This is a Questions and Answers document for RFQ IHS1525675 addressing contractor qualifications and documentation requirements.

The government clarifies that an AABC-certified contractor is specifically required to meet TAB (Testing, Adjusting, and Balancing) requirements under this solicitation; TABB certification is not acceptable. Documentation to be provided includes mechanical and as-built drawings, 2024 and 2025 TAB/Certification reports for the area, and airflow schedules referenced in Tables 2 and 3 of the Statement of Work. Equipment schedules are not available from the government. The Building Automation System (BAS) operates on Automated Logic controls, and a BAS points list or control sequences are not available for contractor reference.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ IHS1525675 – Questions and Answers

• Could the Government please clarify whether a TABB-certified contractor would be considered acceptable to meet the TAB requirements under this solicitation, or if AABC certification is specifically required?

An AABC-certified contractor is required per the SOW.

• Mechanical drawings and as-built drawings.

See attached mechanical drawings.

• Existing TAB reports and Previous ventilation certification reports.

Attached are the 2024 and 2025 TAB/Certification reports for the area.

• Airflow schedules Airflow schedules are attached in Table 2 and Table 3 of SOW.

• Equipment schedules Do not have this information.

• BAS points lists or control sequences, if available.

Points list is not available. BAS is Automated logic.