IFPQ_Solicitation_22A1322.pdf

PDF 1 MB Posted

Attached to
Certified SB/MB or DVBE Only* Roof Replacement Services in Sacramento County
Solicitation number
22A1322
Issued by
Sacramento County, Sacramento City, San Francisco City, West Sacramento City, California

About this file

This Invitation for Price Quote (IFPQ) from the California Department of Transportation (Caltrans) solicits bids for roof replacement services in Sacramento County. The project requires removal and legal disposal of existing built-up roofing material and installation of an induction-adhered Thermoplastic Polyolefin (TPO) roofing system on approximately 14,000 square feet at 1120 N Street, Sacramento, California. The scope includes removal of existing materials, installation of pressure-treated wood nailers, 2-inch isocyanurate insulation, half-inch Dexcell glass mat cover board, 60-mil TPO membrane, flashing systems, pipe flashings, and roof drains. An optional site inspection is scheduled for December 4, 2025 at 9:00 a.m. Written questions must be submitted by December 5, 2025. Price quotations are due by 2:00 p.m. on December 11, 2025, with an estimated award date of December 18, 2025. The Agreement is estimated to commence June 29, 2026 and expire December 28, 2026, with performance during normal business hours Monday through Friday, 6:00 a.m. to 6:00 p.m., excluding state holidays.

This solicitation is restricted to certified Small Businesses (SB), Micro Businesses (MB), Small Businesses for Public Works (SB-PW), or Disabled Veteran Business Enterprises (DVBE) with a maximum bid ceiling of $461,000.00. Bidders must possess a valid California Contractors State License Board Class A General Engineering Contractor or C-39 Roofing Contractor license and be certified installers authorized by the roofing system manufacturer. State prevailing wages apply if the bid exceeds $15,000, requiring contractors to register with the Department of Industrial Relations and submit certified payroll records. A payment bond of at least 100 percent of the contract amount is required if the bid exceeds $25,000. Insurance requirements include general liability of $1,000,000 per occurrence/$2,000,000 aggregate, automobile liability of $1,000,000 combined single limit, and workers' compensation with employer's liability of $1,000,000. The roofing manufacturer must provide an unconditional 20-year warranty. Caltrans requires at least two price quotes from certified SB/MBs or DVBEs before award authorization, and all proposals must include specified documentation including bid certifications, non-collusion declarations, and civil rights certifications.

View the file

Other files

File Type Posted
Addendum__1_22A1322.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCYGAVIN NEWSOM, GOVERNOR

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30TH STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

November 25, 2025

Invitation for Price Quote (IFPQ)

IFPQ # 22A1322

Notice to Prospective Contractors

You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 22A1322 entitled Roof Replacement Services in Sacramento County. In submitting your quote, you must comply with the instructions found herein.

“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00, to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”

This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.

In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:

Gurinder Kaur California Department of Transportation (Caltrans) Email address: Gurinder.Kaur@dot.ca.gov Phone: (279) 234-2252

Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.

*Technical questions regarding this solicitation will be addressed, in writing and at an Optional Site Inspection to be held on December 4, 2025, at 1120 N Street, Sacramento, CA 95814. See Section C1, Time Schedule, for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT

LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.

Sincerely, Gurinder Kaur Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/

Invitation for Price Quote IFPQ Number 22A1322

A) Purpose and Description of Services

1. Contractor shall furnish all labor, parts, materials, supplies, equipment, tools, permits, fees, travel, and incidentals necessary to provide roof replacement services to Caltrans.

2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.

B) Bidder’s Minimum Qualifications

1. Bidder shall possess at the time of bid submittal and for the duration of the Agreement, a valid and current Class (A) General Engineering Contractor or C-39 Roofing Contractor license issued by the California State License Board (CSLB).

2. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.

3. Contractor shall be a certified installer authorized by the manufacturer of the roofing system. This will be verified by Caltrans Contract Manager before the start of work.

4. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.

C) Price Quotation Requirements and Information

1. Time Schedule

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time (Pacific Time)

IFPQ available to prospective bidders November 25, 2025 OptionalSite Inspection December 4, 2025 9:00 A.M.

Written Question Submittal December 5, 2025 Final Date for Quote Submission December 11, 2025 2:00 P.M.

