IFPQ_Solicitation_Package_11A4302_Final.pdf

PDF 649 KB Posted

Attached to
IFPQ Paint Exterior & Upgrade Doors, San Diego County
Solicitation number
11A4302
Issued by
San Diego County, Rancho San Diego CDP, San Diego City, San Diego Country Estates CDP, California

About this file

This is an Invitation for Price Quote (IFPQ) issued by the California Department of Transportation (Caltrans) for painting exterior surfaces and upgrading doors at the Santee Maintenance Station in San Diego County. The project encompasses surface preparation and painting of multiple buildings, structures, fencing, gates, cargo containers, and bollards, along with furnishing and installation of hollow metal doors and hardware at the facility located at 8502 Railroad Avenue, Santee, CA 92071. Work includes painting nine building structures ranging from 10 feet to 200 feet in length, eight cargo containers, wrought iron fencing (540 linear feet), four motorized gates, three pedestrian gates, and 50 bollards. The contractor must also furnish and install five hollow metal doors (three standard 3'-0" x 7'-0" doors and two louvered 3'-0" x 7'-0" doors) with complete hardware specifications. A mandatory site inspection is scheduled for March 3, 2026, at 10:00 a.m., with written questions due by March 4, 2026, and price quotes due by March 10, 2026, at 5:00 p.m. The estimated award date is March 24, 2026, and the contract term runs from April 1, 2026, through March 31, 2027, with work performed during normal business hours Monday through Friday, 6:00 a.m. to 3:30 p.m., excluding state holidays.

This IFPQ is designated for certified Small Businesses (SBs), Micro Businesses (MBs), Small Businesses for public works (SB-PW), or Disabled Veteran Business Enterprises (DVBEs), with a maximum bid limit of $461,000. Prevailing wage requirements apply if the total bid exceeds $15,000. The bidder must possess either a Class A General Engineering Contractor license or Class B General Building license from the California Contractors State Licensing Board and maintain valid Department of Industrial Relations registration throughout the contract term. Caltrans requires a minimum of two price quotes from certified SB/MBs or DVBEs before award. If the bid exceeds $25,000, a Payment Bond equal to 100 percent of the contract amount is required prior to work commencement. Insurance requirements include Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate, Automobile Liability of $1,000,000 combined single limit, and Workers' Compensation with Employer's Liability of $1,000,000. No subcontracting is permitted under this agreement. A one-year warranty on coatings and workmanship is required upon completion and acceptance of work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30TH STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

February 19, 2026

Invitation for Price Quote (IFPQ)

IFPQ # 11A4302

Notice to Prospective Contractors

You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 11A4302 entitled Paint Exterior and Upgrade Doors in San Diego County. In submitting your quote, you must comply with the instructions found herein.

“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00, to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”

This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.

In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:

Tim Murphy California Department of Transportation (Caltrans) Email address: timothy.murphy@dot.ca.gov Phone: (279) 234-2662

*Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official *Technical questions regarding this solicitation will be addressed, in writing and at a Mandatory Site Inspection to be held on 10:00 a.m., March 3, 2026, at the Santee Maintenance Station 8502 Railroad Avenue Santee, CA 92071. See Section C1, Time Schedule, for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT

LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.

Sincerely, Tim Murphy Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:timothy.murphy@dot.ca.gov

Invitation for Price Quote IFPQ Number 11A4302

A) Purpose and Description of Services

1. Contractor agrees to supply all labor, tools, equipment, materials, travel, and incidentals necessary to prepare surfaces, apply paint coatings to exterior buildings, structures, fencing, gates, cargo containers, and bollards, and furnish and install hollow metal doors and hardware to the California Department of Transportation (Caltrans) owned property, as described herein.

2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.

B) Bidder’s Minimum Qualifications

1. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the

Agreement (if awarded), a Class A General Engineering Contractor license or a Class B General Building license issued by the California Contractors State Licensing Board (CSLB).

2. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.

3. At the time of bid submittal, continuously thereafter, and for the duration of the Agreement, bidder shall be a certified SB, including a micro business (MB) or a SB for the purpose of public works

(SB-PW).

4. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR).

Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.

5. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.

C) Price Quotation Requirements and Information

1. Time Schedule

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time (Pacific Time)

IFPQ available to prospective bidders 02/19/2026 Mandatory Site Inspection 03/03/2026 10:00 a.m.

Written Question Submittal 03/04/2026 12:00 p.m.

Final Date for Quote Submission 03/10/2026 5:00 p.m.

Proposed Award Date (estimate) 03/24/2026

2. Mandatory Site Inspection A. A Mandatory Site Inspection is scheduled at 10:00 a.m., March 3, 2026, at the Santee

Maintenance Station 8502 Railroad Avenue Santee, CA 92071 for the purpose of discussing concerns regarding this IFPQ.

B. In the event a potential prime contractor is unable to attend the Mandatory Site Inspection, an authorized representative may attend on its behalf. The representative may only sign in for one

(1) company.

C. All prospective contractors are to be assembled at Caltrans, at 10:00 a.m., March 3, 2026, at the Santee Maintenance Station 8502 Railroad Avenue Santee, CA 92071. Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Failure to comply with these provisions may result in the rejection of your quote.

Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary.

3. Reasonable Accommodation For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the Mandatory Site Inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the Mandatory Site Inspection to arrange for a reasonable accommodation.

4. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by March 4, 2026.

B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 11A4302. Questions must be sent to the following email:

Email: timothy.murphy@dot.ca.gov

C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website https://caleprocure.com/pages/index,aspx. It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.

5. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.

6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.

7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).

8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of San Diego as described in the Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://caleprocure.com/pages/index,aspx https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.

9. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.

10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and

34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).

B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.

11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).

B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.

C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

12. Contractor’s License Bidder must have at time of quote submittal and for the duration of the contract, either a valid, current Class A General Engineering Contractor license or a Class B General Building license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).

13. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

14. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.

15. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.

16. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying a Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

17. California Civil Rights Laws

Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.

18. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).

19. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.

B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:

IFPQ Number: 11A4302

PRICE QUOTATION SUBMITTAL

C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.

D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

E. Email to: timothy.murphy@dot.ca.gov

F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.

G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.

H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.

Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.

J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.

Bidder modifications offered in any other manner, oral or written, will not be considered.

K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at timothy.murphy@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.

L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.

M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.

N. Caltrans reserves the right to reject all price quotes for reasonable cause.

O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.

P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.

20. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.

mailto:timothy.murphy@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language

B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.

C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:

individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.

21. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.

B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.

C. Antitrust Provisions

1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.

2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.

3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).

D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.

E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

22. Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

23. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder / Offeror must notify the State in writing if it:

1) Intends to provide GenAI as a deliverable to the State; or

2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:

a) Functionality of a State system,

b) Risk to the State, or

c) Contract performance.

Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 11A4302 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 2

ADM-1412 (REV. 9/2025)

Contractor’s Name (Please Print):

Item Number

Estimated Quantity

Unit Of Measure Item

Unit Price (Price Per

Unit of Measure)

Total (Estimated Quantity X Unit Price)

1 1 Lump Sum

All labor, tools, equipment, materials, travel, and incidentals necessary for Surface Preparation and to Paint Buildings per STD 213, Exhibit A, Scope of Work.

2 8 Each All labor, tools, equipment, materials, travel, and incidentals necessary for Surface Preparation and to Paint Cargo Containers per STD 213, Exhibit A, Scope of Work.

3 540 Linear Feet All labor, tools, equipment, materials, travel, and incidentals necessary for Surface Preparation and to Paint Wrought Iron Fencing per STD 213, Exhibit A, Scope of Work.

4 4 Each All labor, tools, equipment, materials, travel, and incidentals necessary for Surface Preparation and to Paint Motorized Gates per STD 213, Exhibit A, Scope of Work.

5 3 Each All labor, tools, equipment, materials, travel, and incidentals necessary for Surface Preparation and to Paint Pedestrian Gates per STD 213, Exhibit A, Scope of Work.

6 50 Each All labor, tools, equipment, materials, travel, and incidentals necessary for Surface Preparation and to Paint Bollards (High-Visibility Yellow, 4 Coats) per STD 213, Exhibit A, Scope of Work.

7 3 Each All labor, tools, equipment, materials, travel, and incidentals necessary to Furnish and Install Hollow Metal Doors with Hardware (3'-0" x 7'-0", Oil House) per STD 213, Exhibit A, Scope of Work.

8 2 Each All labor, tools, equipment, materials, travel, and incidentals necessary to Furnish and Install Louvered Hollow Metal Doors with Hardware (3'-0" x 7'-0", Oil House) per STD 213, Exhibit A, Scope of Work.

9 Subtotal: $

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 11A4302 PRICE QUOTE PROPOSAL Attachment 1 Page 2 of 2

ADM-1412 (REV. 9/2025)

Contractor’s Name (Please Print):

1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.

3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.

4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.

Total This Proposal $

Attachment 2

Required Documents

The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

☐ Attachment 1 – Price Quote Proposal (ADM-1412)

☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet

☐ Non-Collusion Declaration Non-Collusion Declaration

☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification

☐ Darfur Contracting Act Certification

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Payment Bond Payment Bond

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

Attachment 3

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.

2. The term of this Agreement is:

Contractor’s Name TBD Agreement Number 11A4302

Exhibit A

Public Works (State)

Scope of Work

1. Contractor agrees to supply all labor, tools, equipment, materials, travel, and incidentals necessary to prepare surfaces, apply paint coatings to exterior buildings, structures, fencing, gates, cargo containers, and bollards, and furnish and install hollow metal doors and hardware to the California Department of Transportation (Caltrans) owned property, as described herein.

2. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement.

3. The services shall be performed at Santee Maintenance Station 8502 Railroad Avenue Santee, CA 92071.

4. Any reference to Caltrans Contract Manager shall also include his/her designee.

5. This Agreement will commence on April 1, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on March 31, 2027 (estimate). The services shall be provided during normal business hours Monday through Friday 6:00 a.m. to 3:30 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.

6. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.

California Department of Transportation (Caltrans):

Contractor:

Section/Unit: Project Manager:

Caltrans Contract Manager:

Address Address

Business Phone Number: Business Phone Number:

Email: Email:

7. Detailed Description of Work:

A. Surface’s to be Painted

Contractor shall paint the exterior of the Santee Maintenance Station, which shall include the following structures (Length (L) x Width (W) x Height (H) or Diameter (D) in feet (') and inches ("), as applicable):

1) Region Office

a) 84' L x 46' W x 15' H (including columns)

b) 72' L x 46' W x 15' H (excluding columns)

c) Columns: 9' H x 18" D (8 each)

Exhibit A

Public Works (State)

2) Maintenance Building - 200' L x 42' W x 25' H

3) Mechanic's Shop - 144' L x 42' W x 25' H

4) Staircase Railings - 12' L x 17' W x 8' H (4 each)

5) Electrical Shop - 82' L x 46' W x 25' H

6) Wash Rack Building - 10' L x 8.5' W x 10' H

7) All Hazmat Containers

a) 12.5' L x 6' W x 8' H

b) 10' L x 6' W x 9' H

c) 5.5' L x 5' W x 8' H

d) 11' L x 7' W x 9' H

8) Oil House - 24.5' L x 14' W x 10' H

9) Metal Buildings

a) 46' L x 28.5' W x 15' H + 28' L x 20' W x 15' H extension

b) 51' L x 41' W x 14' H (3 each)

10) All Cargo Containers

a) 20' L x 8' W x 8' H

b) 40' L x 8' W x 8' H (3 each)

c) 26' L x 8' W x 8' H

d) 20' L x 8' W x 8' H (3 each)

11) Motorized Gates - 12' W x 6' H (2 each) and 20' W x 6' H (2 each)

12) Pedestrian Gates - 4' W x 6' H (3 each)

13) Wrought Iron Fencing Employee Parking Lot - 540 linear feet (LF) by 6' H

14) All Bollards - 4' L x 7-8" D (50 each). Bollards shall have two (2) coats of primer and two (2) finish coats and be painted high-visibility yellow.

B. Manufacturer's Data and Documentation

1) Contractor shall provide manufacturer's descriptive data, a materials list, and color samples.

2) Product descriptive data must include product description, manufacturer's instructions for product mixing, thinning, tinting, handling, site environmental requirements, product application, and drying time.

3) Materials list must include manufacturer's name, trade name, and product numbers for each type of coating to be applied.

4) Contractor shall submit certificates of compliance for products required to comply with SSPC standards.

Exhibit A

Public Works (State)

C. Color Samples

1) Contractor shall submit color samples for approval to Caltrans Contract Manager prior to beginning work.

2) Samples must be manufacturer's color cards, nominally two (2) inches by three (3) inches for each color of coating shown.

3) Color samples for stains must be submitted on wood of the same species, color, and texture as the wood to receive the stain.

D. Product Compliance and Standards

1) Contractor shall ensure products for each coating system are from a single manufacturer and comply with the Detailed Performance Standards of the Master Painters Institute (MPI).

Each product must be shown on the MPI Approved Products List unless otherwise specified.

2) Contractor shall ensure coatings and applications comply with the rules for control of Volatile Organic Compounds (VOC) emissions adopted by the air quality control district in the air basin in which the coatings are applied.

E. Product Delivery and Storage

1) Contractor shall ensure products are delivered to the site in sealed, labeled containers.

Caltrans will provide a well-ventilated storage area at an ambient air temperature of at least 45 degrees Fahrenheit. Contractor shall coordinate with Caltrans Contract Manager to designate the storage location upon delivery.

2) Container labeling must include manufacturer's name, type of coating, trade name, color designation, drying time, and instructions for tinting, mixing, and thinning.

F. Coating Systems The surfaces to be coated shall be as specified in this Exhibit A Scope of Work. The coating to be used shall be as specified below. The number of applications specified for each coating listed herein is a minimum:

1) One (1) Prime Coat

a) Primer: Rust Inhibitive, Water Based, MPI List Number 107

2) Two (2) Finish Coats:

a) Flat: Latex, Exterior, MPI Gloss Level 1, MPI List Number 10

• Building field, trim, beams, accents, and vents

b) Semi-Gloss: Latex, Exterior, MPI Gloss Level 5, MPI List Number 11

• Doors, partitions, cargo containers

c) Semi-Gloss: Vista Protec 9800, MPI List Number 157

• Fencing, motorized gates G. General Surface Preparation Methods

Contractor shall prepare all interior and exterior surfaces to be coated and painted in accordance with the coating manufacturer's instructions, unless otherwise specified, and may

Exhibit A

Public Works (State) use any of the following approved preparation methods. Caltrans will provide water and warm water as needed for surface preparation methods:

1) Detergent Wash: Removal of dirt and water-soluble chemicals by scrubbing with a solution of detergent and water, followed by removal of all solution and residues with clean water.

2) Hand Cleaning: Removal of dirt, loose rust, mill scale, excess base material, filler, aluminum oxide, chalking paint, peeling paint, or paint that is not firmly bonded to the surfaces by using hand or powered wire brushes, hand scraping tools, power grinders, or sandpaper, followed by removal of all loose particles and dust prior to coating.

3) Mildew Wash: Removal of mildew by scrubbing with a solution of detergent, hypochlorite-type household bleach, and warm water, followed by removal of all solution and residues with clean water.

4) Abrasive Blasting: Removal of loosely adhering paint, dirt, rust, mill scale, efflorescence, weak concrete, or laitance must be by the use of airborne abrasives. Loose particles, dust, and abrasives must be removed by blasting with clean, oil-free air. Abrasives must be limited to mineral grit, steel grit, or steel shot, and must be graded to produce the surface profile recommended in the manufacturer's data sheet.

5) Steam Cleaning: Removal of oil, grease, dirt, or other foreign matter by using steam generated by commercial steam cleaning equipment from a solution of water and steam cleaning compounds, followed by removal of all residues and cleaning compounds with clean water.

6) Trisodium Phosphate (TSP) Wash: Removal of oil, grease, dirt, paint gloss, and other foreign matter by scrubbing with a solution of TSP and warm water, followed by removal of all solution and residues with clean water.

7) Water Blasting: Removal of dirt, loose scale, chalking, or peeling paint by low-pressure water cleaning. Water blasting must be performed in accordance with Society for Protective Coatings (SSPC) SSPC-SP 12/NACE No. 5, "Surface Preparation and Cleaning of Metals by Water Jetting Prior to Recoating," and must achieve a surface cleanliness level meeting WJ-4 ("Light Cleaning") as defined in NACE WJ-4/SSPC-SP WJ 4. These standards are available for purchase through the ANSI Webstore and other technical standards providers.

Equipment used must have a minimum flow rate of 1.5 gallons per minute (GPM). If a detergent solution is used, it must be biodegradable and must be removed from all surfaces with clean water.

H. Hardware Removal Contractor shall remove hardware, cover plates, light fixture trim, and similar items before preparing surfaces for coating. Following the application of the finish coating, the removed items must be reset in their original locations.

I. Surface Preparation by Material Type Contractor shall prepare surfaces for coating per the material type as follows:

1) Wood: Lightly sand exterior surfaces no more than 24 hours before applying coatings.

Apply a sealer according to the coating manufacturer's instructions to knots, sap, pitch, tar, creosote, and other bleeding substances. After applying the prime coat, all nail holes, cracks, open joints, dents, scars, and surface irregularities must be filled, hand cleaned, and

Exhibit A

Public Works (State) spot primed to provide smooth surfaces before applying finish coats. Irregularities in wood surfaces to receive a transparent stain finish must be filled and hand cleaned after the first coat of stain has been applied. The color of the filler must match the color of the stained wood. Irregularities in wood surfaces to receive a clear finish must be filled and hand cleaned before applying coatings. The color of the filler must match the color of the coated wood.

2) Galvanized Metal: New surfaces must be roughened by hand sanding or light abrasive blasting. Galvanizing must not be removed during cleaning or roughening. Damaged or corroded areas must be cleaned and given two (2) spot applications of a coating that complies with the Detailed Performance Standards of the Master Painters Institute (MPI) and is listed on MPI List "Number 18, Primer, Zinc Rich, Organic."

3) Steel and Other Ferrous Metals: Surface must be cleaned according to SSPC-SP 1.

Surface profile must be as required for the coating system specified.

4) Aluminum and Other Non-Ferrous Metals: Surface must be cleaned according to SSPC-

SP 1.

5) Gypsum Board: Holes, cracks, and other surface imperfections must be filled with joint compound or suitable filler before applying coatings. Taped joints and filled areas must be hand sanded to remove excess joint compound and filler.

6) Cement Plaster: New plaster must be cured at least 14 days before coating. Cracks, holes, and surface imperfections must be filled with patching plaster and hand textured to match adjacent surfaces.

7) Concrete and Concrete Masonry Unit: New material must be cleaned and prepared according to SSPC-SP 13. Cracks and voids must be filled with cement mortar patching material. Concrete must be cured until the surface moisture is below the level specified in the coating manufacturer's instructions.

8) Previously Coated Surfaces: Dirt, oil, grease, or other surface contaminants must be removed by water blasting, steam cleaning, or TSP wash. Minor surface imperfections must be filled as specified for new work. Mildew must be removed by mildew wash. Chalking paint must be removed by hand cleaning. The surfaces of existing hard or glossy coatings must be abraded to dull the finish by hand cleaning or light abrasive blasting. Abrasive blasting must not be used on wood or non-ferrous metal surfaces.

J. Removal of Defective Coatings Contractor shall remove chipped, peeling, blistered, or loose coatings by hand cleaning, water blasting, or abrasive blasting. Bare areas must be pretreated and primed as specified for new work.

K. Authorization and Notification

1) Contractor shall ensure coatings are not applied until surface preparation has been authorized by Caltrans Contract Manager. Contractor shall notify Caltrans Contract Manager at least three (3) business days before application of coatings.

2) Contractor shall proceed with coatings work only when existing and forecasted weather conditions permit work to be performed in accordance with the manufacturer's recommendations and guarantee/warranty requirements.

Exhibit A

Public Works (State)

L. Application Requirements

1) Contractor shall ensure coatings are applied according to the manufacturer's instructions and at the application rates recommended by the manufacturer to achieve the dry film thickness stated in the coating technical data sheet.

2) Contractor shall ensure mixing, thinning, and tinting comply with the manufacturer's instructions. After thinning, the coating must comply with regulatory requirements.

3) Contractor shall ensure coatings are applied only when surfaces are dry and properly prepared.

M. Environmental Controls

1) Contractor shall ensure coatings are applied according to the environmental constraints specified in the manufacturer's instructions. These conditions must be maintained until the coating has cured and is ready for recoat.

2) Contractor shall ensure continuous ventilation will be provided during application of the coatings.

3) Contractor shall ensure adequate lighting is provided while surfaces are being prepared for coatings and during coating applications.

N. Scheduling and Coordination

1) Contractor shall ensure cleaning and painting are scheduled so that dust and other contaminants from the cleaning process do not fall on wet, newly coated surfaces.

2) Contractor shall ensure that the first application of the coating system is applied during the same work shift that the final surface preparation was performed. Additional coats must be applied as soon as the required drying time of the preceding coat, as specified in the coating manufacturer's instructions, has been met.

O. Coverage Requirements and Application Methods

1) Contractor shall ensure materials required to be coated have coatings applied to all exposed surfaces, including the tops and bottoms of wood and metal doors, the insides of cabinets, and other surfaces not normally visible from eye level.

2) Contractor shall ensure that the first application of the coating system is applied to all wood surfaces (face, back,…