IFPQ_Public_Works_08A3946_Roofing_Final.pdf
PDF 2 MB Posted
- Solicitation number
- 08A3946
- Issued by
- San Bernardino County, San Bernardino City, California
About this file
IFPQ Summary: Roof Removal and Replacement with Asbestos Abatement Services
This Invitation for Price Quote (IFPQ) is issued by the California Department of Transportation (Caltrans), Division of Procurement and Contracts, for roof removal and replacement services with asbestos abatement at the Mountain Pass Maintenance Station in San Bernardino County. The project scope requires complete removal of existing roofing systems containing asbestos-containing materials and installation of new 30-year architectural composition shingle roof systems on five employee housing units (approximately 1,215 to 1,321 square feet each) and three detached garages (approximately 300 to 806 square feet each). Contractor services must include all asbestos abatement, underlying structural repairs, roof accessory installation, site preparation, protection, and final cleanup. The mandatory pre-bid site inspection is scheduled for March 2, 2026, at 11:00 a.m. at the Mountain Pass Maintenance Station, 94200 Clarke Road, Mountain Pass, California. Written questions must be submitted by March 3, 2026, at 12:00 p.m., with the final quote submission deadline of March 10, 2026, at 5:00 p.m. The estimated award date is March 17, 2026. The Agreement is expected to commence May 1, 2026, or upon Department of General Services approval, whichever is later, and expire April 30, 2027, with work performed during normal business hours Monday through Friday, 7:00 a.m. to 3:30 p.m., excluding state holidays.
This solicitation is limited to certified small businesses (SB), micro businesses (MB), small businesses for public works purposes (SB-PW), or disabled veteran business enterprises (DVBE), with a maximum bid cap of $461,000. Caltrans must receive at least two price quotes from certified SB/MB/SB-PW or DVBE contractors before making an award. Prevailing wages apply if the total bid exceeds $15,000, with state general prevailing wage rates determined by the Director of Industrial Relations for San Bernardino County. Bidders must maintain active C-39 Roofing Contractor and C-22 Asbestos Abatement Contractor licenses from the California Contractors State License Board, current asbestos certification, and valid Department of Industrial Relations registration. If the successful bidder's quote exceeds $25,000, a payment bond of not less than 100 percent of the total contract amount is required prior to work commencement. Insurance requirements include commercial general liability ($1,000,000 per occurrence/$2,000,000 aggregate), automobile liability ($1,000,000 combined single limit), workers' compensation at statutory limits, pollution liability ($1,000,000 per incident/$2,000,000 aggregate), professional liability ($1,000,000), and builder's risk/installation floater coverage. The asbestos survey report confirms all eight roofs contain asbestos-containing materials, including chrysotile fibers in roofing systems, tar paper, cementitious shingles, and roof penetration sealants, all classified as non-friable Category I/II materials requiring specialized removal and disposal procedures compliant with federal, state, and local regulations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
February 19, 2026
Invitation for Price Quote (IFPQ)
IFPQ # 08A3946
Notice to Prospective Contractors
You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 08A3946 entitled Roof Removal and Replacement with Asbestos Abatement Services in San Bernardino County. In submitting your quote, you must comply with the instructions found herein.
“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $461,000.00to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE). A bid over $461,000.00 will result in rejection of your bid due to non-responsiveness.”
This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.
In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:
Tim Murphy California Department of Transportation (Caltrans) Email address: timothy.murphy@dot.ca.gov Phone: (279) 234-2662
Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.
*Technical questions regarding this solicitation will be addressed, in writing and at a Mandatory Site Inspection to be held on 11:00 a.m., March 2, 2026, at the Mountain Pass Maintenance Station at 94200 Clarke Road Mountain Pass, CA 92366. See Section C1, Time Schedule, for more details.
ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT
LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.
Sincerely, Tim Murphy Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:timothy.murphy@dot.ca.gov
Invitation for Price Quote IFPQ Number 08A3946
A) Purpose and Description of Services
1. Contractor shall furnish all labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary for the complete removal of existing roofing systems (including asbestos-containing materials) and installation of new 30-year architectural composition shingle roof systems on five (5) employee housing units and three (3) detached garages at the Mountain Pass Maintenance Station, including all required asbestos abatement, repairs to underlying structures, and installation of new roof accessories.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
B) Bidder’s Minimum Qualifications
1. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the
Agreement (if awarded), a C-39 – Roofing Contractor license and a C-22 – Asbestos Abatement Contractor issued by the California Contractors State Licensing Board (CSLB). If subcontracting out the asbestos abatement work, the subcontractor shall possess a C-22 – Asbestos Abatement Contractor license issued by CSLB.
2. At the time of bid submittal, continuously thereafter, and for the duration of the Agreement, bidder and subcontractor (if applicable) maintain current ASB (Asbestos Certification).
3. At the time of bid submittal, continuously thereafter, and for the duration of the Agreement, bidder and subcontractor (if applicable) shall be a certified SB, including a micro business (MB) or a SB for the purpose of public works (SB-PW).
4. Bidder and subcontractor (if applicable) shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.
5. By submitting its bid, Bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.
6. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.
C) Price Quotation Requirements and Information
1. Time Schedule
It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Event Date Time (Pacific Time)
IFPQ available to prospective bidders 02/19/2026 Mandatory Site Inspection 03/02/2026 11:00 a.m.
Written Question Submittal 03/03/2026 12:00 p.m.
Final Date for Quote Submission 03/10/2026 5:00 p.m.
Proposed Award Date (estimate) 03/17/2026
2. Mandatory Pre-Bid Site Inspection A. A mandatory pre-bid site inspection is scheduled at 11:00 a.m., March 2, 2026, at the
Mountain Pass Maintenance Station at 94200 Clarke Road Mountain Pass, CA 92366 for the purpose of discussing concerns regarding this IFPQ.
B. In the event a potential prime contractor is unable to attend the mandatory pre-bid site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company.Subcontractors may not represent a potential prime contractor at a pre-bid site inspection.
C. All prospective contractors are to be assembled at Caltrans, at 11:00 a.m., March 2, 2026, at the Mountain Pass Maintenance Station at 94200 Clarke Road Mountain Pass, CA 92366.
Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities.Failure to comply with these provisions may result in the rejection of your quote. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary.
3. Reasonable Accommodation For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the pre-bid site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the pre-bid site inspection to arrange for a reasonable accommodation.
4. Questions and Answers A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by March 3, 2026.
B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 08A3946 Questions must be sent to the following email:
Email: timothy.murphy@dot.ca.gov
C. Written responses to all questions will be collectively compiled and posted as an Addendum to the Cal eProcure website https://caleprocure.com/pages/index,aspx. It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the schedule of events and dates/times. Bidder can contact the Contract Analyst named above.
https://caleprocure.com/pages/index,aspx
5. ADM-1412 – Price Quote Proposal
The total price quote proposal for this Agreement must not exceed $461,000.00. A bid amount more than $461,000.00 will be deemed non-responsive and will be rejected.
6. Costs Included in Bid Rates Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.
7. Employment of Undocumented Workers No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).
8. State Prevailing Wages State General Prevailing Wage Rates will apply for the County San Bernadino as described in the Proposed Form of Agreement. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm or by contacting the Contract Analyst listed on the first page of this solicitation. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.
9. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.
10. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and
34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
B. MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle
Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.
11. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).
B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.
C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.
D. If Contractor lists Subcontractor who is believed to be performing work that is not subject to the registration requirements, written confirmation from DIR must be obtained and submitted with the proposal to validate the bid.
12. Contractor’s License Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current C-39 – Roofing Contractor license and a C-22 – Asbestos Abatement Contractor issued by the California Contractors State License Board (CSLB). If subcontracting out the asbestos abatement work, the subcontractor shall possess a C-22 – Asbestos Abatement Contractor license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).
13. Subcontractors Bidder may subcontract portions of the work as defined in the attached Proposed Form of Agreement. If a Subcontractor(s) is used, complete the Bidder Declaration (GSPD–05-105).
Bidder must ensure Subcontractor(s) shall have all necessary licenses, permits, and/or certifications to accomplish its portion of the work. Failure of a Subcontractor(s) to have the proper licenses, permits, and/or certifications, shall be cause for rejection of price quote. Contractor may only subcontract portions of the work to a qualified Department of General Services (DGS) Certified Small Business (SB)/Micro Business (MB)/SB for the purpose of Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE), with the same status of Contractor. No work may be subcontracted to any business not certified as a SB/MB/SB-PW or DVBE by DGS. Contractor must ensure the Subcontractor(s) is DGS Certified SB/MB/SB-PW or DVBE and has all necessary licenses, permits, and/or certifications to accomplish its portion of the work.
14. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
15. Non-Collusion Declaration for Public Works
Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents..
16. Bonds Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.
17. Insurance A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.
B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:
Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.
C. The additional insured endorsement must accompany the certificate of insurance.
D. Satisfying a Self-Insured Retention (SIR)
All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.
18. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.
19. Darfur Contracting Act
A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.
B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the ADM-0077.
C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).
D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.
E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).
20. Price Quote Submittal A. The price quote should be emailed as described below. The price quote must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.
B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:
IFPQ Number: 08A3946
PRICE QUOTATION SUBMITTAL–
C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.
D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.
E. Email to: timothy.murphy@dot.ca.gov F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email or telephone of any extensions.
G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.
H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.
Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.
I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.
J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.
Bidder modifications offered in any other manner, oral or written, will not be considered.
K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at timothy.murphy@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.
L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.
M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.
N. Caltrans reserves the right to reject all price quotes for reasonable cause.
O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.
P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.
Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.
21. Evaluation and Selection A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.
B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.
C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.
D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:
mailto:timothy.murphy@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.
22. Standard Conditions of Service A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.
B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.
C. Antitrust Provisions
1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.
2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.
3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).
D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.
E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.
F. No oral understanding or agreement shall be binding on either party.
23. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
24. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) Intends to provide GenAI as a deliverable to the State; or
2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) Functionality of a State system,
b) Risk to the State, or
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 08A3946 PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 3
ADM-1412 (REV. 9/2025)
Contractor’s Name (Please Print):
Item Number
Estimated Quantity
Unit Of Measure Item
Unit Price (Price Per
Unit of Measure)
Total (Estimated Quantity X Unit Price)
1 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles at Housing Unit One (approximately 2,862 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
2 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Housing Unit One (approximately 2,862 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
3 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles at Housing Unit Two (approximately 2,862 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
4 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Housing Unit Two (approximately 2,862 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
5 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles at Housing Unit Three (approximately 1,732 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
6 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Housing Unit Three (approximately 1,732 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
7 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles at Housing Unit Four (approximately 1,732 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
PRICE QUOTE PROPOSAL Attachment 1 Page 2 of 3
ADM-1412 (REV. 9/2025)
8 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Housing Unit Four (approximately 1,732 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
9 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles at Housing Unit Five (approximately 1,732 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
10 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Housing Unit Five (approximately 1,732 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
11 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles at Detached Garage One (approximately 806 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
12 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Detached Garage One (approximately 806 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
13 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles and replace roof at Detached Garage Two (approximately 806 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
14 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Detached Garage Two (approximately 806 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
15 1 Lump Sum All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to remove roof and legally dispose of asbestos tiles at Detached Garage Three (approximately 806 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
PRICE QUOTE PROPOSAL Attachment 1 Page 3 of 3
ADM-1412 (REV. 9/2025)
16 1 Lump Sum
All labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary to replace roof at Detached Garage Three (approximately 806 square feet) at the Mountain Pass Maintenance Station per Exhibit A, Scope of Work.
17 150 Hours All Unforeseen labor for roofing repair at the Mountain Pass Maintenance Station per Exhibit A, Item 8, Scope of Work $ $
Maximum allowable expenditure for all materials, supplies, parts, fees, and permits per Exhibit A, Section 7 Parts/Materials/Supplies/Fees/Permits shall be $10,000 and shall not exceed $10,000. Actual costs will be reimbursed based on submitted original receipts. This amount is reflected on the bid sheet.
$10,000.00
1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.
2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.
3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.
4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.
Total This Proposal $
Attachment 2
Required Documents
The following documents should be submitted, or your bid may be considered non-responsive.
Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
☐ Attachment 1 – Price Quote Proposal (ADM-1412)
☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet
☐ Bidder Declaration (GSPD 05105) Bidder Declaration
☐ Non-Collusion Declaration Non-Collusion Declaration
☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification
☐ Darfur Contracting Act Certification
The following documents will be requested of the WINNING BIDDER at time of contract award;
they are NOT required at time of bid submittal:
☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses
☐ Payment Bond Payment Bond
☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)
☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
Attachment 3
Proposed Form of Agreement
Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.
2. The term of this Agreement is:
Contractor’s Name TBD Agreement Number 08A3946
Exhibit A
Public Works (State)
Scope of Work
1. Contractor agrees to provide to the California Department of Transportation (Caltrans) Roof
Removal and Replacement with Asbestos Abatement Services at the Mountain Pass Maintenance Station as described herein.
Contractor shall furnish all labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary for the complete removal of existing roofing systems (including asbestos-containing materials) and installation of new 30-year architectural composition shingle roof systems on five (5) employee housing units and three (3) detached garages at the Mountain Pass Maintenance Station, including all required asbestos abatement, repairs to underlying structures, and installation of new roof accessories.
2. The services shall be performed at the Mountain Pass Maintenance Station at 94200 Clarke Road Mountain Pass, CA 92366 in San Bernadino County.
3. Any reference to Caltrans Contract Manager shall also include his/her designee.
4. This Agreement will commence on May 1, 2026 (estimate), or upon approval by the Department of
General Services (DGS), whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by DGS. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on April 30, 2027 (estimate). The services shall be provided during normal business hours Monday through Friday 7:00 a.m. to 3:30 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.
5. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.
California Department of Transportation (Caltrans):
Contractor:
Section/Unit: Project Manager:
Caltrans Contract Manager:
Address
Address
Business Phone Number: Business Phone Number:
Email: Email:
6. Detailed Description of Work:
A. Pre-Construction Requirements
1) Contractor shall furnish all labor, tools, equipment, materials, supplies, parts, travel, disposal, permits, and incidentals necessary for the complete removal of existing roofing systems (including asbestos-containing materials and all required asbestos abatement) and installation of new 30-year architectural composition shingle roof systems at the Mountain Pass Maintenance Station. This project encompasses five (5) employee housing units and
Exhibit A
Public Works (State) three (3) detached garages.
a) Unit One: approximately 2,862 square feet
b) Unit Two: approximately 2,862 square feet
c) Unit Three: approximately 1,732 square feet
d) Unit Four: approximately 1,732 square feet
e) Unit Five: approximately 1,732 square feet
f) Three detached garages: approximately 806 square feet each
2) Contractor shall meet with Caltrans Contract Manager prior to beginning work to discuss work performance and establish a schedule. All work shall be completed within the time agreed upon at the pre-work meeting, unless an extension is approved in writing by Caltrans Contract Manager.
3) Before starting work, Contractor shall designate in writing an authorized representative who shall have the authority to represent and act on Contractor's behalf. Contractor's authorized representative shall be present at the work site while work is in progress and shall provide a working telephone number to Caltrans Contract Manager prior to the start of work.
4) Contractor shall obtain fire marshal approval. Any costs associated with fire marshal approval shall be included in the Price Quote Proposal at no additional cost to Caltrans.
5) Prior to purchase and assembly of any products, Contractor shall submit the following to Caltrans Contract Manager for approval:
a) Product data
b) Manufacturer's descriptions
c) Factory Mutual test reports
d) Product specifications
e) Installation instructions No work shall begin prior to product approval by Caltrans Contract Manager.
6) The new roof system shall be subject to Caltrans Contract Manager's approval and shall match the existing color. No work shall begin without prior written approval from Caltrans Contract Manager.
B. Site Preparation and Protection
1) Contractor shall secure all work areas using barricades, caution tape, and signage.
2) Contractor shall post regulatory warning signs and barriers around the work area.
3) Contractor shall establish regulated areas and decontamination units.
4) Contractor shall protect landscaping, walkways, patios, and driveways with tarps and plywood.
5) Contractor shall coordinate with occupants and property management to minimize disruption.
Exhibit A
Public Works (State)
6) Contractor shall verify weather conditions are suitable prior to tear-off.
Note: Tenants will be present while roofing work is conducted.
C. Asbestos Removal and Roof Demolition
1) Contractor shall note that the roof has been tested for asbestos containing materials (ACM).
The existing roofing systems consist of composition shingles and hard shake asbestos (non-fibrous) tiles. Test report is included in contract documents. Please see Attachment 3, Asbestos Report.
2) Contractor shall possess and maintain current ASB (Asbestos Certification) and C-22 Asbestos Abatement Contractor License. Contractor shall obtain all necessary licenses, permits, certifications, and other documents needed for asbestos work and provide copies to Caltrans Contract Manager upon request.
3) Contractor shall notify required regulatory agencies (e.g., South Coast AQMD, Cal/OSHA) prior to work in accordance with applicable regulations.
4) Contractor shall conduct a pre-job hazard assessment and air monitoring plan.
5) Contractor shall comply with all applicable asbestos-related requirements of Department of
Industrial Relations (DIR) §1529, Asbestos, including all regulations governing asbestos exposure, handling, removal, containment, and disposal.
6) Contractor shall obtain all required permits and provide copies to Caltrans Contract Manager.
7) Contractor shall prepare and submit a comprehensive asbestos abatement plan to Caltrans Contract Manager seven (7) working days prior to the start of work. The plan shall include:
a) Methods for removing, handling, transporting, and disposing of non-friable asbestos
b) Identification of all EPA and OSHA licenses, permits, and certifications
c) Pre-job hazard assessment and air monitoring plan
d) Schedule of work activities
e) Emergency response procedures
f) Worker protection protocols
8) Contractor shall obtain approval from the Local Air Quality Management District prior to submitting the plan to Caltrans Contract Manager.
9) Contractor shall perform all asbestos removal work using licensed and trained personnel in accordance with EPA 40 CFR Part 61, OSHA 29 CFR 1926.1101, and local Air Quality Management District (AQMD) regulations.
10) Contractor shall remove existing composition shingles and hard shake asbestos (non-fibrous) down to the roof deck.
11) Contractor shall use wet methods to minimize airborne fibers.
12) Contractor shall carefully remove asbestos containing roofing materials and associated debris without breaking, sanding, or grinding.
13) Contractor shall maintain containment areas during removal.
https://www.aqmd.gov/ https://www.dir.ca.gov/dosh/ https://www.dir.ca.gov/title8/1529.html https://www.dir.ca.gov/title8/1529.html https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61 https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1101
Exhibit A
Public Works (State)
14) Contractor shall use full personal protective equipment (PPE) and respiratory protection Powered Air-Purifying Respirator (PAPR) or half/full-face respirators.
15) Contractor shall carefully expose, remove, and dispose of the existing roofing material, sheathing, any damaged insulation and wood so that no damage occurs to the supporting roof deck, joists, fascia, or any other part of the building. Contractor shall remove and protect rain gutters, downspouts, and roof extrusions on site if necessary.
16) Contractor shall load removed materials into double six millimeters (6 mm) asbestos disposal bags or approved leak-tight containers.
17) Contractor shall seal and label asbestos waste per U.S. Environmental Protection Agency and U.S. Department of Transportation regulations.
18) Contractor shall ensure all asbestos material is double-bagged and labeled.
19) Contractor shall transport asbestos waste to an approved hazardous waste disposal facility.
20) Contractor shall provide waste shipment records and disposal manifests to Caltrans
Contract Manager…