Proposed Award Date (estimate) December 18, 2025

2. Optional Site Inspection A. An optional site inspection is scheduled at 9:00 a.m. on December 4, 2025, at 1120 N Street, Sacramento, CA 95814 for the purpose of discussing concerns regarding this IFPQ.

B. In the event a potential prime contractor is unable to attend an optional site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one

(1) company.Subcontractors may not represent a potential prime contractor at an optional site inspection

C. All prospective contractors are to be assembled at Caltrans, 1120 N Street, Sacramento, CA 95814, at 9:00 a.m. Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities.

3. Reasonable Accommodation

For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the optional site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the optional site inspection to arrange for a reasonable accommodation.

4. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by December 5, 2025.

B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 22A1322. Questions must be sent to the following email:

Email: Gurinder.Kaur@dot.ca.gov

C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website https://caleprocure.com/pages/index,aspx. It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.

5. ADM-1412 – Price Quote Proposal The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.

6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.

7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).

8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of Sacramento as described in the Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.

mailto:Gurinder.Kaur@dot.ca.gov https://caleprocure.com/pages/index,aspx https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

9. Mandatory Organic Waste Recycling

Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.

10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and

34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).

B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.

11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).

B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.

C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

12. Contractor’s License Bidder must have at time of quote submittal and for the duration of the contract, a valid, current Class (A) General Engineering Contractor or (C-39) Roofing Contractor license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).

13. Subcontractors Bidder may subcontract portions of the work as defined in the attached Proposed Form of Agreement. If a Subcontractor(s) is used, complete the Bidder Declaration (GSPD–05-105).

Bidder must ensure Subcontractor(s) shall have all necessary licenses, permits, and/or certifications to accomplish its portion of the work. Failure of a Subcontractor(s) to have the proper licenses, permits, and/or certifications, shall be cause for rejection of price quote. Contractor may only subcontract portions of the work to a qualified Department of General Services (DGS) Certified

Small Business (SB)/Micro Business (MB)/SB for the purpose of Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE), with the same status of Contractor. No work may be subcontracted to any business not certified as a SB/MB/SB-PW or DVBE by DGS. Contractor must ensure the Subcontractor(s) is DGS Certified SB/MB/SB-PW or DVBE and has all necessary licenses, permits, and/or certifications to accomplish its portion of the work.

14. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

15. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.

16. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.

17. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying a Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

18. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.

19. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).

20. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.

B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE

QUOTATION SUBMITTAL’, as shown in the following example:

IFPQ Number: 22A1322

PRICE QUOTATION SUBMITTAL–DO NOT OPEN

C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.

D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

E. Email to: Gurinder.Kaur@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.

G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.

H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.

Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.

J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.

Bidder modifications offered in any other manner, oral or written, will not be considered.

K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at Gurinder.Kaur@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.

L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.

M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.

N. Caltrans reserves the right to reject all price quotes for reasonable cause.

O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.

mailto:Gurinder.Kaur@dot.ca.gov mailto:Gurinder.Kaur@dot.ca.gov

P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.

21. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.

B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.

C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:

individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.

22. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.

B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.

C. Antitrust Provisions

1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.

https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language

2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.

3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).

D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.

E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

23. Executive Order N-6-22 – Russia Sanctions

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

24. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder / Offeror must notify the State in writing if it:

1) Intends to provide GenAI as a deliverable to the State; or

2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:

a) Functionality of a State system,

b) Risk to the State, or

c) Contract performance.

Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf

C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 22A1322 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 1

ADM-1412 (REV. 9/2025)

Contractor’s Name (Please Print):

Item Number

Estimated Quantity

Unit Of Measure Item

Unit Price (Price Per

Unit of Measure)

Total (Estimated Quantity X Unit Price)

1 1 Lump Sum All labor, equipment, tools, travel, and incidentals necessary to remove and legally dispose of roofing system per STD 213, Exhibit A, Scope of Work. $ $

2 1 Lump Sum All labor, equipment, tools, travel, and incidentals necessary to replace roofing system per STD 213, Exhibit A, Scope of Work. $ $

3 120 Hourly All labor, equipment, tools, travel, and incidentals necessary to perform unforeseen labor per STD 213, Exhibit A, Scope of Work. $ $

Subtotal: $

Maximum allowable expenditure for all parts, materials, supplies, fees, and permits per Exhibit A, Item 9. Actual cost will be reimbursed based on submitted original receipts. This Amount Shall be 10 percent (10%) of the Actual Subtotal Amount (0.10 x Subtotal). Enter 10% in Total column. $

1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.

3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.

4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.

Total This Proposal (Subtotal + Line 4)

Attachment 2

Required Documents

The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.

☐ Attachment 1 – Price Quote Proposal (ADM-1412)

☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet

☐ Bidder Declaration (GSPD 05105) Bidder Declaration

☐ Non-Collusion Declaration Non-Collusion Declaration

☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification

☐ Darfur Contracting Act Certification (DOT ADM-077) Darfur Contracting Act Certification

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Payment BondPayment Bond

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

Attachment 3

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.

2. The term of this Agreement is:

Contractor’s Name Agreement Number 22A1322

Exhibit A

Public Works (State)

Scope of Work

1. Contractor agrees to provide all labor, materials, parts, supplies, equipment, tools, permits, fees, travel, and incidentals necessary to remove and legally dispose of existing roofing material and furnish and install an induction adhered Thermoplastic Polyolefin (TPO) roofing system consisting of thermoplastic polyolefin roofing membrane, cover board, insulation, flashing, bonding adhesive, fasteners, roof drains, and all other accessories and components which are required for a complete, securely fastened and weather tight installation to Caltrans.

2. The services shall be performed at 1120 N Street, Sacramento, CA 95814.

3. Any reference to Caltrans Contract Manager shall also include his/her designee.

4. This Agreement will commence on June 29, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on December 28, 2026 (estimate). The services shall be provided during normal business hours Monday through Friday 6:00 a.m. to 6:00 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.

5. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.

California Department of Transportation (Caltrans)

Contractor: TBD

Section/Unit: D22/Business Operations Project Manager:

Caltrans Contract Manager: TBD

Address Address

Business Phone Number: Business Phone Number:

Email: Email:

6. Detailed Description of Work A. Contractor shall remove and legally dispose of all existing built-up roofing material necessary to install new roof system according to the specifications outlined in this Exhibit A, Scope of Work.

B. Contractor shall install all pressure treated wood nailers as required for proper installation of the roof system, clad metal edge, and miscellaneous flashings.

C. The approximate area of the roof is 14,000 square feet. This area is approximate and shall be field verified by Contractor before the start of work.

D. Contractor shall ensure insulation is not exposed to precipitation or left exposed at the end of each workday.

E. Insulation shall be installed as per manufacturer’s recommendation.

Exhibit A

Public Works (State)

F. Contractor shall cut and fit insulation within one-fourth of an inch (¼”) of nailers, projections, and penetrations.

G. Insulation shall be installed and secured using mechanical fasteners specifically designed and sized for fastening roof insulation. Insulation tape shall be used as recommended by the insulation manufacturer.

H. Contractor shall trim surface of insulation where necessary at roof edge so the completed surface is flush and does not restrict flow of water.

I. Contractor shall install cover board with long joints of insulation in a continuous straight line with end joints staggered between rows, abutting edges and ends between boards. Gaps exceeding one-fourth of an inch (¼”) shall be filled with insulation.

J. Contractor shall fasten cover board as per manufacturer’s recommendation.

K. Contractor shall install the Induction Plate/Purlin fasteners into the purlins at 12” on center to provide membrane attachment. Contractor shall follow membrane manufacturer installation requirements.

L. Contractor shall install roofing membrane per manufacturer’s recommendation.

M. Roofing membrane shall be accurately aligned and maintain uniform side and end laps of minimum dimensions as required by manufacturer. End laps shall be staggered. Membrane sheets shall be aligned perpendicular to the flutes of the deck.

N. Contractor shall apply roofing membrane with side laps shingled with slope of roof deck where possible.

O. Contractor shall perform induction welding for each plate per manufacturer’s recommendation and repeated for each plate.

P. Contractor shall mechanically fasten and seal roofing membrane securely at terminations, penetrations, and perimeter of roofing, per manufacturer’s recommendation.

Q. Seam areas shall be clean, overlap roofing membrane, and hot-air weld side and end laps of roofing membrane per manufacturer recommendation to ensure a watertight seam installation.

R. Seam weld shall be verified for continuity by testing lap edges with probe. Contractor shall apply lap sealant to seal cut edges of roofing membrane. Field strength of seams shall be verified a minimum of twice daily and sample area repaired. Contractor shall remove and repair any unsatisfactory sections before proceeding. Contractor shall repair any tears, voids, and lapped seams in roofing membrane that do not meet the manufacturer’s requirements.

S. Membrane roofing system shall be protected during the installation period. Any deficiencies in the membrane roofing system that do not comply with the manufacturer’s requirements shall be corrected, repaired, or reinstalled to a condition free of damage at Contractor’s sole expense.

T. Contractor shall install rubber blocks to support all conduits, including a block every eight (8’) feet and additional blocks at changes in direction and where needed for proper support.

Contractor shall add risers where needed to accommodate heights greater than five inches (5”).

Contractor shall use redwood blocks for conduit that is lower than five inches (5”) off the roof surface.

U. Contractor shall install new crossovers at all existing locations with walkway pad sections under feet and re-install conduit protection with walkway pad section under the entire run.

Exhibit A

Public Works (State)

V. Contractor shall install new counterflashing and wind clips at all existing locations.

W. Contractor shall install new TPO pipe flashings.

X. Contractor shall replace roof drains and clean debris. Water block sealant and new membrane shall be installed into the roof drain.

Y. Contractor shall replace any damaged plywood, up to 160 square feet, prior to new roof installation.

Z. Contractor shall remove old seal prior to any replacement work. Prepare, prime, and coat all vent seams with acrylic sealer and polyester reinforcement at a rate of three (3) gallons per square.

AA. Overspray and spillage from work shall be cleaned using cleaning agents and procedures per manufacturer’s recommendation.

7. Material Specifications A. Contractor shall obtain all roofing system components from a single source roofing manufacturer who has produced the required type of product successfully for at least five (5) years or more. The Johns Manville brand or equivalent will be acceptable. Caltrans Contract Manager has sole authority and must approve all components before installation begins.

B. Roofing products shall have been tested and listed by the Underwriters Laboratory, Factory Mutual, or other recognized testing agency, and shall bear those labels.

C. Contractor shall deliver roofing materials to site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, and directions for storing and mixing with other components.

D. Induction adhered thermoplastic polyolefin roofing system shall be built with:

1) Thermoplastic polyolefin sheet shall be a uniform, flexible sheet formed from an internal fabric or scrim reinforced thermoplastic polyolefin and have a nominal 60 mils thickness.

2) Flashing shall be 22-gauge galvanized sheet metal cleat and comply with manufacturer’s recommendation.

3) Cover board shall be one half inch (1/2”) Dexcell glass mat cover board with Rhino plates and fastening pattern six-ten-fifteen (6-10-15).

4) Roof insulation shall be two inches (2”) layer of isocyanurate roof insulation.

5) Bonding adhesive for membrane shall be a water based. Bonding adhesive for flashings shall be a low Volatile Organic Compound (VOC) solvent-based bonding adhesive. Both shall be per manufacturer’s recommendation.

6) Metal termination bars shall be predrilled stainless steel or aluminum bars with anchors.

7) Fasteners shall be as recommended by the thermoplastic polyolefin roofing system manufacturer.

8) Induction welding plate shall be a round, specially coated plate with a recessed center and raised flat bonding surface specially designed for induction welding application.

9) Seam plates shall be as recommended by the thermoplastic polyolefin roofing system manufacturer.

Exhibit A

Public Works (State)

10) Pressure treated wood nailer strips shall be per manufacturer’s recommendation for type of insulation used.

11) Clean surface of all dust, debris, moisture, and any other substances detrimental to roof installation per manufacturer’s recommendation.

12) Remove all flashings, counterflashings, pipe flashings, vents, and like components necessary for new installation.

8. Parts/Materials/Supplies/Fees/Permits A. Contractor shall notify Caltrans Contract Manager in writing of any parts/materials/ supplies/fees/permits not specifically identified in Price Quote Proposal, Attachment 1 that are necessary to complete the work. Written approval from Caltrans Contract Manager must be obtained prior to the purchase or installation of such items for the costs to be eligible for reimbursement.

B. Contractor will be reimbursed for the actual cost of pre-approved parts/materials/supplies/fees/ permits purchased to be consumed or installed at the work site in performance of the Agreement (including applicable sales tax), without additional allowance for markup. No additional compensation will be made for the cost to acquire, store, deliver, or use/install any purchased items. Cost of parts/materials/supplies/fees/permits are to be verified and substantiated by submitting a copy of appropriately signed receipts. Total expenditures for parts/materials/ supplies/fees/permits shall not exceed the amount set forth in Attachment 1.

C. Contractor shall not be reimbursed for any parts/materials/supplies/fees/permits that were not pre-approved in writing by Caltrans Contract Manager.

9. Unforeseen Labor A. Contractor must notify Caltrans Contract Manager in writing of any labor not reasonably anticipated in this Exhibit A, Scope of Work but necessary for completion of the work.

Contractor must receive written approval from Caltrans Contract Manager prior to performing unforeseen labor.

B. The cost of unforeseen labor shall be in accordance with bid rate in Price Quite Proposal, Attachment 1.

C. Contractor shall not be reimbursed for any unforeseen labor that was not pre-approved in writing by Caltrans Contract Manager.

10. Discovery of Asbestos, Lead-Based Paint, or Other Hazardous Substances/Material A. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials in the area affected by the Agreement, Contractor shall STOP WORK IMMEDIATELY. Contractor shall verbally notify Caltrans Contract Manager of these findings immediately and confirm verbal notification in writing within 24 hours. Contractor is not responsible for any work related to clean up or disposal of these substances.

B. Continuation of work shall not commence until Contractor has been authorized to do so in writing by Caltrans Contract Manager.

C. Should it become necessary to terminate work, Contractor shall be compensated only for work completed to Caltrans Contract Manager’s satisfaction. No payment shall be made for delay or lost profits anticipated for uncompleted work.

Exhibit A

Public Works (State)

D. Failure to notify Caltrans Contract Manager of the discovery of asbestos, lead-based paint or other hazardous substances/materials may result in immediate termination of the Agreement for default. Contractor shall be responsible for all damages arising from failure to disclose the discovery of any hazardous substances.

E. No hazardous materials or waste shall be handled by Contractor.

11. General Contractor Responsibilities

A. Contractor shall provide manufacturer's technical product data submitted for approval.

B. Product data shall include the manufacturer's name and a complete material description of all components of the thermoplastic polyolefin roofing system.

C. Contractor shall provide full-time supervision at the jobsite when roofing work is in progress. The jobsite supervisor shall be certified by the roofing system manufacturer and shall possess the manufacturer’s written certificate to install the approved roofing system.

D. Contractor shall proceed with the roofing work only when existing and forecasted weather conditions will permit work to be performed in accordance with the manufacturer’s recommendations and guarantee/warranty requirements.

E. Contractor shall be a certified installer authorized by the manufacturer of the roofing system.

This will be verified by Caltrans Contract Manager before the start of work.

F. During business workdays, Contractor shall ensure entrance is always accessible to Caltrans employees and guests.

G. Caltrans property shall be always secured.

H. No area is available within the work site limits for the exclusive use of Contractor. Contractor shall arrange with Caltrans Contract Manager for areas to store equipment and materials within the work area.

I. Contractor shall ensure that only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed to the highest industry standards.

J. Contractor shall take all the necessary precautions to prevent injury or hazard to Caltrans employee(s), invitee(s) and/or to the general public and shall avoid causing any unreasonable inconvenience to any person doing business on Caltrans property.

K. Contractor shall be responsible for any and all liability imposed by law or Agreement for any damage to any person resulting from any causes whatsoever during the performance of these services.

L. Contractor shall conduct its operations in such a manner that existing facilities, surfacing, installations, and utilities shall remain in place and will not be damaged.

M. All access areas shall be protected by Contractor from Contractor's materials and equipment.

N. Contractor shall obtain and pay for all permits and licenses, regulations and certifications required by local ordinances.

O. Contractor shall plan its work to minimize interference with Caltrans staff, other contractors working at the facility, and the public.

Exhibit A

Public Works (State)

12. Contractor Project Manager Responsibilities A. Contractor Project Manager shall coordinate work-related matters and Contractor’s operations under this Agreement.

B. In addition to other responsibilities described in this Agreement, Contractor Project Manager shall be responsible for all matters related to Contractor’s personnel including, but not limited to, the following:

1)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .