SEE ADDENDUM
(No Collect Calls)
N6660422Q0137 06-Jun-2022
b. TELEPHONE NUMBER
401-832-4502
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 05 Jul 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N666049. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
GINA M PROSKE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVAL UNDERSEA WARFARE CENTER
GINA M PROSKE, CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-C9
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: (401) 832-4502 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
334511
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF91
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N6660422Q0137
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 3 Each First Article
FFP
First Article TR-233 Transducer in accordance with the Statement of Work in Section C.
All offerors must include pricing for First Article units.
The contractor shall include the following “Mark For” information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract/order:
Mark For:
Receiving Officer, Naval Station Newport 47 Chandler Street Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 5845
NET AMT
0002 Each TR-233D Transducer
FFP
TR-233D Transducer Production Years in accordance with the Statement of Work in Section C.
OFFEROR TO FILL IN SECTION B PRICING TABLES
The contractor shall include the following “Mark For” information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract/order:
Mark For:
NAVSUP FLCN, Cheatham Annex 1 C Street, Williamsburg, VA 23185-8792
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0003 Each TR-233D Assemblies and Acoustic Windows
FFP
TR-233D Electrical Receptacle Assemblies or TR-233D Acoustic Windows in accordance with the Statement of Work in Section C.
OFFEROR TO FILL IN SECTION B PRICING TABLES
The contractor shall include the following “Mark For” information clearly marked on all packages (or items themselves if they are not packaged) delivered under this contract/order:
Mark For:
Receiving Officer, Naval Station Newport 47 Chandler Street Newport, RI 02841-1716 NUWC Division, Newport
POC: DETAIL PROVIDED AT AWARD
Contract #: DETAIL PROVIDED AT AWARD
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0004 1 Lot Data Deliverables
FFP
DATA in accordance with Exhibit "A," Contract Data Requirements List (CDRL), DD Form 1423. Specific, applicable CDRLs will be attached to individual delivery orders, as required.
NOT SEPARATELY PRICED
PRICING TABLES
(a) This is an Indefinite Delivery/Indefinite Quantity contract with Firm Fixed Price Provisions. The contractor shall deliver items according to the orders issued hereunder, using the prices in the individual Contract Line Items
(CLIN).
(b) Offerors shall fill in the CLINs by stating the unit price for each item by quantity and CLIN.
(c) The Tables below contain pricing according to each Ordering Period and Quantity Range. The Government will determine each quantity to be purchased by issuing a delivery order. Multiple items may be purchased multiple times via individual orders.
OFFERORS SHALL COMPLETE THE BELOW TABLES
Production CLIN 0002 TR-233D Transducers Stepladder Quantity Range 4 – 10 Each 11 – 25 Each 26 – 50 Each Year 1 Unit Pricing Year 2 Unit Pricing Year 3 Unit Pricing Year 4 Unit Pricing Year 5 Unit Pricing
Production CLIN 0003 TR-233D Electrical Receptacle Assemblies Stepladder Quantity Range 11 – 20 Each Year 1 Unit Pricing Year 2 Unit Pricing Year 3 Unit Pricing
Year 4 Unit Pricing Year 5 Unit Pricing
Production CLIN 0003 TR-233D Acoustic Windows Stepladder Quantity Range 11 – 20 Each Year 1 Unit Pricing Year 2 Unit Pricing Year 3 Unit Pricing Year 4 Unit Pricing Year 5 Unit Pricing
Section C - Descriptions and Specifications
STATEMENT OF WORK
TR-233D TRANSDUCERS PRODUCTION
1.0 BACKGROUND
The Fleet Sensors & Cables Engineering Branch (Code 1535) of the Sensors and Arrays Division (Code 153) of the Naval Undersea Warfare Center Division, Newport serves as the Navy's Technical Design Agent (TDA), and In- Service Engineering Agent (ISEA), and assists with Acquisition Engineering Agent (AEA) activities for surface ship and submarine transducers, hydrophones, and sensor assemblies (collectively referred to as transducers). Code 1535 maintains the Navy's transducer inventory in large part by establishing contract vehicles to procure transducers that are delivered both to the stock system to support emergent fleet needs and to new construction shipyards for initial outfitting.
1.1 Places of Performance
All work will be performed at the contractor’s facility.
1.2 Authorized Users
This contract is applicable to the Sensors and SONAR Department, Code 15, of the Naval Undersea Warfare Center Division, Newport, Newport RI.
1.3 Sponsors
PMS 401 Submarine Acoustic Systems PMS 450 Virginia Class Program Office PMS 397 Columbia Class Program Office FMS Foreign Military Sales Office Type Commanders Naval Shipyards IWS5B Undersea Systems PMS326 International Fleet Support
1.4 Types of Funding
Operation & Maintenance, Navy (O&MN) Other Procurement, Navy (OPN) Research, Development, Test & Evaluation, Navy (RDT&EN) Shipbuilding and Conversion, Navy (SCN) National Sea-Based Deterrence Fund (NSBDF) Foreign Military Sales (FMS)
2.0 SCOPE
This SOW reflects a build-to-performance specification approach. The contractor shall design, document, manufacture, test, package, and deliver TR-233D First Article and Production Transducers that meet the performance requirements of the TR-233D Transducer Critical Item Performance Specification (CIPS). The spare parts, Window, Acoustic (Part No. 8482201-1) and Receptacle Assembly, Electrical (Part No. 8482196-1), will be build-to-print items in accordance with the respective drawings included in the Reference Baseline drawing package.
3.0 APPLICABLE DOCUMENTS
The contractor shall perform the tasking required in Section 4.0 in accordance with the below Applicable Documents (AD).
3.1 NAVSEA Drawing 53711-7285537H Critical Item Performance Specification (CIPS) for the TR-233D Transducer
3.2 NUWC Drawing 50225-00267RD Configuration Management Engineering Drawing Requirements
3.3 NUWC Drawing 50225-00266MN Configuration Management Engineering Change Document Manual
4.0 TECHNICAL REQUIREMENTS
The contractor shall design, document, manufacture, test, package, and deliver First Article and Production TR- 233D Transducers that meet the requirements of AD 3.1. The contractor shall deliver the following build-to-print spare parts, Window, Acoustic (Part No. 8482201-1) and Receptacle Assembly, Electrical (Part No. 8482196-1).
Table 1 defines the requirements for this procurement.
The following terms apply throughout this requirements section:
Configuration Item The configuration item (CI) for this contract is the TR-233D Transducer.
Functional Baseline The Functional Baseline is established at contract award and is defined by AD 3.1.
First Article Baseline The First Article Baseline is established prior to First Article testing and consists of the engineering drawings and applicable revisions that define the CI.
Product Baseline The Product Baseline is established upon completion of the Functional and Physical
Configuration Audits (FCA and PCA) and consists of the engineering drawings and applicable revisions that define the CI.
TABLE 1. REQUIREMENTS
Task Task Description Contract Timeframe Deliverable
4.1 GENERAL
4.1.1 Contract Kick-Off Meeting
The contractor shall conduct a Contract Kick-Off meeting at its facility. The contractor shall prepare the kick-off meeting agenda. The contractor shall present its planned configuration and present a Program Objectives and Milestone Schedule (POAMS) for the First Article and Production phases to include:
- tasks and milestones
- requirements review
- data submittals
- schedule
The contractor shall prepare conference minutes and shall submit the POAMS with the conference minutes.
Within 45 days after contract award
CDRL A001
DI-ADMN-81249C
(Meeting Agenda)
CDRL A002
DI-ADMN-81250C
(Meeting Minutes)
4.1.2 Progress Reports
The contractor shall prepare and submit Progress Reports using Government Furnished Information (GFI) item 5.1.
Monthly over the life of the contract
CDRL A003
DI-MGMT-81867
(Production Report)
4.1.3 Failure Reports
The contractor shall have a system to handle all material it determines to be non-conforming. This system shall also handle all transducers that fail a First Article or Production Acceptance test. The contractor shall submit Failure Summary and Analysis reports that identify the nature of the failure, and identify remedial and corrective action for preventing future occurrences.
System to handle all non-conforming material shall be in effect for the life of the contract
CDRL A004
DI-SESS-80255B
(Failure Summary and Analysis Report)
4.2 TR-233D Transducer FIRST ARTICLE PHASE
4.2.1 TR-233D Transducer First Article Hardware
The contractor shall design, document, inspect, fabricate, test, package and deliver First Article TR-233D Transducers. The contractor shall sequentially serialize the First Article transducers starting with FA001. The contractor shall fabricate the First Article TR-233D Transducers to meet the performance requirements of AD 3.1.
Prior to fabrication, the contractor shall perform 100% inspection of all incoming parts for First Article transducers.
The contractor shall record variables data for all dimensions specified on the drawings for all first article parts. The contractor shall have this information available at the First Article Physical Configuration Audit (see section 4.2.4).
Defined in Delivery Orders (DO)
Applicable Deliverables identified in subsequent sections.
4.2.2 TR-233D Transducer Preliminary Configuration Review (PCR) The contractor shall conduct a PCR via Video Teleconference (VTC), conference call, or other remotely enabled delivery system. The purpose of the PCR is to evaluate the technical adequacy of the contractor's preliminary build configuration in meeting the Functional Baseline requirements. Prior to the PCR, the contractor shall submit Engineering Change Notices (ECNs) which document changes to the Reference Baseline (GFI 5.2) and which reflect its build configuration at the PCR.
The contractor shall develop the drawing changes via ECNs and any drawing changes shall conform to NAVSEA requirements in accordance with AD 3.2.
Within 90 days after First Article transducers delivery order award.
CDRL A005
NUWC DRAWING
50225-00266MN
(Engineering Change Notice
4.2.3 TR-233D Transducer Final Configuration Review (FCR)
The contractor shall conduct an FCR at its facility. The purpose of the FCR is to evaluate the technical adequacy of the contractor's final build configuration in meeting the Functional Baseline requirements. At the FCR, the contractor shall be prepared to review:
‐ the drawing package (GFI 5.2 and all ECNs previously submitted for PCR and FCR) ‐ manufacturing flow chart which identifies the manufacturing build steps, in-process steps and inspection points and final production acceptance tests
‐ POAMS
‐ Any risks and mitigation plans if applicable
Prior to the FCR, the contractor shall submit ECNs which document any additional changes to the Reference Baseline (GFI 5.2) since the PCR and which reflect the final build configuration. The contractor shall develop the drawing changes via ECNs so that any drawing changes conform to NAVSEA requirements in accordance with AD 3.2.
The contractor shall provide to the Government ECNs which document any additional changes subsequent to the FCR.
The contractor shall resolve all technical discrepancies noted at the PCR and FCR and subsequent to the FCR, prior to delivering First Article transducers.
After PCR and prior to delivering First Article transducers
CDRL A005
NUWC DRAWING
50225-00266MN
(Engineering Change Notice)
4.2.4 TR-233D Transducer First Article Physical Configuration Audit (FA-PCA) The contractor shall conduct an FA-PCA. The purpose is for the Government to validate that the components that comprise the First Article transducers match the technical documentation and that all key processes are properly documented. The contractor shall have copies of the reference drawing package and all ECNs from the PCR, and the FCR available for audit team members at the FA-PCA. The contractor shall have all First Article piece parts available and shall provide the incoming inspection variables data for all the parts. The contractor shall deliver any drawings that have changed since the FCR (which includes changes resulting from discrepancies identified at the PCR and FCR).
Prior to First Article transducer fabrication
CDRL A005
NUWC DRAWING
50225-00266MN
(Engineering Change Notice)
4.2.5 TR-233D Transducer First Article Test Procedures
The contractor shall develop First Article test procedures for contractor-performed tests and inspections in accordance with AD 3.1. The contractor shall include applicable acceptance and rejection criteria for First Article tests and inspections to ensure that the CI meets the requirements.
Prior to First Article testing
CDRL A006
DI-NDTI-80603A (Test Procedure - First Article Acceptance Test Procedure)
4.2.6 TR-233D Transducer First Article Baseline Configuration
The contractor shall document changes to the CI that occur between FA-PCA and First Article (FA) testing and include that information in the First Article Baseline Report.
The contractor shall submit ECNs which document any changes to the First Article Baseline since the FA-PCA and which reflect the final build configuration. The contractor shall develop the drawing changes via ECNs so that any drawing changes conform to NAVSEA requirements in accordance with
AD 3.2.
Upon successful FA- PCA and prior to commencing First
Article testing
CDRL A005
NUWC DRAWING
50225-00266MN
Engineering Change Notice)
CDRL A007
DI-MISC-80508B
(Technical Report – Study/Services - First Article Baseline Report)
4.2.7 TR-233D Transducer First Article Test and Inspection
The contractor shall verify that the First Article transducers meet the CIPS requirements by performing First Article tests and inspections using the test procedures developed in SOW section 4.2.5. In the event that any First Article unit fails to meet CIPS requirements, the contractor shall be responsible for redesign, rework, retest, and First Article unit replacement.
The contractor shall submit a First Article Test Report detailing the contractor-performed First Article tests and corresponding test results for each First Article transducer identified by serial number.
Test Report upon completion of contractor-performed First Article testing
CDRL A004
DI-SESS-80255B
(Failure Summary and Analysis Report)
CDRL A008
DI-NDTI-80809B
(Test/Inspection Report
– Contractor First Article Testing)
4.2.8 TR-233D Transducer Functional Configuration Audit (FCA) and Physical Configuration Audit (PCA) The contractor shall conduct a concurrent FCA and PCA at its facility. The FCA is to verify that the CI is compliant with the CIPS; the PCA is to verify that the First Article CI conforms fully to the First Article Baseline. The contractor shall have the following documentation available for auditing at the
FCA/PCA:
‐ The complete drawing package (The complete drawing package includes the reference baseline drawings and all changes resulting from ECNs and discrepancies identified at the PCR, FCR, FA PCA and during FA testing phase.)
‐ Inspection/Test Flow Chart with inspection/test criteria and procedures
‐ Manufacturing methods and process sheets ‐ Incoming inspection control procedures ‐ Production acceptance test procedures ‐ Test method sheets and standards selection procedures describing operation and calibration of test equipment ‐ Non-standard parts and parts requiring source control ‐ Material Review Board (MRB) and Failure Review Board
(FRB) process and procedures
Upon Government First Article testing completion
CDRL A001
DI-ADMN-81249C
(Meeting Agenda)
CDRL A002
DI-ADMN-81250C
(Meeting Minutes)
CDRL A005
NUWC DRAWING
50225-00266MN
(Engineering Change Notice)
4.3 TR-233D TRANSDUCER PRODUCTION PHASE
4.3.1 TR-233D Transducer Production Hardware
The contractor shall manufacture, test, package and deliver Production transducers to meet the performance requirements of AD 3.1 and the Product Baseline provided as GFI 5.3. The contractor shall serialize the production transducers in accordance with GFI item 5.4.
Defined in Delivery Order
Applicable Deliverables identified in subsequent sections.
4.3.2 TR-233D Transducer Production Test and Inspection
The contractor shall develop Production Acceptance Test Procedures in accordance with applicable document 3.1. The contractor shall perform final acceptance testing of all production hardware items prior to delivery to the Government.
Through acceptance testing, the contractor shall ensure that all TR-233D Transducers meet the requirements of AD 3.1 and the Product Baseline provided as GFI 5.3.
During active production
CDRL A009
DI-NDTI-80603A (Test Procedure - Production Acceptance Test Procedures)
4.3.3 TR-233D Transducer Production Acceptance Test and Inspection Reports The contractor shall record actual test results for each production unit by serial number, including date of acceptance by the Government. In the Production Acceptance and Inspection Reports, the contractor shall identify units that failed Production Acceptance Tests or were otherwise accepted only after rework and retest and shall explain the circumstances and corrective actions taken where rework occurred.
During active production
CDRL A004
DI-SESS-80255B
(Failure Summary and Analysis Report)
CDRL A00A
DI-NDTI-80809B
(Test/Inspection Report
- Production Acceptance Test and Inspection Data)
4.3.4 TR-233D Transducer Certification Card
The contractor shall complete a Certification Card for each TR-
233D Transducer to be delivered in accordance with AD 3.1.
Certification cards submitted to the Government shall be in electronic format.
During active production
CDRL A00B
NAVSEA DWG. No.
53711-7285537H Figure 7 (Transducer/ Hydrophone Certification Card)
4.3.5 Production Program Reviews (PPRs)
The contractor shall conduct Production Program Reviews annually. The purpose of the PPRs is to review programmatic and technical issues.
During active production
CDRL A001
DI-ADMN-81249C
(Meeting Agenda)
CDRL A002
DI-ADMN-81250C
(Meeting Minutes)
4.3.6 Engineering Changes
The contractor shall prepare Engineering Change Documents in accordance with AD 3.3.
As required during production
CDRL A00C
DI-SESS-80639E,
(Engineering Change Proposal (ECP))
CDRL A00D
DI-SESS-80640E
(Request for Variance
(RFV))
NOTE: In the case of First Article waiver, task (and sub-tasks) 4.2 TR-233D TRANSDUCER FIRST ARTICLE PHASE will not be applicable and will be marked ‘RESERVED’ in the resulting contract award.
5.0 GOVERNMENT FURNISHED INFORMATION (GFI)
5.1 DD Form 375 Production Progress Report Form
5.2 NAVSEA TR-233D Drawing
Package (Reference Baseline)
Government will provide the contractor TR-233D engineering drawing package including all native files at contract award. This forms the Reference Baseline. This package will include the drawings for the build-to-print spare parts: Window, Acoustic (DWG # 8482201) and Receptacle Assembly, Electrical (DWG # 8482196).
5.3 NAVSEA TR-233D Drawing
Package (Product Baseline)
Contractor will assume configuration management upon receipt of Reference Baseline drawing package. The Government will review all ECNs from the PCR, FCR and through FA testing. Contractor will incorporate all approved ECNs and update drawings in accordance with AD
3.2 and 3.3.. Updated drawings will be tracked with numbered revisions through FA testing. Upon successful completion of FCA/PCA the updated baseline drawing package will be released via ECP and the Government will assume configuration management control, any drawing with a numbered revision will be advanced by a letter revision. The updated drawing package forms the Product Baseline.
5.4 Production transducer serial
numbers
Block of serial numbers that the contractor shall use to serialize TR-233D transducers.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-209-H001 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (OCT 2018)
(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.
(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.
(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Contractor Testing" (FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.
C-209-H002 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (OCT 2018)
(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.
The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "First Article Approval--Government Testing" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements.
(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.
(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Government Testing", the First Article shall not be delivered as part of the production quantity.
C-209-H003 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
(Offeror to fill in contract number(s), as applicable. See Section M)
(End of Text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.
No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL- DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).
(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto.
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (JAN 2019)
(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.
(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.
The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract.
If required, the Contractor’s Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow non-compliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 and MIL-HDBK-61A of 7 Feb 2001 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.
(d) Non-Engineering Change Proposals (NECPs) – An NECP shall be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.
(e) Deviations/Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.
The explanation of "Need for Deviation/Waiver" in the DD1694 shall provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance and the effect on ship equipment or system operation.
(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, and Deviations/Waivers, the Contractor shall receive equitable adjustment under the following circumstances:
(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.
(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.
(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.
(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.
(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be subject to equitable adjustment.
(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "Disputes" (FAR 52.233-1).
(g) Any cost reduction proposal submitted pursuant to the clause entitled "Value Engineering" (FAR 52.248-1) shall be submitted as a Value Engineering Change Proposal (VECP). The Contractor shall follow the VECP preparation requirements of FAR 52.248-1(c) and any additional guidance provided by the Contracting Officer.
C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I
(NAVSEA) (MAY 2019)
(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.
(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:
(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or
(ii) add items of data or information to the attachment identified in Section J; or
(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.
(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:
(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or
(2) By submitting a request to the
Department of Defense Single Stock Point (DoDSSP)
Building 4, Section D
700 Robbins Avenue Philadelphia, Pennsylvania 19111-5094 Telephone (215) 697-6396 Facsimile (215) 697-9398.
Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.
C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)
The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.
Section D - Packaging and Marking
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)
All reports delivered by the Contractor to the Government under this contract shall…