U.S. Department of Justice

Federal Bureau of Prisons Administrative Division

Field Acquisition Office Grand Prairie, Texas 75051

February 8, 2013

ATTN: ALL BIDDERS

RE: Clarification Set Number One

Solicitation IFBP05181300002 FCC Oakdale, Louisiana Install High Voltage Switch

Dear Bidders, In reference to the above solicitation, enclosed are clarifications to questions that have been submitted. These clarifications are for informational purposes only.

If you have any questions, feel free to contact me at (972) 352-4641, fax at 972-352-4546 or e-mail at dpatton@bop.gov

Sincerely, //s// Douglas V. Patton Contracting Officer Federal Bureau of Prisons Field Acquisition Office - SCRO U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, Texas 75051

Enclosure cc: File

SCS, FCC Oakdale COR, FCC Oakdale Facility Manager, FCC Oakdale Regional Facilities Administrator, SCRO

CLARIFICATION SET NUMBER ONE

IFBP05181300002

INSTALL HIGH VOLTAGE SWITCH

FCC OAKDALE, LOUISIANA

1. Question: Temporary electricity - when cut overs are made. Do you have temporary power supply during that time and how long can the power be off when cutovers are made?

Answer: Yes, the Institution has emergency generator power, but we ask that the cut over time be kept at a minimum. Please make all preparations possible prior to cutover. It is also required that a 48 hour notification is made in writing to include the start time and duration of the power outage. See the SOW at Part I, General Requirements, Item K.

At site of switch

2. Question: At this pole (Pole with Existing High Voltage Switch) does the spare 4” conduit run from High Voltage Switch directly to transformer?

Answer: It is unknown if the spare 4” conduit runs to the transformer. Bid as the SOW requires. This can be determined when hand digging starts. Drawings do not indicate.

IFBP05181300002 CLARIFICATION SET NUMBER ONE COVER LETTER INSTALL HVS OAK
IFBP0518130002 CLAR SET NUMBER ONE INSTALL HVS FCC OAK
1. Question: Temporary electricity - when cut overs are made. Do you have temporary power supply during that time and how long can the power be off when cutovers are made?
Answer: Yes, the Institution has emergency generator power, but we ask that the cut over time be kept at a minimum. Please make all preparations possible prior to cutover. It is also required that a 48 hour notification is made in writing to include...
2. Question: At this pole (Pole with Existing High Voltage Switch) does the spare 4” conduit run from High Voltage Switch directly to transformer?
Answer: It is unknown if the spare 4” conduit runs to the transformer. Bid as the SOW requires. This can be determined when hand digging starts. Drawings do not indicate.