II_1 - Request for Quotation (RFQ) Number 2023H2-26-Q-00023 MEMPHIS LANDSCAPING.pdf
PDF 1002 KB Posted
- Attached to
- Memphis Landscaping and Grounds Maintenance Services Federal contract opportunity
- Solicitation number
- 2023H2-26-Q-00023
About this file
This is a Request for Quotation (RFQ) for landscaping and grounds maintenance services at the Memphis Internal Revenue Service Center (MIRSC) located at 5333 Getwell Road, Memphis, Tennessee. The solicitation number is 2023H2-26-Q-00023 under NAICS code 561730, with quotations due by Friday, May 8, 2026 at 1:00 PM EDT. This is an 8(a) competitive set-aside contract.
The contractor shall provide comprehensive grounds maintenance services for a 109-acre campus consisting of lawns, trees, ponds, natural areas, roads, and sidewalks. Services are structured in two categories: Basic Services provided at a firm-fixed monthly price, and Additional Services ordered separately via fixed-price work orders based on established hourly rates. Basic Services include grass cutting (maintained at uniform height not exceeding 4 inches), edging, plant and shrub pruning, cultivation and mulching, fertilization, weed eradication, ditch/curb cleaning, fence line maintenance, raking, irrigation coordination, grassing up to 10 square feet, and pest/disease control. Tree pruning must be supervised by a certified arborist. Additional Services include tree removal with stump extraction, grassing beyond 10 square feet, erosion control, underbrush removal, severe shrub pruning, and tree/shrub replacement. All work must comply with OSHA, EPA, and state environmental regulations; utilize bio-based products where possible; and maintain a Quality Control Plan approved by the Contracting Officer's Representative. The contractor must provide a Project Manager with minimum three years' experience and supervisory personnel with grounds maintenance experience. Work shall be performed Monday through Friday, 6:00 AM to 7:00 PM (except herbiciding and mulching in courtyards on Saturdays, 12:30 PM to 7:00 PM). All contractor personnel requiring facility access must undergo security screening and complete mandatory IRS security awareness training. Quotations must remain valid for 90 days and include a 20-page technical volume addressing technical approach, Quality Control Plan, and two past performance profiles, plus a separate price quote in Excel format for the base period and option periods.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Request for Proposal Amendment 1 - Memphis Landscaping Signed.pdf | ||
| IRS campus Memphis Landscaping.pdf | ||
| Wage Determination 2015-4673 Rev. 31 2.pdf | ||
| II_1 - Request for Quotation (RFQ) Number 2023H2-26-Q-00023 MEMPHIS LANDSCAPING 2.pdf | ||
| Line Item Schedule Memphis Ground 2.pdf | ||
| Quality Assurance Surveillance Plan.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Internal Revenue Service (IRS) Memphis Internal Revenue Service Center (MIRSC) Landscaping and Grounds Maintenance Services
Request for Proposal (RFP) Number 2023H2-26-Q-00023
NAICS: 561730
Quotation Due Date: Friday May 8, 2026, 1:00 PM EDT
Table of Contents
PART I: PERFORMANCE WORK STATEMENT
PART II: CONTRACT CLAUSES AND PROVISIONS
PART III: SOLICITATION INSTRUCTIONS
PART IV: TECHNICAL ACCEPTANCE CRITERIA AND BASIS FOR THE AWARD
Attachment 1: QASP
PART I: PWS
DESCRIPTION/SPECIFICATION/PERFORMANCE WORK STATEMENT
C.1. GENERAL INFORMATION/BACKGROUND
The intent of this contract is to obtain grounds maintenance service for the Memphis Internal Revenue Service/Enterprise Computer Center Campus (MIRSC), located at 5333 Getwell Road, Memphis, TN 38118, GSA Building Number TN0005ZZ (“Campus”), by means of a performance-based contract. The facility consists of grounds totaling 109 acres of lawn, trees, ponds (wet and dry), natural areas, roads, and sidewalks. As a performance-based contract, the requirements are stated in terms of desired results with associated quality standards. The contract shall consist of two major functional areas: Basic Services (“Basic Services”) and Additional Services (“Additional Services”), collectively (“Services”) as specified herein.
C.1.1 SCOPE OF WORK/OBJECTIVES
The Contractor shall provide all supervision, administrative and technical support, equipment, labor, management, materials, personnel, subcontractors, supplies, tools, transportation (except as expressly set forth as Government furnished), and shall plan, schedule, coordinate and assure effective completion of all services described herein.
C.1.2 OVERVIEW OF BASIC SERVICES
Basic Services (as defined in Paragraph C.2) shall be provided at a firm-fixed monthly price. The Contractor shall determine how often the work is to be performed, how much labor is needed to perform the tasks, what methods will be used to complete the job and which supplies, materials and equipment are needed to perform Basic Services. The Contractor shall submit to the Contracting Officer Representative (COR) a schedule of monthly grounds maintenance services for planning purposes within a timeframe mutually agreed upon (but no later than 30 days) after contract award and within five workdays prior to start of each option period (if exercised).
C.1.3 OVERVIEW OF ADDITIONAL SERVICES
Additional Services shall be ordered separately on an as-needed basis in accordance with contract terms. Additional Services will be authorized by fixed-price work order(s) based on fixed hourly rates established in the contract. Additional Services requirements shall be ordered through issuance of work orders by the Authorized Ordering Official.
There is no guarantee that any Additional Services will be ordered. Additional Services work orders shall be requested by the Government in writing and shall not be diverted from daily productivity.
