II.H-3. Sol Attachment 1 - Performance Level Milestones.docx

DOCX document 20 KB Posted

Attached to
TR-233D Transducers
Solicitation number
N6660422Q0137
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION N6660422Q0137

PERFORMANCE BASED MILESTONES

THE BELOW MILESTONES APPLY TO CLIN 0001

TR-233D First Article Milestones
Severable or Cumulative
Percent CLIN 0001 Price
Milestone Completion Verification Method
1. Preliminary Configuration Review (PCR) Completion
Severable
20%
PCR is conducted IAW the SOW.

TPOC receives, reviews, and accepts contractor-submitted PCR presentation package and supporting technical documentation.

2. Final Configuration Review (FCR) Completion
Cumulative - based on Milestone 1
20%
FCR is conducted IAW the SOW.

TPOC receives, reviews, and accepts contractor-submitted FCR presentation package and supporting technical documentation.

3. First Article material received
Cumulative - based on Milestone 1 and 2
20%
Contractor provides internal report to TPOC which provides proof of purchased material receipt (receipt report and date received).
4. Delivery of First Article Transducers
Cumulative - based on Milestone 1, 2, and 3
20%
Contractor delivers First Article Transducers and the Government receives them.
TOTAL
80%

THE BELOW MILESTONES APPLY TO CLIN 0002

TR-233D Production Level Milestones
Severable or Cumulative
Percent CLIN 0002 Price
Milestone Completion Verification Method
1. Drawings and Production Documentation released.
Severable
15%
DCMA representative receives, reviews, and accepts contractor-submitted Product Baseline Drawing listing and supporting technical documentation. Contractor provides internal report to DCMA representative which provides proof of release of production documentation.
2. Material Ordered
Cumulative - based on Milestone 1
15%
Contractor provides internal report to DCMA representative which provides proof that the material was ordered (PO number and date issued).
3. 90% of material line items received.
Cumulative - based on Milestone 1 and 2
20%
Contractor provides internal report to DCMA representative which provides proof that the material was received against the purchase orders (PO) which were placed.
TOTAL
50%

File details come from the government source that posted it. Updated .