have an adjustable hold time on stationary objects from 0 to 15 minutes. The microwave detector shall be designed to detect moving vehicles at a maximum range of 300 feet (90 m). The microwave detector shall have an ability to accurately discriminate between vehicles arriving and
Section (124,125)RS-3 & (125 BR-1)BR departing. The Contractor shall supply the type of lead-in cable recommended by the manufacturer for his microwave detector.
Construction Requirements. The Contractor shall mount a metal arm to each near right signal post (an arm for a light fixture would be acceptable). The arm shall be reasonably stationary to prevent false calls on the microwave sensor. The final mounting height of the microwave detector shall be 17.5 feet (5.33 m) plus or minus 0.5 feet (0.15 m). The microwave detector shall be horizontally positioned somewhere between the center of the driving lane and 2 feet (600 mm) from the edge of the driving lane. The microwave detector shall be aimed to a 6 feet (1.8 m) height at the stop bar at the center of the driving lane.
The microwave detector voltage shall be the highest allowed by the manufacturer.
At the time of inspection and programming of the controller, one of the Contractor's employees or representatives at the inspection shall be capable of doing all cabinet wiring or controller programming necessary to accomplish the type of operation desired or to modify the cabinet for any unusual conditions.
The UPS shall be installed adjacent to the controller cabinet and mounted according to Article 701.18(b)(2)d.
No vehicle, trailer, or other large object may be parked between the microwave detector and 500 feet (150 m) in the direction of approaching traffic.
Where there is an intersecting street or driveway within the limits of the stage construction stop bars, the following specifications shall also apply:
Material. Each signal for an intersecting street or driveway shall consist of one red ball section, one yellow ball section, one green left arrow section, and one green right arrow section with backplate.
Construction Requirements. Signal heads shall be located as shown on the plans.
Detection for the side road and driveway shall consist of a microwave detector. The microwave detector shall be mounted 14 to 18 feet (4.30 m to 5.50 m) high on the near right post for the side road and driveway.
Each approach of a side road and driveway shall be a separate phase.
When the green proceeds from one side of the bridge to the other, the controller shall time a programmable long all red period. Approaches on the same side of the bridge shall be able to cycle between each other without incurring the long all red time but a shorter programmable time.
The Contractor shall supply and install two (one near right; one far left) NO TURN ON RED signs for each sideroad and driveway approach.
The Contractor shall supply and install two (one near right; one far left) STOP HERE ON RED signs for each sideroad and driveway approach to be placed adjacent to the stop bar.
The Contractor shall be required to remove and store or securely cover any conflicting existing signs.
Section (124,125)RS-3 & (125 BR-1)BR
The Contractor shall supply and erect a SIGNAL AHEAD sign for each side road.
The Contractor shall be required to restore all original traffic control when the temporary bridge signals are removed.
Basis of Payment. This work, including the UPS, will be included in the contract unit price each for TEMPORARY BRIDGE TRAFFIC SIGNALS.
TRAFFIC CONTROL IN THE VICINTY OF A RAILROAD GRADE CROSSING
(Effective August 4, 2017)
In accordance with Chapter 8 of the Manual on Uniform Traffic Control Devices (MUTCD):
When a grade crossing exists either within or in the vicinity of a temporary traffic control zone, lane restrictions, flagging (see Chapter 6E of the MUTCD), or other operations shall not be performed in a manner that would cause highway vehicles to stop on the railroad or LRT tracks, unless a flagger or uniformed law enforcement officer is provided at the grade crossing to minimize the possibility of highway vehicles stopping on the tracks, even if automatic warning devices are in place.
See Figure 6H-46 and associated notes of the MUTCD regarding the temporary traffic control in the vicinity of the railroad grade crossing.
Basis of Payment. The cost of the additional flagger and any additional signs, if necessary, will not be paid for separately, but shall be included in the cost of associated traffic control items.
TEMPORARY ACCESS (FIELD ENTRANCE)
Revise Article 402.10 of the Standard Specifications to read:
402.10 For Temporary Access. The contractor shall construct and maintain aggregate surface course for temporary access to field entrances according to Article 402.07 and as directed by the Engineer.
The aggregate surface course shall be constructed to the dimensions and grades specified below, except as modified by the plans or as directed by the Engineer. The use of existing onsite aggregate is permitted.
CONSTRUCTION REQUIREMENTS
For Temporary Access (Field Entrance). The minimum width shall be 24 feet. The minimum compacted aggregate thickness shall be 6 in. The maximum grade shall be eight (8%) percent, except as required to match the existing grade.
Section (124,125)RS-3 & (125 BR-1)BR
As shown in the plans the temporary culvert pipe shall be constructed underneath the Temporary Access (Field Entrance) at Sta. 448+00. Temporary access shall include a minimum 18 in. culvert pipe with the end sections installed underneath the entrance to maintain drainage continuity. The ditches at the upstream and downstream ends of culverts shall be regraded and kept free of debris to maintain drainage continuity.
Maintaining the temporary access shall include relocating and/or regrading the aggregate surface course whenever construction operations disturb or remove the temporary access. If relocation of the temporary access to a different location is required, the Contractor shall construct the temporary access in accordance with this special provision.
The same type and gradation of aggregate material used to construct temporary access shall be used for its maintenance. The Contractor shall maintain roadway access to the temporary entrance at all times. Maintaining roadway access will not be measured for payment.
When temporary access is no longer required, the aggregate material and the 18 in. culvert pipe with its end section shall be removed and disposed of in accordance with Article 202.03 of the Standard Specifications.
Method of Measurement. Aggregate surface course for temporary access will be measured for payment as EACH for every entrance, roadway and walkway constructed for the purpose of temporary access.
Basis of Payment. Aggregate surface course for temporary access will be paid for at the contract unit price per Each for TEMPORARY ACCESS (FIELD ENTRANCE). Temporary access will be paid only once per contract.
Culvert and end sections installed or maintained underneath the driveway will not be paid for separately but shall be included in the cost of TEMPORARY ACCESS (FIELD ENTRANCE).
TEMPORARY INFORMATION SIGNING
(Effective September 24, 2013; Revised July 31, 2020)
Description. This work shall consist of the furnishing, installation, maintenance, and removal of temporary information signs.
Materials. Materials shall be according to the applicable portions of Section 701 of the Standard Specifications and as shown on the plans.
Construction Requirements. The temporary information signs shall be in place at least one week prior to the beginning of construction activities that impact traffic flow and shall remain in place until the completion of the project. If all lanes are open for an extended period of time during the project, the Contractor shall cover the signs until lane closures resume. If the project is shut down for the winter, the signs shall read “Road Work Resumes Spring XXXX.”
Signs shall be installed according to the requirements of Section 701.
Method of Measurement. This work will be measured for payment in square feet in place. The auxiliary sign panel will not be measured for payment.
Section (124,125)RS-3 & (125 BR-1)BR
Basis of Payment. This work will be paid for at the contract unit price per square foot for
TEMPORARY INFORMATION SIGNING.
TRAFFIC CONTROL AND PROTECTION STANDARD 701321 (SPECIAL)
This work shall conform to Section 701 of the Standard Specifications, Standard 701321 ,and as modified herein.
US Route 52 intersects Pleasant Lane on the south and private entrance on the north, making the intersection to operate as a temporary 4-legged intersection during stage 1 and stage 2. To maintain the safe flow of the traffic the NB and SB leg will flow concurrently however, EB and WB US Route 52 shall have split flow.
Field entrance located on the north side of US 52 and east of Mission Creek Culvert shall be relocated temporary to sta. sta. 451+58 during Prestage. Coordinate with the property owner prior to closing the existing field entrance location.
The temporary pavement markings shall be placed for the inside and outside edge lines in the construction zone. The layout of the temporary concrete barrier, impact attenuators, temporary pavement markings, and is shown in the stage 1 and stage 2 construction details in the plans.
This work will be paid for at the contract unit price per EACH for TRAFFIC CONTROL AND PROTECTION, STANDARD 701321 (SPECIAL). The temporary concrete barrier will be measured and paid for according to Section 704. The temporary impact attenuators will be paid for separately.
LINEAR DELINEATOR PANELS, 6 INCH
(Effective April 28, 2017)
Description. Linear delineator panels shall be placed on each parapet wall 6 inches down from the top. Panels shall also be placed on structures containing bridge rail as directed by the Engineer. These panels shall be either white or yellow, matching the color of the adjacent pavement marking edge line. They should be spaced at a minimum of 80 foot centers horizontally, with the first and last panel located within 20 feet of the parapet wall ends. Structures that contain existing linear delineator panels shall have any damaged or missing panels removed and replaced as directed by the Engineer.
When attaching linear delineator panels to concrete, the panels shall be secured using an anchor bolt method approved by the Engineer that will anchor the entire panel securely but also facilitate removal of the panel by maintenance operations if damaged or weathered in the future. The Contractor shall also sufficiently cover the back side of the linear delineator panel, to the satisfaction of the Engineer, with an adhesive caulking system to aid in the permanent adhesion and alignment of the panels prior to drilling through the pre-drilled linear delineation system holes.
When securing the linear delineator panels to metal bridge rail or any other metal surfaces, the Contractor may use a linear delineation system panel and bracket mounting method approved by the Engineer. The Contractor may also use an adhesive caulking method to sufficiently cover the back side of the linear delineator panel to the satisfaction of the Engineer. The Contractor shall
Section (124,125)RS-3 & (125 BR-1)BR be responsible for testing the durability and strength of the method used to ensure permanent adhesion of the linear delineator panel to the bridge rail. Drilling into metal bridge rail or other metal surfaces to secure the linear delineator panels will not be permitted.
When removing and replacing missing or damaged linear delineator panels, the existing linear delineator panels and any adhesive used to secure the existing linear delineator panels shall be removed to the satisfaction of the Engineer. All cost and labor associated with the removal and cleanup of the existing linear delineator panels shall be included in the unit price of the pay item
LINEAR DELINEATOR PANELS, 6 INCH.
Each panel shall not be less than 34 inches in length and 6.00 inches in width. The panels shall be constructed of cube-corner retroreflective material in standard highway colors permanently bonded to an aluminum substrate. The lateral edges of each panel shall be hemmed. The panel assembly shall have a repeating raised lateral ridge every 2.25 inches. Each ridge shall be 0.34 inches high with a 45° profile and a 0.28 inch radius top.
Daytime color requirements shall be determined from measurement of the retroreflective sheeting applied to aluminum test panels. Daytime color shall be measured instrumentally using a spectrophotometer employing annular 45/0 (or equivalent 0/45) illuminating and viewing geometry. Measurements shall be made in accordance with ASTM E1164 for ordinary colors or ASTM E2153 for fluorescent colors. Chromaticity coordinates shall be calculated for CIE Illuminant D65 and the CIE 1931 (2o) Standard Colorimetric Observer in accordance with ASTM E308 for ordinary colors or ASTM E2152 for fluorescent colors.
Chromaticity Limits for White x y x y x y x y Limit Y (%) Min Max
White 0.303 0.287 0.368 0.353 0.340 0.380 0.274 0.316 40 -
Chromaticity Limits for Fluorescent Yellow
Total
Luminance x Y x Y x y x y Factor YT (%) Min
Fluor.
Yellow 0.521 0.424 0.557 0.442 0.479 0.520 0.454 0.491 40
Inspection of Linear Delineator Panels. The linear delineator panels installed under this contract will be inspected following installation, but no later than December 30th. In addition, they will be inspected following a winter performance period that extends 180 days from December 30th.
Within 15 calendar days after the end of the winter performance period, a final performance inspection will be made. If this inspection discloses any work which is not visibly intact and serviceable, the Contractor shall, within 30 calendar days, completely repair or replace such work to the satisfaction of the Engineer.
Section (124,125)RS-3 & (125 BR-1)BR
Measured in its entirety, the work shall be 97 percent intact.
Upon completion of the final performance inspection, or after satisfactory completion of any necessary corrections, the Engineer shall notify the Contractor in writing of the date of such final performance inspection and release him/her from further performance responsibility.
This delay in performance inspection and performance acceptance of the linear delineator panels shall not delay acceptance of the entire project and final payment due if the contractor requires and receives from the subcontractor a third party “performance” bond naming the Department as obligee in the full amount of all linear delineator panels listed in the contract, multiplied by the contract unit price. The bond shall be executed prior to acceptance and final payment of the non-linear delineator panel items and shall be in full force and effect until final performance inspection and performance acceptance of the linear delineator panels. Execution of the third party bond shall be the option of the Contractor.
Basis of Payment. This work, including all materials, equipment, and labor necessary to complete the work as described will be paid for at the contract unit price per each for LINEAR DELINEATOR
PANELS, 6 INCH.
PAINT PAVEMENT MARKING – TWO APPLICATIONS
(Effective November 1, 2011)
Description. This work consists of furnishing and applying paint pavement marking according to Section 780 of the Standard Specifications except that the paint shall be applied in two applications.
Materials. Each application shall meet the requirements of Article 780.06 of the Standard Specifications.
General. The first application shall be allowed to dry prior to placing the second application over the first. The Contractor shall not place one thick application in lieu of two regular applications.
Basis of Payment. Each application will be measured and paid for.
LINEAR DELINEATOR PANELS, 4 INCH
(Effective January 1, 2022)
Description. This work shall consist of furnishing and installing linear delineators on steel plate beam guardrail at locations shown on plan details.
General. Linear delineator panels shall be attached to steel plate beam guardrail as shown on plan details and as directed by the Engineer. These panels shall be either white or yellow, matching the color of the adjacent pavement marking edge line. They should be spaced at a minimum of 80-foot centers horizontally, with a minimum of two linear delineator per guardrail run.
Linear delineators shall not be placed on guardrail terminal sections. Linear delineator spacing through horizontal curves where the normal speed limit is reduced, the spacing of the linear delineators shall be reduced to 40-foot centers. Existing steel plate beam guardrail that contain
Section (124,125)RS-3 & (125 BR-1)BR existing linear delineator panels shall have any damaged or missing panels removed and replaced as directed by the Engineer.
When securing the linear delineator panels to steel plate beam guardrail, the Contractor may use a linear delineation system panel and bracket mounting method approved by the Engineer. Linear delineation system panel and bracket including installation methods shall be according to the manufacture’s recommendations.
The Contractor shall be responsible for testing the durability and strength of the method used to ensure permanent adhesion of the linear delineator panel to the bridge rail. Drilling into metal bridge rail or other metal surfaces to secure the linear delineator panels will not be permitted.
When removing and replacing missing or damaged linear delineator panels, the existing linear delineator panels and any adhesive or bracket when used to secure the existing linear delineator panels shall be removed to the satisfaction of the Engineer. All cost and labor associated with the removal and cleanup of the existing linear delineator panels shall not be paid for separately but shall be included in the cost of this work.
Each panel shall not be less than 34 inches in length and 4.00 inches in width. The panels shall be constructed of cube-corner retroreflective material in standard highway colors permanently bonded to an aluminum substrate. The lateral edges of each panel shall be hemmed. The panel assembly shall have a repeating raised lateral ridge every 2.25 inches. Each ridge shall be 0.34 inches high with a 45° profile and a 0.28-inch radius top.
Daytime color requirements shall be determined from measurement of the retroreflective sheeting applied to aluminum test panels. Daytime color shall be measured instrumentally using a spectrophotometer employing annular 45/0 (or equivalent 0/45) illuminating and viewing geometry. Measurements shall be made in accordance with ASTM E1164 for ordinary colors or ASTM E2153 for fluorescent colors. Chromaticity coordinates shall be calculated for CIE
Chromaticity Limits for Fluorescent Yellow
Luminance x Y x Y x y x y Factor YT (%) Min
Fluor.
Yellow 0.521 0.424 0.557 0.442 0.479 0.520 0.454 0.491 40
Section (124,125)RS-3 & (125 BR-1)BR
Inspection of Linear Delineator Panels. The linear delineator panels installed under this contract will be inspected following installation. In addition, they will be inspected following a winter performance period that extends 180 days from December 30th.
Within 15 calendar days after the end of the winter performance period, a final performance inspection will be made. If this inspection discloses any work which is not visibly intact and serviceable, the Contractor shall, within 30 calendar days, completely repair or replace such work to the satisfaction of the Engineer.
Measured in its entirety, the work shall be 97 percent intact.
Upon completion of the final performance inspection, or after satisfactory completion of any necessary corrections, the Engineer shall notify the Contractor in writing of the date of such final performance inspection and release him/her from further performance responsibility.
This delay in performance inspection and performance acceptance of the linear delineator panels shall not delay acceptance of the entire project and final payment due if the contractor requires and receives from the subcontractor a third party “performance” bond naming the Department as obligee in the full amount of all linear delineator panels listed in the contract, multiplied by the contract unit price. The bond shall be executed prior to acceptance and final payment of the non-linear delineator panel items and shall be in full force and effect until final performance inspection and performance acceptance of the linear delineator panels. Execution of the third-party bond shall be the option of the Contractor.
Basis of Payment. This work, including all materials, equipment, and labor necessary to complete the work as described will be paid for at the contract unit price per each for LINEAR DELINEATOR
PANELS, 4 INCH.
MODIFIED URETHANE PAVEMENT MARKING – TWO APPLICATIONS
(Effective March 30, 2023)
Description. This work consists of furnishing and applying modified urethane pavement marking according to Section 780 of the Standard Specifications except that the modified urethane shall be applied in two applications.
Materials. Each application shall meet the requirements of Article 780.12 of the Standard Specifications.
General. The first application shall be…