A ceiling price for each of the contract line items for Additional Services will be established at time of contract award based on estimated amounts. The ceiling price for Additional Services for the base period will be funded at the time of contract award [subject to the availability of funds and thru modification(s) if necessary] and the ceiling price for Additional Services for option periods will be funded at the time the option is exercised [subject to the availability of funds and thru modification(s) if necessary]. The ceiling price shall not be exceeded without the Contracting Officer's (CO) prior approval.
To exceed the ceiling price without prior approval will be at the Contractor’s own risk.
Adjustments (up or down) to the ceiling price for any contract line item for Additional Services shall be performed by the Contracting Officer through modification(s).
C.1.4. SCHEDULE AND NORMAL WORKING HOURS
The Contractor shall schedule and arrange work to cause the least interference with the normal occurrence of Government business and mission. Grounds maintenance (with the exception of herbiciding and mulching of the courtyards and unless otherwise notified), shall be performed between the hours of 6:00 AM to 7:00 PM, Monday through Friday except Federal holidays and other days the building is closed. Herbiciding and mulching in the courtyards shall be performed on Saturdays between the hours of 12:30 PM to 7:00 PM. However, Contractor’s personnel shall enter building gate no later than 3:30 PM on Saturdays. Work delayed by causes beyond the Contractor’s control and performed beyond normal duty hours and/or non-scheduled days shall be performed at no additional cost to the Government. Examples: Federal holidays, inclement weather, extended power outages.
The Enterprise Computer Center (ECC), which includes the MIRSC, operates 24 hours 7 days a week, and the Government’s primary operation at the MIRSC is conducted on day and night shifts, encompassing the hours of 6:00 AM to 3:30 AM Monday through Friday, except Federal holidays or any other day(s) designated by Federal Statute, Executive Order, or Presidential Proclamation. The ten Federal holidays at the Campus include New Year’s Day, Martin Luther King Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.
C.1.5. PROJECT MANAGEMENT/SUPERVISION
The Contractor shall provide sufficient onsite project management and supervision as is essential to carry out all the terms and conditions of this contract. The Supervisor(s) shall be present onsite at all times when work is being performed and be available to interact with either the CO or the COR as needed. The Project Manager(s) shall oversee the overall operation under the contract and be available to interact with either the CO or the COR as needed. Five workdays after contract start, the Contractor shall provide to the COR the name, location, and telephone number of the Project Manager(s) and Supervisor(s) specifically designated for this contract. The Project Manager(s) and Supervisor(s) must be fluent in reading, writing, and speaking English.
Internal Revenue Service (IRS) employees are not authorized to exercise either direct or indirect supervision over the Contractor’s employees.
C.1.6 OTHER INFORMATION
a. Additional information for performance of Services shall be provided upon request.
The data provided in the documents above are estimates only, and the Contractor is responsible for verifying information.
b. The Contractor shall utilize methods (such as latest innovation, technology, etc.) that are most efficient in performing the grounds maintenance for the facility.
c. The Contractor is responsible for providing personal protective equipment to employees and ensuring that the appropriate attire is worn.
d. The Contractor shall provide and implement an effective Quality Control Plan (QCP), conforming to quality requirements.
e. The Contractor shall reduce the environmental impacts of work performed under this contract by using, to the maximum extent, environmentally sound practices, processes, and products.
f. The Contractor shall keep the COR informed of current status of the work being performed, through provided work schedules and any other pertinent information.
g. The Contractor shall give an updated listing of Ground Maintenance Inventory.
h. The Contractor shall give an updated listing of types of trees, shrubs, and flowers.
C.2 DEFINITIONS / ACRONYMS / ABBREVIATIONS
As used throughout this contract the following terms shall have the meaning set forth below and specified as applicable to this contract.
C.2.1 GENERAL DEFINITIONS
1) Acceptable Quality Level (AQL) - The standard at which service is considered satisfactory as agreed upon by the Contractor and Government.
2) Additional Services – Services intended to satisfy the Government’s short term, non-recurring need on an as-needed basis at fixed priced work orders based on established fixed hourly rate.
3) Alternate Dispute Resolution (ADR) – Process for the resolution of disputes regarding work determined to be unsatisfactory.
4) Basic Services – Those recurring services provided at the facility as defined in this contract.
5) Contractor - The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall ensure that subcontractors comply with the provisions of this contract.
6) Contract Work Inspector (CWI) - An individual designated to be responsible for conducting inspections of the building and grounds to determine Contractor’s compliance with terms and conditions of the contract.
7) Contracting Officer (CO) - One with the authority to enter into, administer, and/or terminate contracts and make related determinations.
8) Contracting Officer’s Representative (COR) – One who is designated and authorized in writing by the CO to be responsible for surveillance/monitoring of the Contractor’s performance.
9) Contractor Owned Property – All property owned or furnished by the Contractor.
10) Contractor Representative/Project Manager – An onsite foreman or superintendent assigned by the Contractor to manage the project.
11) Defective Service - A service output that does not meet the standard of performance associated with it.
12) Government Owned Property – All property owned by or leased to the Government or acquired by the Government under the terms of the contract. Government property includes both Government-furnished property and Contractor acquired property as defined in FAR 45.101.
13) Performance Requirements – Works to be performed by the Contractor.
14) Performance Requirements Summary (PRS) – An outline of contract requirements that identifies the key service outputs of the contract that will be inspected/surveilled by the Government, and related performance standards, method(s) of performance assessment and surveillance, and portion of required service to total contract value.
15) Performance Standard – The desired results, expressed by he
Government, expected from performance of contract services, to satisfy the requirement.
16) Quality Assurance (QA) – Those actions taken by the Government to assure services meet the acceptable quality level established in the contract.
17) Quality Assurance Surveillance Plan (QASP) – An organized written and “living” document outlining the Government’s methodology for monitoring and documenting Contractor performance.
18) Quality Control (QC) – Those actions taken by the Contractor to ensure
Contractor performance meets the requirements of the contract.
19) Response Time – The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the worksite, with appropriate tools, equipment, and materials, ready to perform the work required.
C.2.2 DEFINITIONS THAT APPLY TO GROUNDS MAINTENANCE
1) Debris – Includes, but not limited to, man-made items, i.e., paper, cans, and bottles; and biodegradable items, i.e., limbs and branches, mud, pine straw and pinecones, mulch, leaves, rocks, and similar items.
2) Diameter at Breast Height (DBH) – As measured, 4.5 feet above ground level.
3) Environmental Protection Agency (EPA) – The Federal agency delegated authority to enforce the Federal Insecticide, Fungicide and Rodenticide Act (FIFRA).
4) Grounds Maintenance – Represented by healthy, evenly cut green grass, neatly edged, free of weeds and debris, and an overall appearance of well-manicured grounds; beds maintained weed-free with healthy, correctly pruned, fertilized, mulched plants and healthy flowers; straight standing, healthy trees free of insects and disease.
5) Irrigation – Involves the artificial application of water to promote proper health, growth, color, and appearance of cultivated vegetation. RAINBIRD irrigation system is installed at the facility.
6) Parcel – A given area of land.
C.2.3 ACRONYMS
AQL - Acceptable Quality Level CLIN - Contract Line-Item Number
COR - Contracting Officer’s Representative EPA - Environmental Protection Agency FAR - Federal Acquisition Regulation GFP - Government Furnished Property SDS - Safety Data Sheet OSHA - Occupational Safety and Health Administration PRS - Performance Requirement Summary O&M - Operations and Maintenance QA - Quality Assurance QASP - Quality Assurance Surveillance Plan QC- Quality Control QCP - Quality Control Plan SF - Square Foot
C.3 GOVERNMENT FURNISHED PROPERTY (GFP) AND SER VICES
The Government shall provide the Contractor with the Government furnished items (in an “as-is" condition). The use of GFP for purposes other than official Government business in performance of work under this contract is prohibited.
C.4 CONTRACTOR FURNISHED ITEMS
Except for the property and services referenced in Paragraph C.3, the Contractor shall provide all facilities, equipment, materials, and services to perform the requirements of this contract. After work requirements have been accomplished each day, all contractor equipment used for Services shall be removed from the worksite.
C.5 QUALIFICATIONS OF PERSONNEL
Contractor shall have a fully trained staffed on the first day of contract performance and be prepared to maintain a fully trained staff throughout the life of the contract. All personnel shall be fluent in reading and speaking the English language.
C.5.1 QUALIFICATIONS OF PROJECT MANAGER(S)
The Project Manager(s) shall possess 1) a minimum of three years’ experience within the last six years managing facilities of similar magnitude and scope of the total requirement of the contract, and 2) a Certification of Training in this career field. Once approved to serve as Project Manager, the Project Manager shall not be changed without the written approval from COR. If designated Project Manager can no longer serve as Project Manager, a résumé of the proposed new Project Manager shall be submitted to the COR. COR shall review the résumé within ten business days of receipt of résumé and inform Contractor of approval or disapproval of Project Manager. If disapproved, COR shall identify rationale for disapproval. This process shall continue until a new Project Manager is approved.
C.5.2 QUALIFICATIONS OF SUPERVISORY EMPLOYEE(S)
The Contractor shall employ competent supervisory personnel capable of training employees on methods of accomplishing the work performance and quality standards in this contract. The Supervisor(s) shall have experience with performance based and quality control processes, procedures, supplies, and equipment. The Supervisor(s) shall, at a minimum, have completed a supervisory training course for this type of work and have prior grounds maintenance supervisory experience in similar size facilities.
The on-site supervisor(s) is required to be fully conversant in English. The COR shall be notified within two business days if there is a change in the supervisory personnel.
Résumé of the new supervisory personnel shall be submitted to the COR within five business days to be kept in COR’s contract file. Government reserves the right to approve/disapprove supervisory personnel.
C.5.3. QUALIFICATIONS OF OTHER CONTRACT PERSONNEL
The personnel employed by the Contractor shall be capable, trained and qualified in performing grounds maintenance type work. All employees must be fully conversant in English. Additionally, all personnel employed to perform Service shall undergo training of the IRS emergency procedures in the event of emergencies. The training shall be coordinated with the COR. Contractor shall submit an Emergency Procedures Plan to the COR ten (10) workdays after start of contract performance, and annually thereafter.
The plan shall include, at a minimum, how employees will respond to emergency procedures in case of emergency, how Contractor will communicate with employees in case of an emergency, and who the Government shall contact to inquire if all employees are accounted for. The plan shall be filed with the COR’s contract file.
C.6 ENVIRONMENTAL/SAFETY REQUIREMENTS
General Requirements The contractor, its employees and any subcontractors shall adhere to all Occupation Safety and Health Administration (OSHA), Environmental Protection Agency (EPA) and applicable state and local environmental, health and safety rules and regulations. The Memphis Service Center has established environmental, health and safety management requirements and procedures and requires all contractors to comply and participate with such plans and procedures.
The contractor shall notify the Government in writing of any changes necessary in supplies, procedures, or practices in order to comply fully with said rules, regulations or laws.
The IRS conducts unannounced Environmental Health and Safety (EHS) inspections throughout IRS workspaces, including operational areas. IRS maintains the right to stop any work where there is an immediate and serious threat to the safety and health of contractors or IRS employees or a serious threat to the environment. Inspection findings will be forwarded to the COR. If, during the contract, IRS personnel note any situations of non-compliance with federal, state, or local regulations, the contractor's environmental and safety program/plan or IRS EHS policies and requirements, IRS personnel will verbally bring them to the attention of the CO and/or COR and will immediately follow up in writing.
The abatement and any associated cost of violations shall be the responsibility of the contractor and/or the Government as determined by the CO with input from the COR and contractor.
Training Requirements The contractor shall submit a training plan that includes but is not limited to the following required OSHA training topics: Hazard Communication; Personal Protective Equipment to be used; Hazardous Energy Control (lockout/tag/out) for affected employees. Training records for all employees working on the contract shall be submitted to the COR within 30 days of the contract.
Safety Data Sheets (SDSs) The Contractor shall maintain a set of two binders of the SDSs for chemicals to be used on site, to include gasoline, lubricant oils, and pesticides. One binder will remain with the COR and the other with the facility’s senior safety officer. Materials or supplies shall not be used in performance under this contract or placed/stored on Government property until the applicable Safety Data Sheets (SDSs) have been submitted to the COR, for approval, and filed in the appropriate SDS binders.
Personnel Safety Safety for all personnel stationed at or visiting this facility is the primary concern of the Government. The contractor, Project Manager (PM), supervisors, employees and sub-contractors shall always, take the immediate necessary action(s) to protect all personnel from any spills of non-hazardous materials (water, food, beverages etc.), tripping hazards, water, snow, or any other task. The contractor’s employees shall take immediate actions to clean, treat, wipe up, rope off or otherwise take control of any situation that endangers the health or safety of the occupants of this facility. The contractor’s employees shall notify the COR, Custodial Work Inspector (CWI), the Building Manager, Security Guards or PM as quickly as possible that such a condition exists (any spill encountered that is not identifiable as non-hazardous must not be touched and immediately reported to the COR, Facility Safety Officer, and the Building Manager for instructions).
Personal Protective Equipment The contractor shall assess potential hazards associated with each type of tasks employees will be performing and provide all contractor personnel with the appropriate personal protective equipment (PPE) required by OSHA or any other state or local laws/regulations including, but not limited to hand, foot and eye protective equipment.
Use of Chemicals All chemicals brought on site to perform work including gasoline, oil, and pesticides.
Shall be removed at the end of the day. Nothing can be stored at the facility property. All waste produced by contract activities shall be removed and disposed of in accordance with federal, state, and local regulations.
Environmental and Air Emissions The contractor shall not cause any air emissions that would be subject to environmental permitting or control requirements. The contractor shall control emissions from activities on-site in accordance with the federal, state and local requirements.
The Contractor shall be responsible for all fines, fees, citations, etc., due to negligence that results in environmental or safety related issues.
Environmental/Safety Fines The contractor shall be responsible for all fines, fees, citations, etc., due to negligence that results in environmental or safety related issues.
The Contractor shall take every precaution to ensure that if available, only safe and environmentally preferable products are used. Preference shall be given to products that meet the following: United States Department of Agriculture (USDA) - designated bio-based products, Green Seal Certified Products, Comprehensive Procurement Guidelines (CPG), and/or applicable Executive Orders.
BIO-BASED PRODUCTS/SERVICES
The Government requires products used and performed on its facilities to be Bio-based products. These products shall be commercial or industrial products that are composed in whole, or in significant part, of biological products or renewable domestic agricultural materials or forestry materials.
BIOBASED PRODUCT REPORTING
The Contractor shall provide the required Biobased purchasing data using the United States Department of Agriculture (USDA) online reporting tool annually (Attachment 2) before October 30th. The reporting tool can be found at:
http://www.biopreferred.gov/FARReporting/FARReporting.xhtml. The list of Biobased products can be found at:
http://www.biopreferred.gov/ProductCategories.aspx The Contractor is responsible to keep current on additional Biobased products designated by the USDA and available for use in the performance of this Contract.
Additional information can be found at www.biopreferred.gov. The necessary reporting templates and step by step instructions are included in Attachment 1 and Attachment 2.
http://www.biopreferred.gov/FARReporting/FARReporting.xhtml http://www.biopreferred.gov/ProductCategories.aspx http://www.biopreferred.gov/
C.7 QUALITY CONTROL
The Contractor shall establish a comprehensive Quality Control Program as described below to assure the requirements of the contract are provided as specified.
C.7.1 QUALITY CONTROL PLAN (QCP)
The Contractor shall submit a copy of its Quality Control Plan (QCP) to the COR for review and approval within a time period mutually agreed upon (but no later than 30 days). The basic tenet of the plan is that the Contractor is responsible for quality control.
