This document is a Quality Assurance Surveillance Plan (QASP) for Electronic Research Services (ERS) Tax Research Services. The QASP outlines the government's methodology for monitoring and evaluating the contractor's performance, with key objectives including ensuring accurate monthly notifications of research sources being added or dropped, timely communication of system changes, and implementation of web-based services with appropriate security measures.

The plan establishes performance standards with 99-100% acceptable quality levels across multiple areas, such as source notifications, system change communications, and security implementations. Surveillance will be conducted through file reviews, periodic inspections, random observations, and customer complaints. The Contracting Officer's Representative (COR) will perform monthly assessments, prepare written reports, and initiate discussions with the contractor if performance standards are not met. The document includes a Performance Requirements Summary table and a Sample Quality Assurance Monitoring Form to standardize the evaluation process.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Tax Research

TABLE OF CONTENTS

1 INTRODUCTION

1.1 Purpose

1.2 Performance Management Approach

1.3 Performance Management Strategy

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

2.2 The Contracting Officer’s Representative (COR)

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY

LEVELS

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

4.2 Customer Feedback

4.3 Acceptable Quality Levels

4.4 The Performance Management Feedback Loop

4.5 Monitoring Forms

5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

5.1 Determining Performance

5.2 Reporting

5.3 Reviews and Resolution

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Electronic Research Services (ERS)

– Tax Research Services – Performance Work Statement. This plan sets forth the procedures and guidelines the Servicewide Policy, Directives, and Electronic Resources office will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Servicewide Policy, Directives, and Electronic Resources office to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control program (QCP).

Quality Control is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by Contracting Officer Representative and the contractor.

2.2 The Contracting Officer’s Representative (COR)

The contracting officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY

LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate.

The primary methods of surveillance are (include those that apply)

Random monitoring, which shall be performed by the COR or a COR designated inspector. This involves logging into the vendor’s system to ensure access, proper functionality and availability of procured content. This will be done at least weekly.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating any issue and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving the availability of content, the desired performance level is established at 99 percent.

4.4 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

4.5 Monitoring Forms

The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.

4.5.1 The COR will retain a copy of all completed QA surveillance forms.

5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

5.1 Determining Performance

5.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

5.2 Reporting

5.2.1 At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance.

This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

5.3 Reviews and Resolution

5.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:

Monthly performance assessment data and trend analysis Issues and concerns of both parties Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis Recommendations for improved efficiency and/or effectiveness

5.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

5.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Required Services (Tasks)

Performance Standards

Acceptable Quality Levels

Methods of Surveillance

Incentive (Positive and/or Negative) (Impact on Contractor Payments)

The contractor shall provide monthly notification to the Contracting Officer and the Contracting Officer’s Representative (COR) of all sources being added and all sources being dropped that are within the scope of this contract. If third party negotiations prevent monthly notice, the contractor shall advise the IRS as soon as it is permissible to provide such notification. (PWS C.2.2)

100% of reports accurately depict current status

99%

File reviews, periodic inspections, and random, observations, customer complaints

If the IRS determines that a dropped source is essential, the COR will request from the contractor a list of comparable offered replacement sources.

(PWS C.2.3)

The government reserves the right to approve offered replacement sources. If the comparable sources offered by the contractor are not acceptable to the

Government, the contractor shall propose price reductions for those discontinued sources.

Any price reductions shall take effect on the date the sources are no longer available online. (PWS C.2.4)

The contractor shall notify the COR at least 30 days in advance of any changes in operation or functionality of the research system.

(PWS C.2.5)

100 % Compliance

99% inspections, and random, observations, If such proposed changes are unacceptable to the IRS, the COR will initiate discussions with the contractor to resolve the situation.

(PWS C.2.5)

The contractor shall not charge the IRS for any system or product upgrades, new functionality, or expanded content that are inspections, and random, observations, customer complaints

The COR will initiate discussions with the contractor to already part of the library purchased by the IRS, and/or are part of the contractor’s continual product development and enhancement.

(PWS C.2.6)

resolve the

Any external web-based service shall be implemented in a manner that eliminates any reasonable security concerns regarding the use of Java applets, ActiveX or similar client-side processing. If any such add-in applications are used, the contractor shall work with the COR for security testing and implementation.

(PWS 4.2.2)

inspections, and random, observations, The COR will initiate discussions with the contractor to resolve the

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check): Meets Standards Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: _________________________ DATE: _________________

1 INTRODUCTION
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting th...
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality a...
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by...
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control program (QCP). Quality Control is work output, not workers, and therefore includes all work pe...
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Representative (COR)
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
4.4 The Performance Management Feedback Loop
4.5 Monitoring Forms
4.5.1 The COR will retain a copy of all completed QA surveillance forms.
5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
5.1 Determining Performance
5.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to sh...
5.2 Reporting
5.2.1 At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report...
5.3 Reviews and Resolution
5.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews w...
5.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
5.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics wil...
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY