U.S. Department of Justice
Federal Bureau of Prisons Administrative Division
Field Acquisition Office Grand Prairie, Texas 75051
February 8, 2013
ATTN: ALL BIDDERS
RE: Clarification Set Number One
Solicitation IFBP05181300002 FCC Oakdale, Louisiana Install High Voltage Switch
Dear Bidders, In reference to the above solicitation, enclosed are clarifications to questions that have been submitted. These clarifications are for informational purposes only.
If you have any questions, feel free to contact me at (972) 352-4641, fax at 972-352-4546 or e-mail at dpatton@bop.gov
Sincerely, //s// Douglas V. Patton Contracting Officer Federal Bureau of Prisons Field Acquisition Office - SCRO U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, Texas 75051
Enclosure cc: File
SCS, FCC Oakdale COR, FCC Oakdale Facility Manager, FCC Oakdale Regional Facilities Administrator, SCRO
CLARIFICATION SET NUMBER ONE
IFBP05181300002
INSTALL HIGH VOLTAGE SWITCH
FCC OAKDALE, LOUISIANA
1. Question: Temporary electricity - when cut overs are made. Do you have temporary power supply during that time and how long can the power be off when cutovers are made?
Answer: Yes, the Institution has emergency generator power, but we ask that the cut over time be kept at a minimum. Please make all preparations possible prior to cutover. It is also required that a 48 hour notification is made in writing to include the start time and duration of the power outage. See the SOW at Part I, General Requirements, Item K.
At site of switch
2. Question: At this pole (Pole with Existing High Voltage Switch) does the spare 4” conduit run from High Voltage Switch directly to transformer?
Answer: It is unknown if the spare 4” conduit runs to the transformer. Bid as the SOW requires. This can be determined when hand digging starts. Drawings do not indicate.
| IFBP05181300002 CLARIFICATION SET NUMBER ONE COVER LETTER INSTALL HVS OAK |
| IFBP0518130002 CLAR SET NUMBER ONE INSTALL HVS FCC OAK |
| 1. Question: Temporary electricity - when cut overs are made. Do you have temporary power supply during that time and how long can the power be off when cutovers are made? |
| Answer: Yes, the Institution has emergency generator power, but we ask that the cut over time be kept at a minimum. Please make all preparations possible prior to cutover. It is also required that a 48 hour notification is made in writing to include... |
| 2. Question: At this pole (Pole with Existing High Voltage Switch) does the spare 4” conduit run from High Voltage Switch directly to transformer? |
| Answer: It is unknown if the spare 4” conduit runs to the transformer. Bid as the SOW requires. This can be determined when hand digging starts. Drawings do not indicate. |