All methods, procedures, and forms shall support this concept. The Contractor may not begin work until its QCP has been approved by the COR. The QCP shall address/include, at a minimum, the following:
a. An inspection system that is tailored to the specific grounds covered under the terms of the contract, and which covers all services specified in the contract.
b. A system for identifying and correcting deficiencies in the quality of services before the level of performance becomes unacceptable and/or the Government inspectors point out the deficiencies.
c. A system to ensure that the Contractor’s employees are notified of deficiencies found in their areas of responsibility; that the noted deficiencies are corrected (if possible); and that these employees are counseled/retrained as necessary to ensure that deficiencies do not recur.
d. A system that provides for Government access to all Contractor documentation, reports, and files (to include any forms on which quality control inspections are documented) with respect to Contractor quality control inspections and any corrective actions taken.
e. How the Contractor’s corporate/home office will provide contract support, services and controls.
f. The identity of all personnel who will be performing QCP inspections by name, title, and type of inspection are authorized to perform. Note: The person designated to perform the work inspection shall not perform Quality Control Inspections.
The COR will return, within three (3) business days of receipt by the Government, the QCP to the Contractor approved or requiring revisions/corrections by the Contractor. If revisions/corrections are required, the Contractor shall resubmit its QCP within five (5) days of receipt from the COR with the requested revisions or corrections.
Revisions/corrections, if any, to the Contractor’s QCP during the life of the contract shall be made in these specified timeframes respectively. The Contractor shall not implement any change to its QCP prior to review and approval by the COR.
C.7.2 QUALITY CONTROL (QC) INSPECTIONS
In addition to the IRS’ inspections, the Contractor shall perform its own Quality Control Inspections by qualified personnel (i.e. personnel being sufficiently knowledgeable of all technical aspects covered under this contract which would allow identification/discovery of improperly performed services). The documentation must be signed and dated by the inspector at the time the inspection is completed. All completed inspection reports shall be available to the COR.
C.7.3 IRS/CONTRACTOR MEETINGS
The Contractor or Contractor Representative(s) and COR shall meet at least monthly, or as often as the COR determines to be necessary, to discuss contract performance, identify and resolve all problems, and keep lines of communication open. A mutual effort shall be made to resolve all problems identified during these meetings, e.g., effectiveness of quality control; corrective action plans; proposal submittals for extra services;
management of subcontractor(s) if applicable; problems impacting overall contract performance/service delivery, etc.
C.8 QUALITY ASSURANCE
The Government will assure quality services through its Quality Assurance Surveillance Plan (QASP). Government reserves the right to make adjustment to its QASP as deemed necessary and without concurrence from Contractor.
C.9 QUALITY REQUIREMENTS – BASIC SERVICES
All the area inside the perimeter fence and a distance of 10 feet outside the fence shall be covered by this contract. Services to be provided as Basic Services and defined standards for each of the processes involved are listed in Paragraph C.1.2. An inventory of grounds to be maintained shall be provided. Grounds Maintenance Inventory, and a listing of types of trees, plants and flowers to be planted and maintained shall be provided that list types of trees and flowers.
C.9.1 OBJECTIVES
Services shall be performed by the Contractor on a continuous cycle to maintain evenly cut grass, neatly edged, free of weeds and debris; weed-free beds of healthy, correctly pruned, fertilized, cultivated, mulched plants and flowers; straight standing, mulched, healthy trees free of insects and disease; and grounds free of leaves, pine cones, needles, straw, and other debris. Grounds shall reflect an overall well-manicured appearance, maintained in a manner that prolongs life and sustains a healthy appearance.
C.9.2 SERVICES INCLUDED
The Contractor shall maintain all plants, trees, shrubs, ground cover, and lawns in a manner that prolongs life and sustains a healthy appearance. The Contractor shall seek to prevent pollution by, among other things, minimizing runoff. The following services shall be included in Basic Services: Grass cutting; edging; plant and shrub pruning;
cultivation and mulching; fertilization; weed eradication; ditch/curb cleaning; fence line maintenance; raking; irrigation; grassing up to ten square feet; insects, pests diseases, and wildlife control and removal; and installation of “color”. Defined standards for each of the processes involved are as follows.
C.9.2.1 GRASS CUTTING
All grass areas shall remain at a uniform height not to exceed 4 inches. Grass cutting is to be accomplished free of scalping, rutting, bruising, and uneven and rough cutting. No grass trimmings shall be left in any of the beds or in the courtyards. Sidewalks shall be free of any resulting dirt and debris. Contractor shall ensure lawn mowers are powered off when traveling through building connections to courtyards/atriums.
Trimming operations (including with herbicides) shall be considered a part of grass cutting and shall be accomplished concurrently (same day) with grass cutting operation.
Grass cutting will not be considered complete until all trimming operations are accomplished. Trimming operations shall not damage trees and shrubs. Trees, shrubs, flowers, or areas of grass which are killed or damaged as a result of the Contractor’s work shall be replaced or repaired by the Contractor at no cost to the Government. Any branches that are growing outside the property boundaries shall be trimmed back so they do not hang over the fence line. Branches and/or vines shall not be permitted to grow through or be tangled in the fence wire.
C.9.2.2 EDGING
All sidewalks, driveways, street edges, curbs, and other paved areas shall be edged to maintain a clear zone immediately adjacent to the paved surface. Edged lines shall be neat and clean, providing a clear zone half inch wide by one inch deep, free of scalping, rutting, bruising, and uneven and rough cutting. Contractor shall be responsible for any damage done to the concrete during the edging process.
In conjunction with the performance of edging, all vegetation shall be removed from expansion joints and cracks in all paved surfaces, including sidewalks and parking lots in the parcel being edged.
C.9.2.3 PLANT AND SHRUB PRUNING
Prune or remove growth in front of windows, over entranceways or walks, around light poles, and in areas where vision is obstructed at street intersections. If an entire plant should die, Contractor shall remove the entire plant, including ground roots below ground level to a depth so as to avoid unnecessary soil excavation and ground disruption. If the hole is in a lawn area, the hole and any other surface damages caused by removal of the plant and/or shrub shall be grassed. If the hole is not in a lawn area, it shall be filled with topsoil and the surface prepared to match the surrounding surface.
Contractor shall notify the COR in writing no later than the next business day of the type and location of dead plant(s) removed. Replacement of dead plants [not caused as a result of the Contractor’s performance] will be accomplished as “Additional Services” as requested by the COR.
Shrubs, hedges, trees, and cultivated plants (excluding flowers) shall be pruned to:
A. Remove new growth to evenly form and balance the plant in order to shape it to its natural growth habits.
B. Remove dead, damaged or diseased wood; and C. Remove vines, tree sprouts, ground cover, or any other extraneous vegetative growth from under or on the plant.
C.9.2.3.1. Tree Pruning
All tree pruning shall be accomplished under the supervision of a certified tree worker or arborist (furnished by the Contractor) who is trained, experienced, and otherwise qualified in proper tree pruning techniques. A copy of the certification shall be provided to the COR five (5) calendar days prior to initiation of any tree pruning. Trees shall be pruned to evenly form and balance the tree, promote proper health and growth, to respond to damage inflicted by natural or human causes, and to prevent interference with pedestrian and vehicular traffic. Trees shall be pruned in accordance with the following guidelines to selectively remove unwanted growth and encourage trees to grow or respond in a desired manner:
(1) Remove dead, damaged, or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including the removal of dead palm fronds.
(2) Remove branches that extend over building and endanger roofs, eaves, and windows; obstruct lighting from poles; or hang within 8 feet vertically over sidewalks, parking lots, and driveways.
(3) Provide clearance for buses, moving vans, and similar vehicles along streets.
(4) Cut back branches that overhang or grow into power lines. Anticipate the effects of wind on branches that might fall on power lines and cut back accordingly. Shape the entire tree rather than notch the top.
(5) Remove growth of small trees in front of windows, over entranceways or walks, and those that will obstruct vision at street intersections.
(6) Remove sprouts that grow from the trunk. Remove sprouts to the height of the first major lateral limb.
(7) Branch stubs shall not be allowed. All branches shall be pruned (removed) back to the next major limb or the tree trunk. Pruning cuts shall be performed in a manner that leaves the branch collar exposed (with no stub beyond the branch collar).
C.9.2.4. CULTIVATION AND MULCHING
Shrubs, hedges, and flowerbeds shall be cultivated and mulched as necessary to maintain a healthy and well-groomed appearance. Mulch shall match throughout the property and shall be free of foreign material. Mulch shall be applied in appropriate amounts, for example, two-to-three-inch layers over well-drained soils, and thinner layer on poorly-drained soils. All bed edgings shall be realigned as needed. Mulch shall be applied out to the tree’s drip line (if possible) and not piled against the tree trunk. The appearance of mulch ring shall resemble that of a “donut”, not a “volcano”.
Note: Mulch is to be applied to courtyards on weekends or other non-work IRS day, as approved by COR.
C.9.2.5 FERTILIZATION
The Contractor shall ensure that correct soil conditions are maintained for each tree, shrub, flower, grass or plant in order to promote optimum growth, correct environment, and obvious good health for the species of plant, e.g., grass shall be of a lush, green color.
Fertilizer used shall be of a balanced type that contains the appropriate nutrients and shall not be offensive to the smell. Fertilizer shall be delivered in the original, unopened containers bearing the manufacturer’s chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. In lieu of containers, fertilizer may be furnished in bulk if accompanied by a certificate indicating the above information with each delivery.
C.9.2.6 WEED ERADICATION
All areas of the property, including parking areas or paved walkways around the building, and ponds (wet or dry), shall be free from all weeds, wild onions and other foreign grasses at all times during performance on this contract. If plant(s), tree(s), etc. damaged or killed as a result of Contractor’s performance, Contractor shall replace the plant(s) and/or trees(s) with equal species and size, at no additional cost to the Government.
Contractor shall adhere to the following when using herbicides:
(1) Control Methods. The Contractor shall utilize only herbicides registered by the EPA and applicable state lead agency for the use intended. Within thirty (30) calendar days after award of the contract, and ten (10) calendar days thereafter, prior to introducing a herbicide for usage, the Contractor shall submit the SDS to the COR for each herbicide intended to be used. Use shall be in strict compliance with label directions for the control of the target weeds. Any proposed changes in approved herbicide usage shall be submitted to the COR, along with documentation of EPA approval, at least five working days in advance of the anticipated need.
(2) Herbicide Use Records. The Contractor shall maintain records of all herbicide usage on a contractor provided form. This form shall be filled out as weed control operations are performed and provided to the COR within five (5) work days upon request.
(3) Herbicides shall be applied in courtyards on weekends or other IRS non-regular workday, as approved by COR.
Extreme care shall be exercised to avoid entry of herbicides into drainage structures, streams, ditches, etc. All work shall be in accordance with federal, state, local, and installation laws and regulations. Contractor shall be responsible for obtaining all applicable licenses/permits, and Contractor shall provide to the COR, within one (1) business day upon request, proof of current license from the State of Tennessee for each person performing vegetation/weed control on this contract.
C.9.2.7 DITCH/CURB CLEANING
All ditches, inlets, outlets, and culverts shall be cleared of sediment, vegetation, and debris to allow unrestricted flow of water.
C.9.2.7.1. Natural Area Cleaning
All natural areas shall be cleared of all debris to include fallen limbs and branches that will be cut and disposed in such a manner that damage will not occur to the tree, other trees, or improvements. Hanging limbs / branches shall be pruned in accordance with C.9.2.3.1.
C.9.2.8 FENCE LINE MAINTENANCE
Fence line maintenance shall provide security effectiveness as well as aestheticism. No branches or vines shall exist in or extend over the fence less than twenty feet high.
There shall be no deep ruts or holes under or at the fence line at any time. The fence line requirements include an area extending ten feet outside the fence, and ten feet inside the fence. Grass, weeds, trees (less than three inches in diameter at ground level), and all other vegetative growth to ground or pavement level shall be eliminated within ten inches on both sides of fence through a method to avoid erosion. Residue of work generated by fence line maintenance shall be removed and disposed of off the property the same day.
C.9.2.9 RAKING
The Contractor shall remove leaves, pine straw and pinecones, limbs, and all other debris from the raked area to maintain a neat and clean appearance. All debris shall be disposed of off the property the same day raking occurs. Throughout the year, the Contractor shall remove minor accumulations due to isolated leaf drop and shall check all storm drain openings on the premises and remove any accumulated leaves or debris.
Care shall be taken to remove leaves in existing mulched areas to maintain a neat and clean appearance
C.9.2.10 IRRIGATION
The Contractor shall regulate irrigation of grassed areas, shrubs, trees, flowers, and ground cover plants in accordance with their needs. The Contractor shall coordinate with the Operations & Maintenance (O&M) contractor, who is responsible for operation and maintenance of the Rainbird Irrigation System, in developing a watering schedule.
Contractor shall ensure that irrigation requests are the amount necessary to preserve healthy plant life throughout the Campus.
The watering schedule for the upcoming growing season shall be established by a person on the Contractor’s staff who has training on the Rainbird Irrigation System and submitted to the COR prior to April 15th of each year. The Contractor shall apprise the O&M contractor on a continual basis, (copying the CORs for this contract and O&M Contract) advising of changes that need to be made, e.g., more or less water in specific areas. Contractor shall inform the O&M contractor in advance of any scheduled service that could be hampered by the irrigation system being turned on in a specific area at other than scheduled times.
The Contractor shall inform the O&M Contractor (copying the CORs for this contract and O&M contract) of any instances of excessive quantities of water or rates of application which cause waste of water, erosion, run-off, or ponding. Irrigation operations shall be conducted in a manner and at time intervals to prevent the least disruption to employees. The Contractor shall be responsible for replacement of sprinkler heads, other equipment, or property damaged by its employees.
Replacements shall be of the same make, manufacturer, and model, if available, as existing equipment or property. If the same is not available, the Contractor shall replace with an equal or better at no additional cost to the Government. The Contractor shall promptly report any damage to the COR.
C.9.2.11 GRASSING - UP TO TEN (10) SQUARE FEET
The Contractor shall ensure there are always no bare or thinning spots in the turf (up to 10 square feet) during performance on this contract. Contractor shall notify COR of any bare/thinning spots beyond ten square feet within one business day of noticing bare spots. Contractor shall grass and/or re-grass whenever necessary to maintain the uniform appearance of the turf. (See Additional Services Section C.9.3, Grassing, for maintenance beyond 10 square feet.) Contractor shall mark the areas in the property that are grassed and/or re-grassed on the day grassing /re-grassing is performed. Grassed areas that fail to develop noticeable growth within three (3) weeks of grassing shall be re-grassed by the Contractor at no additional cost to the Government.
Grassed areas that die within one (1) year after grassed or re-grassed shall be redone by the Contractor at no additional cost to the Government. Contractor shall coordinate with COR to ensure both parties are in agreement with dates areas are grassed and/or re-grassed.
C.9.2.12 INSECTS, PESTS, DISEASES AND WILDLIFE CONTROL AND REMOVAL
Contractor shall provide services necessary for the control, removal and eradication of insects, pests, and diseases throughout the exterior portion of the property to include the courtyards (with the exception of the following areas: termite bait stations, the outer foundation of the building, and the guardhouses) to ten (10) feet beyond the fenceline.
This include, but is not limited to, moles, ants/ant hills, and pests and insects that feed on outdoor vegetation, raccoons, snakes, etc. (Service to the termite bait stations, the outer foundation of the building, and the guardhouses will be performed by the janitorial and pest control contractor.)
Contractor shall be responsible for the control of pests and diseases of the trees, shrubs, and plants, including but not limited to bagworms, and shall take immediate action to eradicate any such diseases or infestations that occur. Any diseases found should be noted on the Ground Maintenance Daily Report, with location and plan of treatment.
The Courtyards shall be free and clear of all wildlife (including but not limited to geese, ducks, birds) and animal droppings to the maximum extent possible. Removal of all wildlife shall be in accordance with all State and Federal Regulations. Contractor shall be responsible for obtaining all permit(s) required by the State of Tennessee or other government entities for the removal of wildlife.
Eradication programs shall be continuously in effect and there shall be no signs of infestations. Additional inspections and treatments shall be applied as required at no additional cost to the Government. Contractor shall respond to any complaints within 24 hours, or in case of an emergency such as swarming bees or any event that poses imminent danger, Contractor shall respond within fifteen (15) minutes.
A Pest Control Plan that covers all of the exterior property (with the exceptions of the areas noted above) shall be submitted within a timeframe mutually agreed upon (but no later than 30 days) after start of contract performance, and annually thereafter. The plan should detail proposed methods for control, removal, and/or eradication including labels and Safety Data Sheets for all chemicals to be applied, dates, amounts, locations, frequency, etc. and include a copy of the Pesticide Applicator Certificate or License for contractor’s representative who will be performing on-site service under this contract.
The plan shall also include mosquito breeding control measures for wet detention ponds, repellent measures for Mockingbirds, etc. Upon receipt of the Pest Control Plan, the COR will render a decision regarding its acceptability within ten (10) working days. All pesticides used shall comply with the provisions of the Federal Insecticide, Fungicide, and Rodenticide Pesticide Control Act of 1972, Public Law 92516, and the regulations issued thereunder. Copies of all Safety Data Sheets shall be submitted to the COR for all pesticides used.
Contractor may use approved mechanical or electronic devices integrated with pesticides upon prior approval from the COR.
C.9.2.13 INSTALLATION OF “COLOR”
In the Spring and Autumn seasons, the Contractor shall plant flowers (annuals and/or perennials), add mulch, etc., as appropriate and as previously approved by the COR, in the beds provided at the following locations: main entrance sign on Getwell; circle outside Module E; entrances at Modules AB, BC, FG, GH, AJ and E; and the three courtyards. It is estimated that 2,100 flowers will be planted during the Spring season and 2,100 during the Autumn season. Planting shall take place at the appropriate time in order to ensure health and growth of the flowers. The Contractor shall coordinate with the O&M contractor to ensure that the planting occurs during the operable schedule of the irrigation system.
The Contractor is responsible for maintaining the beds, ensuring they are weed-free and replacing any plants that die within a year, at no cost to the Government.
C.10 ADDITIONAL SERVICES
Performance of Basic Services works described herein in excess of the frequency established by the Contractor and Government will be considered Additional Services, and shall follow the ordering process described in Section C.10. Contractor shall not perform any Additional Services unless ordered by the Government. Additional Services does not include re-performance of works to correct previous unsatisfactory performance and shall be provided at the rates specified in the contract for Additional Services. The services described below are considered Additional Services and the quality requirements established shall be met whenever Additional Services are ordered by the Government.
C.10.1 TREE REMOVAL, INCLUDING STUMP AND ABOVE GROUND ROOT
REMOVAL
Trees, including their stumps and above ground roots, shall be removed to a depth below normal ground elevation to avoid unnecessary soil excavation and ground disruption. All debris shall be disposed of off the property the day of removal. If in a lawn area, any stump hole and any other surface damage caused by removal, shall be grassed as specified herein. If the hole is not in a lawn area, it shall be filled with topsoil and the surface prepared to match the surrounding surface. The cost of all work shall be included in the price quote for tree removal.
C.10.2 FILLING HOLES
The Contractor shall fill holes in the lawn around the sprinkler heads and in other areas as holes are observed and/or as directed by the COR.
C.10.3 GRASSING BEYOND TEN (10) SQUARE FEET
The Contractor shall ensure there are no bare or thinning spots in the turf (beyond 10 square feet) at all times during performance on this contract. Contractor shall grass and/or re-grass whenever necessary to maintain the uniform appearance of the turf.
Contractor shall mark the areas in the property that are grassed and/or re-grassed.
Grassed areas that fail to develop noticeable growth within three (3) weeks of grassing shall be re-grassed by the Contractor at no additional cost to the Government. Grassed areas that die within one (1) year after grassed or re-grassed shall be redone by the Contractor at no additional cost to the Government. Contractor shall coordinate with COR to ensure both parties are in agreement with dates areas are grassed and/or re-grassed.
C.10.4 EROSION CONTROL
Soil erosion damages beyond that which grassing can control shall be repaired with appropriate soil type to return the area to normal ground elevation. If area adjoins a grassy area it shall be fertilized and seeded to blend in with the area. Repaired grassy areas shall be firmly established. Areas which again erode within one year from date of repair shall be repaired by the Contractor at no additional cost to the Government.
(Contractor shall coordinate with COR to ensure both parties are in agreement with dates areas are repaired.) Erosion in pond areas may require installation of additional rip-rap of equal size to that in place.
C.10.5 UNDERBRUSH REMOVAL
All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level, removed from the property, and disposed of in accordance with standard commercial practices for industry. Any vegetation to be saved will be marked by the COR prior to starting work. Any debris generated from cutting underbrush or found in the area (e.g., limbs, dead trees, trash, etc.) shall be removed from the property and disposed of offsite in accordance with local ordinance or best commercial practices.
C.10.6 SEVERE SHRUB PRUNING
Severe pruning of shrubs shall consist of removal of all or a major portion of the total growth of the shrub. The extent of pruning will be indicated by the COR, but generally shall consist of pruning large shrubbery to a level approximately 1 to 3 feet above ground level. Debris resulting from the pruning process shall be disposed of off the property the same day of pruning.
C.10.7 TREE AND SHRUB REPLACEMENT
To the extent possible, all tree and plant replacement(s) shall be those included known to do well in the tri-state area of West Tennessee, East Arkansas, and North Mississippi, and to blend with existing ones.
(1) Trees – Trees established shall be compatible to the Southwest Tennessee area, and in accordance with the existing ones, with trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering.
(2) Shrubbery – Shrubbery ordered shall be compatible to that of the Southwest Tennessee area, and shall be in accordance with the existing ones on the property of the one, three, or five gallon class size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering.
All plants shall be nursery grown and shall bear certification indicating species, common name, and grade.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .