IFPQ_Solicitation_09A1090_Final.pdf
PDF 5 MB Posted
- Solicitation number
- 09A1090
- Issued by
- Mono County, Mono City CDP, Mono Vista CDP, California
About this file
IFPQ 09A1090: Asbestos Roof Removal and Replacement Services
This Invitation for Price Quote (IFPQ) was issued by the California Department of Transportation (Caltrans) on February 20, 2026, for asbestos roof removal and replacement services at the Sonora Junction Maintenance Station in Mono County, California. The project requires the contractor to remove and legally dispose of an existing asbestos-containing roof covering approximately 6,150 square feet and install a new 80-millimeter induction-adhered thermoplastic polyolefin (TPO) roofing system. The scope includes obtaining a State Fire Marshal permit, conducting asbestos surveys and sampling, removing and disposing of asbestos-containing materials in compliance with EPA and Cal/OSHA regulations, installing new insulation and roofing materials, and providing a 20-year manufacturer warranty. An optional pre-bid site inspection is scheduled for March 2, 2026, at 10:00 a.m. Written questions must be submitted by March 3, 2026, at 12:00 p.m., and price quotes are due by March 10, 2026, at 5:00 p.m. The estimated award date is March 24, 2026. The Agreement will commence April 1, 2026, (estimated) and expire March 30, 2027. Work shall be performed during normal business hours, Monday through Friday, 6:00 a.m. to 7:00 p.m., excluding state holidays.
The maximum allowable bid amount is $461,000, with prevailing wages required if the total bid exceeds $15,000. This is a small business (SB) set-aside contract open to certified SB entities, including micro businesses (MB), small businesses for public works (SB-PW), and disabled veteran business enterprises (DVBE). The bidder must hold either a C-39 Roofing Contractor license with C-2 Insulation and Acoustical Contractor and C-22 Asbestos Abatement Contractor licenses, or a B General Building Contractor license with a C-22 license. Current asbestos certification (ASB) and Department of Industrial Relations (DIR) registration are mandatory throughout the contract term. Payment bonds are required if the bid exceeds $25,000, and comprehensive insurance coverage is mandated, including general liability ($1,000,000 per occurrence/$2,000,000 aggregate), automobile liability ($1,000,000 combined single limit), workers' compensation, and pollution liability ($1,000,000 per incident/$2,000,000 aggregate). Caltrans must receive a minimum of two certified SB/MB or DVBE price quotes before award. Asbestos survey reports from 1993 and 1988 indicate positive asbestos content in roofing materials, pipe insulation, and fittings at the facility.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
February 20, 2026
Invitation for Price Quote (IFPQ)
IFPQ # 09A1090
Notice to Prospective Contractors
You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 09A1090 entitled Asbestos Roof Removal and Replacement Services in Mono County. In submitting your quote, you must comply with the instructions found herein.
“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00, to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”
This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.
In the opinion of Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:
Tim Murphy California Department of Transportation (Caltrans) Email address: timothy.murphy@dot.ca.gov Phone: (279) 234-2662
Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.
*Technical questions regarding this solicitation will be addressed, in writing and at a Site Inspection to be held on March 2, 2026 at Sonora Junction Maintenance Station, US Highway 395 at post mile
93.8 in Bridgeport, CA 93517. See Section C1, Time Schedule, for more details.
ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT
LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.
Sincerely, Tim Murphy Caltrans Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:timothy.murphy@dot.ca.gov
Invitation for Price Quote IFPQ Number 09A1090
A) Purpose and Description of Services
1. Contractor shall provide all labor, materials, equipment, tools, permits, travel, and incidentals necessary to remove and legally dispose of existing roof known to contain asbestos and furnish and install a new induction adhered Thermoplastic Polyolefin (TPO) roofing system required for a complete, securely fastened, and weather tight installation.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
B) Bidder’s Minimum Qualifications
1. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the
Agreement (if awarded), a C-39 – Roofing Contractor license with a C-2 – Insulation and Acoustical Contractor and a C-22 – Asbestos Abatement Contractor license issued by the California Contractors State Licensing Board (CSLB) OR B – General Building Contractor license with a C-22 – Asbestos Abatement Contractor license. If Contractor subcontracts asbestos abatement work, the subcontractor shall hold a valid C-22 – Asbestos Abatement Contractor license issued by CSLB. If Contractor subcontracts insulation work, the subcontractor shall hold a valid C-2 – Insulation and Acoustical Contractor license issued by CSLB.
2. At the time of bid submittal, continuously thereafter, and for the duration of the Agreement, bidder and subcontractor (if applicable) maintain current ASB (Asbestos Certification).
3. At the time of bid submittal, continuously thereafter, and for the duration of the Agreement, bidder and subcontractor (if applicable) shall be a certified SB, including a micro business (MB) or a SB for the purpose of public works (SB-PW).
4. Bidder and subcontractor (if applicable) shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.
5. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.
6. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.
C) Price Quotation Requirements and Information
1. Time Schedule It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Event Date Time (Pacific Time)
IFPQ available to prospective bidders 02/20/2026 Optional Pre-Bid Site Inspection 03/02/2026 10:00 a.m.
Written Question Submittal 03/03/2026 12:00 p.m.
Final Date for Quote Submission 03/10/2026 5:00 p.m.
Proposed Award Date (estimate) 03/24/2026
2. Optional Pre-Bid Site Inspection A. An optional pre-bid site inspection is scheduled at 10:00 a.m., on March 2, 2026, at Sonora
Junction Maintenance Station, US Highway 395 at post mile 93.8 in Bridgeport, CA 93517 for the purpose of discussing concerns regarding this IFPQ.
B. In the event a potential prime contractor is unable to attend the optional pre-bid site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential prime contractor at a pre-bid site inspection.
C. All prospective contractors are to be assembled at Caltrans, Sonora Junction Maintenance Station, US Highway 395 at post mile 93.8 in Bridgeport, CA 93517, at 10:00 a.m. Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Failure to comply with these provisions may result in the rejection of your quote. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary.
3. Reasonable Accommodation For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the pre-bid site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the pre-bid site inspection to arrange for a reasonable accommodation.
4. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by March 3, 2026.
B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 09A1090. Questions must be sent to the following email:
Email: timothy.murphy@dot.ca.gov
C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website https://caleprocure.com/pages/index,aspx. It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.
https://caleprocure.com/pages/index,aspx
5. ADM-1412 – Price Quote Proposal
The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.
6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.
7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).
8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County of Mono as described in the Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.
9. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.
10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and
34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle
Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.
11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).
B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.
C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.
12. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current - 39 – Roofing Contractor license together with a C-2 – Insulation and Acoustical Contractor license and a C-22 – Asbestos Abatement Contractor license issued by the California Contractors State Licensing Board (CSLB) or a B – General Building Contractor license and a C- 22 – Asbestos Abatement Contractor license issued by the California Contractors State Licensing Board (CSLB), for the type of work to be performed.
If Contractor subcontracts asbestos abatement work, the subcontractor shall hold a valid C-22 – Asbestos Abatement Contractor license issued by CSLB. If Contractor subcontracts insulation work, the subcontractor shall hold a valid C-2 – Insulation and Acoustical Contractor license issued by CSLB. Contractor shall ensure that all subcontractors performing licensed work maintain the required CSLB licenses for the duration of the Contract.
Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).
13. Subcontractors Bidder may subcontract portions of the work as defined in the attached Proposed Form of Agreement. If a Subcontractor(s) is used, complete the Bidder Declaration (GSPD–05-105).
Bidder must ensure Subcontractor(s) shall have all necessary licenses, permits, and/or certifications to accomplish its portion of the work. Failure of a Subcontractor(s) to have the proper licenses, permits, and/or certifications, shall be cause for rejection of price quote. Contractor may only subcontract portions of the work to a qualified Department of General Services (DGS) Certified Small Business (SB)/Micro Business (MB)/SB for the purpose of Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE), with the same status of Contractor. No work may be subcontracted to any business not certified as a SB/MB/SB-PW or DVBE by DGS. Contractor must ensure the Subcontractor(s) is DGS Certified SB/MB/SB-PW or DVBE and has all necessary licenses, permits, and/or certifications to accomplish its portion of the work.
14. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
15. Non-Collusion Declaration for Public Works Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.
16. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.
17. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.
B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:
Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.
C. The additional insured endorsement must accompany the certificate of insurance.
D. Satisfying a Self-Insured Retention (SIR)
All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.
18. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights
Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.
19. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.
B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.
C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).
D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.
E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).
20. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.
B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:
IFPQ Number: 09A1090
PRICE QUOTATION SUBMITTAL–DO NOT OPEN
C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.
D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.
E. Email to: timothy.murphy@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.
G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.
H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.
Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.
I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.
J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.
Bidder modifications offered in any other manner, oral or written, will not be considered.
K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at timothy.murphy@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.
L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.
M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.
N. Caltrans reserves the right to reject all price quotes for reasonable cause.
O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.
P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.
Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.
21. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.
B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.
C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.
mailto:timothy.murphy@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language
D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:
individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.
22. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.
B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.
C. Antitrust Provisions
1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.
2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.
3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).
D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.
E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.
F. No oral understanding or agreement shall be binding on either party.
23. Executive Order N-6-22 – Russia Sanctions On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
24. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) Intends to provide GenAI as a deliverable to the State; or
2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) Functionality of a State system,
b) Risk to the State, or
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 09A1090 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 1
ADM-1412 (REV. 9/2025)
Contractor’s Name (Please Print):
Item Number
Estimated Quantity
Unit Of Measure Item
Unit Price (Price Per
Unit of Measure)
Total (Estimated Quantity X Unit Price)
1 1 Lump Sum
All labor, materials, equipment, tools, travel, and incidentals necessary to obtain a permit from the State Fire Marshall to perform the roof replacement at the Sonora Junction Maintenance Station as described in Exhibit A, Scope of Work.
2 1 Lump Sum All labor, materials, equipment, tools, permits, travel, and incidentals necessary for the management and removal of Asbestos Containing Construction Materials at the Sonora Junction Maintenance Station as described in, Exhibit A, Scope of Work.
3 1 Lump Sum All labor, materials, equipment, tools, permits, travel, and incidentals necessary to remove and legally dispose of the existing roofing system at the Sonora Junction Maintenance Station per STD 213, Exhibit A, Scope of Work.
4 1 Lump Sum All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at the Sonora Junction Maintenance Station per Exhibit A, Scope of Work.
5 80 Hours All Unforeseen labor for roofing repair at the Sonora Junction Maintenance Station per Exhibit A, Item 14, Scope of Work $ $
Subtotal: $
Maximum allowable expenditure for all materials, supplies, parts, fees, and permits per Exhibit A, Section 13 Parts/Materials/Supplies/Fees/Permits shall be $10,000 and shall not exceed $10,000. Actual costs will be reimbursed based on submitted original receipts. This amount is reflected on the bid sheet.
$10,000.00
1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.
2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.
3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.
4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.
Total This Proposal $
Attachment 2
Required Documents
The following documents should be submitted, or your bid may be considered non-responsive.
Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
☐ Attachment 1 – Price Quote Proposal (ADM-1412)
☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet
☐ Bidder Declaration (GSPD 05105) Bidder Declaration
☐ Non-Collusion Declaration Non-Collusion Declaration
☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification
☐ Darfur Contracting Act Certification
The following documents will be requested of the WINNING BIDDER at time of contract award;
they are NOT required at time of bid submittal:
☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses
☐ Payment Bond Payment Bond
☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)
☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
Attachment 3
Proposed Form of Agreement
Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.
2. The term of this Agreement is:
Contractor’s Name TBD Agreement Number 09A1090
Exhibit A
Public Works (State)
Scope of Work
1. Contractor agrees to provide to the California Department of Transportation (Caltrans) Asbestos
Roof Removal and Replacement Services as described herein.
Contractor shall provide all labor, materials, equipment, tools, permits, travel, and incidentals necessary to remove and legally dispose of existing roof known to contain asbestos and furnish and install a new induction adhered Thermoplastic Polyolefin (TPO) roofing system required for a complete, securely fastened, and weather tight installation.
2. The services shall be performed at the Sonora Junction Maintenance Station, US Highway 395 at post mile 93.8 in Bridgeport, CA 93517 in Mono County.
3. Any reference to Caltrans Contract Manager shall also include his/her designee.
4. This Agreement will commence on April 1, 2026 (estimate), or upon approval by the Department of
General Services (DGS), whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by DGS. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on March 30, 2027 (estimate). The services shall be provided during normal business hours Monday through Friday 6:00 a.m. to 7:00 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.
5. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.
California Department of Transportation (Caltrans):
Contractor:
Section/Unit: Project Manager:
Caltrans Contract Manager:
Address
Address
Business Phone Number: Business Phone Number:
Email: Email:
6. Detailed Description of Work:
A. Contractor shall remove and replace an approximately 6,150-square-foot roof consisting of four separate levels. Contractor shall note that the roof contains asbestos which requires asbestos sampling, removal, and legal disposal. Contractor shall field verify the approximate roof area of 6,150 square feet before the start of work.
B. Pre-Construction Requirements
1) Contractor shall review Attachment 3, Title Sheet for the specific location of roof replacement.
2) Contractor shall be responsible for obtaining a permit from the State Fire Marshal for
Exhibit A
Public Works (State) performing roof replacement prior to beginning work. This includes all deliverables, fees, travel, and correspondence needed to procure the permit. Contractor shall submit final approved permit documents to Caltrans Contract Manager.
3) Contractor shall work with the State Fire Marshal to schedule progress and final inspections of work.
4) Contractor shall obtain all required permits and provide copies to Caltrans Contract Manager.
C. Asbestos Removal and Roof Demolition
1) Contractor shall note that the roof has been tested for asbestos containing materials (ACM).
The test report is included in the Agreement documents. Contractor shall refer to Attachment 4, Asbestos Survey Reports.
2) Contractor and/or subcontractor shall possess and maintain current ASB (Asbestos Certification) and C-22 Asbestos Abatement Contractor License. Contractor shall obtain all necessary licenses, permits, certifications, and other documents needed for asbestos work and provide copies to Caltrans Contract Manager upon request.
3) Contractor shall conduct a pre-job hazard assessment and air monitoring plan.
4) Contractor shall follow all specifications for asbestos sampling, removal, and disposal shown in Attachment 5, Asbestos Specifications.
5) Contractor shall submit an Asbestos Survey and Sampling Report as shown in Attachment
5, Asbestos Specifications.
6) Contractor shall submit a work plan for and sample all areas planned to be disturbed for asbestos per Attachment 5, Asbestos Specifications.
7) Contractor must have an Asbestos Compliance Plan and an Asbestos Removal Work Plan approved by the Contract Manager prior to beginning work.
8) Contractor shall prepare and submit a comprehensive asbestos abatement plan to Caltrans
Contract Manager seven (7) working days prior to the start of work. The plan shall include, but is not limited to:
a) Methods for removing, handling, transporting, and disposing of non-friable asbestos
b) Identification of all EPA and OSHA licenses, permits, and certifications
c) Pre-job hazard assessment and air monitoring plan
d) Schedule of work activities
e) Emergency response procedures
f) Worker protection protocols
9) Contractor shall notify and obtain approval from the local Air Quality Management District and the Division of Occupational Safety and Health (DOSH), (better known as Cal/OSHA) prior to submitting the plan to Caltrans Contract Manager and in accordance with all applicable regulations.
10) Contractor shall perform all asbestos removal work using licensed and trained personnel in accordance with EPA 40 CFR Part 61, OSHA 29 CFR 1926.1101, and local Air Quality https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1101
Exhibit A
Public Works (State)
Management District regulations.
11) Contractor shall use wet methods to minimize airborne fibers.
12) Contractor shall carefully remove asbestos containing roofing materials and associated debris without breaking, sanding, or grinding.
13) Contractor shall collect, containerize, seal, and label all asbestos-containing waste materials in strict accordance with applicable EPA regulations (40 CFR Part 61), DOT hazardous materials regulations (49 CFR Parts 171-180), and all applicable state and local requirements. All waste containers shall be properly marked with the appropriate hazard warnings and shipped only to an EPA-approved disposal facility.
14) Contractor shall use full personal protective equipment (PPE) and respiratory protection (PAPR or half/full-face respirators).
15) Contractor shall carefully expose, remove, and dispose of the existing roofing material, sheathing, any damaged insulation and wood so that no damage occurs to the supporting roof deck, joists, fascia, or any other part of the building. Contractor shall remove and protect rain gutters, downspouts, and roof extrusions on site if necessary.
16) Contractor shall load removed materials into double six millimeters (6 mm) asbestos disposal bags or approved leak-tight containers.
17) Contractor shall seal and label asbestos waste per EPA and DOT regulations.
18) Contractor shall ensure all asbestos material is double-bagged and labeled.
19) Contractor shall transport asbestos waste to an approved hazardous waste disposal facility.
20) Contractor shall provide waste shipment records and disposal manifests to Caltrans
Contract Manager upon completion.
21) Contractor shall conduct daily air monitoring by a qualified air monitor inspector.
22) Contractor shall perform final visual inspection as required by local regulations.
D. Roof Demolition and Removal
1) Contractor shall remove and legally dispose of all existing built-up roofing material necessary to install a new 80-millimeter thermoplastic polyolefin (TPO) roof system according to the specifications outlined in this Exhibit A, Scope of Work.
2) Contractor shall inspect for compromised framing or decking resulting from weathering or structural degradation after removal of existing roofing materials.
3) Contractor shall replace compromised decking or framing with materials equivalent to the original material specifications to maintain the structural integrity of the roof. Decking and framing shall match the same section depth, dimensions, and material grade as the original components. Actual costs for these repairs will be reimbursed based on prior written approval from Caltrans Contract Manager and submitted receipts.
E. New Roof Installation
1) Contractor shall install new Type R-30 insulation per manufacturer's recommendations.
2) Contractor shall ensure insulation is not exposed to precipitation or left exposed at the end of each workday.
https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61?toc=1 https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-C/part-171 https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-C/part-171
Exhibit A
Public Works (State)
3) Contractor shall cut and fit insulation within one-quarter of an inch (¼") of nailers, projections, and penetrations. Contractor shall trim the surface of insulation where necessary at the roof edge so the completed surface is flush and does not restrict the flow of water.
4) Contractor shall install all pressure-treated wood nailers as required for proper installation of the roof system, clad metal edge, and miscellaneous flashings.
5) Contractor shall install and secure insulation using mechanical fasteners specifically designed and sized for fastening roof insulation. Insulation tape shall be used as recommended by the insulation manufacturer.
6) Contractor shall install cover board with long joints of insulation in a continuous straight line with end joints staggered between rows.
7) Contractor shall ensure abutting edges and ends between boards are properly fitted.
8) Contractor shall fill gaps exceeding one-quarter of an inch (¼") with insulation.
9) Contractor shall fasten cover board per manufacturer's recommendations
10) Contractor shall install induction plate/purlin fasteners into the purlins at 12 inches on center to provide membrane attachment. Contractor shall follow membrane manufacturer installation requirements.
11) Contractor shall install roofing membrane per manufacturer's recommendations. Roofing membrane shall be accurately aligned and maintain uniform side and end laps of minimum dimensions as required by the manufacturer. End laps shall be staggered.
12) Contractor shall apply roofing membrane with side laps shingled with the slope of the roof deck where possible.
13) Contractor shall perform induction welding for each plate per manufacturer's recommendations and repeat for each plate.
14) Contractor shall mechanically fasten and seal roofing membrane securely at terminations, penetrations, and the perimeter of roofing per manufacturer's recommendations.
15) Contractor shall ensure that seam areas are clean and overlap roofing membrane.
16) Contractor shall hot-air weld side and end laps of roofing membrane per manufacturer recommendations to ensure a watertight seam installation.
17) Contractor shall verify seam weld for continuity by testing lap edges with a probe.
18) Contractor shall apply lap sealant to seal cut edges of roofing membrane.
19) Contractor shall verify the field strength of the seams a minimum of twice daily and sample areas repaired.
20) Contractor shall remove and repair any unsatisfactory sections before proceeding.
21) Contractor shall repair any tears, voids, and lapped seams in roofing membrane that do not meet manufacturer requirements.
22) Contractor shall ensure membrane roofing system is protected during the installation period.
Any deficiencies in the membrane roofing system that do not comply with manufacturer requirements shall be corrected, repaired, or reinstalled to a condition free of damage at
Exhibit A
Public Works (State)
Contractor's sole expense.
23) Contractor shall install rubber blocks to support all conduits, including a block every eight feet (8') and additional blocks at changes in direction and where needed for proper support.
24) Contractor shall add risers where needed to accommodate heights greater than five inches
(5").
25) Contractor shall use redwood blocks for conduit that is lower than five inches (5") off the roof surface.
26) Contractor shall install new counterflashing and wind clips at all existing locations.
27) Contractor shall install new TPO pipe flashings.
28) Contractor shall replace all roof drains and clean debris.
29) Contractor shall install water block sealant and new membrane into the roof drain.
30) Contractor shall remove old seal prior to…