This addendum document, issued by the State of Texas on September 15, 2026, modifies the original Invitation for Quotation (IFQ) 1100 for disk stack equipment. The addendum extends the quotation due date from September 22, 2026 to September 18, 2026 at 2:00 p.m. Offerors are required to acknowledge and return the signed addendum with their quotation response; failure to do so will result in rejection of the submission. The scope of work encompasses disk stack equipment with specified technical specifications and performance standards as detailed in the original IFQ documentation.

Quotations must include all costs for materials, labor, and delivery to qualify for award consideration. Offerors must submit comprehensive quotations by the established deadline. The contract term and renewal options are contingent upon award and will be negotiated between the State of Texas and the selected vendor. The IFQ may contain set-aside provisions for small businesses or other designated vendor categories in accordance with Texas procurement regulations. All submissions must comply with state procurement standards and contract administration procedures as outlined in the complete IFQ documentation.

View the file

Other files

File Type Posted
IFQ_1100_AGM1024_IFQ_ADD_2_v1.pdf PDF
IFQ_1100_AGM1024_IFQ_ADD_3_v1.pdf PDF
IFQ_1100_AGM1024_IFQ_PAC_1_v1.docx DOCX document
IFQ_1100_BAS1101_IFQ_ADD_1_v1.docx DOCX document
IFQ_1100_AGM1024_QUOTE_v1.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation For Quotation

Addendum 1 for IFQ 1100 AGM1024

This Addendum changes documents associated with IFQ 1100 AGM1024. The following changes are incorporated to the subject IFQ:

Question 1: Is the City requiring the exact CCI part number 728705238, or may technically equivalent products be considered with supporting documentation?

Answer 1: Yes, the City is requiring the exact part number. No alternatives.

Question 2: Is OEM traceability or manufacturer certification required with the quote or only upon delivery?

Answer 2: Yes, OEM traceability

Question 3: Does the City require the supplier to be an authorized CCI/IMI distributor, or may the prime contractor source the OEM part through an authorized reseller?

Answer 3: Yes

Question 4: Is there a preferred delivery window beyond the lead-time information requested on the quote sheet?

Answer 4: No preferred delivery window. Normal lead time is acceptable.

Question 5: Are there any commonly missed submission items you recommend vendors double-check before submitting?

Answer 5: Please be sure to submit the offer and acceptance form, along with the pricing submittal.